Okay, good afternoon and welcome to our
virtual design review panel meeting. My
name is Edward Winter. I'm a urban
designer at the city of Hamilton and I
coordinate the design review panel. On
our agenda today, we have a development
proposal at 96 Main Street East in
Hamilton. Today we have with us the
applicant team, city staff, members of
the public, public public and media in
attendance. Members of the public are
welcome here to observe. Uh however,
there is no commenting or questions um
from the public or media during the
presentation.
Uh this meeting is being recorded and
will be uploaded to the city of
Hamilton's DRP web page. Chair of the
DRP, Jennifer Mard, will be leading our
discussion today. Uh, Jennifer, you may
begin when you're ready.
>> Thanks, Edward. Good afternoon,
everyone. Edward, can you please
reconfirm that the session is being
recorded?
>> Yes, recording is going.
>> And are there any changes to the agenda
today?
>> No.
>> Are there any declarations of interest
from any of the panel members? I'll take
silence as uh no declaration.
Okay.
Thank you. On the agenda today is the
review of 96 Main Street East. The lead
planner on the file is Michael Fiorino
and he's available to answer any policy
questions. Edward Winter, the urban
designer at the city of Hamilton, will
make a brief presentation.
Thank you, Edward. We're ready for your
five minute pres.
Okay, here we go.
All right. The proposed development
would include the construction of a
29story multiple dwelling with 370
residential units and 309 square meters
of ground flooror commercial space on
Main Street East. The proposal would
include one level of underground parking
and two levels of above grade parking uh
provided in the podium for a total of
121 parking spaces.
On the overhead map here you see Main
Street West proceeding diagonally from
left to right and the blue rectangle
with the yellow star is the subject
lens. Uh we also have Katherine Street
on the east side and Bowen Street on the
west side.
Okay, here we have some site photos. Um,
the properties in the center and you
notice the tall building on the side and
this is Bowen Street in the foreground
here.
All right. Uh now we're looking south uh
down Catherine Street and again the the
subject property uh is the lower
currently the commercial complex on the
right and we have a an existing tall
building on the left and in the right
distance you can see some newer
construction that's going up that is on
James Street uh James Street
Okay, turning around again. We're now
looking west uh back up Main Street. So,
the subject property would be on the
left. And you can see varying stages of
the downtown in in our image here um
with the newer construction on on the
left.
Okay.
And we've moved around again. We're now
looking north uh along Catherine Street
and uh the subject site would be on the
left just behind this stone building.
Now this stone building is not part of
the subject lands um but directly
adjacent.
All right, here we've moved across to
Bowen Street. So we're looking north uh
along Bowen Street. And again, the
subject property is just on the other
side of this stone building.
Okay. And here we are looking around the
corner um at at uh sort of norththeast
direction uh towards Main Street across
the corner of the subject site.
All right. So, here's our conceptual
site plan. Um again, Main Street coming
along from east or west to east and
Bowen Street on the west of site and
Catherine on the east of the site.
Catherine uh is one way north to south
uh and Main Street again is one way
currently um west to east. There are
proposals uh to turn Main Street to
two-way uh in the future.
and the conceptual rendering. This is
looking from the north across Main
Street onto the site.
Uh this proposal uh did have a formal
consultation
uh earlier this year. Uh at that time it
was submitted for a 30story mixeduse
building with a five-story podium. uh
slightly more uh 393 units and 362
square ft of commercial ground floor
space. At that time there was 77 parking
spaces including seven barrierfree and
197 long-term bicycle parking. Um that
time there was two levels of underground
and three uh on the podium. staff
provided comments at that time and
raised concerns with the proposal
specifically identified with regards to
the height and shadow impacts um to 50
Main Street East.
So for uh discussion today we have four
um topics and they are how well does the
building base or podium work to support
the pedestrian realm along and establish
a street wall on Main Street?
Second, how well does the proposed
design mitigate the shadow and wind
impacts at street level and at the
common shared amenity terrace?
Third, how does the landscaping plan
work to support an active streetscape on
the three different sides, that being
Main Street East, Katherine Street
South, and Bowen Street, and noting the
different different characteristics of
each street. And lastly, how the how
does how is the design implementing
sensitivity towards the heritage
building directly south of the subject
site? And um is the narrow gap between
the buildings uh effective uh in this
regard?
All right. So that brings the staff
presentation to an end and I'll pass it
back to you Jennifer.
>> Thanks Edward. We're now ready for the
consultant to provide additional
information. Please keep your
presentation to 10 minutes.
>> Okay. Good afternoon everyone again. Uh
let me just grab make sure my screen
works here.
Out of the way.
Okay. Just want to confirm quickly
everyone can hear me. Everyone can see
my screen.
>> Yes, it's good.
>> Awesome. Thank you everyone. Okay. Uh
good afternoon. My name is Ryan Ferrari.
I am a senior planner with Agent Clark
and Associates. I'm the agent on this
file. Uh we're going to be presenting to
you uh 96 Main Street, Art Design. Um I
will start the presentation with a
little bit of context for the subject
site. Um and then after u my portion's
concluded, I'll ask John from
Chamberlain to um uh go ahead and
introduce the design of the building.
So, I'll start with a little bit of site
context. Ed gave us a little bit of that
previously. We are downtown Hamilton.
Um, we've just outlined the site here
with the proposed LRT line. Uh, the two
nearest stops will be the future Mary
Street and James Street stops uh which
will both be walking distance to the
site. Uh in addition, I think it's also
worth pointing out Hamilton GO station
uh the community train station to uh
using the Lakes Shore West Line is
located within walking distance of the
site as well.
Um I'll skip this slide. I just uh just
zooming into the site a little bit more.
Uh corner of the main main Captain
Street. Um this is an old uh burial of
what's around the subject site. and I'll
provide a little bit more context um a
little further below.
Uh really quickly, as I've mentioned, uh
the subject site is on the right here.
It's a currently a commercial plaza um
that it is tenanted. Uh you'll note, uh
Ed alluded to this. Main Street runs uh
west. It's a one-way street with four
lanes currently.
Um and then the other picture is just
showing the other side of Main Street
with the subject site on the left. Um
there is a bus stop uh as well fronting
the subject site which I think is worth
pointing out.
Uh this is just a shot of the Hamilton
LRT line. Uh latest and greatest is will
go from McMaster to Eastgate Square.
Uh and just really quickly touching on
uh potential Main Street two-way
conversion. Uh this is not necessarily
the design that's going to be
implemented for the site, but I think
it's important for the panel just to see
um how big of a change it's going to
bring to Main Street going from a
four-lane road to potentially two lanes
one way, one lane the other way. Um the
our subject lands are just located where
the HSR stop here in that blue square.
Uh quickly on some planning policy. So,
the site is designated downtown
mixeduse. Uh, it's also designated
high-rise 2, which does permit 30
stories. I just want the panel to note
uh the subject lanes outlined in blue,
but also the green rectangle located to
the west of us, that is Princess Square.
Um, there are policies in the official
plan, I won't dig into them too much,
that essentially say you cannot shadow
onto Princess Square. and we'll have
some slides later on showing uh what
that looks like in context of the
development.
Uh another important piece in the
downtown secondary plan when you're uh
building a tall building is the
escarment height. Uh this is just an
excerpt from the official plan showing
uh the viewshed. Uh our viewshed is here
at 190.2 m above sea level. Um our
development is right there at 190.19
meters above sea level. So, uh we are
meeting the escarbon height uh for the
site.
Uh just quickly on zoning, the permitted
height in zoning is 93 m. Uh we're
proposing just slightly over at 93.8 m.
So, we will need a minor variance for
that for a slight increase in height.
Uh just quickly going through some of
the height context here. I'm not going
to go through every single one, but as
the panel can see, lots of 30story
buildings. We're right beside Landmark
Place. that's at 43 stories. Um, so it's
highly urbanized uh very tall uh
contexts that we're working in here.
Uh we've come up with six examples of
recently approved or constructed
developments. I won't go through all of
them here. Uh there's two important ones
I think the panel should know about. Um
on the third page here, so 111 Jackson
Street is located kitty corner to our
site. Landmark Place is just here in the
background. This is an approved
development. It's actually taller than
the escarment at 39 and 30 stories.
Hasn't been built yet, but it is
approved uh to be built. Uh the other
project I think worth noting um this is
in the context of Princess Square is 64
Main Street, which is 18 stories and is
approved. A minor variance application
was approved for the site. Um and the
Landmark Place is in behind that
building which is yet to be built. Our
building would wedge in between Landmark
Place and 64 Main Street in here.
Uh sort of with that context being
provided, I'll pass it on to John at
Chamberlain. And maybe I'll ask John
quickly if he wants me to keep operating
the presentation or if he wants to take
over. I'm in your hands.
>> We can't hear you, John.
No, still nothing.
How about now?
>> There we go.
>> Okay, there we go. Sorry about that.
There was multiple options there and I
had it was the last one, number four.
So, okay. Thanks, Ryan. Yeah, if you
don't mind uh continuing to flip
through, that would be great for me.
>> Um Okay, if you want to hit the next uh
slide.
>> Okay, so just real quickly, uh obviously
Ryan hit some of the basics for the
building. uh 29 stories, 370 units, uh
just under 28,000 square feet or square
meters. We've got about 5,000 square
meters of amenity space, including our
indooroutdoor terraces and balconies, uh
93 meters and 122 parking stalls. Uh if
you want to go on to the next uh slide,
Ryan.
Okay, next slide. So, here we can see
our ground floor plan. This is on the
north side. We've got Main Street. Uh
we've got Bowden and Katherine on the on
the flanks. So we've got street tracing,
retail, commercial, about 3,000 square
feet which is wrapping around u Maine
onto the two side streets. So the whole
goal here was to kind of wrap and bring
that entire pedestrian experience, you
know, not only along Main Street, but
also kind of wrap it around. So we got a
bit more of a an active corners or
active corners happening. The
residential lobby is located off of
Bowden. So, as you transition around um
the main street and Bowden access, you
kind of get into, you know, a slightly
let's call it less pedestrian areas as
you leave the retail space and then you
go directly into the vestigual of the
residential lobby. So, both of those are
kind of very closely connected.
Residential traffic onto Main Street is
is all kind of very close to to Main
Street, activating that corner and
activating the space. Um, all the
building services have been
internalized. So, we've got an access
route that kind of runs through the
building both from Bowden and Katherine.
You can see it there in the center.
We've got our um our loading space in
the middle and then access to our
parking garages both up and down um kind
of in that U-shape uh on on both the
east and the west side of the plan. Um
the centralized access kind of allows us
to bring everything inside there, all of
our garbage, everything kind of
happening inside that space.
Uh Ryan, do you want to flip to the next
uh sheet?
Okay, so next sheet here. Um, this is
our second floor parking plan. So, we do
have above grade parking, but one of the
goals here was to uh minimize uh that
impact onto the main street facads. So,
what we've done is we've gone with
obviously a higher floor for the ground
floor to really kind of emphasize that
uh retail and commercial space and we've
introduced some mezzanine space. So
again, you know, wrapping the two side
streets along with Main Street, we have
full glazing and activation happening
along those levels. And then we've got
uh our first level of above grade
parking and some locker storage
happening. We go to the next slide,
Ryan.
Okay, so next slide, we get into some
units. Um so this becomes our our our
full third our own full our partial
third floor. Again, uh we've placed
those units facing Main Street and
wrapping around the corners, keeping all
of the parking in behind.
Go up to the next one, Ryan.
Okay, so this becomes our our our
residential podium level. So, here we've
we've moved into a slight step from the
podium, as you can see on the east and
west side of the drawings along with the
rear. Uh we're getting into our our
let's call it typical unit mix for the
next few floors before we step again
into our tower. And we also have some
concealed uh storage space in the center
section and a bit of a transfer stair
happening to kind of get us out of the
way of our parking parking facing
levels. Go to the next floor, Ryan. So
this becomes our fifth and our sixth
floor. This is kind of our our typical
podium floor. Uh sorry, Ryan. One more
floor up.
Did it move? I'm still seeing the one
below.
>> Yeah, just give it a second. No problem.
>> There it goes. Okay, great. So, here's
our fifth and sixth uh typical floor.
The transfer floor is now transferred
into a scissor stair that's going to run
all the way up the tower. Uh, and we
still have our our kind of typical floor
that we've been chasing up from uh four,
five, and six. If you want to flip on to
the next floor, Ryan.
Okay, so this is our our seventh floor.
This is where we transition into our uh
our tower floor plate. You can see we've
kind of split this floor into um our
indoor amenity space, rooftop terraces.
Um, again, this these larger terraces on
the units help to kind of give us um
some activation along the street edges
as we continue up the building and also
help us transition from the the podium
now into the tower portion. Want to go
on to the next one, Ryan?
And here we get into our tower floor
plate. Um, lots of kind of undulations,
some inset balconies, some outset
balconies, different things that are
kind of helping us play with the facade
as we move up the building.
And then if you want to flip to the next
slide, Ryan, quickly, this is just our
our rooftop mechanical space. Okay, if
you want to go on to the next slide. So
this is just kind of a quick design
methodology slide showing um you know
some of the key components of the
design. So obviously access and flow is
a big piece of what's happening here.
Um, we can see our our facade here with
our activation points, how we're kind of
looping around the site, how the
vehicular traffic is happening, our
access points for pedestrians. Um, if we
get on to the next uh the middle section
of the slide, we can see the activation
spaces. So, we've got lots of activation
on the ground floor with all of our
retail and commercial spaces. And then
from a a residential point of view,
we've got our our like green roof
rooftop amenity space wrapping around um
uh on this section, the the northern
portion of the drawing there. Um and as
we start to get into talking about a
little bit some of the design elements,
um we're looking at some of the
verticality. So, one of the challenges
always when we're working on um these
taller towers is, you know, trying to
create interest obviously at the podium,
but also some verticality that we think
has has really lended itself nicely to
help us, you know, divide this building
up and make it look, you know, nice and
tall and slender and work and and fit
into a downtown context with a lot of
this these building types. Do you want
to flip on to the next slide, Ryan?
Okay, so this is our main street facade.
And so the the thinking here is the
facade is broken into four parts. We've
got our retail facade which is street
facing you and call the all of the
pedestrian interactions. We've got our
second our second piece which is is the
base. So this is our kind of glaze
mezzanine level um and residential
units. This is where we're kind of
concealing the parking. We're starting
to introduce some of that that uh
residential play happening on the third
floor. And then we get into our our
third piece which is the transition. So
this is the start of the residential
units and the stepping of the building.
And then kind of our fourth piece is is
the tower portion. So what we've done is
we've kind of taken the third the third
piece and the fourth piece and started
to blend them together. And you can see
how that kind of center element is
starting to to kind of merge its way
into the into the base of the podium.
And then on the right hand side of the
facade, we're taking the darker facade
kind of up, you know, kind of
introducing more of a vertical play on
the elevation itself.
Flip to the next uh slide, Ryan.
Okay, so here we're going to kind of
walk through some of the materiality of
the building. I mean, the the main um
portions of the tower are obviously
glazing and some pre-fabricated ephus
panels. Uh we've got some grays and some
whites. Uh we've got some aluminum
frames kind of happening on the on the
base um with some spandrel and glazing.
And then on the the lower podium
portion, we've got um you know, a
pre-fabricated ETH stone to kind of
emulate and work with the historic
building a little bit. And then on the
lower level um we've got a darker uh
masonry finish. Uh again, for a little
more um you know, durability and and
finish and just to kind of create a nice
float to the base. The base itself is
canolvering a little bit um just to kind
of emphasize that that transition and
that change and and and really contrast
between the pedestrian realm and the
building happening above.
Flip on to the next slide, Ryan.
Okay, so this is a corner view of Main
Street and Bowden. So you can see the
the cafe space or the retail commercial
space. As we wrap around Bowden, we can
see the entrance of the residential
area. We can also see the vehicular door
there entering into kind of the service
and and vehicular entrance. Um, but we
can start to see some of that activation
happening um, you know, throughout the
the lower level of the building, how
that facade wraps around. So, you can
envision a cafe or a restaurant or a
retail space that's really kind of
bringing some life down those side
streets.
flip on to the next slide, Ryan.
So, this is a view of the the the rear
side um and and side streets facades. Uh
so this starts to show the the
transition and relation and material um
a little bit more between the historic
building um the historic building itself
um you know obviously in its current
position and and potential future
development on um on the other side of
the property is going to be kind of
wedged there in the middle. So, we
wanted to kind of play with, you know,
the colors and and blend in there a
little bit. So, we're working with a
facade that, you know, complements and
works with with our facade, even though
there's a far more, you know, uh,
historic element to it with some of its
openings and and interesting kind of
post lentils and and things like that
happening.
Uh, you want to go on to the next slide,
Ryan?
Oh, sorry. One more. Ryan,
did we lose you?
>> There we go. Oh, too far. Sorry. One
back.
>> It wants to go. It's just taking a
second.
>> Okay. Okay. No problem. No problem.
>> There we go.
>> There we go. Okay. Great. So, this is a
close-up view of the main street facade.
You can see the activation happening. We
can see the, you know, the levels of
activation happening even above the
third floor. As we get up the sixth
floor and the terrace is wrapping around
the building, we can see that center
element coming down into the base.
Really trying to play a little bit of a,
you know, horizontal play to emphasize,
you know, the horizontal relationship on
the pedestrian scale, but then also some
vertical elements within that. You know,
starting to kind of push the eye up into
the tower and and promote some of that
slenderness that's that's happening in
the tower portion.
Okay, so following that we have our
appendix uh the remainder of the
drawings, elevations,
you know, studies, all of that that
stuff. But that kind of concludes the
architectural portion of the
presentation. Right.
>> Oh, okay. Thank you. I was wondering if
there was any other component of the
presentation. I think uh we will want to
see those sun shadow studies. Um
um so if somebody could line them up and
maybe one of the panelists could bring
that up as a question. Um are are you
finished presenting? Uh
>> yes.
>> Sorry. Yeah.
>> Okay.
Thanks very much. At this time we want
to provide an opportunity for each panel
member to see clarification on any
points that may require further
explanation. Please hold your comments.
uh the proponents clients or comments uh
until the end and and we'll deal with
them all at once. We're going to start
the questions with Olga.
Thank you. Thank you for your
presentations. Um
uh I I was wondering if there has been
any any sort of thinking about the the
fact that Hamilton has such a rich
industrial heritage fabric um and your
selection of materials which I see as a
different variations of ephus up this
very tall building. if there's been any
connection to looking at its the
heritage context of this area and given
that you're adjacent to a a
important heritage little building um
have you what was your rationale for
material selection and the second
question I have is sustainability is I
haven't seen anything about any
sustainability or storm water management
what are what are the strategies for
that you have in place for this building
if you have any that you can um discuss
with us.
That's those two questions. These are
just my two questions to answer.
>> Okay. Uh
>> Ryan or John, will you be Thanks. Okay.
>> Yeah. Yeah, we I can start with those.
Um
yeah, from the heritage point of view,
uh
that that that's a that's a tough one to
chase those materials up the building. I
mean, it's we've got wood and stone, um
not really um you know, great materials
to chase up a tall tower. Um so what we
had done and maybe in this image is not
showing quite as well. Um it's a bit of
a field stone look on the side of the
building even though that side of the
building will end up uh being covered up
eventually on the other side as well. Um
so what we had done and and I don't know
if Ryan if you can zoom in here at all
but we had taken kind of a simplified
pattern of that for the lower level
elevation to kind of um if you can see
it in the rendering there or not. Um to
kind of emulate that that look a little
bit to you know pay some homage to that.
Um, and then also kind of, yeah, you can
see it a little bit there. And then, um,
as far as kind of framing it between the
black frames of kind of the the fourth,
fifth, and sixth floor and then the
ground floor.
Uh, as far as sustainability, um, you
know, we will obviously go through uh
all of the necessary um, civil
requirements to make sure that we're
meeting all of the the city's
requirements. Um, as far as the
panelization of the building, uh, the
the Ephus panelization system is
actually a wonderful system as far as
creating
are arguably one of the the best
envelopes that you can from an
architectural point of view, placing all
of your insulation on the inside of the
building. Um, you know, as far as
materiality goes, it's probably the most
sustainable.
So, that's definitely one of the, you
know, the strategies that we end up
using. you know, additional insulation
for all of our rooftops, green roofs,
um, in as many areas as we can. Uh,
those are kind of the primary, uh,
things that we're kind of looking at.
And then all of the other kind of, you
know, standard high efficiency, you
know, appliances and and, uh, mechanical
systems.
>> Okay. Thank you.
>> If if if it's all right, uh, just to add
on the heritage component. So, um, the
building next door 33 Bowen, it used to
be a a horse stable, believe it or not,
that facilitated, uh, visitors to a
hotel nearby. Um, so it's a one-story
heritage structure. Um, it's since been
designated, but um, there weren't any
material connections, I'll say,
specifically to the one-story heritage
structure to this building. you know, to
echo John's point, just trying to make
sure the colors sort of transition uh
into that. So, sympathetic on the ground
floor um was how we chose to uh
implement the design. So, hopefully that
adds a little bit of clarification.
Thank you.
>> Thanks, Ryan. And John, um over to you,
Eric. Do you have any questions?
>> No questions. Thank you.
Okay, Jen Sison, questions.
>> Thank you all for your presentations.
Um, I did want to ask, I noted the
design includes vehicle access on both
Bowen and Catherine Street. I think
Ryan, you may have touched on this a
little in your presentation about it
being for uh access and vehicular flow.
I was wondering what other reasons or
drivers were behind that double access.
Is it was it kind of an early design
decision when Main Street was only going
to be one way? Now that it's two ways,
is that something that you would be
looking at again?
>> Uh Brian, I can answer that. It really
comes down to a a servicing point of
view. I mean, we've got to be able to
get a garbage truck in there. We got to
be able to empty
uh overhead garbage bins. We need lots
of space. Uh pretty difficult to turn
around. They can't back out back onto
the main streets. So, a lot of it came
down to just the servicing of the
building. And then also, you know, we've
got
uh 300 plus units. So, we're trying to
make sure that, you know, at those peak
times, we're able to kind of get people
in and out with lots of options.
>> Okay. Thank you. That's it for my
questions.
>> Thanks, Jen. Sharon, do you have any
questions?
>> Yeah, just uh one, can you just clarify
the property lines on the site plan?
There are a number of different um
colors, red, uh purple, and blue, and I
just want to clarify what the actual
property line is.
Sure,
John. I I I can quickly do that. So, uh
there is a widening on on Main Street
here. So, the the purple here would be
the widening proposed uh on Maine
specifically. Um there staff did request
widenings on Bowen Street. I think
that's something we're still going to
discuss with them further, but I think
for the sake of reviewing this, the
primary road widening would be the the
main street road widening, which we're
giving up for the design.
>> So, sorry. And to clarify, so staff are
asking for a widening on Bowen, which is
from the blue to the red.
>> Correct.
Correct. So, both
>> Sorry. Go ahead.
>> Go ahead.
I was just going to say the same thing
is is the same for Catherine Street
where I see a blue and a red as well.
>> Yeah. So I believe trying to recall
staff I believe there was a widening on
Catherine Street but the reason why
since we since we prepared this design
actually I believe there's some changes
that came to the official plan. Um so
for the for the sake of this review uh
we're considering the blue line to be um
the the ultimate road winding for
Katherine, the blue line on Main Street
to be the ultimate road winding for Main
Street and then we acknowledge staff
requested road winding on Bowen Street.
Um but that is still sort of in flux and
will be flushed out through the site
plan. Um, and just the reason why the
Bowen Street widen is in question is
Bone Street is actually an alleyway. Um,
it is a public road for the sake of this
proposal, but it was never upgraded to
urban standards. Um, so it's kind of
this weird orphaned alleyway, public
street and kind of access back a house.
So that's why I feel like that details
worth clarifying uh for the panel. So
sorry for the longwinded answer, but I
hope that answers your question.
>> Yep, it does. and it provides me with a
good comment for the next round. Thank
you.
>> Thanks, Sharon. Uh Tyler, do you have
any questions?
>> Uh yeah, just one. Um thanks for the
presentation. Um on the U Main Street
elevation, there's a kind of large
portal signifying an entrance. Um is
that an entrance to retail or what? It's
unclear because you've got the cafe on
the corner and the renderings. I'm just
curious what the large portal
signifying.
>> Yes, an entrance an entrance to retail.
Correct.
>> Okay. Thanks.
>> Thanks, Tyler. Uh I I had a similar
question to Tyler's that um that the
entrance to retail was a lot more
celebrated than the entrance to the
tower on on Bowen Street. Um
uh I have
another question. Um
if we can you go to the uh blow up of
the site plan um that like the little
orange inset that you've got there, but
there is a sheet that shows all the
setbacks.
Are you referring to the tower sheet? I
believe that's the one.
>> I have a question on the tower and then
and then further question on on Sharon's
question on property lines. This one
might work. Um,
so this one is showing
No, it's not showing the tower set back
to the property line. Yeah.
>> So, uh, so that that would be a
dimension.
>> I think it's to the right there, Ryan. I
can't I can't make it out, but
>> Yeah. Okay. So, you're referring to the
the tower set back. It's slightly less
than 12.5 meters. I think we're 12 11.6
the closest point
>> on this site plan.
>> But the but the balconies and the Yeah.
And the balconies and the terraces are
further than that. You're saying,
>> Ryan, I I think the site plan is maybe
the better zoom in on that.
>> I can share there's a different sheet
that's not on there. It's um the site
plan with an orange building with all
the setbacks on it. It's on A005.
>> I think it's in it's in the appendex.
Yeah. Page 34.
>> Okay.
>> Okay. You'll have to for excuse me while
I ripple through this.
There were a couple of red lines on that
on that uh the one we were previously
looking at that I was wondering what
those red lines were too. But uh uh
let's focus on one question at a time.
>> All right, just bear with me. Like right
there.
>> There you go.
>> This is the site plan. It's not
dimension.
Okay, here we go.
>> It's not that one though.
>> Here we go.
>> If you zoom way in there. Yeah. And I
think you mentioned it was
was it less than 12.5 for the tower
separation to the property line. Right
from the furthest protrudence of the
tower
>> to the property line. That's assuming
you've got a heritage building to the
south that nobody would build on top of.
Is is this your assumption?
>> And that you would
>> Yeah. So that's relying on
on them not
building a tower on, you know, if if
there's a facade treatment or something
to retain the heritage elements and a
tower that goes up, you're restricting
their development potential.
That's just uh is that I'll put this
into a question. Yeah, I I think I think
if we were so the thinking behind
Jennifer, maybe if I can clarify, was if
we we could we can't develop the site as
a whole. We don't own the property, but
if we were to take this whole thing with
the designated heritage property in the
middle and we created an imaginary 25
meter setback, there would be some room
for a tower on the development next
door.
>> I guess you could look at it as,
>> you know, restricting their development
rights, but We're trying to show that
we're keeping that spirit of that 25
meter set back essentially. That was the
attempt there. And that heritage since
we've actually designed this very
recently like a couple months ago, it's
actually been designated under for the
heritage act. So that building is not
get demolished.
>> Hope that clarifies.
>> And I Yes, it does. Thank you. Um Um
So I'll I'll save my comments for later.
Um,
>> and sorry, do you want me to answer on
the entrance on the entrance side
>> the the hierarchy of the two?
>> Why don't why don't we save that?
>> Okay, go ahead. Yes. Yeah.
>> No, I was just I was just going to say
typically we we will we'll we'll
celebrate the the public entrance a
little bit more. that's the one that's
being used more frequently. So you don't
have people heading into a a lobby
getting it confused with um you know a
commercial space.
>> Um did you if we could sorry to delay
can you go back to a ground floor plan
that shows the entrance to the tower off
of Bowen Street. We were wondering if
that front the whole ground floor
>> Yeah.
Did you consider flipping it so that the
entrance to the tower would be off of
Catherine instead of Bowen? Because
Bowen is a is a little alleyway
currently and and a lot less of a civic
street.
>> I I I think from a residential point of
view, I mean, based on the the number of
other residential projects that we work
on, we typically try to put it on the on
the quieter street. That's the feedback.
>> The quieter one. Okay.
>> Yes.
Okay, that's fine.
Uh, at this point, uh, we'll now close
the Q&A session and, uh, based on the
information presented, each panel will
have a chance to ask, uh, to provide
their feedback and recommendations. We
will start with Olga.
>> Sorry, Jen, before we move forward, we
didn't ask about the shadow study on the
uh, square.
>> Oh, right.
>> Thank you, Sharon.
>> Ask about that. That would be great.
>> Yeah.
>> Sure. Ryan, do you want to run through
that one? Flip through that.
>> It's in the appendix.
>> Okay.
Uh actually, John, I'm happy to quickly
run through this.
>> Yeah, go ahead. Yeah. Yeah, of course.
>> So, this is just one excerpt. The shadow
stud on March 21st. So, Princess Square
is an important piece uh for the uh in
the official plan. uh you can't cast any
net new shadow on Princess Square. So
the way we ran the shadow study is we
have our proposed building and the
shadows in in blue. Um next door 64 main
uh is approved. It's an 18story
building. There is some shadow onto
Princess Square. Um and in terms of our
building, our shadow is within the
adjacent building shadow. Um so we are
not casting any net new shadow on a
princess square that already has been
approved. Um not shown in the shadow
study just really quickly uh J the
Jackson Street project I mentioned
previously being at 39 story is also
shadows of corner princess square. Um,
this is the shadow study at 9:00 a.m.
and then at 10:00 a.m. There are more
shadow slides if if the panel wishes to
look at them together, but we just
selected a few just to note even by 10
a.m. like our shadow is is gone. So,
>> and the 9:00 a.m. one is the worst of
>> of all in different times of the year
even too.
>> Yep.
>> Yep. Yeah. This is on March 21st and I
believe Yeah.
Yeah. Thanks. Okay. Um Yeah. Yeah. And
the shadow moves away
>> the rest of the day. So that was the
thinking that we thought that was
important to note.
>> Yep. Thank you very much.
Okay. Over to comments. Um uh Olga.
>> Yes. Thank you. Thank you for the
clarifications and the presentations.
Uh my one my two comments are
now that this is a designated heritage
building adjacent to the property when I
look at the elevations I find that your
development is really pinching it's its
frontage and um given that you've got
three levels of podium there's I would
think there's an opportunity for you to
be able to pull back and look at that
building in the composition of your of
your lower levels. of this of this
building or pulling it back to give it a
bit more respect and breathing room. And
the second thing is um I do appreciate
the articulation of the facades and the
different colors and it's been rendered
with richness which I do appreciate.
Uh, I do wonder if the durability at the
base of the building could be explored a
bit more with some real materials that
could have a a stronger impact to the
fabric um of of Hamilton that is a bit
more in keeping with with that language.
Uh, I do appreciate again the ephus, but
um maybe there's an opportunity there to
make something really quite quite rich
as well at the grade level. Thank you.
>> Thanks, Hula. Eric, your comments.
>> Thank you, uh, Ryan, Jonathan, and
Claudia. Appreciate the opportunity to
comment. Uh, uh, most of my stuff is
pretty light. Uh, generally, I'm fine
with the design. Appreciate the
variation in the facade and the design
that comes with that. Uh, my comments
are probably more based in in planning
world. Um, pleased to see the vehicular
entrances coming not on Main Street. So,
that's positive. Uh, protects the
pedestrian environment. Um, I'd ask, you
know, and this is more of a planning
question, so we don't have to get into
here, but given the proximity to the
LRT, why so much parking? Um, and that
might just come down to zoning and minor
variance needs or otherwise, but um,
given where this is, I think you could
probably get more built form or more
housing. So even in that case,
consideration could be given to a
long-term transition of some of that uh
parking to residential use. So if you
designed design that parking garage
space to allow for future transition,
again, this is all predicated if this
was a rental building versus condominium
or otherwise, but flagging that as an
opportunity. I think you you got such a
great location that I feel you're not
necessarily taking advantage of
everything there and then taking on all
the additional costs that come with
parking. So again, more planning than
than design. Um I would ask uh um and
maybe this is just timing, but I noticed
a lot of the site plan work didn't
really flag that the Main Street 2-way
uh conversion and maybe that's just a
matter of timing. And I did wonder how
people would get to to the residential
if you're coming west on Maine with uh
Bowen not being a full moves interchange
or intersection and how flows might
might be happening because I believe
Catherine is a one-way street. So that's
kind of just something I think uh have a
look at that and just the best way to to
fit it. That was really all I had to
have. Thank you.
Thanks, Eric. Over to you, Jen.
>> Thank you. So, wanted to say thank you
for your presentations. Really
appreciate uh seeing a good development
like this coming forward. Uh there are a
couple things that I thought you did
really well. I wanted to say I was
really happy to see that you've included
a large number of long-term bike parking
at grade. Uh, I think you had 259 bike
parking spaces. Um, and some sheltered
short-term biking as well. So, I was
happy to see that. Uh, as well as your
use of soil cells to support tree
plantings in the city right away. I was
really pleased to see that. But I would
have liked to see maybe some more trees
overall, particularly on some of the
flanking streetscapes. I think they
would benefit a lot from additional
vegetation more than just the um,
movable planters that I'm seeing in the
landscape design. Um,
I was also very appreciative of the
retail that you've put on Main Street at
grade and that you've tried to wrap that
around the sides of the building. Uh,
I'd love to see more active uses if you
could find a way to make that feasible
along Bowen and Catherine Street just to
activate those flankages as well.
Uh, in terms of the building, I would be
echoing Eric on that parking reduction.
I would I would support that as well and
considering an ability for having a
future transition of that above grade
parking into residential use would be uh
something to help in future proofing the
building. And I do have a concern with
the floor plate exceeding the
recommended 750 m square that's in the
tall building design guidelines that
this building would fall under. It's
exceeding it by over 100 meters square.
I think you're sitting at 850 or
roundabouts there. uh for a building of
this size, I would have also expected a
higher percentage of three bed units. I
think you're at 3%. But I do appreciate
that you've given a high percentage of
two beds at almost or over a third of
the building is two bed units. So, thank
you for that. Um, for the wind study, I
think adding windscreens uh per their
recommendation, particularly for the
amenity space that was showing
uncomfortable conditions at both the
northwest and southeast corners is going
to be important to making that
comfortable year round. But also some
consideration or more consideration or
design changes that will help to
mitigate more of the wind impacts that
this building will be creating, not just
in the amenity space, but around the
building. and uh around in the
neighboring sites as well. Um and
overall I think I'd recommend looking at
a reduction to the 700 or reducing down
to that 750 m square floor plate to be
within the tall buildings design
guidelines and also that might help you
address some of those um wind concerns.
I don't have as much of a concern with
the sun shadow as you've illustrated. it
doesn't look like there is any
additional negative impacts happening on
the park. So, thank you for providing
that. Uh, and overall really happy to
see new development coming forward. So,
thank you. And that is all of my
comments.
>> Thanks, Jen. Sharon,
>> great. Thank you. Um, so overall, I
think the density is great. No issues
with the height um of the building. Um,
where my concern is is more in the
detail of the base of the building and
particularly you putting a lobby in the
lane way. I know you like to do it on
the quieter street and I agree with
putting on a choir street, but when
you're calling it a laneway or a service
lane way, I don't think it's appropriate
to put a uh building entrance along
that. So, I would suggest you actually
flip the building to the other side.
particularly if Katherine is going to be
a two-way street, it will probably slow
down in traffic and become more of a
pedestrian-oriented street. Um, you
showed a really good example, too, of a
heritage building in Hamilton, um, with
a building above it. And in that image,
you noted that there's a bit of a
setback to a structure when you have a
designated heritage building. and I
don't see that in this particular
example that you've provided. Um it
isn't really a celebration of a the
designated building. So I'm just
wondering if you can maybe explore at
least on the Bowen side um if you are
planning on leaving the residential
entrance there uh maybe a bigger
celebration to the heritage building
because you're making it a much more
elevated street in that case. Um, I
always like to see eyes on the street
when you do an entrance way. And um, a
laneway is never really an eyes on the
on the street um, area, particularly um,
in a downtown area. So, um, yeah, other
than that, I mean, uh, good thing you're
putting density in the downtown. It
needs more pedestrians, so that's a
great thing. And I just want to see a
little bit more, um, emphasis put around
the pedestrian realm, around the
building.
That's comments for me.
>> Thanks, Sharon.
>> Your comments.
>> I guess um yeah, thank you again for
your presentation. Uh my comments echo a
lot of uh my panelists. Um and maybe
just to tie them together a little bit.
Um Eric's comments on the kind of the
location of the site and the proximity
to downtown and all of the kind of
transit. Um completely agree. And is
there a negotiation to have with the
city about parking reduction? Maybe like
I enjoy the idea of it being able to be
future proof to convert to residential,
but the the the weak spot in the current
design is the relationship to the
historic building. So, if you could
achieve a parking reduction and pull
that podium back from the historic
building, um that would be uh a much
greater celebration of it in my opinion
and would give the historic building
like an opportunity uh for future
development uh that would, you know,
help out your neighbor. Um my other
comment is tied to uh the celebration of
the kind of the retail entrance off of
Maine. It kind of has the feeling of a
grand mall entrance, which I don't think
is the kind of texture and scale of
retail that you're looking for. Um, it
doesn't doesn't suit a kind of
pedestrian walking environment in my
opinion. Um, and I think it could be
toned down uh and simplified um and
would be more successful.
>> Thank you.
>> Thanks, Tyler.
Uh, in summary, I I I will echo many of
the things said and I agree with my
fellow panelists, but could you flip to
a series of renderings that show the
whole building and and we can maybe walk
around?
>> Sure.
>> Just summarize some of the comments.
>> I think we start right
uh let's start here.
>> Yeah, that's great. So I I agree with
comments that have already been said
about a successful uh uh treatment of
massing and texture. Um I I I like the
play of the color and and the
um variation of the of the mullions
in treatment
going up the building and and the
separation of the the base and the the
the podium, two pieces. and then
stretching up to the tower. I think it's
really well done. There's a nice subtle
play there that uh breaks down the mass.
Um I think that's really well done. Um
one concern there on the side elevation,
if you flip to that one that's next to
the heritage building
>> and and uh to echo Tyler's points,
um yeah, we can see it here. Um uh so
but there's a 2 foot n gap there and I
guess that's you know as much as you
need maybe for shoring. Um uh I don't
know how you're even going to get there
in there and finish the building the
outside of your building. Uh so it I
mean that's means the methods up to you
but um I think the the treatment of the
podium there with and I recognize those
are spandreal
uh panels in the in the openings in the
beige ephus. Um so it's it meets the the
uh exposure to the property line
regulations but but that pattern is sort
of just truncated at that roof line. And
I wonder if there's a different way. It
maybe it need just needs some study on
how to how to recognize that building um
just in treatment. I echo Olga's
concerns about the ethos and I um I I I
don't mind it on on floors above the
beige beige colored podium. Um but I
think that that beige band is so
celebrated and it's really really well
done. Um,
uh, even some some pre-cast or or
fabricated stone, something that just
elevates the level of quality would be
really nice there.
Um,
talking about the property lines, it it
appears that the terraces that are in
Catherine Street go out over top of the
rightway. So, I guess that's going to
have to be sorted out with the city when
you get to to a building permit stage.
Um, I echo uh Jen's comments on the the
unit mix. Um, really nice to see uh your
dedication to a higher number of
two-bedroom units. I I think that's a
really good move. And I also echo Jen's
comments about the um the unsafe wind
condition on the terrace on that lower
corner. Uh there is a recommendation in
the wind study for for a a protected
wind panel. That terrace is so important
because these are urban dwellers and
this is a very urban site built you know
lot line to lot line. So that terrace is
their outdoor space. So um quality
landscape design is going to be really
important I think.
But otherwise, a very successful uh uh
submission. I I congratulate you on a
job well done.
Uh we went a bit over time just because
there was that tech pause in the middle,
but um we can go a bit over time more if
you have any comments on what you've
heard.
>> Ryan, did you want to add anything?
No, I think maybe um maybe the just one
quick comment on me on on Bowen like I
guess I wouldn't It's funny it it it is
a street for all intents and purposes.
It is not an alleyway. I think so I just
didn't want I hope I didn't confuse
anyone with the characterization of
that. It it's a street. It's got
ashvall. It doesn't have curbs and it
was an alleyway with services in it, but
it's bigger than your typical alleyway.
So, it's kind of in between. So, I don't
know if that changes any comments with
respect to the case of the of the
residential entrance, but I I just
wanted to highlight that it's not your
sort of if we're familiar with Hamilton,
the alleyways we see behind houses. It's
more of a urban wider street alleyway
for lack of a better term. So, that's
the only thing I just really wanted to
clarify.
>> No, I think from the architectural end,
I've taken lots of notes and appreciate
the comments and and we'll certainly
take them to heart as we move along.
Okay.
>> Yeah. I just wanted to say thank you to
everyone for your uh participation today
and your comments. These were really
great. I've done a few of these and we
always walk away circle back with the
team and uh take these comments
wholeheartedly and ultimately lead to a
better development. So, thank you very
much.
>> Okay. Thank you for a great submission.
Thank you for everyone in attendance and
we'll now adjourn the meeting.
>> Okay. Thank you everyone. Take care.
Take care. Bye.