Waterloo Advances Cycling, Sustainability Goals - 28 Sep 26
Waterloo · September 30, 2026
Well, good afternoon.
All right. Well, good afternoon,
council, and uh welcome to the
continuation of our meeting this
afternoon. So, I just would like to
start with a territorial
acknowledgement.
As we recognize the National Day for
Truth and Reconciliation on Wednesday,
September 30th, I acknowledge the
indigenous peoples who have cared for
these lands since time in memorial. I
honor the survivors of residential
schools, the children who never returned
home, and their families and
communities. I recognize that
reconciliation requires more than words.
It calls for listening, learning,
reflection, and meaningful action. I
remain on a learning journey, and I'm
committed to deepening my understanding,
confronting the ongoing impacts of
colonialism, and carrying what I learn
into my actions and relationships.
My own connection to the land has been
shaped by living in Woodstock,
Kitchener, and now Waterlue. I recognize
Woodstock as being on the traditional
territories of the Hodnoni, Lape and
Anage Abbe and within lands covered by
the upper Canada treaties. I also
recognize Kitchener and Warloo as being
on the Halddederman tract with
traditional territory of the Chinatan
Anesnab and Hodnon peoples. As I reflect
on the places I have called home, I'm
grateful for the land and waters that
have sustained me and acknowledge my
responsibility to learn about their
histories, honor the enduring presence
and contributions of indigenous peoples,
and deepen my relationship with the land
through respectful action.
As a city, we encourage everyone to take
time to deepen their understanding of
the residential school system and its
lasting impacts. Reconciliation is not a
single day or action. It's an ongoing
commitment to build respectful
relationships, advancing understanding,
and taking meaningful action. There are
a number of events and activities that
will take place in our community, and we
encourage everyone to find the time to
participate in some way. City services
will remain open, but staff will spend
time reflecting and learning. As a city,
we reaffirm our commitment to
reconciliation work and to supporting a
community where future generations can
thrive.
Under our moment of reflection,
the city of Waterlue would like to
recognize the legacy of Dr. Ron
Schlleggo.
The city of Waterlue extends its
condolences to the family, friends, and
many colleagues of Dr. Ron Schlaggel,
whose remarkable contributions as an
entrepreneur, educator, philanthropist,
and community builder have left a
lasting impact in our community. As a
professor at the University of Wateroo,
Ron played an important role in the
development of health studies and
gerontology,
helping to strengthen the connection
between academic research and the
well-being of our community. His
dedication to improving the lives of
older adults continued through his work
with Schlaggo Villages and the Schlaggel
University of Wateroo Research Institute
for Aging. His entrepreneurial spirit,
commitment to learning, and remarkable
generosity extended across many sectors
from agriculture and urban development
to health care, including mental health
and addiction care through Homeward
Homewood Health Center. He will be
remembered as a community builder who
helped make Waterlue region a stronger
and more connected place. Ron was a true
barn raiser in Waterlue region and his
legacy is one of innovation, compassion
and commitment to community. His
contributions to urban development,
mental health and healthy aging continue
to have an impact in water. On behalf of
the city of Waterlue, we extend our
heartfelt condolences to Ron's sons,
their families, and all those who had
the privilege of knowing and working
with Ron. As many of you may know, the
flags are at half mass in memory of Ron
Schllegel and all that he has
contributed to the city of Waterlue.
Uh council disclosure of Canary interest
and the general nature thereof.
Seeing none, we are on to presentations
and delegations. And our first
presentation is the museum. Welcome,
David. It's always lovely to see you
here.
Um, I'm here today to thank you for your
ongoing support of the museum and to
just give you an update. I had hoped to
do this before our opening on Wednesday
night, but um, working with the clerk,
it was best that I did it today. Um
so um just very quickly our our board
has turned over 60% in the last 18
months. Uh but we still have a pretty
stellar group of pe people uh leading
leading our mission uh which is
wonderful and represented representation
from across the region. Um,
we began, as many of you know, as a
children's museum 23 years ago with the
motto of art and technology at play. And
I've tried to stay true to that as it
was, um, such an important connection to
this community, the art and technology.
Um,
we're doing well. Um, we've been working
with the city of Kitchener for a couple
of years now to get to that sustainable
model that we all want.
um while trying to meet uh the demands
of a growing population. Um our numbers
have been increasing gatewise. Um we're
almost back to the pre-COVID numbers and
uh some of our past uh March break we
had the highest numbers of of the week
sort of the highest single day um
attendance and that type of thing. Um
and um last year our fiscal ended June
30th last year uh year-over-year our
date went up 20% and we achieved a
surplus um and um it's the highest
revenue ever for a number of categories
um from membership education camps and
so on. And this uh this summer we've uh
beginning the new fiscal we're doing
quite well. Um we've just finished Q
well this week we will finish Q1 um and
be have actually overachieved the
targets there. Uh we have some great um
speakers coming up in connection to the
Da Vinci dialogues. Um we recently had
uh Colonel Hatfield here in Waterlue uh
to a thousand people at Lazariti Hall.
Um we've got Bob McDonald from Corks and
Corks and Canadian astronaut Jeremy
Hansen who just went around the moon and
We're bringing Margaret Atwood back. Um
she was wonderful the last time we had
her here. Um
from Waterlue we have a good
representation and we try our best to be
Waterlue's museum as well. Um many of
our board are from from the city. Um Da
Vinci Dialogues both seven um from from
universities and areas including the
water cycling club who built um a Da
Vinci bridge in the hydro cut. I did not
know that, but they actually built a Da
Vinci bridge, um, engineered it, which
will be one of the dialogues. Um,
there there's a number of things as you
can see there. I'm sure you've had this
deck for a couple of days. Um, lots of
school groups and and different um
categories that represent approximately
25% of our of our um attendees and
guests that we have. U part of the the
Da Vinci um evenings on Wednesday nights
we will have be working with the button
factory to do some painting uh workshops
and so on. Um and I I've mentioned Da
Vinci a couple of times now and I hope
you've heard of it before now. Um coming
out of Wednesday we had um a lot of
media. I was very very pleased CBC and
Kitchener did a five minute segment on
the morning after which was picked up on
fresh air uh CBC across the province.
had some national um national exposure.
Um bottom line is we've had heavy media
earned media coverage for the show and
this past weekend on a glorious days
that we had weatherwise we had over,50
people come which is pretty large for
our organization especially on lovely uh
lovely days like we've had.
Um we've reached out part of my role in
this has been reaching out to the the
Italian community. um here and abroad.
Um we had the the ambassador open the
event on uh on Wednesday evening and we
worked with a number of of groups um
that you see up there including uh the
Hamilton in the G area um business
professional groups um they have large
Italian populations so we're we're
spreading the word. The show is in
partnership with the the Leonard Da
Vinci Museum in Rome which is kind of
fun. Um, and
the core of it to me is is the festival
that we that we put on. And um, we've
done this several other times with
Titanic and Boreh Hall and the Rolling
Stones and so on, but I'm particularly
pleased with how far we've uh we've
reached in terms of partnerships and so
on. Um, the the list on the left is what
we normally do and we've kind of
dainized it. And on the right is some of
the rooms that you will see, the
galleries that you will see when you
come to the show.
Um you can see the anatomy um drawings
up on the top right. Some of some of the
creations that were uh that he drew and
didn't necessarily build uh on the right
lower right and then the digital
immersive gallery IPO on the bottom
left.
The dialogues are um outstanding and um
it's not very humble of me to say but
ranging from Atwood and Hansen all the
way through six post university or sorry
postsecary um institutions including
Villanova in Pennsylvania and Carlton um
and obviously the local the local
universities here. So we're um we're
very pleased to have brought that to the
community. I want to thank you for your
ongoing support of the museum. We're
working hard to bring worldclass
exhibits here and uh give a reason for
people to to live and work here. So,
thank you very very much.
>> Thank you. Thank you very much, David,
for joining us today. It's always great.
I had to look up as you were talking the
Dainci Bridge because I hadn't seen that
design before. It has no um uh no nails,
no nothing. It's all self-supporting.
>> They would use they would use it um a
lot for the military 500 years ago when
they would
>> uh harvest logs and build it to take
things over the takeps
and so on. Um as an engineer, you can
come. You can actually try to build a
miniature one at the museum as part of
the display.
>> There you go. That's very
questions. So, thank you all very
>> um well, I'll just double check with
council um councelor Ray.
>> Thank you through you, Chair. Um thanks
again for this presentation. Um you did
make reference to um you know the the
sort of journey that you've been on over
the last couple years and we know that
key cultural institutions across the
community have definitely you know um
struggled with rebounding after the
pandemic area closure. So I just was
curious whether you could share a little
bit with us about what's working and
why.
>> Um what is definitely happening for us
is the attendees are coming back. the
guests are coming back. It's about
80,000 of the 100,000 prior to COVID,
which is is growing exponentially, as I
mentioned, year-over-year. And then this
summer was uh some of our largest
numbers. The rentals, um there was some
negative media about us, would we be a
be afloat and so on. So, we we took a
bit of a hit there for weddings and that
type of corporate events, but they're
starting to come back. Um and um this
the third sort of um bucket of revenue
if you will is around sponsorship and
grants and so on and those have slowed
not just with the museum but where we
used to enjoy a sponsorship at 25,000.
Now we're fortunate to get 10,000 and
and definitely the upper levels of
government provincial and federal grants
are just not what they were certainly
before co. So, we're working hard and
and this particular exhibit allows us to
to have something that will appeal to a
very broad demographic age- wise to CBC
listeners, university students, people
in Toronto. We've got advertising in
Hamilton, Toronto, Global Mail, Toronto
Star, and so on. But we also have that
family floor, and we don't want to,
that's our core market. Uh, so we're
we're working sort of two exhibits at
the same time. So,
Okay, thank you all.
>> I should turn my microphone on. My
apologies. Um, my next presentation is
uh with Christopher Hodson with regard
to the bike friendly communities awards.
Uh good afternoon, Chair Freeman and
members of council. Um so I wanted to
share with council uh the exciting news
that Waterloo has been designated a
platinum uh level bicycle friendly
community and also to acknowledge the
level of effort in achieving this
milestone as it's so much more than just
an award or a sign. It's a significant
commitment investment made to cycling,
active transportation and road safety
over a long period of time.
It is also a significant achievement
given decisions at the uh provincial
level which add to our own challenges
here in Waterloo of a growing
population, an intensifying city, public
expectation and the often competing
needs of the of limited space within our
roadways.
And I want to recognize my team for all
the effort and energy they bring each
day. And I want to acknowledge the
incredible support from teams teams
across the corporation in all that we
do.
The bicycle friendly community program
is administered by share the world
coalition and essentially the program
evaluates, ranks and awards communities
on how well they support cycling as a
mode of transportation for all ages and
abilities.
There are four levels of award and
Waterloo started out as a silver silver
level back in 2014. We progressed to
gold in 2018 and we've retained that
level in 2024 and now platinum. Waterloo
along with the city of Ottawa are the
only platinum level communities in
Ontario.
This program started out in the US in
the mid '90s and the application was
just four basic questions. Today's
application is more than 300 questions
requiring varying levels of information
and data in the responses. And it
doesn't just focus on cycling anymore.
Active transportation, transit, and road
safety all four major components of the
application.
The application is based on a framework
of key criteria collectively known as
the five E on the screen in front of
you. Education, engineering,
encouragement, evaluation and planning,
and equity and accessibility.
And communities that demonstrate
strength and commitment across all these
five dimensions and present a balanced
comprehensive approach are best
positioned to earn an award.
The bicycle friendly community
initiative is an important program for
the city as many of the goals and
objectives of the program align with the
city's strategic plan and transportation
master plan including objectives around
sustainability, road safety, climate
action, healthy living and
accessibility.
The application is extensive and it
would be difficult to capture here the
level of work and effort we applied. I
was told it's not for the faint-hearted.
And so I'll just touch on a a few key
areas.
And the share the road coalition
provides feedback to municipalities on
how they can improve moving forward. And
a key takeaway uh message from our 2024
application was for Waterloo to tell its
story, explain it. Don't just say what
you're doing, but show how you're doing
it and why. And so our recent
application was prepared capturing work
since 2024. And the following are just
some examples from the web bas based
application.
I won't really pause because it's uh way
too much to read but it just gives you a
bit of a snapshot of some of the
applications we had to complete.
In all we created
sorry um so some questions required
short answers others were more detailed
providing data statistics descriptions
of programs and policies some requiring
maps and links to reports and
information on our website such such as
our budget and some fields limited the
number of words or characters you could
use but they did provide the opportunity
to add further context and content by
attaching appendices. So we took
advantage of that and developed
appendices for each of the five criteria
to help capture the finer grain details
and provide waloo's examples of what we
were doing and why. And these are just
some of the examples
of our programs outreach work and uh
education efforts.
In all we created more than 50 pages of
appendicities to support our
application.
We also prepared a set of tables
capturing and explaining more than 50
city and region projects and initiatives
such as bikeways, pedestrian crossovers,
and studies just to name a few that have
been completed or currently in planning
or design since 2024.
And here are some examples.
Again, I won't really pause on them, but
it just bit of a reflection on the type
of work we did. And the tables help
explain what the project is, why are we
doing it, how, when, and who is doing
it. Essentially, we're trying to tell
WL's story.
And from a visual perspective, we added
these into a map uh into the existing
network to kind of show the relationship
of the works that are ongoing and the
works that are in planned.
Essentially, we wanted to clearly
demonstrate that these are tangible
actions that have been either completed
or being worked on and we wanted to show
that we are not just talking about it,
but we're doing it.
Achieving platinum standard was a
recommendation of the last
transportation master plan and so
achieving this status reflects the level
of effort the city has put into this
over many years.
This award is truly a corporate effort
not just a team effort not just in this
application itself but the work that is
done across the city by so many teams
every day every week every year. And we
must recognize the significant work the
region and the GRT contribute toward
loose transportation vision. The
influence, dedication and work of many
others over the years have contributed
to where we are today, including former
staff, the Grand River accessibility
advisory committee, Woo's active
transportation committee over many, many
years to name a few, but most especially
our city decision makers both past and
present. None of this would be
achievable without the support of
council in having those tough
discussions and making those tough
decisions
and for those tough discussions and
tough decisions yet to come as we
continue our work. The most common
question I get asked by other
municipalities is how does wloot do what
it does? And it's because of the support
at the top by our decision makers and
our corporate leaders.
We know there will be different
perspectives and viewpoints within the
community on Waterloo's platinum award
and that has to be acknowledged and
accepted and we know we need to be keep
doing more but the important thing is
that I believe we've just started to
scratch the surface of what water can
achieve and that's something to get
really excited about as we continue our
journey and progress our cycling active
transportation and road safety programs.
Thank you.
Well, thank you so much for that
presentation, Chris. And I think that
this is just a small sampling on this
window of the people at the city that
have made this happen. Um, and I just I
want I wanted to also put this in
context for council. Um, there's 444
municipalities in Ontario. There's two
that are bike friendly platinum just
this year. It's the first time ever it's
been awarded and in all of the United
States of America, there are only five
communities that are platinum. So, we're
joining a really small elite list of
municipalities in North America that
have really worked hard to try to
demonstrate that we want to be a
community where people feel welcome to
walk, roll, or ride. Um, I think that
the work we've done around bike friendly
communities has also made us a more
accessible community. I always try to
remind people that I am only temporarily
able-bodied and there may come a time
when I can't I don't have a driver's
license or I will have to rely entirely
on some kind of mobility device. And by
building these kinds of corridors and
and this thoughtfulness, we're building
a community that's welcoming to many
people.
Um, so I really I really have to I know
I said it in the when we were together
in Toronto, but I really want to thank
Chris and Chris and Louise and Ron like
I know Rhonda's just joined the team,
but Chris, Chris and Louise,
um, CS squared L.
um you have done a lot of heavy lifting
for a long time and I just really
appreciate all that you do. And I
realize as I sit here that the award
itself still resides in my house and I
forgot to bring it with me. And so I I
know that we will be receiving a large
like we'll be receiving the road signs
that say platinum and we'll be replacing
all of our road signs. So I hope it's
okay. Maybe we can do a picture when we
get the road signs. Uh Elellanar
McMahon, the president of Share the
Road, will be coming back to council to
make that presentation.
So, yep. Questions?
>> Yeah.
>> Thank you very much, Diane. I actually
just had a question about the
presentation, but certainly echo uh what
you just shared and thanks to staff for
the for the this is this is a long
journey. This isn't something that just
happened over the last couple of years
or even four years. So, thank you very
much to everyone who contributed. Um I I
cycle very very frequently. So I really
appreciate all the the improvements in
the in the in the structure and the
connections particularly. So um and and
I do hear from people who use mobility
devices how how much more accessible it
is. I know there's more we need to do
but but that they it's really helpful uh
from a variety of perspectives. And I
was I was pleased to be able to go down
last Wednesday and be on a panel and
take the pre-dinner uh photo um but
wasn't able to stay for the celebration
in the evening. But I just actually my
question about the slides that you had
here was would you mind going back to
the slide that had all the different um
like seven point this and four point
that.
>> I'm just curious if you could explain
that a little bit more what that
actually means. Oh n you you were just
there.
It's the map. Yeah, this map. Could you
just explain what these the different
numerical values mean and and what the
different color coding means? That would
be really helpful. And my other question
is just how remind me how many
kilometers of bike trails or trails we
have multi-use or is it 280
something like that? Is that in the in
the ballpark?
>> I would have to get back to you. I'm
sorry through the chair. I'd have to get
back to you on that. Exactly. Um we we
We have I know we have almost 50
kilometers of multi-use paths. So those
are the pathways that we run adjacent
the road um many many more trails of
kilometers um both on the active
transportation side and within parks. So
it's an extensive network for sure.
>> Okay. Thank you. But yeah, if you could
provide a bit more explanation of what
we're looking at here that would be
helpful.
>> Yes. So for sure. So it actually speaks
to the table the three tables and maybe
I'll just back up to those. Um, so these
these are just a snapshot of some of the
tables we use to try and capture
projects that have either been completed
since 2024
or in motion. So that could be um linear
projects um uh any kind of um road
safety initiatives, traffic calming, the
pedestrian crossovers, all the work that
is being done across um the city and the
region. And what we did, we created
these series of tables and we kind of
mapped out the journey of these each uh
each one send using what it was, why,
how, etc. And then we were thinking that
um you know once we've got all this
information it looks good but it's
pretty daunting to the evaluators that
they may they may not know water is very
well. They they may not ever been to
water because it's I don't even know who
the evaluators are. It's most of them.
So we we built this map to try and show
what the work is that we've been doing
and are going to be doing across the the
city and the region. Um and each one of
these numbers correlates to the table
number. Um which is why it's also
colorcoded. So if you had all the tables
in front of you, you could see what that
what what is going on in that particular
um street. You know, what does that
black dotted line mean? what does the um
the blue line etc mean? Um and it gives
the evaluators a sense um when we
layered it over the existing
network they can see how we are
infilling you know those missing pieces
and getting people across the road as
well. It's not just the linear projects.
Um so yeah it was a bit of a snapshot
for them to look at it to say that this
is what we're doing. We're not we're not
just talking about it. It's not just a
line on a map. These are actually all
projects that have been completed or are
in motion as of the time of the
application.
>> Thank you. That's it's really impressive
when you see it when you see it laid out
like that on the map. Thanks for that
additional explanation.
And I I I I also thought council might
like to know that when the bike friendly
communities program came to Canada from
the League of American Cyclists, one of
our former planners, Scott Nevin, who's
part of the Waterlue Cycling Club. He
worked with Share the Road to
essentially Canadianize the
applications. So there's hundreds of
hours of city staff time that have gone
into supporting share the road to even
create the bike friendly communities
wards. Um after which Scott then
couldn't obviously read our application.
So, uh, he was on the the committee for
many years and, um, you know, Bob,
you've you've got a great team and it
started a long time and I ago and I
remember when Phil Huittson started on
this work, too. And so, we've had we've
had a lot of leaders in the
transportation department and I hope
that uh I hope that you can share back
with your team just how valued they are.
Thank you so much. I apologize again for
leaving the framed certificate at home.
I kept thinking I gave it to Louise and
then realized she was taking the train
and so I agreed to bring it home and and
then I forgot.
>> Thank you.
>> So, thank you. Yeah. Was there any other
questions, council? No. Thank you so
much, Chris.
All right. So, um we are on to the
consent agenda. Did we want to remove
anything from consent? Uh there's only
one item so I'll assume that we're re
removing the one item 7A and um
councelor or right sorry you had
questions. Yeah thank you. Um so I just
have a quick question regarding the
honoraria and compensation policy update
in the uh report uh shared. Uh first
first off I just want to say how
supportive I am of this approach that
we've taken to um normalizing honoraria.
Um I think this is a really great move
in the right direction. Um and I'm
really excited to see um the intent to
integrate it across uh all divisions.
And so that's actually the thing that
popped up to me is to better understand
how and how that will likely happen. And
one of the reasons that that sort of um
came forth for me is because um while we
when we first initiated this practice um
it was about $5,000 for a portion of the
year. Um 2025 it jumps up to 15,000. Um,
but then there's a a statement about it
being in the range potentially of 50,000
annually. And I just wanted to better
understand that. That works out to about
a hundred different people contributing
to things. I just want to understand
what that looks like possibly in the
future. Thanks.
>> Thank you for the question through chair
to the counselor. Um the main con
contributing factor in the increase in
the honorarium budget is the revised gr
partnership that we have with the
region. So moving forward under the
proposed arrangement the city would
contribute 40% of the overall costs and
the region 60% and that includes
honorarium costs. Uh the budget as it's
been to this point we haven't always had
a dedicated line item to track
specifically. So a portion of honorarium
or other reimbursement funding may have
been coming out of project budgets. So
it will also reflect some improved
tracking of the numbers.
>> So essentially it's a it's a
centralization of this mechanism is what
we're talking about.
>> That's correct.
>> Okay. Thank you very much.
>> Thank you. Any other questions on this
item, council? Uh do I have a mover?
Moved by councelor Wright, seconded by
councelor Row. All in favor? That's
carried unanimously. Thank you. Um we
are on to items or staff reports I
should say item nine and the first is
silly city facilities and it's a
greenhouse gas emissions progress update
and we have a presentation from Scott
Post. Welcome Scott. How are you?
>> Thank you.
>> Is it on? There we go.
Good afternoon everyone. I'm here to
present an update on city- owned
facilities GHG emissions. So, this will
include progress and projects uh to date
here. Uh the timer's not
on. If someone wants to go,
>> you're good now. We'll count you down.
>> Yeah. Thank you. Um, so we'll we'll talk
about the project strategies we've
employed, completed projects, uh, in
progress projects, review the grants and
incentives we've been successful with to
date, a summary of our GHG savings, and
then we'll wrap it up and highlight a
few next steps.
So the green building policy for
city-owned buildings really guides our
design um and our strategy and approach.
So we've got electrification of heating
which is fuel switching. So converting
our heating sources for air and water
from natural gas to electricity heat and
energy recovery. So when those two are
paired we can receive very we can
achieve very high efficiencies which is
great. Our building controls. So we
moved to a standardized building
controls. We have a master specification
that we issue. So, it really allows us
to modify our building controls and take
control of that. Uh, no pun intended.
The building closure upgrades. So, when
those opportunities present themselves,
we're looking at uh higher performance
envelopes, windows, roofing, uh we'll
get into a little bit more of that. LED
lighting retrofits, of course, that's a
cost-saving measure. And they are
phasing out uh fluorescent uh any
mercury containing uh lamps. And then
we're always looking to align our energy
and GHG projects with our infrastructure
renewal.
So this AMCC phase A, so this was um uh
we were successful with the grant for
2.4 million under the green inclusive
community buildings. So it included
electrification of the hot water system,
heat recovery off of the refrigeration
plant. Um we replace the skylight in the
west rink with opaque roofing. You can
see in that up uh the top left picture.
And then we've got the electric hot
water heater um serving the building and
the ice reservicing water.
Here we've got so we did uh install
double glazed windows in the corridor
and we installed where while we're in
the process of installing dehumidifiers.
The right hand picture shows the new
duct work that'll serve the
dehumidification. And then on the left,
you can actually see here the uh
condensation that is inside the arena on
the uh rink glass, but there's no
condensation on the on the corridor
glasses, which is a positive. So once we
install the dehumidifiers, we would
expect the condensation to be removed
from the arena. So there's no fogging on
any of the uh surfaces.
So this is the cold water ice
resurfacing, the real ice technology.
So, we ran this with uh uh between
facilities and recreation services back
in 2022 2023, we ran a pilot at Rim
Park. And so, what this does is it uh
eliminates or greatly reduces the need
to heat up ice resurfacing water. So,
when the ice resurfacers commonly
referred to as Zambonis, they flood the
rinks after each use, they use what's
called flood water. Uh so, they scrape
off the ice and put down this flood
water to make a smooth surface.
conventional practice would see that
water that flood water heated uh to
remove air. So this uh this um
technology, this nozzle here, it
actually mechanically removes air from
the water. So you don't need to heat the
water up. So it really reduces energy
and GHG emissions associated with
flooding the ice. And we were so we
installed that at RIM uh AMCC and Moses.
And uh you can see the GHG emission
savings there, 136 tons. and we were
successful with $58,000 of utility
incentives.
So these are just various uh
decarbonization or electrification
projects that we've undertaken. So the
Dearbornne building adjacent to the
service center. So when that was rened
uh we installed airsource heat pumps
with controls to reduce the amount of
energy used in the building. Um and then
we replaced windows. So that's uh 30
tons of emission savings. Gray silo
electrification. So this included
roofing and air source heat pumps,
electrification of the uh water and
ventilation system. So that was 38 tons
of emission savings and we uh coupled
that with control so they can operate
the building as efficient as possible.
And then various buildings in water park
um we installed heat pumps there and in
some buildings we um we made sure that
they were winterized and then we removed
the heating altogether so they didn't
need to be heated throughout the winter
and that had 26 tons of uh CO2
emissions.
So those were the completed projects. Uh
we've got pre-construction projects or
projects that are in the final stages of
design. We've got the AMCC uh water
public library. So the McCormick branch.
So this will be an all electric new
design, high performance and you can see
in the uh table there. Um it's not a
huge uh emission emitter. It's not uh
it's not very energy intensive.
Libraries are not, but this will follow
the green building policy and um we'll
be looking at 24 tons of emission
savings. So it's not a huge absolute
value, but you can see the um the
percent reduction there. There's an 81%
reduction in emissions intensity. So
coupled with that project that the rest
of the arena will be replacing um
rooftop units that are gas heated. Uh
they have old refrigerant which is also
being phased out. So we're relying that
infrastructural renewal and so combined
that'll um have a emission savings of
around 45 tons. That's what we're
modeling.
So the Moses Springer energy and
accessibility retrofit. So this is a
similar project to AMCC where we're
adding new dehumidification, adding
space cooling. We are uh undertaking
electrification of the building controls
heat recovery. So this was also a
successful application under the green
and inclusive community building. So
this is receiving federal funding of 2.4
million. So when this project is
complete, there'll be approximately 73
tons of emission savings. And then you
can see there in the the left hand
picture that kind of wide red bar that's
where the new um duct work will go and
then the arrow is pointing to the
existing dehumidifiers which will be
replaced with electric dehumidifiers. So
those two will work in uh conjunction
when the winter time when the ice is in
the duct work provides ventilation or
provides ventilation and air circulation
but then in the summertime it's going to
activate that space for camps um same as
AMCC uh because the new rooftop unit
will have uh will have space cooling
capabilities and on the right hand side
you can see there so that the older
looking unit there um that will be
replaced and then there's a new unit
which will be installed and penetrated
and served serve the arena there. So
that's an exciting project.
Uh there's also some accessibility
improvements we'll be which will be
touched on uh later in the following uh
report.
So the rim park energy and accessibility
retrofit. So this is uh this is our
largest project. Um it is driven by uh
by a lot of infrastructure renewal. So
you can see the mechanical
infrastructure and electrification. We
have uh we are implementing near full
scale refrigeration plant heat recovery
which is somewhat of a novel approach,
LED lighting. There'll be accessible
washrooms. Um and then the
infrastructure that we install will
enable future electrification. So some
of the units which are not at end of
life when we convert they can take
advantage of the existing infrastructure
to lower costs. So right now we're
modeling about 400 tons of emission
savings from this project. Here
you can see it. It really is an entire
building encompassing project. Um, at
the front there, we're going to be
installing airsource heat pumps, uh,
just packaged units. And then on the two
large roofs, uh, one above the
gymnasium, one above the banquet hall,
those will be, um, units that are heated
by hot water, which is, uh, the heat is
recovered off of the refrigeration
plant, and we're also replacing some of
the original roof. So, there is still
original roof from 2001 there. So once
this is complete then all the roofing
will have been replaced at rim park
which will um improve conditions.
So this is the refrigeration uh
refrigeration plant heat pump strategy.
So existing we have the heat from the
compressors uh which you can see there
the compressors send the cooling to the
rink and then there's the evaporative
condensers which are the pieces of
equipment which reject heat. If you're
ever around an arena in the winter time,
you'll see the these units and there'll
be steam coming off of the top. It's
it's just it's water vapor that's coming
off of that. So, that's where all the
waste heat is. So, and you can see we've
got these rooftop units which are
simultaneously providing space heating.
So, throughout this project, we are
going to install a heat pump and heat
exchanger which is going to be capable
of capturing all of that heat and then
it will send it first to the building
space and water heating. And so it will
reject as much as it possibly can to
that it will be sized for the full uh
heat recovery load and then certain
times when the full heating load is not
required in the building it will be
rejected uh in the in the current uh
current method.
So we've got the project summary. So,
the completed and then preconstruction.
Uh, we've got 365
uh tons of completed uh emission
savings. And then we do have a lot of
projects um either in the pipeline or
that are about to be implemented there.
So, you can see that number 536 is
greater uh than the completed project.
We've got around 900 tons. The 200 uh
the sorry the 2050 emission savings
number. So, that is just these savings
projected out to 2050. So these it's not
our total savings that we'll achieve
because we're still going to be
implementing additional GHG uh reduction
projects, but that's for this cohort of
projects taken out to 2050. So being
mindful of that net zero goal.
So it's we're 42% of the way there. Um
and then any differences from now to the
2030 and 2050 target, those are going to
be influenced by the provincial grid
emissions.
Here's the grant and incentive summary.
So, the two largest grants that we were
successful with were for infrastructure
projects at AMCC and Moses Springer.
We've received some utility uh
incentives through Save on Energy, which
is um indirectly through Anova Power on
the electricity side as well as Nbridge,
some uh FCM grants for studies as well
as the infrastructure for the emergency
generator. Um and then we've got some
metering and then various uh utility
incentives there. So all in all um since
2022 we have been able to uh receive
$6.2 million in incentives.
So as I had mentioned the uh identified
projects represent 42% of the emission
savings required to achieve the 2030
target. We have been successful with
provincial and federal funding. Um more
support is needed. the Ontario
electricity gr grid emissions are
projected to inc uh decrease long term
but in the short term they will
increase. So any changes to that to the
province's strategy about using natural
gas generators to produce electricity
and taking that into uh to a longer
period that will uh that will impact our
savings. um future projects that we've
got um WMRC and uh the Harper branch
which are our second and third largest
GHG emitters within the building
portfolio. Um so those we're kind of at
tackling the the lowhanging fruit, the
largest opportunity for GHG emission
savings and we've also got some fire
station projects lined up as well. So
that uh that's a summary of our uh
progress to date and I'd be happy to
take any questions.
>> Thank you. Um, council questions for
Scott.
Councelor Ray,
>> thank you through you, Mayor. Um, this
is encouraging. Um, it's great to see
those grants coming forward and the the
breadth of the projects. Um, I just have
a couple of questions. So, one is um you
know, a number of these facilities
really require um the advanced building
automation systems and um so I'm just
wondering what our threat perception or
our risk perception is there um as we
deal with increased ransomware attacks
and and that sort of thing. Do we have
the um I guess the processes in place to
to manage and mitigate that risk as a
municipality?
uh through the chair to councelor
Wright. I would defer the full
explanation to our IT department, but on
our building automation side, we do have
it on a separate server. So, it's not
connected to the main city network. It's
on its own network and anyone who
requires access, there's a VPN uh which
has to be set up and credentials and
multiffactor authentication. So, we've
moved existing automation systems over
to that, but that is the dedicated I'm
going to call it the silo for our uh
building automation system and controls
for our facilities.
>> Okay, that that's helpful to know and I
I will happily have a chat with it about
some of the other um risks associated
with that. The other question I have is
um you you made reference a couple of
times to being dependent on what the
grid is made up, the electricity grid.
And um we're also in a situation where
we're applying for grants and we get to
a point eventually where um you know we
have smaller and smaller gaps to close
in terms of our GHG emissions and it
gets more and more difficult because you
can't do business as usual and it
becomes the hunger games for grants.
It's not um it's not as exciting to fund
really small incremental
changes. Um, and so I'm just wondering
what are like obviously we still have
lots of the big stuff to do like you you
clearly uh show that rim park is you
know the big thing that we need to
tackle here. Um but what what will our
strategy be basically to um figure out
what that innovation cycle needs to look
like when we're getting to that end
game.
>> Uh through the chair to councelor.
Right. So for our smaller facilities uh
once we go through the electrification
process um and then the grid kind of
cleans out the emissions there will go
down to near zero for our larger
facilities where it's not practical to
install all electric systems. We'll have
say the gas backup boiler. There's
redundancy piece, there's resilience
piece. So there to control kind of
utility cost. We've got utility cost
strategies about when the um the
electric heating is placed on when
that's turned on and and turned off. So
that uh kind of heading down and then
that coupled with renewable energy where
it uh where we can install that. So on
the solar side of things, but then we
would be looking for um if if we're if
we're only left with say building
enclosure improvements, which are
costly, then there would have to be some
sort of discussion about where where
this are the city's dollars best spent
um to uh to achieve those remaining GHG
emission reductions.
>> Okay, thanks for that. And then I'm just
looking at the the last sort of threat
on the horizon is just regarding our
natural gas supply um largely coming
from the US and so understanding I
suppose what what that looks like u for
us going forward. Obviously we can't do
anything about the uh provincial grid
supply that's not within our our
jurisdiction. Um but uh any ways that uh
we can be less reliant on on natural gas
and I I guess that's really just this
process that we're going undergoing
right now.
>> Yes. And so as we we will rely less on
natural gas in terms of absolute volume
but I would say that we are not a huge
uh consumer of natural gas. their larger
institutions, universities, postsecary
and healthcare, which which do require a
larger volume. So when we hook up the
utility doesn't really blink because
we're relatively small.
>> Um I'm not sure if that answers your
question.
>> It does. Yeah. Just just understanding
what level of risk it presents for us
going forward. Okay. Thanks.
>> Any other questions, council? Uh, seeing
none, there is a recommend. Oh, sorry,
Mary McCabe. Yep.
>> Thanks for your chair. I was just
waiting to see if others had any
questions. Um, thanks for the report.
It's it's really encouraging to see. Um,
and if I'm reading this right, we're so
we're 8% away from our 2030 target.
Correct.
>> Through the chair to uh Mayor McCabe, we
are we are 42% of the way to our 2030
target. Right. So the the 50% so that's
I guess relative terms to the savings.
So right now we basically have to double
those emissions savings uh by 2030. So
our goal is 50% reduction by 2030 uh
relative to to the 2010 levels. So that
42% is measuring the amount of savings
that we still need to achieve.
>> Okay. Okay.
>> Yeah.
>> Got it. Um, so I'm just curious about
there's a couple of of the buildings
that you referenced like Grey Silo roof
and the Albert McCormack Center which
the roof was just redone and are they
both like the Elbert McCormack one could
support a solar array. Can the gray can
the gray silo one supported as well
>> uh through the chair? So gray silo
possibly on the the barn structures. So
on a flat roof you need a certain amount
of space to make scale to make it
financially feasible to do so. Um so we
did have an engineering study at Albert
McCormick uh on the west rink and the
flat spaces and the east rink. Um and
that building can support solar uh with
the exception of the east rink. So when
we replace that uh when we replace that
arena roof, we would look at reinforcing
the structure in there so that that can
accept solar. So it depends on we look
at it from when the roof needs to be
replaced and the available space on the
roof. So at Gray Silo, there's just not
a lot of roof space, for example, to
install solar. But at AMCC, there is
there is more roof space. So AMCC would
be viable in terms of just a practical
and physical point of view. Um Moses
Springer, we are looking to replace the
arena roof. So when we do that, we would
integrate and include a structural
redesign and support of that arena
space. Uh and then we would look after
that has been completed, we would look
to install solar on that.
>> Okay. And and so just going back to the
Elbert Mor the Albert McCormack
Community Center um because the report
said that we're not looking at doing it
doing solar and a solar array at this
time, but is that something that um
either we might look at or we would
partner with um like a local um solar
company to do something like that? Like
how feasible? What what would what would
you recommend is the best route
>> uh through the chair? Either route is
possible and the reason why it's just
staged is because a lot of these solar
projects are
uh more efficiently completed as
engineering procurement construction. So
they don't follow the typical it doesn't
fit in well to the existing um design
bid build stream that we are undertaking
for AMCC phase A and phase B. So once
that construction is completed then it's
then you can go in and install the
solar. So that's a cleaner separation
between having a large general
contractor carry a smaller solar sub
because then you're paying the markups
from the general contractor when it's
more cost-effective to go just directly
to the uh solar installer themselves. So
it could be uh it could be city-owned or
we could look at a um a power purchase
agreement of PPA with a third party.
Both would both would be viable. And
when we are installing these we are
considering um existing electrical
infrastructure and how we would install
it. So it's not, you know, kind of
putting the shutters on and tunnel
vision and then we say, "Hey, what about
this?" We're looking at, "Okay, is there
existing capacity? Where is it going to
connect into the electrical
infrastructure, the panels, and so uh
other, you know, requirements for that?"
>> Okay, thank you. That's really helpful
and and good to know. And just could you
ballpark approximately how much funding
we need to complete the the rest of the
identified future projects?
I would have to get back to you on that.
Um, we did apply for some uh grants at
RIM and it was in the um to do the all
the additional rooftop units and the it
was combined with accessibility
improvements inside but I think it was
around
15 million that was the grant
application. So obviously we had
adjusted our scope accordingly but um we
are just we look to you know reduce
those capital costs by aligning it with
infrastructure renewal. So that's um but
we could definitely get back to you on
that.
>> Yeah, that would be helpful. Thank you
so much.
>> Any other questions, council?
>> Great. Well, seeing none, uh there is a
recommendation here and I'm hopeful
moved by councelor Wright, seconded by
councelor Roach. Uh all those in favor.
That's carried unanimously. Thank you so
much for the update.
Um, the next item is uh RFT 2016-12
Moses Springer Community Center Energy
Accessibility Renovation and Retrofit
Project. And we have a presentation from
um Matthew is it reggier or is it Reder?
>> Reager.
>> Ritter. Thank you.
>> Thank you. Good afternoon councilors and
chair. I'm pleased to present the Moses
Springer energy accessibility renovation
and retrofit project and and the updates
um as as they are uh today. Um so kind
of to tack on to everything Scott said
regarding this project, I'll just give a
more over um over high level oversight
of of what it is from a renewal of
critical building systems and focus more
on the accessibility side of the scope.
Um, but the main project focus for this
was the renewal of critical building
systems and dovetailing that into all
the energy and sustainability objectives
that Scott mentioned there. And and you
can see the list on the slide of the
various upgrades that Scott went
through. And the second component of
this project was renovating the spaces
to meet the community's accessibility
needs. So I'll be going into that into a
bit greater detail in the following
slides. um project teams that were
engaged in this was heavily in
recreational services. They aided us in
uh how this relates uh from a
construction standpoint and ensuring
that we have an operable operating
facility while construction takes place
while also finding areas within the
facility that we can adjust and make
better for community members and staff.
Um so multi-tered there. We also engage
community programming and outreach
services. As Scott alluded to before,
the arena can now be used for summer
camps uh w with air conditioning. So
they they're heavily involved in in in
items of of rework and remodeling and
ready team was heavily used on this uh
for all the accessible uh upgrades and
Grand River accessibility advisory
committee um reviewed and and aided us
in the design as well as giving us an
approval go ahead for the way it's
designed. Um funding for this was a
result of the successful $2.4 million
grant from the green and inclusive
building grant, the third intake and and
then the city's contribution of 600,000
uh from the partial lease of KURF. Um so
here this is the the highle slide that I
want you to focus on the top just just
for bearings. Lincoln Road is to the
east of Moses Springer and you go down
the embankment and there there is Moses
Springer and that black outline I have
for you is the area of of the majority
of the work. Um to the left I have the
existing floor plan and you can see the
grayed out areas. Those are areas that
will be reworked either remodeled or or
demolished or or a mix thereof. So you
can see that the concessions area in
Moses will be reworked and remodeled.
the front main foyer with the customer
service desk will be remodeled and then
the men's change room for the aquatic
side will be remodeled to allow for
these accessibility upgrades. And to the
right is my color-coded legend of of
what's going on there. And I'll I'll
make that a bit bigger in this slide so
you can see the green uh represents the
accessibility upgrades. U the orange is
the public space modifications uh which
is a result of making room for the
accessibility upgrades. And likewise the
staff space modifications. Um we had to
do that to again make room for
accessibility upgrades. Other options
were vetted out but these uh internal
modifications of the of the existing
space uh was the most feasible. So I can
start with the uh accessibility
upgrades. Um like many of of the other
buildings that we're doing, we're adding
a universal washroom to the facility
which has a full nine yards. you have
above code um accessibility standards
applied like large turning radiuses um
adult change tables, lifts for the
shower, tactile markers, etc. So, it is
a a fully full nine yards from an
accessibility standpoint. We've also
included a gender neutral washroom to
the facility and specifically an
accessible pathway to the pool deck.
This was something that was that's been
requested upon for for a long time now.
Um to date, uh members of the community
would have to go through the aquatics
offices, which is just north of all that
green, um markup that I have there. They
would have to go through the staff space
and exit through the office, which which
wasn't ideal. And and now we've we have
the opportunity to have a a clear
uninhibited path to the pool deck for
for those um members of the community.
Uh, additionally to this uh, project, we
have um, a lot more ADOS's, automatic
door operators throughout the facility,
not just the ones I've highlighted.
There's more sliding doors at the
entrance um, in various spaces for for
better access accessibility to the
remainder of the facility. Uh, and
lastly, uh, there to the bottom left,
you can see the um emergency accessible
ramp. So, there was only really one form
of egress for a member of the community
that needs accessible um, components. So
now there are two um forms of egress to
safely exit the the building in the
event of an emergency.
Uh these orange spaces. So as I alluded
to before, we had to accommodate the
existing floor plan to fit in the
accessible requirements. So we've
renovated the men's change room to
accommodate that universal washroom and
and effectively there hasn't been an
operational change here. Uh the the
major reduction would be one shower
that's been reduced. But this has all
been vetted by recreational services
that that this is satisfactory for for
the amount of um amount of community
that come in and out of here. The same
amount of lockers, the same washroom,
etc. And you can see that the orange
men's change room actually aid into the
customer service desk for the aquatics
area. So, we reconfigured that front
entrance um to allow for the men's
change room and removed that customer
service desk. So, there's a bit more
room at the foyer area for people to
line up and and um get all the um things
from the customer service desk on the
left, which I'll go to in the next
slide. Um
so where the existing customer uh sorry
the existing concession area was is now
going to be the staff um main staff room
because the men's change room aid into
the existing staff room. Uh without my
laser point I can't really show you
exactly where all these things are but I
can ask answer questions after.
effectively this this space in the
middle of the screen that you have um
it'll be a multi-purpose room for staff
to have lunches for training. There's
enough room for training. There's uh
additional uh touchdown desks for people
to put their laptop on and do work uh
for public community programming. Um and
then there's an additional smaller
office to the bottom left that was
requested by by programming department
to um to have more uh one-on-one
conversations, closed dooror
conversations. So, it's just additional
space for for staff to use uh in the
summer when when this will be um more
for summer camps, etc. And then where
the existing uh facility attendant
office is, that'll be shared with the
customer service desk, which um was
vetted by recreational service again and
uh there's plenty of room for them to do
their work there. And just to the north
of this image, you can see we repurposed
a few rooms. We've gotten creative so
that the aquatic staff have adequate
washrooms and change rooms as the
universal um washroom that we've added
uh took away a couple of their rooms.
So, we've we've reconfigured and and got
creative to make sure that they have the
required room and space that they need
to uh maintain existing operations.
Um the tender submitted price came under
that of the grant which which is
encouraging news and um from from
today's date uh barring the decision um
of the award construction will start
within uh two to three weeks from now
and is slated to be completed by end of
May next year which allows for time to
open up and and um resume pool
operations in the summer next year in
27.
Recommendations are for council to
approve this report uh approve the award
to Jackman Construction and uh for mayor
and clerk to be authorized to sign the
agreement and I'm happy to field any any
questions that you may have.
>> Uh thank you for the presentation and
for joining us today. Uh questions
council
councelor Basic.
>> Uh thanks. Um I wasn't I I didn't This
is great news. Uh it's a sort of a sub
question from the presentation that
wasn't in the report. Um so it's really
great to see all of the um changes and
proposed changes outlined. Um uh and
they all look really great. My questions
are about the concession area. Um and
for those who haven't had a chance to go
and look at the concession area at Moses
Springer, it is truly needing to be
changed. So that's that's good news. um
the only comm and it's it's excellent to
have the uh thoughtful space for staff
very much needed. So I'm I'm supportive
of that. I just want to highlight um a
community need that has come up over and
over again for space where people can
gather and make food and share food and
community spaces which were uh lacking
in that area of the city. Um and so it's
not as if people were using this
concession area. So you're not taking
anything away. So, I'm not suggesting
any changes here. I'm just saying it out
loud to be mindful as I'm leaving
council uh that we keep it top of mind
to have community spaces. And in
particular, at Le Armon, they have a
community garden and so sometimes it's
well used and taken care of and other
times it's not as well taken care of as
all community gardens are because it it
depends on how available people are. Um
but there is a really nice sort of um uh
uh connection between that community
garden uh the housing in the area and
the and the community center where there
could be community gatherings around
food. Um, and so, uh, I'm just mindful
that these are important changes and we
need them in the interim and I really
love the work we've done at Rim Park and
at AMCC and all of those things are
needed, but there still remains work to
be done at um, Moses Springer and I
don't know when that will happen in um,
uh, facilities and and recreation
services. Um, but it's it's a it's a gap
uh in some ways, even though I
understand that it's meeting important
needs around the pool uh and the ice and
the um outdoor public spaces as well and
the accessibility upgrades which are
obviously extremely important and the
GHG ones. But it's still a little sad to
be leaving council seeing that the
community needs that are uh uh essential
aren't being met there. And it's not to
be upset about it because we need to
prioritize all of the wards. Um but I'm
just sharing that for consideration. No
response needed. Just pontificating.
>> Thank you.
>> Thank you. Thank you, councelor Basic.
Uh any other questions or comments?
>> Uh seeing none, did you want to move the
motion? Moved by councelor Basic,
seconded by councelor Row. All those in
favor? Uh that's carried unanimously.
Thank you.
>> Thank you.
And the next item is the Grand River
Accessibility Advisory Committee terms
of reference refresh.
And I guess I don't see a presentation.
So it's just if there's any questions.
Um Amy's joining us. Welcome Amy.
Was there any questions for Amy? There
is. So maybe we'll just take a minute
and we can lower the podium for Amy so
that she's can answer questions.
>> That's great. Welcome Amy.
Um councelor Hanmer.
>> Uh thank you chair through through you.
Amy, thank you very much for joining us
today. And and I just want to I I do
have a question, but I at first I want
to acknowledge all the hard work that
you've done through it's been a a whole
year of reviewing and taking a look at
what the terms of reference for GRA
needs to needs to be or can be moving
forward. And I think as council's aware,
there have been some changes that have
happened, not uh by the nature of uh GRA
itself wanting to do it, but just some
changes in how it's going to be
supported and yet still kept at a
regional at a regional level. So I'm
pleased that we are still at that
regional regional approach with the city
also taking a very integrated approach
and I think all the work that you've
done in trying to encourage everyone to
be part of it has really gone uh a long
way and I hope will continue as we move
forward because we've made great
strides, no question, in making sure
that our new renovations and buildings
that we're putting in the city um are
getting better at meeting the standards
and making it easier for people to get
around and use the facilities that the
city has. So, thank you for all of that.
My question though is can you share with
us a little a little bit uh the terms of
reference that we have for the newly
revamped GRA will include residents who
live anywhere within the region and are
uh having with any kind of a disability
and I like the nature and and breadth of
how we're going to have involvement.
Maybe my concern is um some of these
residents may come not from the city of
Waterlue and with the way the new
structure is going, we don't have at the
table all of the uh municipalities
anymore because they are choosing to go
in other directions.
What's been built in or is it still
something to be thought about if
something is happening in the township
and a resident from the township is a
member of GRA? How are we going to make
sure that things are communicated uh
actioned? I'm just I'm kind of stuck on
how that whole process might be working.
>> Some of it will be a work in process. Uh
there are some
um
pieces to be designed in terms of how
the committees communicate with each
other. So Kitner's accessibility
advisory committee and then the existing
Brack will uh have some hopefully
overflow uh where there may be members
that are part of Kitchener accessibility
advisory committee who also are part of
GRA. We are open to that uh but it will
be a bit of a work in progress for a
little while. There will be members from
the townships as long as we can source
those members then they're absolutely
welcome to be on the committee but they
may be more interested in the regional
projects that come forward than in
particular to the city of Wateroo's
projects. Okay. And a second question if
if I might along those lines then if
there were something happening in the
townships. There's nothing preventing in
this structure staff from the townships
being invited to present or be part of
it. So we can still try to do that that
communication as well.
>> We intentionally left the offer open. We
didn't preclude anything. the current
members are who they are, but we can
always add to that with a review process
and coming back to council
>> and coming back forward. I think, you
know, great strides have been made to
try to be consistent across the entire
region in um the formats that we're
using, the standards that we're using,
the ease of transportation and ease of
movement for everyone throughout the
region. I hope that we don't lose any of
that and that we're able to continue if
we have to create a new way of
communicating, we create a new way of
communicating.
Thank you.
>> Thank you for your questions. Any other
questions for Amy?
>> Seeing none, thank you very much. I
appreciate your willingness to be here.
Um, so we have recommendations here.
Council, moved by councelor Hanmer,
seconded by councelor Row. All those in
favor, that is carried unanimously.
So we're on to item 10, consideration of
notice of motion given at a previous
meeting. There's none. Notice of motion.
None.
Communications and correspondence. None.
Unfinished business. None. And
questions. Council.
Um, seeing none.
New business.
I I do have to say that I was thrilled
to celebrate the 25th anniversary of the
opening of the Butterfly Learning Center
on the weekend. Um, it was a really
special space. I was thankful to be
joined by the mayor and MPP Fe and it
was an extraordinary
event, great weather and of course there
was the pow-wow this weekend which was
amazing and it looked like it was um
just a really great community event
and um and the hospice um had their hike
on Sunday to raise money for hospice
water reason and Uh it was again a
beautiful day and it started with the
Fergus pipe band walking through the
memory gardens and um it's always a
really special place um to spend time
and we're I I realize it's in my ward
and I'm thankful it's there but it
serves all of Waterl region certainly.
Um, so yeah, there's there's a lot
there's been a lot going on since we
last met. And I think the other thing
that happened in my ward was the fox
hunt um party in the park. It wasn't not
this past weekend, but the weekend
before, but we didn't have a council
meeting.
So, and if we start going back in time,
then we're going to unpack everything,
right? So, so yeah, that there was a lot
happening. Was there anything else,
councelor Wright? just just in terms of
going back in time just acknowledging
that um we did celebrate Lumen and so um
that's always a massive heavy lift from
the city um on on all fronts and so just
applauds to uh applauding staff um for
all your effort on that. It was very
well attended. Thanks.
>> Great point. Thank you for that. So,
we're into the enactment of bylaws.
Moved by
uh councelor Row, seconded by councelor
Hanmer. All those in favor is carried
unanimously.
And I need a motion to adjurnn.
Moved by councelor Bodley, seconded by
councelor Roach. All those in favor?
That's carried. Thank you.