Public Works Approves Subdivision Assumption - 07 May 26
Grimsby · May 09, 2026
Okay. Good evening everyone. I'd like to
call the meeting of the public works
committee to order.
>> Grimby is situ situated on treaty land.
This land is steeped in the rich history
of the first nations such as the
Hodtoander, the Hodnosoni and the
Anesnab, including the Missagas of the
Credit First Nation. There are many
First Nations, Matei and Inuit people
from across Turtle Island that live and
work in Niagara today. The regional
municipality of Niagara and Grimby stand
with all indigenous people past and
present in promoting the wide
stewardship of the lands on which we
live. Our first agenda item is
disclosures of interest. Do we have any
pecunary or non pecuniary interests that
would like to be disclosed?
Seeing none, we have approval of the
agenda. Can I get a mover and seconder
to move the agenda? Got councelor How
and Councelor Dvoli.
Resolved that the agenda of the May 7th,
26, 2026 public works committee meeting
be approved. All in favor? That's
carried.
Next I have receipt of previous minutes.
Can I get a mover in secondary? I got
member Spank and Councelor Christi.
Moved by member Spank seconded by
councelor Cstani. Resolved that the
minutes of the March 25th, 2025 2026
public works committee meeting be
received. Having some problems with
dates this evening. Um, all in favor
>> I almost said 2016 for the last one. So,
>> uh, there are no delegations or
presentations. There's no consent
reports. So, we're moving on to item
eight, which is discussion reports. Can
I get a mover and a seconder to
get report DPW 2613 assumption municipal
services 314 Main Street subdivision on
the floor for discussion? Member Murphy,
seconded by member Ray.
>> Brandon, please go ahead.
>> Thank you, Mr. Chair. I'm actually going
to defer to Spencer on this one.
>> Thank you. Uh, thank you, Brandon.
Through you, Mr. Chair. Uh this report
is to recommend that uh the mayor and
town clerk be authorized to execute the
necessary assumption bylaws uh and for
the director of public works to issue
the final certificate of completion of
services. Uh some background on this.
This is for subdivision development 314
Brandt Haven or 314 Main Street which is
the Brand Haven subdivision. Uh
traditional subdivision. We don't get a
lot of these in town anymore. So nice to
see see this one go through and get
finished. Uh it's fully detached
subdivision of 56 units uh or 56 homes.
I guess I'll get back to the mic. Uh
primary services were completed in 2022.
From there they completed the secondary
services top ash vault uh the
landscaping and getting the rest of the
homes built. Uh goes into a maintenance
period. During the maintenance period, a
couple deficiencies came up. They've
been addressed. So, maintenance period
served. All deficiencies are addressed.
So, we're at a point where now we'd
assume the subdivision and take on the
responsibility of the primary and
secondary services. So, sanitary, water,
man, storm, sewer, the road, street
lights, uh all the infrastructure. Uh
so, yeah, really at this point as per
the subdivision agreement, we're
required to have the bylaw to actually
take over the assumption of it. And the
last final thing we do is release the
letter of credit that is owing to the
developer.
If there's any questions, happy to
answer any.
>> Thank you, Spencer. Uh maybe I think
this is our first for this entire term
of the public works because we haven't
had a lot of development. Um if you want
to just give a brief explanation of how
it works which you kind of did uh that
the developer builds uh you know uh and
then the town assume the developers
responsible for the construction of
everything and then the town assumes it
just so people understand the process a
little bit better in case they're not
familiar with it if you don't mind
giving like a really brief explanation.
>> Yeah, no problem through you, Mr. Chair.
I was just trying to be quick because I
heard there was a time restraint. Uh
but uh
>> it's a teacher in me that I I still want
people to learn. So
>> So yeah, subdivision application is
private developer is carving up some
property, creating different blocks or
lots in this case, uh including the
road. The road and everything while it's
being developed, there's a subdivision
agreement in place that lays out the
responsibilities, drawings that have to
be approved to lay out what's required
to be installed. that developer then
builds all of that infrastructure.
There's different kind of milestones.
So, primary servicing being a big
milestone where all the underground
servicing, base, ashvault, and curbs get
put in. Once they achieve that, then
they're able to apply for building
permits. So, that's the big milestone
because then it gets them building
permits where it starts to generate that
revenue for them. Uh, then they have to
build out that subdivision. So, they got
to build out roughly 80% of the lots. In
this case, they're all built out until
they can actually apply to put it on
maintenance uh and finish those
secondary services. Top ashvalta, as I
mentioned, is the the large one there
and the landscaping grading of the final
lots. This entire time it's under the
developers responsibilities to do all
that maintenance. Uh we do the snow
plowing. Everything else is under their
their responsibility maintenance. We'll
go out do inspections, deficiencies get
addressed. If we get a call on a broken
sidewalk or a pothole, we go back to the
developer. They have to address it. Uh
once they get to the maintenance period,
once it's built out, that's when
it's where did it's 3 years, but it's
from the primary completion. So, uh that
maintenance period starts again. Now, we
get to see it go through winter. No more
construction is happening. Any further
deficiencies show up, they have to
address them. Uh and then we're at this
point where they would we'd actually
assume those services and take on the
full responsibility of that
infrastructure.
>> Perfect. Thank you for the explanation.
I just wanted to you know it's we this
is it's it's standard procedure but not
everybody is familiar with it. So it's
always good to to remind people of of
how this stuff works. Uh I have
questions from members and then
councelor Devote.
>> Thank you through you Mr. Chair. Um,
this is literally at the end of my
street. So, I I have seen the whole
process and I think it looks great. Um,
I couldn't see anything on the public
side that looked like there was any
problem at all, which is what we want.
Um, I do know that when the um the
public information centers were
happening at the beginning, there was a
lot of concerns by residents on Lawrence
and I know there were some special um
conditions in terms of fences and um
maybe in terms of the how the storm
water was supposed to go through there.
I just want to make sure that all of
that was all covered before we we get
that sign off. Thank you.
>> Yes. Through you, Mr. Chair. Yes, that's
all been reviewed and insured. I know
some of the fences requiring like a wood
fence instead of a chain link fence and
certain heights of that. So that's all
been reviewed, installed. Uh yes. Yeah.
>> Thank you, Councelor Dvoy.
>> Thank you, Chair. Um when we do assume
this of and this is the accountant in
me. Um we're obviously assuming a dollar
value which we then record in our
capital assets. Um, can you share with
us the totals or some details as to the
composition of this?
>> I would have to get back to you on the
totals, but I do know we did just go
through, well, not just go through it,
but we did obviously included in our PAB
and all that. Uh, but I could definitely
get back to you the totals of it. It's
broken out obviously by different type
of infrastructure. So, for water, road,
sanitary. Uh, but yeah, I can bring that
back to you.
>> Thank you. Sorry, it just occurred to me
now. Otherwise, I would have asked you
before the meeting, so you'd have a
chance to look into it. Um, yeah,
getting back to us is fine. Um, the
reason I asked though is because I
think,
um, it's good to understand the dollar
value that the developers/builders
actually are investing in our
infrastructure. And it's it's good to
understand that because it is not an
inconsequential amount by any means. Um,
my second question, and I can certainly
defer till everybody else has a chance,
is is another one of those, I'm sorry if
I'm putting you on the spot, but
outstanding letters of credit are being
released in this particular case. Um,
but we've had really old ones as well
kicking around and I would just like an
update on where we stand on those, but
we can certainly defer that till the
till the rest of the questions about
this specific one if you want to. Yeah,
we should keep it on topic, but uh if
that's something you want brought back
for future because I I'm assuming
Spencer doesn't have all their letter of
credit information on him now. So maybe
for the we have another meeting in May
if if if somebody could bring that back
to the Brandon. Go ahead.
>> Just a a quick response. I won't get
into the details because I don't have
them, but we have done a lot of work
over the last year or so uh trying to
clean up a lot of the subdivisions. So I
know Spencer and the team as well as
Martin has done a lot of effort towards
uh getting into the subdivisions looking
at them trying to get those LC's reduced
when the deficiencies are are done. So
uh on this one three or sorry uh this
specific development uh you know given
the age of it it it's it's worked
through the cycle really quickly and and
so I feel like uh this is one of the
newer ones that has been cleaned up uh
in a timely manner which is is nice to
see that which uh and that's been a a
criticism in the past so we are working
towards doing that. Not that we have
many more subdivisions coming up but uh
I thought we would take uh benefit to
pat ourselves on the back for that. Any
further questions or comments? Uh,
seeing none, I have a motion moved by
member Murphy, seconded by member Ray.
Resolve that the report DPW2613
Assumption Municipal Service 314 Main
Street East subdivision dated May 7th,
2026 be received and that the director
of public works be be authorized to
issue the final certificate of
completion of services and that the
mayor and town clerk be authorized to
execute the necessary assumption bylaw.
All in favor?
That's carried.
Uh correspondence. Brandon, please go
ahead and explain the correspondence
from Niagara region regarding an
extension of the Niagara Regional Courts
intermunicipal agreement.
>> Uh thank you, Mr. Chair. Uh so yeah,
attached is a memo from the the region
of Niagara. Uh it's essentially
requesting council to approve an
amendment to the intermunicipal courts
agreement. Uh this agreement allows the
region to issue traffic tickets uh with
the within the local municipalities uh
relating to their vision zero program uh
which is a road safety program. Uh and
the previous version of the agreement
included both the red light camera uh
program and the automatic speed
enforcement or automated speed
enforcement program. So under the
previous agreement, region uh had a
portion of the revenue uh that was
collected from those tickets was
returned to the municipalities who were
participating in that program. Uh and as
you may remember the uh province removed
the automatic speed enforcement I think
it was November of last year. Uh so the
region is essentially updating their
agreement to reflect the removal uh and
is asking for an extension of the
agreement of this sorry a removal of the
automatic speed enforcement. uh and
they're asking for an extension of the
agreement covering the red light cameras
uh for additional three years. Uh I've
had a conversation with her CIO and
she's uh recommending that we consider
extended by one year. Uh the thought
being we just didn't want to tie the
next council to a longerterm decision.
So that would allow the uh upcoming
council to uh uh speak next year about
whether they wanted to extend it
further. Um, I believe there's a
resolution that drafted up for your
consideration as well.
>> Sorry, just to clarify, I guess the
changes to the resolution will come to
council. Is that fair?
>> Okay. All right.
>> Uh, any questions for Brandon?
Members
>> through you, chair.
I went into a real rabbit hole on this
one because once you start going at
regional council committees and budgets
very eyeopening um very eye opening my
question is actually I'm trying to
follow the money on this
have we ever received any revenues from
this I gather that it's we're supposed
to receive half of the fines from the
red light camera after the cost of the
red light camera
um project or the the the whole
operation are are are handled and I
don't understand if that's half from the
one that is in our town or is it 1112th
or 110th because there are 10 locations
any kind of information about that I
appreciate it. Oh, and if we received
any of the automated speed enforcement,
um, it would be good to know how much
that was and where it went, if it went
into general revenues or if it went into
our traffic safety program programs.
Thanks.
>> Yeah. So, I can speak to that through
through you, Mr. Chair. Uh, so in terms
of the revenue received, I don't have
the exact numbers. I can say it's in the
range of a couple hundred,000.
Uh, and that was more uh towards the
speed enforcement than it was the red
light cameras. I think there's one in
town for the red light cameras. The
again, I'm kind of talking uh I I don't
have all the details in my head, but as
I remember when we approved this a
couple years ago, uh the program was
essentially the region uh issues the
tickets. Uh the revenue or they they
make sure that the they have enough
revenue or that revenue that's coming in
from the tickets essentially pays for uh
the maintenance of the program. So the
devices, their staff, that kind of
thing. The leftover amount then gets
dispersed to the municipalities for
participating. Um in terms of going
forward, uh the the what the region is
telling us is that uh obviously that
there was a lot of revenue generated
from the speed enforcement uh which was
uh any surplus was given back to the
municipalities. In the case of the red
light camera, uh they don't think the
revenue will be as uh as high. So, it's
likely uh that uh the program will break
even and we won't see any benefit uh
going forward. In terms of the money we
did receive um uh through through
council approval is we spent or we put
that money towards uh uh a staffing
resource to help uh the team manage our
own transportation and traffic safety
program in terms of a contract employee.
Um, and what else did I answer? There
was one more thing that I might have
missed.
If you don't remember, then I'm good.
>> If it if it's possible for you to get
back to us with
>> the exact amount
>> with the with the amount. I guess it was
it was more I think it I think it's
supposed to go like after costs half to
the region, half to us. But if going
forward they think they're just going to
be breaking even um why do we need to
have an agreement like is it it's their
infrastructure and it's their
intersection
>> it's Clark and South Service right or
sorry South Service Clark and Mountain
uh Christie
>> through you Mr. chair. Um, so my
understanding, uh, not law a law, a
lawyer, uh, but my understanding is they
legally they have to have an agreement
with us in order to, um, issue the
tickets within the town of Grimby and,
uh, uh, deal with the courts in in
Niagara region. Uh, I don't understand
all the intric in intricacies of that,
but that's my general understanding of
how it works. So, if we didn't agree,
then they couldn't write the tickets and
and so on. In terms of the number of
locations right now, I think there's
only one in town. I don't know if they
would be considering expanding that. I
haven't heard that yet. Uh but yeah, I
think it's fair to say that the revenue
will be lower and and what they're
saying is uh um it would be basically a
break even rather than surplus coming
coming the municipalities way. So, which
does create a bit of a uh challenge in
terms of the resourcing that we've uh
dealt with. So, we're going to have to
talk about that when it comes to council
at the end of the year.
>> Thank you. Any further questions?
Member 80.
>> Thank you, Mr. Chair. So, I I went down
the same rabbit hole. Um, and it's and
it's 50% to the local area,
municipality, 50% to the region after
they pay off what they need to pay off,
which is fine. So, we saw 29.4% decrease
in in tickets issued monthly, which is
good, right? never said anything about
accidents. And I had the same question.
Poor Brandon, you're going to get it
again. Is okay if we saw $200,000 this
money the way that it was the way that
this program was put together initially
was the vision zero road safety
initiative and that's where the money is
supposed to be spent.
>> So I'd be curious to know what did we
get for $200,000 on road safety
initiatives. What did you know and I
don't I'm not putting you on the spot,
but I don't remember seeing anything
saying watch for red cameras other than
maybe Facebook or in the local news. So
do we really get anything out of this?
>> Yeah. Yeah. So through through through
you, Mr. Chair. So the essentially the
agreement said uh basically uh as part
of that agreement any of those that
revenue came back needed to go into uh a
program that had had to do with uh road
safety. So that the money wasn't being
put towards uh you know fixing roads or
pa paving uh paving roads or uh plowing
sidewalks. was uh essentially put
towards the road safety program. So uh
again through council approval we uh
used that money towards uh hiring a
resource uh to help run our own road
safety program for the last 2 years. Um
so we did things like the um um pilot
study that we did with the flexible
signs uh data collection uh dealing with
the day-to-day concerns or complaints
that we receive. uh also has helped us
uh advance the things like the
transportation master plan uh and the uh
and our parking study. Uh we previously
had one resource, now we have two. It's
still a lot to take on, but uh we we've
been able to manage it with that. So,
yeah.
>> Okay. See, no further questions. Um
>> Oh, sorry. Go ahead.
>> Just out of curiosity, how many cameras
are there in Grimby? because they seem
to have a short lifespan.
>> It's just the red light cam at
>> Yeah.
>> Yeah.
Uh thank you. Any
f no further questions? Uh can I get a
mover and seconder for the
correspondence, please? Member Murphy,
Councelor How?
Resolve the Niagara Regional Report PW10
2026
extension of the Niagara Regional Courts
Intermunicipal Agreement Amendment Three
dated March 6, 2026 be received and that
the public works committee recommends
the mayor and clerk be authorized to
execute the amending agreement amendment
three to the Niagara Regional Courts
intermunicipal agreement to continue the
red light camera RLC program. All in
favor? Opposed? That's carried.
Thank you. Brandon, please go ahead and
explain the correspondence from
municipal standards harmonization office
regarding municipal feedback on proposed
regulation for harmonization of the
municipal road construction standards.
>> That was a mouthful that rolled.
>> Yeah. Thank you, Mr. Chair. I'll try not
to read that title again. Uh so the
enclosed memo was submitted to the
province as input into their proposal
for harmonizing municipal road
construction standards. uh it's
identified on the Ontario registry as
ERO026
uh 0105. Uh so essentially the province
uh is proposing to make Ontario
provincial standards for municipal road
construction mandatory
um for municipalities to follow for when
we build our roads. uh as part of the
ERRO, the province was soliciting
feedback asking us to answer a series of
questions and and we've provided our
response uh in in that memo along with
some additional feedback uh for
consideration. Uh to summarize kind of
our our thoughts, I mean, it's a
three-page memo. I don't want to get
into the details cuz we have to get out
here on time. Uh but uh while the town
has uh adopted some uh components of the
OPS standard, OPS or Ontario provincial
standards uh for our design and our
contracts, we often modify these
standards to suit the Grimby context. Uh
we do appreciate the the province's
efforts to review and harmonize
municipal road construction standards
and support the overall objective of
improving the consistency and efficiency
within infrastructure sector. But at the
same time, I think municipalities in our
opinion should retain the ability to
apply, you know, professional
engineering judgment and adapt standards
where necessary to address our local
conditions. Uh that, you know, and and
uh how it applies to our asset
management strategies and and our
overall uh our fiscal responsibilities
or realities. Uh so at the end of the
day uh I think what we're asking for to
see or we're hoping to see is the
province to establish some form of a a
collaborative governance model which
would provide stakeholders the ability
to provide input into those standards,
modify them where needed and allow
exemptions where appropriate. So uh
we're not saying that the standards
aren't good. We actually follow them. Uh
but we do uh modify them from time to
time. and and I guess what we're asking
is the ability to still be flexible in
how we apply those standards. Uh that uh
memo did go to the province and uh um
I'm sure it will be well received.
>> Thank you Brandon. Member
>> through you chair. I thought it was a
very um well-crafted response. you put a
a lot of effort into giving rationale
and I appreciated that. Um just as an
example that came to my mind uh you were
talking about how you might have to have
some u modifications for local
conditions for example soil stability
and I thought like like the Wolverton
road like you might want something
different in a situation where you have
a very extreme slope or if you've got
you know and and you have to be able to
do that modification using the standard
or have an exemption for it. So, um I
could immediately see that and I know
that Grimby is not alone in in having um
needs. It could be that 85 90% of the
time you can follow the opsds and the
opss. Um what I did wonder is because we
have um I think it's still an ongoing
project u with engineering standards. Is
there any implication to that project?
Thank you.
>> Very good question. I didn't put that in
my notes but thank you thank you for
asking. So yeah last year and a half
we've put a lot of efforts towards this
engineering design standards spending a
lot of time uh going through line by
line drawing by drawing to established
standards again built on OPS built on an
industry best practices uh so this did
come as a bit of a shock to us of like
oh my goodness all this effort is it
wasted are we going to lose this that
kind of thing so um uh which is I don't
normally send responses to the erros
because just it's timeconuming but I
felt like this one is one that it does
impact us and it was a bit cathartic to
provide some comment. So uh will it will
it impact our our hope is at the end of
the day um that there will be some
flexibility. I guess in a perfect world
it it we I think we would say hey here's
our design standards province you tell
us where um they don't meet certain
elements or where your concerns are
we'll review them and maybe revise them.
I I don't think that's probably what's
going to happen. So, we we're in a bit
of a wait and see. Um I think there were
other uh agencies, advocates that have
similar comments to ours. Uh Municipal
Engineering Association is one, Good
Roads Association. So, uh they I think
uh have have also provided comments
similar or have provided their concerns.
hoping that the province uh uh listens
to those concerns and and adapts uh
their their changes uh to to take those
into consideration.
>> Thank you, Brandon. Any further
questions?
>> Just one. Um there's some nicely
diplomatic language in this memo, but
I'm wondering if the province has
responded to any of it. You know,
there's a there's there's some very
nicely said stay off of our property
kind of language in here which I rather
admired and I'm just wondering if you've
had a response from them at all.
>> Sorry, can you ask the question again? I
I missed.
>> It's just if if there's been any
response.
>> Oh, sorry. I apologize. Um uh through
you, Mr. Chair. Uh no, we haven't
received response yet. I I would have to
look at the details in terms of when it
closes. I can't I can't remember if it
was a 60-day window or a 90-day window.
Uh oh, shoot. Typically, what happens is
they um they would provide an update to
the RRO uh or or go right to the
regulation and and describe what the
regulation is going to entail. So, uh I
don't foresee a direct uh feedback, but
uh I do hope hope that uh they'll listen
to the collective comments and reflect
that in in what they're bringing
forward.
>> Councelor H.
>> Thank you to you, Chair. um probably for
the director. Do you think is this a
good example of how the province um is
trying to rid
um our working processes of red tape?
Or is this just so that we can create
some more jobs for some other people
downstream?
>> No, it's it's just a bunch of
>> Thank you. Uh, it wasn't a rhetorical
question, right? You're looking for an
answer. Um, I know I I like like I said
in my memo, I think I understand where
they're coming from. At the same time, I
have concerns that it's not a one shoe
or one-sizefits-all approach. I think
they are probably hearing feedback from
uh development community. I'm guessing
in terms of, you know, trying to uh put
put uh uh processes in place would help
improve efficiencies and help uh speed
things along. Um I I'm not sure in this
case that is that is going to help, but
I I do understand where they're coming
from. That's my political answer.
>> Uh any further questions?
Seeing none, can I get a mover and
second to receive the correspondence,
please? I've got councelor Dvoli and
seconded by member Murphy. Resolved that
the correspondence from municipal
standards harmonizations office
regarding providing feedback on proposed
regulations for harmonization of
municipal road construction standards be
received for information. All in favor?
That's carried. No. Please go ahead and
explain the end of term presentation.
and zoom in a little bit.
Thank you, chair, through you. Uh we're
looking at the end of term presentation
kind of structure here. Uh there were
some questions after this was introduced
at all the standing committees last
month's meeting. Uh so we're trying to
address some of those and if there's
more happy to answer those as well. Uh
so really all that we're looking for is
answers to those two questions or
essentially filling out those two
um little bullet points lists there uh
for every single member individually to
provide to to myself at clerksgrimsby.ca
A uh the list of major accomplishments
in your opinion of this committee and
then future opportunities for the next
term if this committee is to continue,
what you would like to see, uh what are
priorities,
um you know, things like that. So, that
is the short version. I'll keep it short
and sweet. Uh yeah, we'd like those
emailed to clerks grimby.ca as well as
to uh to the chair. Uh the date for that
would be
uh let me pull it up here. I have it
by June 15th. And that will give me time
to put together a
a draft or whatever you want to call it
of of essentially the script that the
chair will deliver at council including
all of those comments. Right. So, uh,
we'll be looking at that at the June
24th public works meeting for comment
from everyone and then in July, uh, the
chair will present that at council.
>> Thanks, Noah. And I think after the next
public works meeting, which is May 27th,
we'll have a better idea, you know, kind
of a more final
uh, idea of that. And so, but if you can
get those in uh, to Noah and to the
clerk's office, we can. And I'm sure
they'll send out a reminder if we don't.
But I think after the next meeting,
maybe June 1st, we should start really
thinking about getting those in. If you
have ideas now, that's great. But I
think that we we're going to see some
some more progress hopefully before the
end of the term and kind of wrapping or
getting an idea of what's going to be
wrapped up. Uh are there any questions
for Noah about that report? Seeing none,
um
vote on that. We don't need to vote on
that. Okay, good. Uh, is there any new
business?
>> Uh, oh, Ron, you okay?
>> Yeah, of course.
>> I'm guessing that some of the topics I
was speaking to you'll have questions
about.
>> Sorry. Uh, so yeah, again, thought
thought there'd be an opportunity short
agenda if I could provide a couple
updates. Downtown reimagined is one. Uh
so the tender for phase 1 uh closed this
afternoon at 4 p.m. Uh so the unofficial
results are now posted on on bids and
tenders. Uh if anyone's interested in
seeing those results, you can reach them
through the procurement page on our
website. Uh so they are unofficial. Uh
so we have to do a a thorough review of
the submissions ensuring that they're
complete and once we're satisfied all
the eyes are dotted and tees are crossed
uh we'll be reaching out to the
successful contractor uh for the uh to
execute the appropriate agreements. Uh
from there we'll be setting up a
pre-construction meeting to dig into all
the details of uh the project including
refining the project schedule. Uh and
then once we have those details
available, we'll providing notifications
and updates through our normal channels
to ensure everyone is is kept up to date
on the on the project start. So uh we do
have our May later May uh public works
committee May 27th uh I believe. Uh so
we'll provide a further update at that
point. I'll stop there if there's any
questions on that and then I do have one
other update to provide.
>> Any questions for Brandon about that?
Seeing none, Brandon. And then yeah, so
just my other update was uh with respect
to the transportation master plan. Uh so
we're scheduled to present the our TMP
or transportation master plan to council
at the May 25th council meeting. Um so
we're getting very close to having the
final draft uh out ready for posting. Uh
our hope is to have uh an executive
summary uh as well as a presentation out
to council in the next week or so ahead
of that uh the May 25th meeting. Uh and
then we're hoping to have the TMP uh
draft itself. It's a larger document, a
number of hundreds of pages uh posted by
May 25th, but realistically we think it
could be a few days past that council
meeting. So uh we'll just have to play
that by ear. Uh but we will make sure
that public works committee members are
included in the correspondence and uh
we'd invite uh committee members to the
May 25th uh council meeting as well. Uh
happy to take questions about that as
well.
Thanks, Brandon. That's good
information. Any questions for Brandon
about that?
Seeing none, uh that those those were
two things that I think everybody was
happy to hear about. Thanks, Brandon. Um
our next meeting is
scheduled for May 27th, 2026 at 6:30
p.m.
Thank you everyone. The meeting's
adjourned.