Heritage Permits Approved, Process Review Underway - 19 May 26
Hamilton · May 21, 2026
Check one, two. Check one.
Karen, it looks like we're live, so I'll
turn it over to you to go ahead.
>> Okay. Thank you very much.
Uh members of the public are advised
that individuals and the media may be
audibly and/or visually recording this
meeting. I would like to call this
meeting of the heritage permit review
subcommittee May 19th, 2026 to order.
And please note that quorum is present.
Uh committee, you have before you the
agenda for this meeting. May I have a
motion to approve the agenda as
presented?
See Graham
and Steve. Okay.
Is there anyone opposed?
Okay. Um and also Carol again um if you
um since I can't see you on the camera,
if you can raise your hand, if you have
um you need some attention, just do it
that way. That would work out fine.
>> Okay. Thank you.
>> Okay. Thanks. Um All right. So, uh,
seeing no one opposed, that motion is
carried. Are there any declarations of
interest today?
Okay. I see no declarations interest.
Um,
now you have before you the approval of
the minutes of the previous meeting,
HPRC
26004,
April 2026. May I have a motion to
approve the minutes as presented?
See Andy and I see Graham.
Thank you. And is there anyone opposed?
See none. That motion is carried. And
onto the heritage permit applications
for this evening, which is found under
section six of your agenda.
So the first permit we have this evening
is for uh HP 202616
pertaining to 19 Mil Street South in
Flamborough which is part of the Mil
Street Heritage Conservation District.
So part five property um and the
application is for repairs to the public
facing facades of the property including
stucco repairs and infill of holes in
the stucco and repair and replacement of
fascia boards where necessary. Uh, do we
have the applicant or representative the
applicant here to speak to the
application?
>> Hi Karen, I'll be speaking to the
application.
>> Uh, is that uh is that Lisa?
>> Yes.
>> Yes. Okay. Sorry. Okay. Um, great. Um,
so Lisa, is there anything you'd like to
add to what we already covered?
>> Uh, nope. This is So this application is
a result of a property standards bylaw
uh property standards order um for
repairs to the property. There's a
number of items on the order, but this
is the only one that does require a
heritage permit. Um, so we're just
looking to have the contractor confirm
how they're doing stuckco repairs and
the replacement of those fasia boards
where necessary.
>> Okay.
>> Happy to answer any questions.
>> Thank you. Yeah. Are there any questions
from the committee for Lisa?
>> Uh, go ahead, Graeme.
>> Yeah, from the pictures I couldn't see
the holes in the stucco you were talking
about or the bad stuckco. Is it really
obvious or is it just minor stuff that
you want to get in front of?
>> Uh, it's it's more minor in nature.
There's a few um holes that are probably
like an inch or two in size. Um, so they
might not show up in the photos, but
there are a few of them scattered around
the the property. Um, I can try and draw
attention to them. Um, if I share my
screen,
let me just give me one moment.
Uh, so it's some of the the holes like
this one here, um, if you're seeing my
screen.
>> Mhm.
>> And then there's one further up. Oops.
Over here.
And
I believe there's a couple others.
There's another here. And then there's
the cracking at the base of the
building. Um, so really just looking to
make sure that those are shored up and
then um addressing those concerns.
>> Okay. I'm assuming the hole in the
roof's been repaired since this
picture's been taken.
>> Uh, yes. That is work that doesn't
require a heritage permit. So, we've
asked them to do that um as soon as
possible. So, the contractor should
already have been on site doing that.
And if not, they'll be doing it as soon
as possible.
>> Okay. Thank you. And uh yesterday I got
contacted by Devon and Thompson. He sent
me an image of this house that was taken
either by himself or someone he knows
recently and glass has been broken in
that gable window.
>> Okay.
>> So, that's going to have to get uh
sealed up as well.
>> Sure. I can flag that for the property
standards um officer and they can add
that to the um list of items that the
contractor will be on site completing.
>> Okay. Do you want me to forward you that
picture?
>> Uh sure. That would be great. Thank you.
>> Okay. Thank you.
Okay. Thank you, Graeme. Uh, are there
any further questions from the
committee? Andy, please go ahead.
>> Yeah, through the chair. Um, this
building has been flagged for quite some
time. Uh, and even to the point of uh,
our committee, the what I don't know,
Mr. Paris Committee had contacted the
owner back in 2013 and asked what his uh
um idea of what he wanted to do with the
property. Uh the property was uh um or
the building was in really rough shape
um just recently. Uh in other words, the
hole in the roof as Graeme was
indicating that there was a massive hole
in the roof and then they tarped it
over. Every window was smashed out. Um
uh so um at the time, this is going back
to 2013, they they didn't want to do
much with the building uh and said that
the chances are they might redevelop the
property at some point. This is uh going
back over 10 years now. Um so now what's
happened is that the smash out windows
they've replaced with plywood. Uh the
plywood has been um painted black and
the roof has a new roof has been put on.
A new uh roof is uh covering the hole.
Um so I'm just curious and this is more
a question towards staff. Um, is there
any um idea of what Atri uh um
transportation um uh you know school
busing owns the property? Um of what
they intend to do with the building cuz
at one point they were considering
tearing it down and it was in such bad
um uh condition it was almost going to
fall down. And uh they have done some
movement to uh um you know correct uh
the leaking roof and the smashed out
windows because at one point there was
glass all over the sidewalk. Um and that
has been cleaned up and the plywood that
they put over the windows is now painted
black. Uh this is a property which is
very prominent when you enter uh Mil
Street uh um heritage district because
it's coming up Mil Street South. Um, and
just as you enter town, um, it's right
on the sidewalk. It's, uh, um, so is
there any thought of what's happening
with the building or are they just
sealing it up? Because now I understand
that they're asking to fix the the Sucko
and what have you, and they fix the roof
and they've got black painted plywood
over the windows. So, I'm just curious
on has there been any um discussion on
what what's going to happen with the
windows and with the building in
general.
>> Yeah, thanks Andy. So, Alyssa Golden,
cultural heritage program lead. Uh to
date, we do not have any planning act
applications or any other sort of
proposals for the site related to this
building. Um, and to clarify, uh, as
Lisa just spoke to, um, this is in
relation to a property standards order,
uh, required to maintain the building as
per our property standards bylaw. Um,
this work is being coordinated by our
municipal law enforcement officers and
the city. So, it is not being
coordinated by the owner.
>> Oh, thank uh, thank you, Alyssa. So, um,
okay. So,
is property standards okay, which is
fixing the roof and having boarded up
painted windows in an entrance of a
heritage district um within the city
because they are cleaning it up a bit,
but they're certainly um not fixing it
up, putting in windows, uh doing
anything with it. It's almost like
sealing it up. But, uh, is that going to
be okay with property standards, um, or
okay with Heritage being an uh, heritage
district?
>> To the chair.
>> Uh, great great followup question, Andy.
So, through the chair, um, what we are
able to do as a city is in relation to
our property standards bylaw. So, the
boarding up of this vacant building, um,
painting the hoarding black, those are
specific provisions within the property
standards bylaw for vacant designated
heritage buildings. Um, so we only have
the provisions of that bylaw in terms of
the interventions that we are doing.
They're only being done now by city
staff because the owner has not acted on
um the order for the work to take place.
So now city is actioning that work. So
that's really the the scope of our
ability as a city in terms of ensuring
that the property is sound um the in
terms of being um safe from trespass or
breaking and entering uh and that it's
meeting all of the property standards
bylaw requirements in terms of
maintenance.
>> Okay. Thank you Alyssa. So, um, my last
point would be, um, within the Heritage
District, um, any kind of work is all to
do with streetscape and how it's going
to look, uh, in the neighborhood, how a
building looks in the neighborhood. So,
now you've have, uh, an abandoned
building. Basically, it hasn't had
anything in it for over a decade. Um,
and now they fixed the roof and they've
put plywood over it and painted it
black, which might be okay with bylaw.
Um but is that okay with uh Heritage um
regarding having a building like that
that could be like that for decades um
because nothing has happened probably in
the last 12 years on that building
through the chair.
>> Yeah, thanks Andy. So to clarify there
in the property standards bylaw there
are general provisions for all
properties regardless of heritage status
and then there are additional provisions
for designated heritage properties like
this one in the in the Mil Street
heritage district. that requirement to
paint the hoarding black is a heritage
specific requirement that speaks exactly
to what you're getting at in terms of um
the optics of these buildings. So the
goal of painting the hoarding black is
to have it read as though it's a window
uh to try to improve the aesthetics and
also make it seem like it's more cared
for. Um so those are specific provisions
for designated heritage properties that
were developed in consultation with
heritage staff when the property
standards bylaw was updated at the time.
Okay. Thank you. And and one last point
uh to the chair is is there any timeline
that um these small um
improvements, if you want to call it
that, I'll use that lightly, but uh um
can stay in place or it could it be
another decade that this building is
just boarded up on the the main street
as you enter the heritage district in
Watertown?
Thanks Andy. Through the chair. So with
this being a vacant heritage building,
it is now monitored regularly by
municipal um municipal law enforcement
staff. Um so the this current order
that's being actioned is a result of the
proactive monitoring of the building. So
municipal law enforcement staff will
continue to do that as per the vacant
building registry requirements. I
believe it's quarterly that they attend
sites. So if any um new trespass or new
issues are identified through those
subsequent proactive visits then then
there might be subsequent orders to deal
with those.
>> Okay. Uh thank you. That's all I have.
Thanks Louis.
>> Thanks Andy. Yeah I I uh understand your
concern. I think honestly there's the
same kind of issue in a building in
Dundas as well which is designated and
which is vacant and we have no idea
what's going to happen to it, right? And
it's all the windows are broken. Alyssa,
we may want to look at that as well for
painting those windows black on Two Hot
Street. I know. Sorry, off topic. It's
back onto the agenda. My apologies. Um,
okay. So, may we see the proposed
conditions, please, Lisa or Kira?
So the two standard conditions at the
bottom and then the uh uh specific
conditions for this that the final
details of the proposed repairs to the
phase should be submitted and uh for
satisfaction approval prior to
commencement and that the proposed
masonry restoration work conforms to the
city's masonry restoration guidelines
and the final details and specs be
submitted uh prior to commencement. So H
um may I have a mover and a seconder to
recommend approval of heritage permit
202616
uh subject to these staff recommended
conditions?
Moving a secondary. I see Graham and I
see Steve and uh is there anyone
opposed?
Okay, seeing none, that motion is
carried.
Thank you.
Okay. On to uh secondary second uh
application for this evening. HP 202614
uh pertaining to 120 Slair Avenue in
Hamilton, which is part of the St. Clair
Avenue Heritage Conservation District.
So part five property and the
application is for masonry repairs along
the primary facade on the east elevation
and south elevation including repointing
with lime mortar tinted to match the
original construction
reconstruction of the stair wing walls
and replacement of approximately 15
bricks with new clay pressed bricks
where necessary. Uh is the applicant or
the owner here to speak to the
application?
Yes.
>> Is
going off mute. Um yes, I'm here.
Elizabeth Nami.
>> Okay, great. Thank you for joining us.
So, um if you have anything, you know, a
few minutes to uh you have a few minutes
to speak to anything further that you'd
like to explain to the committee before
we go on to deliberation and some
questions.
>> Um no, I I feel like you covered it.
It's it's pretty simple work.
>> Yeah. and and the committee has seen uh
the photograph so I believe um they have
a good idea of what the proposal is. So
yes
>> um committee do you have any questions
or uh clarifications for Elizabeth
please?
Okay, this is uh unusual. Usually they
have something. Okay, that being said,
then maybe we see the proposed
conditions for uh this application.
Okay, so uh the two standard conditions
and completion by May 31st, 2028, so two
years from today. and um that the
proposed masonry restoration work
conforms to the city's ma masonry
restoration guidelines and the final
details and specs be submitted prior to
commencement of the alterations. So,
um may I have a mover and a seconder to
recommend approval of heritage permit uh
202614
subject to these staff recommended
conditions?
see Graham and I second her.
Thank you, Steve. Okay.
And is there anyone opposed?
Seeing none, that application or that
uh motion is carried. Okay. Okay. So,
Elizabeth, thank you for coming in. I
know it was brief. I really appreciate
it. Um, I know there's a lot of people
who who um come in to see us and we
really appreciate that you take the time
to actually check with Heritage before
you do make changes on these. So, thank
you so much and
>> my pleasure. I'm sure we'll see each
other again soon.
>> Absolutely. We will be here for you and
staff will follow up with you on next
steps. Okay. Thank you.
>> Thank you so much. Bye.
>> Bye.
>> Bye.
Okay. application uh item 6.3 on the
agenda HP 202615.
So this is uh 1280 Main Street West
Hamilton which is McMaster University.
So, it's a part four property and um
this application is for various
renovations to the interior of Alumni
Hall, including refinishing of interior
wood elements, including the coffered
ceiling panels, parket floors, wood
paneling, abudding the fireplace, and
interior surfaces of doors and surround
trim, which may include sanding,
staining, and or sealing the wood,
cleaning, and painting of the existing
plaster walls and removal of the
existing valances and draperies,
including any of the associated minor
plaster repairs.
Uh, also various renovations to the
exterior of Alumni Hall, including
replacement of existing wood guard rail
with new engineered aluminum and glass
guardrail system, replacement of
existing seconds story window assembly
at office 203 with a new system similar
to past replacements in material and
pattern, and repair of brick veneer
damage from redundant service equipment
anchorage.
And please note that this uh property
did receive conditional approval from
the Hamilton uh heritage permit review
committee for heritage permit which
included a similar scope of work in 2023
under heritage permit HP 2023 023 and
that was approved in July 2023 and it
has expired as of July 2025.
So that's why uh they're back again. So,
do we have a owner? Well, the applicant
here representative to speak to the
application.
>> Uh, yes, that would be myself, Ed Shook.
>> Okay. Welcome, Ed. Thank you for joining
us. Um, is there anything further that
you'd like to add to the description of
the proposal?
>> Uh, one item that, uh, I think I caught
uh, as you were saying at the beginning
there, uh, the Coffford ceiling. Um,
they're not they're not doing any work
on that this time around. They decided
not to forego any of the work on the
wood surfaces uh which is a majority of
the work inside the home. Um they're
going to limit doing to the painting of
the uh the plaster. Um the redoing of
the u the parket floor and addressing a
couple of doors at the I believe it's
the south end of the building or the
room rather. Um much like it was in the
the previous scope.
>> Okay. Okay. And will there be is there
still work a proposed work on the
paneling abing the fireplace?
>> No.
>> No. So that's removed as well.
>> Just plaster.
>> Yeah.
>> Okay. And the park
>> it's a little reduced. It's the parking
floor is in. Yeah. They're going to
they're going to work on that. Yes.
>> Okay. Okay. That's in. Okay. All right.
So, um just to be clear, I'll read this
out again just to make sure that I
haven't uh taken out too much. So, it
would be refinishing of interior wood
elements um such as the parkquet floors
and interior surfaces of doors and
surround trim which may include sanding,
staining and or sealing the wood. Does
that sound appropriate? Okay, great.
>> Okay. Um uh do we have any questions
from the committee for Ed?
>> Uh please go ahead Graeme.
On your previous uh conditional permit,
was any of the work that was scoped out
done?
>> Uh no. No. Due to budgetary constraints,
they uh they shelf the whole project.
>> Okay. And the I was going to just going
to confirm. It doesn't look like it to
me, but the handrail you're replacing is
a modern handrail. Correct.
>> The handrail that we're replacing is an
old wooden handrail. Replacing with a
modern system. Yes.
>> Yeah. So, I mean, it's not like it's a
1920s30s handrail. It's more like a
mid-50s60s.
>> Yeah. Yeah. It's not pressure treated.
You It's kind of a do it yourself you'd
see on your your tech at home.
>> Yeah.
>> I just wanted to confirm that before we
approve taking it out if it was new or
old. Thank you.
>> Okay. Um, do we have any other
questions, clarifications?
>> All right. Um, okay. May we see the
proposed conditions, please?
Thanks, Cara. So the two standard
conditions, the bottom two, and um the
three specific conditions to this
application, that the proposed stain be
submitted to the satisfaction approval
priority installation. The final details
of the railing design be submitted and
that the proposed masonry work conforms
to the city's masonry restoration
guidelines and final details and specs
be submitted prior to commencement. So
okay. Um, may I have a mover and a
seconder to recommend approval of
heritage permit 202615?
I see Carol and I see Sandra. Great.
Thank you.
And is there anyone opposed?
Okay, see none, that motion is carried.
Okay, Ed, thank you. Um,
appreciate you coming in. I hope uh we
get it finished this time around.
>> Yeah. Okay. And staff will follow up
with you on any next steps. Okay. Thank
you very much.
>> Thank you very much.
>> Have a good evening.
>> Okay. Um application uh item 6.4 on the
agenda. Uh, application HP 20226013
is 64 Hat Street in Dundas, otherwise
known as the Gart Shore building, which
is a part four property recently
designated. And um this is a a lot of um
work they have planned and I will read
it out to you because it's u restoration
of 24 fixed wood windows including
reglazing using linseed oil glazing
compounds retaining original glass where
possible replacing broken glass with
heritage glass which matches the
existing historical character and
replacing mountains styles and rails to
a match to match original profiles. Also
restoration of 13 double hung wood
windows including cleaning and
reinstallation of original hardware,
glazing windows using linseed oil putty
and reinforcing sash joinery using
waterproof glue and hardwood pegs.
Uh third point, installation of new
window sills, including installing
custommilled sills made from Douglas fur
to match existing historical character.
uh stabilization, repair and refinishing
of the exit exterior face of the primary
entrance, including installing custom
milled slats to match existing heritage
profiles and replacing the rotted wooden
slatted pro panels.
And finally, various masonry repairs in
various locations, including restoring
and repointing brick along the primary
facade and restoring and repointing the
brick chimney located on the west
elevation.
So, um, uh, the committee has received,
uh, background information, but is there
an applicant or representative
application here to speak to the
application?
>> Yeah, it's me, Graham McN from Tom's McN
Design here in Hamilton.
>> Okay, great. Thank you for joining us,
Graham. Um, is there anything you would
like to add, expand upon, um, what was
covered already?
>> I mean, I think that the the description
is quite uh, detailed. I don't know how
much I could add. Um, obviously the the
contractor they've engaged is uh
experienced and knowledgeable and uh you
know knows what he's doing here. So I
think anything he says I I I pale in
comparison his knowledge is deeper than
mine. So
>> Okay. All right. Well um I will then
open up to the committee if they have
any questions and um address to you.
Anybody have anything on their mind?
Okay, I see none. Um I know this
committee loves to see um you know when
you're using
>> I will if I could. Yes, please.
>> It occurred to me I we were here not
that long ago um doing facade
improvements on this as well. And just
circling back on the one element that
was the coping on top of the limestone
wall area. Um the owner has decided to
go with stone up there. So score one for
the heritage folks on that one. You've
made some people happy.
>> I thought I thought you guys might want
to know. So, or you folks might want to
know. So,
>> thank you. I appreciate that.
>> That really makes me happy because I was
the one that was fighting for it.
>> Yep. Yeah.
>> Thank you.
>> Okay. All right then. Um, let's see. All
right. Uh, if there's no questions then
on this application, may we see the
proposed conditions, please, Kira?
Okay. So, um the two standard conditions
and um that the proposed masonry work
conform to the city's masonry
restoration guidelines and the final
details and specifications to be
submitted to the satisfaction and
approval of director of planning and
chief planner prior to commencement of
the application of the alterations. Um
okay. So, may I have a mover and a
seconder to um
recommend approval
of heritage permit 2026? Uh my
apologies. Uh 013. Okay, I see Sandra
and I see Carol. Okay, great.
See,
and is there anyone opposed?
Okay. Seeing none, that motion is
carried.
Okay. So, um, thanks, Graham.
Appreciate you coming in and, um, yeah,
good luck continuing work on this
building. It's really happy to see all
these improvements coming. So, it's it's
really great great news.
>> Is doing a great job. So, thanks very
much.
>> Okay.
Okay. So, and with that, we will move on
to our last um application for this
evening.
>> I beg your pardon.
>> Bigger pardon.
>> Oh, somebody might have somebody might
have two computers on.
>> Two computers on.
>> Yeah, we're going to try to talk. Let's
see what happens. Let's see what
happens.
>> All right.
causing a problem, I think. I think
>> I've been on a while.
>> Okay. Has anybody changed any settings
lately?
>> Through the chair, sir. Karen, Alyssa
Golden here.
>> Could we ask you to maybe turn your
speaker down? It's causing
>> Is he watching?
>> I can't hear I can't hear anything on my
end.
>> Yeah, but are you watching the live
stream at the same time you're watching
this?
>> No. No. I've just I got your WebEx open.
That's it.
>> It's really doubling back.
>> Doubling back.
>> Let me let me try my headphones and see
if that solves it.
Okay, let's see. How's that now?
>> That's good. Okay. Can you hear us? Can
you hear us, Charles?
>> Can you hear me now?
>> Yeah, we can hear you. Can you hear us
>> there? Can you hear me?
>> Yep, we can.
Is that okay?
You can't hear us? Can you hear us?
>> I could hear you now.
>> Yes, that's good.
>> Yes, that's good.
>> Okay, we'll see how this goes. All
right, one application left.
>> One application left.
>> HP 2026,
>> which is 7 John Street East in
Flamborough, part of the Mil Street
Heritage Conservation District, part
five property. And so it is pertaining
to demolition of the existing
contemporary one-story detached garage
and construction of a new 1 and a half
story detached structure including
ashvalt shingles color match the
existing dwelling board and batten
siding a solid wood door vinyl windows
and doors white prepainted aluminum
eaves trough vented sophet and fascia
and a covered front porch and decorative
gable trim and shutters.
So, um, with that description, is there
anything, uh, Charles that you would
like to add to this before the, uh,
committee begins deliberations?
Uh, you may be on mute.
>> Sorry, Karen. through the chair. Um, the
echoing was still happening, so we had
muted Charles while you were talking.
Charles, I think you just need to unmute
yourself now before you talk.
If you are Charles, if you're looking at
the meeting screen, um, at the bottom of
WebEx, it should say mute, unmute,
start video. That's where you'd find the
the button to unmute yourself.
>> Also, the space bar, you know,
Okay. Do the standards Windows fix a
reboot of sorts?
through the chair Karen. Yes, it looks
like Charles is just leaving and
re-entering. So, if we just give him a
minute if that's okay.
>> Absolutely.
>> Great pace tonight, by the way, Karen.
>> Well, it's because everybody is coming
prepared, having their questions. It's
excellent
>> that Garore one for a complex amount of
work. It was beautifully documented.
>> Yeah, great pres like Yeah, exactly.
Didn't lead to a lot of questions
because it's so well written
and through the share. Yes. It's always
great when you have all the specs of
what materials are being used for the
application as well.
>> Can we can we hear me now?
>> Oh, there we go. Wonderful. Thanks,
Charles.
>> Is the echo gone? Sorry. My apologies.
>> Hey, I think it sounds great.
>> Okay. So, Charles, um, do you have
anything you would like to add to, uh,
or expand on for the committee before
they ask any questions they have?
>> Uh, no. So, I was saying your your
summary, it's very it really captures
everything we're doing. Um, that along
with the plans that uh were previously
provided. Um, the only thing that we did
provide that I'm not sure if the
committee does have is a site plan that
shows the new building relative to the
existing building. Um, but we're I'm
happy to share my screen uh if that's
possible and you can see that. Um,
conditions, we're fine with all those.
So yeah, I'm really I'm really just
happy to entertain any questions or or
comments that the committee might have.
>> Okay. Um I think it's he can share a
screen, correct stuff?
>> Yep, that's correct. He should be able
to share.
>> Yeah.
>> Let's see how this goes.
Okay. Any chance of sharing?
>> Yeah, we can see that.
>> Perfect. So, um, John Street would be to
the bottom of the page. Uh, the existing
dwelling being light gray there. Uh, the
new proposed ADU, Bach ADU in the back,
darker gray.
And if you notice, there's a a faint
dashed line that it's sitting over top
of which depicts the existing structure
there. So, our new building is
essentially in the same spot and the
same size as what's currently on the
site. So, as far as impact from the road
and neighbors, there should be little
little to none. It'll it'll just look
like a new refreshed uh structure in the
yard at the back of the back of the
property.
>> Okay. Thank you. Um, all right. I guess
then we could take questions from the
committee. Um,
is there anybody who has anything they'd
like to ask?
>> I
go to say
>> I know I don't live in the neighborhood,
but this looks like to me a contemporary
garage coming out with a newer old older
looking building going back in. So
really the view from the street is not
even going to be impacted. I have no
issues with this project at all.
>> Thank you. Are there any other
questions?
Uh Andy, please go ahead.
>> Yeah, through the chair. Um uh I sort of
uh mimic Graham's um thoughts. It's sort
of a building that uh uh that I don't
know what the age of the garage is, but
uh I don't think it'll uh affect the
streetscape whatsoever. Um and it looks
like it uh might the newer version might
fit better um within the neighborhood
than the existing.
>> That's all I have right now. Thank you.
>> Okay. Thank you.
>> Are there any other questions?
I guess I just had um one question. Um
in comparison to the current structure
that's there. Is this significantly
taller or is it about the same or
>> not significantly taller? Maybe about uh
5T give or take taller and it's only in
the roof structure. We're proposing a
steeper roof u just so that they can
accommodate a small loft area built into
the roof. That's the extra half storage
for the walls. The walls themselves are
the same size as what's out there right
now.
>> Okay. All right. Okay. Thank you.
>> Any other questions?
I'm not seeing any. Um Okay.
Um may we see the proposed conditions,
please, Kira?
Okay. So, the two standard conditions um
with a 2-year um deadline for completion
and the additional condition is that the
final details of the windows and siding
and roofing materials be submitted to
the satisfaction and approval of the
director of planning and chief planner
prior to installation.
>> Um,
>> sorry, I'm I'm sorry. I have different
conditions here than you have there.
>> Oh,
>> actually, not not even different. Just
the dates in mine. I've got a longer a
longer time than you have there.
>> Yeah. And I saw a draft version as well.
So, I'm not sure maybe um staff could
speak to that because generally it is a
two-year date and I wasn't sure if this
was being given a three-year date for
some other reason.
>> Uh yeah, Karen. So, through the chair um
we did discuss doing an extended date.
Um and also it should read August uh
30th or 31st uh 2028 or 2029.
um just because it is a larger project,
they'll need full uh they'll need a
demolition permit as well as building
permits. Um and the current rate of
construction is sometimes a little
slower than anticipated. Um
additionally, just flagging that because
this is a part five property, it will
need council approval. Um so by the time
it goes to council, the the approval
date will likely be closer to August. Um
which is why we've changed the date a
little bit as well.
>> Okay. So the condition would be then
August 31st, 2029. Is that correct?
>> That's correct.
>> I think that's what's on the um agenda
>> through through the chair again, Alyssa
Golden, culture heritage program lead.
Maybe I think as we were preparing the
draft slides, um there might have just
been a copy and paste. So could I ask
Lisa, would you be able to just pull up
the note sheet which has the
um proposed staff conditions that
Charles was mentioning as well? We'll
just make sure it's in front of all of
you before you take your vote.
Okay. So, that looks the same except for
the revised date. So, okay. With um this
in front of you then. Um, may I move may
I have a mover and a seconder to
recommend approval of Oh, did someone
have a comment? Oh, yes, Sandra. Sorry.
Oh, sorry. You're moving and seconding.
Okay. Um, mover and a seconder to um
recommend approval of HP 202612
7 John Street East in Flamborough with
the proposed conditions. And I see
Sandra and I see Andy. Okay.
And
is there anyone opposed?
Okay, seeing none, that motion is
carried.
So, um yes, thank you for coming in,
Charles, and um
>> and uh staff will be following up with
you on next steps then on this approval.
And um good luck with your project.
>> All right, thank you very much, guys.
Take care. Have a good night.
>> Okay, you too. Take care.
Okay, so now um we have one more item on
our agenda then. Do we have time to deal
with uh this this evening staff? What
what is your recommendation?
>> Yes, thanks Karen. Um so originally I
mean you guys flew through this agenda
which is fantastic. Um the original plan
was to just uh give an initial verbal
update and then we'll do some
consultation with you folks on this item
at the next meeting. Um so I'll proceed
as planned with that but uh yes, too
bad. that I should have planned to give
you the the full presentation and done
it today. Um, so if it's okay, I'll just
I'll just uh jump into this. This is an
update from staff on the heritage
process review. Um, some of you might
have been aware of this. This project
goes back um actually commenced in 2014.
There was a direction from um council
through planning committee for staff to
take a look at our heritage permit
process. And this had come out of some
questions around how permit review used
to function and how we interpreted
different types of applications for
permits like alterations versus partial
demolition. Uh really stemming from the
James Street Baptist Church um parish
permit at the time. Um so that had
resulted in staff reporting to planning
committee with the terms of reference
for this process review which then also
at the time included our designation
process. Um so work had really uh been
done between 2014 and 2016 on this
project. Uh we did a significant amount
of work in terms of best practice review
comparisons provincialwide. We had
consulted with the heritage committee at
the time with this subcommittee uh with
advisory groups with key stakeholders
designated property owners and as well
as municipal heritage planners across
the province. Um, and that resulted in a
stakeholder workshop that we held in
November 2015. And there was a summary
report for that workshop that used to be
on our website which is now down but
will be circulated to this subcommittee
before uh the next time we engage with
you next month. Um but just wanted to
give that background on great amount of
work that was done previously but
unfortunately um didn't cross the finish
line and since then we've had a number
of legislative changes and process
changes that have just happened
naturally without this process review um
being completed.
Um and that includes um really
formalization of how this subcommittee
works. Um, part of the issue was a lack
of transparency and posting of agendas
at the time. That's all been sort of
dealt with already through clerk's
implementation. So, a lot of those um
administrative challenges and issues
that were identified previously have
been addressed through updates to how
the subcommittee functions. Um and then
we also saw some other legislative
changes like provincial changes to the
Ontario Heritage Act. Um Bill 108, Bill
23, if folks are familiar with the bill
names and the various changes since 2018
and now um that have uh sort of forced
some other improvements that would have
been addressed through this process
review, including we've already updated
our designation process. So that
component of the process review has
already been taken care of. Um, and then
more recently, staff have just circled
back and wanted to close the loop and
address the heritage permit um, process
review component of the project. And we
did some preliminary consultation with
some internal staff working from that
original um, set of recommendations that
were at that uh, stakeholder workshop
that I mentioned back in 2015, seeing
what's still needed to move forward,
what's already been addressed. Um so
next month we'll come to you with a more
detailed presentation on what those um
proposed changes could be to get your
feedback on those. Our goal would be to
hopefully bring forward any recommend
recommended changes to our um heritage
permit process before the next term of
council and the new term of the
subcommittee. So we're sort of starting
fresh at that point. Um, but we'll go
into more detail next month, but
essentially this would be looking at
just how do we potentially streamline
our permit process. I know we've had
some conversations about certain types
of applications
um that maybe the subcommittee doesn't
need to see that are very
straightforward. So whether those could
potentially be delegated directly to
staff, that's probably the biggest part
of um the process improvements that we'd
be looking for feedback on. As this
subcommittee is aware, hopefully from
just your experience so far and the
training that we gave at the start of
this term, um the heritage act does
allow us to delegate council's approval
of heritage permits to staff. And our
current process here in Hamilton is that
delegation exists, but every permit has
to go to the subcommittee before staff
could potentially approve or approve it
with conditions. Um so what we'll
consult on next month is a list of some
types of applications. um that
potentially could be de delegated
directly to staff without the
subcommittee having to review. And then
that would hopefully decrease processing
times um require less staff resources
and really give you folks more time to
focus on the types of applications where
your feedback's the most valuable. Um so
looking forward to consulting with you
on those. Um, and I guess leading into
next next month's agenda, if there's
anything that you folks have any
questions about, uh, um, we'll circulate
the facilitator report I mentioned and
we'll provide some slides ahead of time
to really get you thinking. Um, but if
there's anything just with this brief
introduction I've given that comes to
mind that you have any questions about,
happy to answer that now.
>> Okay. Thanks. Yeah. Um, I mean that
sounds great, Alyssa. Especially, um,
getting the information in advance,
giving us a chance to think it through,
um, will be very helpful and hopefully
get some good feedback from people.
Any other thoughts?
Excellent. See, everyone is so
efficient.
Okay. Um,
okay then. Thank you. And um we'll look
forward to hearing the full
questions next month. And if there is no
further business, then I adjourn the
meeting at 5:48 p.m.
See you next month.
>> Good night all.
See you again.