Council Approves 2027 Budget Strategy - 23 Jun 26
Richmond Hill · June 24, 2026
Okay.
>> So cranky.
>> Welcome everyone to this budget
committee the whole meeting. It's it's
uh 1:32. We'll call the meeting to order
and we'll begin by an adoption of the
agenda. Someone want to move that? Thank
you, Councelor Thompson. Any discussion
there? All in favor? Any opposed? That
carries. Okay. Do any members of the
committee have a disclosure of pecuniary
interest?
I don't see any. So, um, we don't have
any delegations. We can move to our
scheduled business. And our first
presentation is the 2022 budget
strategy. A presentation by Gigi Lee,
the director of financial services and
our treasurer.
Go ahead, GG.
>> Good afternoon, budget chair Dala and
members of the budget committee.
I'm presenting staff report CRC CF SRCFS
26022,
our 2027 budget strategy.
This report formally begins the 2027
budget process and sets out the
direction we're recommending for the
year ahead. Over the next several
slides, I'll walk you through the
timelines, the budget pressures we
anticipate, and the guidelines we're
proposing for the capital operating
water, wastewater, and storm water
budgets.
This presentation has three objectives.
First, to provide you with the timelines
for the 2027 budget process. Secondly,
to highlight the budget pressures we
anticipate in the year ahead. And last
but not least, to present the guidelines
for the 2027 draft budget.
By the end, you'll have a clear picture
of the path forward and the key
decisions we're asking for council to
consider.
To comply with the strong mayor powers
of the municipal act, the mayor has
directed staff to begin the 2027 budget
process through mayoral decision 05-26.
That direction rests on five priorities
and they're listed on the slide.
This slide highlights the road map for
the 2027 budget. We begin today, June
23rd, a budget committee at the whole
with a budget strategy alongside with
the tariff of fees update. in September,
specifically September 8th, we'll return
with the 2026 year on operating forecast
as well as capital forecast.
And then deliberations by the budget
committee of the whole are scheduled for
January 2027
following
by the mayor's tableabling of the 2027
budget. These dates are also set out in
the appendix in the staff report.
Turning to the capital budget, the 2027
capital budget built on the approach we
used last year using defined funding
envelopes by source to support long-term
financial sustainability.
They're guided by four principles.
The financial master plan, the asset
management plan, and other council
approved master plans.
It will also adhere to approved rate
supported financial plans that were
approved by council.
It will prioritize the projects through
multiriteria evaluation framework that
we do aligning strategic alignment
service impacts and financial value. And
then last but not least to provide
forward-looking insight through a
comprehensive 9-year capital forecast to
support long-term planning as well as
decision making.
This table lays out the eligible funding
sources and the 2027
funding envelopes for the capital
budget.
As you can see, the tax supported
reserve funds provide $35.6 million,
followed by water wastewater reserve
funds providing 37.
Storm water management projects
approximately $17 million.
$24 million for development charges
and then $7 million for the cash of
parkland reserve fund.
It's worth noting that both rate
supported funding envelopes were
developed in line with the principles of
the financial plans which are
re-evaluated annually to reflect
changing business needs and priorities.
This slide focuses on the tax supported
funding. Our 2027 strategy sets the
envelope at $35.6 6 million as as I
noted earlier uh generated using a
similar methodology as we have in the
past and continues with the capital
asset sustainability levy at 1.5% and
the tax rate equivalent.
Staff developed this envelope by
analyzing the projected expenditures
from the 2026 capital budget forecast
and indexing it
to the annual non-residential
construction price index with the cap.
We are, as you can see on this graph,
forecasting a positive reserve fund by
the end of the forecast period.
Looking further out, our future budget
strategy accounts for a gradual increase
to the CAS levy. And in this report,
staff recommend moving that to 2% from
the 1.5
which was first presented as part of the
financial master plan back in March.
For rate supported funding, both
envelope follows the principles of our
council approved financial plans and we
re-evaluate every year to reflect the
changing business needs and priorities.
For water and wastewater, we're
allocating $37 million from projects.
For storm water management, $17 million.
These envelopes ensure we continue to
meet our ongoing infrastructure
investment requirements for these rate
supported assets.
This slide highlights the growth related
funding. Growth related funding comes
from two sources. The first is
development charges where we're setting
$24 million for DC supported projects.
This figure reflects real revenue
pressures and the timing risks. Slower
growth and lower collections are
impacting revenues. Legislative changes
under bill 17 are delaying our DC
collections
and these funding uncertainties mean
we'll have to reface and rep prioritize
some projects.
The second source is cash parkland where
we're allocating $7 million based on
anticipated revenues and that's a
prudent approach aligned with our
historical collection trends.
This slide highlights the potential
challenges that we have in our capital
budget and forecast.
As noted on the first bullet, our
forecasted capital is significantly
higher than what we spent historically.
We're also faced with limited funding
capacity which constraints our ability
to fully address our infrastructure
needs requiring that we do
prioritizations as we have done over the
last number of years within defined
funding envelopes so that we're reducing
or mitigating the pressure on our
reserve funds.
There continues to be uncertainty as I
noted on the earlier slide in de de
development charge revenues and we'll
continue to monitor that
and then obviously economic and market
volatility including inflation impact of
tariffs and supply chain disruptions
will also continue to create a cost
uncertainty for us here.
Shifting now to the operating budget,
we're weighing both internal as well as
ex external factors.
Internally, we're focused on staffing
and cost management, service delivery
and operational defic efficiencies,
revenue generation and cost recovery,
as well as management of our reserves
and mitigating strategies.
From an external perspective, we're
contending with inflation and cost of
living pressures, the impact of US
tariffs and supply chains,
growth uncertainty and the revenues that
come along with it, and last but not
least, the continued provincial
legislative changes.
Therefore, balancing these forces is at
the heart of building a sustainable
operating budget for 2027.
The slide before you highlights
mitigating measures for this upcoming
budget. In order to manage these
pressures, staff have identified
mitigating measures.
First of all, we'll repurpose vacant
positions and manage discretionary
spending.
We'll continue to pursue process
improvements and alternative service
delivery models. and we'll index user
fees and continue our ongoing review of
revenue streams.
We'll also make strategic use of our
reserves to manage one-time pressures.
Taken together, these measures will help
us absorb cost pressures while
protecting service levels
under rate budget. Our strategy follows
the principles as I mentioned of the
approved financial plans for water
wastewater as well as storm water. We're
proposing a 6% user rate increase for
water and wastewater and a 10% increase
for storm water management.
These adjustments
will keep our rate supported services
financially sustainable and they're
consistent with the long-term financial
plan that council has already approved.
Mr. Chair,
that concludes the first presentation
and the recommendations of the staff
report are listed on the slide here.
>> Okay, thank you very much. Um, a lot to
grapple with in the making a strategy
going forward for 2027.
A lot of factors to consider. I thank
you for the work and what you've
outlined here in your presentation. Um I
think we can we can attempt to have
questions and and deal with the
recommendations at the same time. So
someone want to uh move the
recommendations councilor tree. Okay.
And you you have questions. Go ahead.
>> Yeah. Okay. Thank you so much uh Mr.
Chair to our uh our director. So I thank
you so much for preparing this strategy
plan. um we we we know there are few
challenges here. So um my maybe the
biggest concern is if we raise up the CS
capital budget from current 1.2 five to
2% where I'm going how long that going
to be it going to be a few years or
going to be for five or 10 years
strategies here
>> through the chair to council tree. So
the city's financial master plan
identified growing pressures on the
city's ability to fund infrastructure
assets and the renewal of them. So it
did recommend uh an increase a gradual
increase from 1.5% to three 3%. So that
that is the goal and that was what was
presented in the financial master plan.
Uh the 2% is that incremental that's the
first step in helping us get to that. So
your question is about how long.
>> Um so I I do want to remind council that
this is to bridge the gap that I showed
on the graph earlier. Right. So there
there are infrastructure requirements
and the infrastructure requirements
because our assets are aging will
continue to increase.
So the 2% will be in place and the goal
is to get to 3%.
>> Okay. Thank you so much. Another
questions I remember we talked about DC
charge. If I remember the numbers
correct so each year we are having
around $24 million.
Consider the DC deferral or maybe the
cutings from provincial government. So,
we're going to lose another 24 or 44
million dollars in the incoming year
each year. Is that correct?
How much money going to lost if we go to
that DC uh complying with the DC uh
cutings 30 to 40 to 50 percentage
reduction
>> through the charity council tree. Um so
in reference to the development charges
reduction program uh what staff
presented last week at special council
meeting was um an estimate of $44
million and that's over a threeyear
period. So to maintain the reduction for
a three-year period the estimate was
about $44 million.
>> Okay. Okay. Yeah. That's my two
questions. I might have more questions
after maybe my second run. So I can see
we are facing lot of challenges here.
The one side is we are losing certain
income especially DC charges that's a
lot of money. The second part is
inflation. I see you have a slide
showing all the challenges here. DC
charge is not uncertain also inflation
rates and other factor as well. Um
this is maybe pressure for all of us. So
if we bump out from the CIS capital
budgeting from 1.5 gradually becomes
3%age and consider there's another part
of the operation um budget I don't know
that one yet I don't know what the
number will be if we combine two
together so based on the past few years
if the capital is 3% plus operations
three something like that we're going to
be have a auto tax increasement in next
few years. That that's is my first
impression. Uh I don't have further
questions. I'll wait for more. Okay.
Thank you so much.
>> Okay. Thank you. So we have a motion on
the floor. Um the staff recommendations
and in item
sorry 5.1 here. Uh the next speaker
councelor Thompson.
>> Thank you to the chair. I just want to
uh confirm that we're doing a two for
one right now. So in addition to the
presentation, we are asking our
questions about the report at the same
time.
>> That's right.
>> Okay. Thank you. Um I I just want to
follow up on what councelor Tree was
talking about with the capital asset
sustainability level. I mean, so what's
the I'm trying to understand the the
proposed increment is intended to put us
on a path of uh sustainability or is
this intended to slow the widening of
the infrastructure funding gap? I'm I'm
a little concerned as to what we're
actually trying to do here.
strategically we're trying to achieve a
3% rate. We're we're incrementally
imposing that and and that it it will
put us in a sustainable position that
the that 3% pressure year
year-over-year,
>> right? I guess all I'm trying to
understand is are we actually solving a
problem or are we just merely slowing
its growth? Is that you know that's what
I'm trying to get at the
>> chair to councelor Thompson. So we've
pulled up the slide. It's both. So, as
you can see on this slide, we are um
looking at the vertical bars, those are
the the modified spending based on our
revenue sources. So, as you can see, we
are incrementally increasing the annual
spend on tax supported or state of
repair assets. But also what's important
here to see is that in the background
the backdrop the the the color that's in
peach
that is
the declining balance of a reserve fund.
So we're trying to find that balance
where we are on the one hand managing
and prioritizing our expenditures based
on the income the level of income that
we have but at the same time we need to
maintain long-term sustainability. So
when we look at the peach color we can
see that the reserve fund is declining
on a on an annual basis and as a matter
of fact through 2033 to 35 based on this
projection we actually dip into the
negative before we come back out. So to
answer your question it is a combination
of both. We are trying to manage the gap
so it doesn't widen and at the same time
to maintain long-term sustainability.
>> Good luck with that. No, no, I'm
kidding. Um, no, [clears throat] no,
it's a it's it is very complex and I get
it. You know, it's uh not not an easy
fix for sure. Um, I guess one of the
other things that stood out to me was
the uh reserve sustainability and the
report suggests that our reserves come
under increasing pressure over that
longer term. Um, so do we have a sense
of when that pressure could become
problematic? I guess this chart is kind
of saying 2033, but um you know
are there specific interventions that we
might be looking at or considered so
that we actually avoid reaching that
point
>> uh through the chair
to councelor Thompson. So if I go back
to
slide 10.
So as I've noted earlier, our forecasted
capital spend is significantly higher
and this was presented as part of our
financial master plan as well.
So to mitigate
some of the challenges related to that,
it's it requires a three-prong approach.
So for one, I talked about the
prioritization.
So what we're looking at is a very
robust capital plan that requires for us
to take a look at prioritizing and
perhaps looking at the phasing of
capital projects so that on the one hand
we're managing the expenditures
on the other side we are looking at um
additional revenue sources right so the
the example that I would use here um is
related to tax supported incrementally
increasing the contributions so that
we're we're managing
the gap between our what our needs are
from an expenditure perspective as well
as the revenues that are coming in. Um
last but not least, um as also noted on
the slide, one of the recommendations
from the financial master plan was
potential debt financing in the future.
So in order to undertake this entire
capital forecast and the projects it
does require balancing of of all the
different factors and that's why you
know we we spend a lot of time
monitoring it. We come back on an annual
basis to to inform council as well as to
look for direction on how to best manage
our capital plan.
>> No. And then I don't want my comments to
come out the wrong way. I definitely see
the balancing act that is going on here
and and I do respect um the financial
prudence that has gone into this as well
as the the flexibility that uh that you
know we we may have that will allow us
to adapt to those evolving conditions as
as we move forward. Um,
one thing, uh, in the report we talked
about development charges now being
deferred until occupancy, and I'm just
wondering if we've assessed what the
potential cash flow impacts uh, could be
going forward and whether there is any
risk of this affecting our ability to
deliver capital projects uh, in a timely
manner.
through the charity to councelor
Thompson. Um so we have done some
preliminary analysis on what that impact
would be. Um at this point it's not
significant. Um so really um that said
we do have reserve funds that are
available to us. So we're again doing
the balancing act um doing a a forecast
of what we anticipate in terms of cash
flow and that's why you see that when
we're presenting and recommending a
funding envelope for DC's we're being
very conservative right like we we need
to be able to manage the cash flow um so
that we're still able to advance some of
the growth related infrastructure um but
making sure that we're not going into
the negative.
>> Uh thank you for that through the chair.
So, um, the conservative approach that
you're talking about, would that suggest
that we're not going to be relying on
provincial funding that may or may not
actually materialize? Is that a safe
statement?
I'm talking about what could happen with
the development charges. um through the
chair to councelor Thompson. Our more
conservative approach right now is to
align our capital spending with expected
cash flow and reducing the risk of
overcommitting what we have. So with
respect to the DC uh reduction program
and the potential impact that is an
extra layer that we we need to consider
as well. So right now based on what we
know based on bill 17 based on delaying
the cash flow to occupancy we've
developed this. So as the situation
continues to evolve uh we we will need
to pivot based on what that outcome is.
>> Right. Right. No I appreciate that and I
do like uh the the report that you put
together here. So uh those are all my
questions for the chair. Thank you.
>> Okay. Thank you. And the next questions
are from uh uh Councelor Davidson.
>> Thank you um through you, Mr. Chair, and
thank you for the reports. Um
there was a there was a um a slide there
that it said repurpose positions. Are
you talking about vacant staff
positions? I take it
>> through the charge of councelor
Davidson. That's correct. So, um, so
that looks like we're going to reassess
and see where we can put people so we
don't have to increase the budget in
terms of staff. But my, um, is the
capital budget as as in the bar graph, I
think it was slide 10, is that showing
if we did everything we want to do, this
is the shortfall, or is that just doing
the bare minimum of what we need to do?
Like is there any rigle wiggle room in
capital investments?
uh through the chair to councelor
Davidson. I think you're referring to
this one, right?
>> Right. So,
uh well, maybe that's anyway, the
capital expenditures, the green bars,
right? Are those like for next year it's
36 million. Is that just to keep the
lights on or is that to do some of the
bigger projects we need to? Is there
anything there that can be is everything
a mustd do in the capital budget? I
guess that's my question.
>> Uh through the charity councelor
Davidson. So I do want to clarify this
graph focuses and highlights on tax
supported funding which is only state of
good repair. So it's not the entirety of
our capital budget. But as you can see
on this one um and based on previous
conversations on the asset management
plan, this is the what we call the
phased in approach. So it's not the
everything. we've already scaled down,
for lack of a better word, to um what
we're calling a phase in approach. So,
we're looking at what our upcoming
requirements are and also looking back
and and dealing with some of the
backlog. That is what we're looking at.
And even with this scenario, as you can
see,
there is the the declining reserve
balance to manage the
the phased in,
>> right? So, we're either going to have
less, it's going down, period, no matter
how we approach it. I understand that.
Um, through Mr. Chair, I don't want to
debate debt financing and I don't I
think you're going to explain more to
us, but the thing I don't understand is
when we start talking about debt
financing, how do you ever get ahead of
it if you already don't have enough to
pay for everything you need and now
you're borrowing money and now you have
to pay more? Like I'm I'm look forward
to when we talk about debt financing
because to me going into debt makes it
even harder to be in the black, right?
We'll just always be adding now a
payment. But anyway, I know here isn't a
place to talk about it, but you
mentioned it and
uh through the chair to councelor
Davidson. So I don't I don't think we
want to go too much into the details,
but but I think what what staff are
proposing is the strategic use of that,
right? So perhaps, you know, using a
household example is to not put your
groceries on the credit card. Like I
think um obviously we're going to come
back with um more information to uh a
session to provide more details, but
definitely what staff are proposing is
the strategic one-time use of debt for
major projects. um perhaps um
a community center that will benefit
development and existing residents for
for a number of years to come. Like
those are the things that we'll be
talking about. So definitely that is
it's not
cannot be used for day-to-day operating
costs but even for capital which is
eligible we'll have to be very strategic
about when and how we apply the use of
debt.
>> Okay. Thank you.
>> Okay. And any other speakers? Any other
questions?
Okay. So, just following along with what
uh some counselors have asked about. Um
if you could put that chart back up
there, I I
just want to emphasize this is the this
is the the picture. Um if if if we
continue to do what we're doing at 1.5%
on a capital asset levy. So, um, if we
if we don't increase it, this this is
what we're looking at. Um, based on the
status quo of what we're doing today,
we're we're going to run out of tax
supported funding for tax supported
repair and replacement um about 2032.
So, th this it will shift dramatically.
Um, going to 2% it's a 50% increase on
on the on the amount of our
contributions.
uh sorry a 33.3% increase on on our
contributions. So so that that red line
will go above the green bars and uh the
peach color will will be somewhat more
sustainable. It it'll it'll exhaust
itself at a much later date. And we're
um we've we've determined our strategic
analysis is showing we need to get to 3%
to keep that that peach u area stable um
for for our all of our future repair
placement needs. Um that that's coming
from the tax base. So this is this is
very different from the larger capital
picture and really less significantly
impacted by all the DC changes. This is
this is just um you know to keep all of
our existing
capital assets in in good condition. Um
this is our yearly the the yearly amount
that we we can only get from the tax
base that that we are going to need. So
um
rather than having an unsustainable
position in the next 5 to seven years,
we we're the the recommendation is to
make this increase. I support it
wholeheartedly to go to the 2%. Um I'm
I'm I'm hopeful that maybe even maybe
the 3% is is uh more than we need, but
we're looking at solving a problem. we
are and we would be, you know, somewhere
the somewhere around that 3% mark. We're
going to get a lot closer to solving the
problem at 2%. But, uh, this is this is
a a a pragmatic approach. We're not
leaving future councils with um with
this chart we're staring at right here.
Um it it will change significantly um if
we implement the recommendations and
well if we recommend that the mayor's
budget include this these
recommendations. Do I support what's on
the floor? I I don't see any other other
questions. So I'll call the vote. All
those in favor?
Any opposed? Okay, that carries.
Thank you. Thank you for all your work
with that. Uh and then then we the other
thing we do in the early budget process
for next year is look into the tariff of
fees and we got an update from again
Gigi Lee, our treasurer. Go ahead, Miss
Lee.
>> Thank you, Mr. Chair. I'll now move to
our second report and presentation.
This report covers our annual review of
user fees and the increases that we're
proposing for 2027.
This slide highlights how the annual
tariff of fees review works. We update
the tariff of fees every year in
coordination with the operating budget
process. The review incorporates new
fees and varying levels of increases to
our existing fees. We balance those
increases against prevailing economic
conditions as well as cost pressures
anticipating inflation of around 2%. And
we calculate the revenue impact so that
they can be factored into the 2027
operating budget.
As we set our fees, we apply three
considerations.
Fees should be justifiable and
reasonable for cost recovery, comparable
with neighboring municipalities, and
affordable to our residents and users
while remaining competitive.
Under general guidelines, our bylaw
gives staff delegated authority to index
fees annually up to 5%. As determined by
the treasur, anything beyond 5% requires
council approval. The fee increases are
based on the CPI forecast except where
staff propose higher increases to align
with municipal benchmarks or
marketdriven considerations.
And throughout we align with the mayoral
decision to balance affordability with
the continued delivery of highquality
municipal services.
Here's a summary of REAF for fees
update. fees will increase due to
inflationary pressures and we're using a
2% CPI forecast as the basis for the
city's 2027 fee increases.
Uh for context,
Canada's 2026 inflation rate was 2.8% as
of April and the province of Ontario CPI
forecast for 2027 is actually 2%. And
that's from the 2026 spring economic
forecast.
Here we've also factored in their
minimum wage increase
uh happening on October 1st of 2026 and
that's a 2% increase and that will have
an impact on our 2027 operating budget.
All this feeds into the estimated 2027
revenue budget impact from the annual
fee. As you can see on the slide,
between the operating budget as well as
water rate wastewater or what we call
the rate supported budgets, we are
looking at additional revenues generated
of about $615,000.
We organize our fees into four
categories as we've shown here. So the
legislative fees are really sanctioned
by uh government body or is required by
law. Our regulatory fees are imposed
through regulatory body or city bylaw.
Our cost recovery fees are implemented
to fully or partially recuperate our
costs of programs and services. And last
but not least, our community fees are
charged for discretionary pro programs
and services. And these were primarily
the recreation and culture fees.
This table summarizes the tariff of fees
by c those four categories that I just
spoke about. So in total we will have
1,284 fees in 2027.
Compared to our 2026 fee schedule, there
are 20 uh 36 increases uh sorry
increases of
37 37 new fees, 74 fees remaining
unchanged and primarily for the most
part the fees are increasing by the
inflation factor of 2%. So, as I noted
earlier, uh there will be estimated
revenue impact of 575,000 in the
operating budget and about $40,000 in
the rate supported budget.
Taking a closer look at the recreation
and culture fees, which is our largest
fee area, out of 943 fees in this group,
22 of them are new. uh 35 are unchanged
and a majority of them is increasing by
2% which is our CPI factor and there a
number of them that are increasing more
than 2% and these adjustments are
intended to keep our recreation programs
aligned with the evolving demands of the
community.
A little bit more background on the
changes for recreation and culture fees.
First off, um we did look at the the
fees and for the most part that's the
first category. The fees maintain status
quo.
These are where the programs and
transaction fees are held at current
rates and it's really to protect
participation, maintaining promotional
pricing and cost recovery. Uh the second
group is fee alignment. So there are a
number of fees that we're adjusting to
bring the pricing in line with
comparable programs and we've noted a
number of them here. Uh the third
category or the third bucket that we
have essentially these are the increases
within the CPI forecast where most of
the programs are increased by. Um this
is in line with the inflation factor.
Last but not least, we do have a number
of fees that are increased over the CPI
forecast
and essentially that is to improve cost
recovery and you would note a number of
those programs that are highlighted on
the slide.
As I noted earlier, staff continue to
look at uh fee as well as revenue
opportunities. Uh what you looking at
here is this and the next slide
highlights the new fees that are that
are being recommended for 2027.
As you can see in financial services we
have some fees that are related to
general administration
as well as um fees related to tax
collection. And then over to the right a
number of new fees that are being
introduced related to recreation.
And then over to the far right, fees
that are related to infrastructure
planning and development engineering.
You notice um a number of fees are
related to site plan inspections uh as
well as site alteration permits as well
as the EV charging rates. So again, this
is intended to uh improve or cost
recovery related to efforts or costs
that are related to providing these
services.
A number of other fees are being
proposed for these other divisions with
minimal impact and they're highlighted
on the slide.
The recommendations of a staff report
are highlighted on the slide and that is
for uh the committee to receive the
report and also for the draft bylaw to
the report to be brought forward to the
July council meeting for the effective
date with an effective date of January
1st, 2027.
Mr. Chair, that concludes my second
presentation.
>> Okay. Thank you very much. Okay. So, um
you'll you'll see as part of the agenda
that um it's quite a quite an exhaustive
schedule of all the all the different
fees across the city and what their new
proposed rates will be. So, can I can I
get someone uh to move
I I guess this the staff recommendation.
Okay. You're okay with that, Mayor West?
You want to go ahead?
>> Uh thank you very much. Uh th this is um
always a very uh extensive review of a
whole bunch of different fees that we
charge. I I I may have asked this in the
past. I I can't remember um but I I
wouldn't mind c can I get a sense of if
somebody comes in in particular for a
recreation program and they they can't
afford it and they can they demonstrate
that their their family's not able to
afford the fee. what mechanisms are
available to us to be able to uh allow
that I'm I'm thinking primarily kids to
be able to still partake in the programs
even though their their family may not
be in a financial position to really um
allow that kid to participate.
Uh yes uh through the chair
uh we do have a a subsidy program that
is available to all residents uh if they
qualify.
>> Okay.
>> So that's based on a demonstrated uh
proof of income that that kind of thing.
>> Yes, that's correct.
>> Uh generally speaking without I don't
need numbers but generally speaking how
much uptake do we get on that program?
Uh so typically uh the program is pretty
well subscribed fully. Uh so we do get
good outtake.
>> Okay. And and where the funding for that
subsidy where does that come from?
>> Uh through the chair the the funding is
uh carried through our budget line
items. Uh we do also receive funding
through the region.
>> Okay. All right. And is the same type of
program available to say uh seniors and
seniors groups?
>> Yes, that's it is available to any
resident that does qualify.
>> Okay. So regardless of your age,
regardless of anything, there is an
ability for us to to um take into
account that not everybody has the same
financial capacity to deal with or to be
able to participate fully in the
programs that we offer. That's correct.
Yes.
>> Okay. Okay. I I think um that's probably
not something that's terribly wellnown
and and I I mean I must admit I do get
calls not actually very often from
families but from seniors saying you
know they want a discount for this
program or this program or this program.
Um I I mean would it be fair to say in a
situation like that people on council
that get those types of requests should
be um directing them toward that program
>> uh through the chair they they would
direct them to recreation and culture
and we would handle those requests. Yes.
>> So if in fact they they they do have a
demonstrated need for a discount then
then that could be taken care of through
the program.
>> That's correct.
>> Okay. and and you know and frankly I
think that's a much more fair way of
administering that because you know just
offering a discount because somebody
said they don't really want to pay the
full price is I mean really I think at
the end of the day what that does is it
just puts that lost revenue if we
granted that it just puts that lost
revenue on somebody else and it may or
may not actually be be justified. So I I
appreciate the answer to that. So thank
you very much.
>> Thanks.
>> Okay. Thank you, Mayor West. Uh,
Councelor Davidson,
>> thank you, Mr. Chair. Thanks again for
the report. Um, forgive me if I've
missed it, but I I thought the the the
the idea of taking fees for recreation
is to recover the costs and no more. Is
that right? And is that where we're
headed still? And that goes for room
rentals and the canoe club and all that
stuff.
>> Uh, through you, Mr. chair, we target at
86% cost operating cost recovery.
>> So we're missing 14%.
>> That's correct. So that's tax base for
>> So why would we do that through you,
Miss Mr. Chair? Like why aren't we
actually making even 2% on the fees we
charge? Because frankly,
even things like room rentals, I'm I'm
quite shocked at how cheap it is. And I
feel like we could do a little bit more
for people who want more out of things
like recreation rooms and um we're not
doing that. I mean I don't know why we
can't squeeze a little bit more there
>> through you Mr. Chair. So I'm
understanding that you're asking why we
don't charge more.
>> Yes. Um so our objective in recreation
culture is to provide facilities and
sport and recreation opportunities for
everyone in the population. There are um
private um uh businesses out there that
charge for different uh quality of
services at at higher rates. But we try
to keep our fees. We are a not
for-profit uh just like nonfor-profit
organizations. So we try to keep our
fees and our services at a level that's
available to the majority of the
population so everyone could
participate.
>> Thank you, Mr. Chair. But I think on
things like room rentals
that a 2% increase or even a 5% increase
would not be prohibitive. And this idea
of breaking even or less doesn't match
up with what we're seeing in terms of
the revenue shortfalls. So why wouldn't
we try to collect a little more where we
can? I mean, I get the idea and it's
admirable, but the city's heading into
the next 10 years really strapped. So
why can't we do small little incremental
in increases?
>> Uh through you, Mr. Chair. So, we do
have some premier facilities like uh the
Richmond Hill uh Center for Performing
Arts and the rooms there that are more
competitive and higher cost because
they're higher quality facilities.
They're they're um pristine sorry
prestige sites. So, we do charge higher
rates. Um we aim to balance overall at
that 86% level. So, there are some that
are higher um because people are willing
to pay more and some that are lower. We
do review the fees every year and try to
maximize um so for every time you raise
the rate you get fewer customers coming
in so you're actually not really
generating revenue and we try to hit
that sweet spot um between like the most
that we can charge um without um
deterring customers at the same time. So
it is a bit of a balancing act.
Don Donald, did you want to say
something?
>> Uh, thank you through the chair. Uh, if
I can also elaborate. So, uh,
Commissioner Steel is is correct. We do,
uh, do our municipal comparisons and we
do try to find that balance in which the
rates are, uh, comparable uh, to our
surrounding municipalities. and we are
trying to balance with becoming
unaffordable where we actually do lose
uh a significant participation. So it's
a very fine balance each year when we do
the tariff and fee bylaw. Uh so we do
look at at uh all those rates and do uh
that that significant municipal
comparison.
>> Thank you. Um you Mr. I would say my my
view is at the very least we should be
recovering the cost of the of the room
or the staff or the event. I mean
because otherwise other taxpayers are
subsidizing your personal use of public
facilities. Um but when's the la if we
keep doing it under sort of what it
costs when's the last time we honestly
looked at a small increase what that all
these customers would fall off? Is there
is there data to support that? recent
data to support if we raise it a little
bit more that we won't have people
wanting to use the facilities.
>> Yes, absolutely. We do keep the uh data
in terms of our uh performance measures
and we are seeing uh some of those
external pressures uh that are occurring
uh kind of globally and uh we are seeing
that in terms of uh the utilization our
participation rates. So it again it it
is that fine balance and and trying to
ensure that we do kind of uh strike it
right in terms of the uh fee rate fee
structure.
>> Okay. Thank you.
>> Okay. Thank you. Anyone else have any
questions? Councelor Thompson.
>> Um thank you very much. Don't go away.
Donald. Um, [clears throat]
uh, the the mayor brought up the the
question around the subsidy funding and,
um, I I believe I heard you say that,
uh, it's fully subscribed. So, it sounds
like every year, uh, I guess there's
some form of cap that would be in place
and I think you mentioned that some of
that is because it comes we get it from
the region and whatever we do. Uh I
guess my question is um if it is fully
subscribed every time uh how are we
looking at that? Is it again something
where we're trying to get that balance?
I mean obviously you don't want to have
funding left in the account for sure. Um
but I'm just wondering what type of
analysis do we do to make sure that it's
where it should be or in that regard.
>> Yes. Uh through the chair. So, we do
actually monitor and we do uh u
quarterly reports to ensure that we're
on track and that we're not going to uh
leave people unfunded uh by the end of
the year. And uh by the same token uh
make sure that there isn't kind of funds
sitting there that should have been uh u
utilized uh for subsidy. So we do do
that uh quarterly and uh so again uh
staff are very diligent in making sure
that uh the people who do require the
funds do receive it and that we are able
to utilize it uh fully each year. Um we
do have uh a program in which if
somebody hasn't used the funds by a
certain time frame uh then uh we are
able to go to somebody else and uh use
utilize it. So they it does expire at a
certain point so it doesn't ex you know
sit there forever.
>> Appreciate that. Thank you so much.
Those are all my questions.
>> Okay. Thank you. I don't see any other
questions. I just want to Oh, councelor
Leu, go ahead.
>> Thank you, Mr. Chair. Um, just a just a
few quick question. Um, under the legal
services, um, what is the new fees about
the motor vehicle accident damage
recovery?
>> Mr. Sure
uh through the chair to counselor leave.
So that is related to
the risk
and insurance section. So, it's to
establish an allowable fee within the
bylaw that will allow that section to
substantiate and force the collection of
the administration fee from various
autoinsurers. So, it's um
Can you give me an example? I don't
quite get it. Sorry.
>> What's up?
>> No, it was Oh, the fire department.
Oh.
It's mostly related to fire.
>> I think so.
>> Yeah. Bonus points for that question.
You've stumped some people.
>> Is appendex three, Mr. Chair. I believe
it's a fire fee and the fire chief is
actually online. If we could get him up.
Uh, Chief Rayurn,
welcome. Okay. Can you help us with
this?
>> I hope so.
>> Mute [clears throat]
>> through through the chair. Uh, I I see
this isn't under the fire um tab. So,
I'm I'm not sure. I hope I'm explaining
this correctly. So uh currently when we
bill for service an MVC or motor vehicle
accident we will bill um the involved
parties that bill then goes to the
insurance companies and then we seek to
um recover the monies from the insurance
companies.
So now I believe what this is is that we
have an option now to collect uh by
adding it to the taxes if it is unpaid
rather than going through a collection
agency. But I'm hope I'm speaking to the
right one
that help counselor.
Okay, maybe I'll get the answer offline
then. Uh yeah, I think we'll yeah we'll
we'll have staff follow through.
>> Thank you. And um the other questions
are um under the infrastructure planning
and development uh engineering um
there's a lots of new fees um I'm just
wonder
um like the site plan inspection we
don't have those fees before
through Mr. here
>> through the chair of the counselor.
Yeah, absolutely. Uh as far as uh our
review has gone, there was a lot of
areas that we weren't currently
collecting for and simply uh represent a
recovery in order to uh reflect the work
that was being done and pay for those
services, right?
>> Thank you. So is the the developers are
paying for this or the the the residents
are paying for this?
I mean the the site plan subdivisions
site alteration
all those fees are are paid
by the developers I assume right
>> through the chair for the most part.
Yes, that is correct.
>> Um
okay thank you. Um I think my question
is um you know I I see all most of them
90% of them are cost recovery. Um
are we not allowed to
make some revenue out of this if the
developers are paying for this
because we already deduct their DCs
through Mr.
through the chair and subject to any
additional information that the
treasurer may provide. Uh this is a
regular process where DC's fund
um growth infrastructure whereas the
fees are recovery for the services that
are provided to enable the development
process.
>> Okay.
Right. Thank you.
Okay. Thank you. I I don't see Oh, Mayor
West.
>> Okay. That's actually to I if I'm not
mistaken, are development fees not
legislated as cost recovery only or can
we charge whatever we want because I
think that's really what Councelor Leo
is asking
>> through the chair. Yes, they are cost
recovery only. In some instances uh
there is more work being done by staff
than the current recovery and in some
instances especially when there's
development applications where there's
two three and four submissions or
developers in the spirit of trying to
return um their LC's are looking for um
phased assumptions creates more work for
us. um
road occupancy. Uh there's an example on
uh where
head um sorry I can't remember the name
of the street. Uh the point here is that
uh there's a lot of work that's going
into even road occupancies when staff
has to review what it takes and for
example to remove a crane from a large
condo that's being built. there's
significant impacts and in order to
ensure the um safe passage of of road
users, pedestrians, there's a lot of
engineering work that happens in the
background that we were not
traditionally recovering for. So, I hope
that provides some context.
>> Okay. No, I appreciate that. I mean like
I I think I I would encourage staff um
you know I often wonder when a when a
developer puts forward an application
that's completely out of well untethered
to reality um whether you know they're
actually getting charged more um for
putting something in that's just you
know not going to fit to what is you
know allowed on that land. like do we do
we end up charging more for an
application like that than if then
compared to somebody that says look you
know X is allowed on this parcel of land
and and they apply for X
through the chair. Um there's different
types of applications fees and they're
based directly proportional to staff's
time. That's the evaluation that we go
through. How much time does staff take
on a minor application versus something
that is more complex. So we do have data
that we use to support the fees for
different types of applications. So it's
uh reflective and reasonable.
>> Right. Okay. No, I appreciate that. Um
just because I have the floor, I wasn't
actually planning on doing a second
round. I think um councelor Davidson
made a couple of really good points and
they were this has been an interesting
discussion as it always is on this
council but um I you know I think you
know it's always a balance between
charging what the market will bear and
charging what we need to charge in order
to keep the things that we offer
affordable because I think the one thing
I always try to you know I always get
reminded of every time I get invited to
some community event that's happening in
one of our you know meeting rooms rooms
or something that's happening like a
community group putting something on at
the theater or things like that. It's
it's the benefit to the community that
we almost always get when we have people
coming and using our facilities. Like
I've had many many many many many
situations where you know I've gone to
the community uh to to the the center
for the performing arts to see some
small community group putting on a
really really well done uh performance a
because the talent of the people that
are putting it on but like I said when I
was at the uh theater the other day like
the staff that worked there really
helped to make the quality of the actors
or the musicians or whoever playing at
the at the theater really shine and and
that you know there is a cost to the
taxpayer I suppose for us you know
offering those types of services and
those types of facilities to the public
but at the end of the day that is what
we do as a municipal government we
provide services and you know I think
that this whole exercise and I've been
through this now about I don't know
however many years I've been on council
it's always a balancing act between
balancing the impact to the taxpayer and
ensuring that the value to the taxpayers
who are all paying for this amount that
isn't being cost recovered is good and
the affordability to the people who are
using our facilities. So, you know, it
it's a this is uh a a data-driven and
and wellthoughtout um attempt to achieve
that balance. And I think that's what
we're we we have here. Um, you know, if
there are ever any specific items that
council wants to talk about that, you
know, could be raised to a a level,
that's fine. But I think generally
speaking, the the the list that we have
in front of us is a good one, and it
really does reflect the ability for our
community to use the facilities in a way
that's affordable. So, I I'm comfortable
with this, and I thank staff for all the
work that goes into that. Thank you.
>> Okay. Um and deputy mayor Chan.
>> U thank you very much u Mr. Chair. Um
now it focuses on appendix A. Um I just
want to get a better sense through you
Mr. Chair on the electrical vehicle
charging rates.
So much talk about EV EV EV. Um it looks
to me is very reasonable rate. Um from
base fee to overlay fee. uh how
comparable is it to quote unquote market
or commercial rate? Are we kind of at
par with them or
through Mr. Chair
>> through the chair of the council? I have
director super on the line who can speak
to uh the comparableness of these rates
with uh the work that we did to
benchmark across other jurisdictions.
Okay, Mr. Supa.
You're you're muted. Your camera is off.
There we go.
>> Through the chair, too. Uh, Deputy Mayor
Chan, you're absolutely right. We have
done an industry scan which looked at
what other municipalities are doing and
the rates that you are seeing in the new
tariff of fees uh uh uh chart is
reflective of what other municipalities
are doing.
>> Okay. Thank you. I appreciate that and
and it's good for uh um I guess the
parties who need to have uh this
particular rates to pay is is new. I
realize that and we are not charging
more or less. Uh it's just going with
what the market rate is. That's good to
know. Thank you, Mr. Chair, and thank
you uh uh Mr. Schumer for the answer.
Thank you.
certainly pleased.
>> No, I'm I'm certainly pleased by the
response from the public. You know, all
the all these fees uh go public and when
this report is published and they have
an opportunity through through our
website to to um to to to
object or to send correspondents to
council or call counselors. in in the
past, uh, we sometimes have a wave of of
residents coming forward and saying,
"Well, this isn't right or this that's
out of whack." And I I haven't seen any
evidence of anything like that. So, I
think it's it's very modest increases, a
modest expectation increase in revenue
for the city, but um I I think we've
we've already gone through a lot of the
hard work of of uh analyzing and
readjusting our our tariff for fees. And
I think we're we're in a good position
right now. And I I do just do want to
highlight um the the the mayor touched
on it a little bit, but our overall our
our uh mission statement and our
strategic plan, it goes to it speaks to
bringing the community together and and
um there's so many non-monetary benefits
of of providing these these services. um
community center room rentals and you
you can't put a price on on how
advantageous it is for our community to
be to be h having uh you know c cultural
groups educational seminars uh just just
connecting a community to come together
and ask questions and um I I think I
think what what we're doing right now
and and getting um all of our facilities
are well used and our programs are well
applied for and I I think we're in a
good position. So, happily support
what's on the floor. Any other
questions? All in favor?
Any opposed?
Okay, that carries unanimously.
All we need is a motion for adjournment
now.
Anybody? Deputy Mayor Chan. Any
discussion? All in favor? Any opposed?
That carries. Okay.