Heritage Permits Approved for Multiple Projects - 18 Aug 26
Hamilton · August 20, 2026
three. One, two, three.
Okay, thanks Karen. It looks like we're
live on YouTube now, so we can get
started.
>> Okay, thank you. [clears throat] Welcome
committee and guests. Um
members of the public are advised that
individuals and the media may be audibly
and/or visually recording this meeting
and please note that while the meeting
is open to the public for observation,
any member of the public wishing to
provide comment on any of the agenda
items are encouraing
to provide comment on any of the agenda
items are encouraged to contact cultural
heritage planning staff or may choose to
give a delegation directly to the
Hamilton Municipal Heritage Committee. I
would like to call this meeting of the
heritage permit review subcommittee
August 18th, 2026 to order. And please
note that quorum is present.
All right. So you have before you the
agenda for this meeting. May I have a
motion to approve the agenda as
presented?
See Sandra and I see Andy. Okay.
And is there anyone opposed?
Okay, seeing none, that motion is
carried.
Are there any declarations of interest
today?
No declarations. And also, um, Matthew,
you're since your camera's not on, if
you do want to speak, please um,
indicate by raising your hand
electronically. That would be helpful.
Okay. Um, so I see no declarations of
interest declared today.
uh approval of the minutes of the
previous meeting. So uh you have before
you minutes HPRC 26 007 July 14th 2026.
Um I would like to comment Oh, go ahead
Sandra. Yes.
Oh, you're you are going to Okay. I
would just like to comment that uh
Sandra's name is spelled incorrectly
throughout the minutes. It's an a r at
the end, not e r. So, uh, anybody who's
writing up minutes going forward, pay
attention. Make sure we document these
things correctly. Um, other than that,
may I have a motion to approve the
minutes as presented.
Sandra, and I see Graham.
And, uh, is there anyone opposed?
Seeing none. So that motion is carried.
So onto the herd of permit [snorts]
applications for this evening. So that's
under section six of your agenda.
So um I assume Lisa, we're moving ahead
with the agenda as it's written at this
point.
So the first application
is uh HP 2026-23
pertaining to 295 Bay Street South in
Hamilton which is the Durand Markland uh
heritage conservation district. It's
it's within the heritage conservation
district. So it's part four five
property and the application is for
removal of five trees along the public
right of way. Is the application a
representative of the application here
to speak to the application this
afternoon?
>> Hi Karen, I'll be speaking to the
application.
>> Okay. Um, is there anything you'd like
to add then to the very simple summary I
gave, Lisa?
>> Uh, no. Just want to flag that this was
a request from forestry. Um, so these
are trees that are lowhanging and they
impede pedestrian and traffic. Um, so
the trees aren't specifically dead, but
they are impeding um safety and uh
traffic, so we'll need to remove them.
>> Okay. Are there any questions from the
committee?
Okay, I have no Oh, Graeme, please go
ahead.
>> Yeah, just a standard. I didn't I just
want to make sure, are they replacing
these trees with the correct species?
Um, I can pull up the photos. Um, but
there are several layers of trees in
this area. Um, so they're removing five
of the ones that are on the most outer
edge and there will still be a barrier
in in between. So, um, it's just that
the property owner had planted quite a
few uh trees in there and now they're
overcrowding.
>> Thank you.
Okay, any other questions?
comments.
All right. Um, may I see the proposed
conditions, please?
Okay. And so, these are the two standard
conditions, any changes um to be
submitted
uh prior to commencing any alterations,
and that there's two years from now
until the expiry. Um, Lisa, are we still
keeping the two-year expiry or are we
going to move to the three-year? Can't
recall what she said.
>> Um, we are looking to move to a
three-year expiry as part of our
procedural bylaw updates, but until that
goes through, we're sticking typically
with our standard two-year unless the
project uh deems necessary.
>> Okay, thank you for that. All right. Uh,
so may I have a mover and a secondary to
recommend approval of heritage permit HP
20226023
subject to these staff recommended
conditions? I see Andy and I see
Matthew.
Is there anyone opposed?
Okay, seeing none, that motion is
carried.
Thank you.
Okay. Um,
so item 6.2 on the agenda this evening,
uh, it's permit number HA 2026001,
which is property 286 Victoria Avenue
North in Hamilton, which is the baby's
dispensary guild, and that is not
designation. It's a municipal heritage
easement agreement. And um, do we have
Okay. Uh, sorry. The application
[clears throat] is for replacement of
the HVAC system, including penetrations
along the side of the building for
ventilation and installation of new
utility meters and associated openings.
Now, please note that this heritage
permit is for retroactive approval as
the work has already been completed by
the applicant. Uh, do we have a
representative of the application here
this evening? Like to speak, add any
further um details and take questions
from the committee.
Uh Lisa,
>> hi Karen. I believe it's one of the uh
phone numbers.
>> Oh yeah.
>> Okay. Yes, I can hear you. Yes.
>> Yeah, I'm here. Um uh thank you Lisa for
talking about that. And uh we have the
permit to do the HVAC from inside which
requires venting to the exterior of the
wall. There's no big penetration just a
few pipe sticking out and probably a air
conditioner going on one die and that
nothing else nothing change in the
front. The front will change the front
door and other than that there's no
other penetration from
on the side and front other than the
back.
>> Okay, thank you. And is this could you
introduce yourself as well please?
>> I am Michael Tal. I'm the project
manager for the owner there.
>> Okay. Thank you, Michael.
>> You're welcome.
>> Okay. So, are there any questions from
the committee for Mr. Khil?
Uh I see Graham. Please go ahead,
Graeme.
>> Yeah, I'm just uh trying to figure out
how big these penetrations were for
ventilation because uh we just mentioned
that it was just for piping for the
Hback and ventilation is a different
kind of word. different meaning.
>> It is the H. It is the venting for the
water heater and the HV which is like a
2 in pipe.
>> Oh, so that's the only size in the 2 in.
Okay.
>> Correct. That's just a 2in pipe coming
out of the wall.
>> And is it the very back?
>> There is at the back the back is the
venting. The side is the the the white
pipe. that is a 2in pipe coming out
when you on the on the what is that on
the east side east I'm not familiar with
which one you can tell in there
>> on the north side I think
>> so I'm sure is Lisa's put the south
facade on the screen that we can see
maybe you're not able to see it is that
the area that the holes went through
>> hi
>> on the parking lot side is where the
hole went through
Yeah. So, through the chair there there
were openings on this side here where
the the new utility was open uh
installed. Uh so there's four new
openings in the brick and there's one
down below. Um and then there was
bathroom ventilation on the north
facade. So these two openings here um
where vents will be put in.
>> And then most of the other utilities are
going through the east facade uh which
is not protected by the heritage
conservation easement agreement.
>> Okay. It would have been nice if we
would have had this before it was
completed.
>> Yeah,
>> absolutely. Um, okay. Are there any
further questions or comments from the
committee?
Okay. I don't see any and I don't have
anything to add. So um as this is
retroactively a retroactive approval um
there's no conditions
uh recommended as it's already been
completed and so may I have a mover in a
secondary to recommend I guess approval
of this retroactive approval of this
heritage permit HA
2026001
mover and seconder
Andy
and Steve. Thank you.
And uh is there anyone opposed?
Okay. Seeing none, that motion is
carried.
Okay. Um I believe that Mr. Khalil, you
are our next applicant as well for the
next um item. So stick around, please.
Um, so this next item 6.3 is HA 2026002
pertaining to 286 Victoria Avenue North,
the Hamilton uh, Babies Dispensary
Guild, same building which is under the
municipal heritage easement agreement.
And the application is for replacement
of the existing front door, including
installation of two doors with glazing
inserts painted to match the existing
door.
So, um, is there anything you'd like to
add to that description, Mr. Khil,
before we have any questions or
comments?
>> Uh, no, the existing door. So, we are
replacing matches what the the new door
we areing matches the existing door and
we are putting a glass insert to mimic
what is already there. It is broken now
is blocked up by a plywood. We're trying
to replace it. That's all I have.
Okay.
>> All right. Oh. Um, okay. So, I think I
see Sandra. Do you have your hand up,
Sandra?
>> I do.
>> Okay. Please go ahead.
>> Uh, yes. So, I I I had a look at the uh
the photos that were provided. Uh, and I
had a question about the proportions of
the replacement door do not match uh the
original door. Can you explain why that
happened? And uh if I if I'm misreading
the photos that were shared,
>> that is just a photo that is taken not
to scale that what is there is a double
door. That photo is there exactly fit to
that opening. We are not increasing the
size of the opening. We take the double
door out. We are installing the same
double door. The photo is just not
proportional, not to scale. That's what
it is.
So, are you able to provide a photo that
is to scale so that we can compare the
before and after?
>> I mean, the brick is there. I can't even
find the brick to replace that brick.
So, I can look at the window out. I can
look at the wall out. I'm just The guys
are measuring it. They measured it. They
just taking that out and putting these
things. That's all we have to do. We
don't do any alteration to the fac.
>> I I don't think I was implying that. Uh
I think the question I was asking is can
you provide an accurate photo that shows
the before and after?
>> Um
>> yeah when I am done yeah I'm done. Yeah
for sure.
>> Hi Karen. Do you mind if I jump in?
>> Please go ahead. Yeah sure. Thank you
Lisa.
>> Um so this this permit's not
retroactive. This is work that he'd like
to do on the building. So the the
proposed um photo is just simply an
example of what he's proposing to put in
there. um the opening will stay the same
and the dimensions will fit the existing
opening.
Um so he doesn't exactly have a before
and after at this point um because he is
getting full um prior approval before
installing this one.
>> Okay. So it's a proposal. The f the
photo that is there is a proposal.
>> Yeah, it's mostly just for the design.
>> Okay. So, I'd like to I'd like to ask uh
if we can see the entire building with
your proposed uh door, please at the
right scale.
>> Just as a
>> Sorry, I'm not asking that question.
>> Sandre, are you asking as a drawing
before it's um Is that what you're
asking for?
>> Um a photo a photo of the picture. A
photo of the proposed door was provided.
Yes.
>> Well, yeah, but that's just to give you
an idea of the, you know, that there's
glass in the middle and there's, you
know, metal on the outside. But so
you're asking for, you would like like
an actual dimensions drawing of the
proposal
with the new Dorian. Is that what you're
saying?
>> Uh, yeah. Perhaps a shop drawing. Yeah,
I think so. Yeah. Any any door company
can provide you with that.
The shop drawing is just a dimension
drawing. It won't show you exactly what
the photo looks like unless the door is
manufactured. That's what it is. That
door is specially made and once it is
there, we have to mimic the color and
the paint. I can only do it once
install.
>> Um and actually, okay. So I believe if
you see the conditions um the final
details and specs will be submitted to
city staff the heritage staff um prior
to final approval of this if so it's
either I guess a choice of do we need to
come back to this committee or are we
comfortable with um leaving it in in
this heritage staff's hands to make sure
that it is actually
you know basically identical to what is
currently being replaced.
is that just just to make this clear
[clears throat] and we are in the final
stage of finishing what is inside. We
have a security issue in that area. We
are in the stage that we're really
rushing to change the door. I don't
think we have uh time to go to the next
hearing again. Really, you need
exception here.
>> [clears throat]
>> I mean, if it's if it's in the um if
it's in the uh conditions, then I would
be comfortable. How does the rest of the
committee feel about that?
>> I just got a a question I wanted to ask
before we get into that far.
>> Okay. Um sure. Okay. We'll set this
aside. Graham, please. Uh you can ask
your question.
>> Did you expect how badly damaged is this
door? or is it beyond repair? That's the
first thing.
>> First of all, that door is rotten up. It
is broken down with the pandalism and
they all went inside and we stole our
$80,000 worth of uh elevator equipment.
There's always breakins and breakins.
We're trying to do glass to mimic what
is there, which we're supposed to do.
Still go there and knock it up because
it get broken every day. Probably the
best solution is maybe heritage can
insure that for us and we can do it the
right way and leave it there. We see
what happen every day there is a break
in there. I found you homeless in that
house. I can't even
>> I just want to say want to ask that
question. So I'm I am comfortable if
that's the the style of door that you
were going to order and it's just going
to be scaled down to fit. I don't really
have a problem with going to staff to
say
>> let them do it.
>> That's exactly what it is. We we try I
went through with like I tried so many
things. First I thought I'm going to do
steel door when I realized that it's
heritage then we mimic it and try to
make it good look what is there and we
even take the chance to mimic it with
the glass again to give it the same look
which technically we shouldn't do glass
there to be honest with you. It's
ridiculous what is going on down there.
Um, are there any questions from anyone
else in the committee?
Okay. I have a question. Just the glass
that you're replacing that you are
putting in the new doors. Is there some
special
strong glass that is resistant to
breaking?
>> There's no There's no glass that resist
breaking. Any any glass can be broken.
They just need one hammer. See you
later.
You know the way they break is it
different but there's no blood that can
resist breaking there's no break there
right there.
>> Yeah.
>> Unless maybe you know what I mean. I'm
just doing it a little bit of glass that
they don't see through just to mimic
what is there. I'm very heritage
oriented. You know the company does. So
we're trying to accommodate what is
there. That's all about it.
>> I'm going to jump in here. I' I'd like
to see the hardware that's on that
original door. I don't see it in the
proposal. Um, are you suggesting that
the hardware will be the same?
>> To be honest with you, I don't even know
what hardware was there. When we bought
the building, the door is already
smashed out. No, the hardware there
unless you tell me what hardware you
want, I can put it there. No problem
there.
>> It's your photo that's in the report,
right? Whose photo is that?
>> Yeah. Yeah. But there there is no
hardware there. just uh the door is
broken up. You can see it on the photo.
It's covered with the plywood.
>> If you look at the caption on the one
picture that shows a hard wire, it says
Google Street View.
>> That's fine. If the hard is there,
there's no issue there. I can replace
that hardware. No problem. Whatever you
guys want. No issue there.
That's easy to do.
>> So, is this a wood door that's going to
be replaced or it's a What kind of a
door is it?
It's a woodlook door. Fiberglass woodl
looking door. Stronger insulated door. I
cannot put a solid door. Then it's going
to rot again. So this one looks like
fiberglass but inflated.
You can't tell the difference.
Okay. So, it sounds like the committee
is is um
concerned that it be a sympathetic
design in terms of what the look is and
the the hardware and all.
And so, is there something we can Well,
I guess that's sort of part of the
condition. I guess we could build that
into the condition, Lisa.
>> Uh yes, we could do that. Um the other
thing I just wanted to flag through the
chair is that only the opening is
actually protected. The doors themselves
are not um so while they are replacing
them, they're not original features
um or at least weren't deemed protected
under the HCA. Um so we want to imitate
the style, but the wood door itself is
not is not a protected
uh element.
Just flagging that and clarifying that.
Um but we can build it into the
condition um that's there already. Um I
believe we looked for the we were
looking for the final details and uh
materials to be submitted details and
specs to be submitted.
>> So as part of that we could look for a
different material we could work with
the owner.
>> And uh do you consider the color as well
as part of the specifications?
Uh, not specifically, but the color
presently matches um the kind of brick
tone color
>> um that's surrounding it. So, I I think
a brown would be reasonable um brownish
red.
>> Yeah.
>> Which I think is what uh Michael had
indicated in his proposal as well.
>> Okay. All right. Are there any further
questions from the committee?
I'm just really curious now. What's this
building going to be used for when
you're complete?
>> It's going to be a medical.
>> Okay. So, do you have another entrance
to this building besides that front
door?
>> There is uh a tight internal you can see
on the side on the parking lot side. I'm
going to do that. Um that basement is
not finished yet. We are just renovating
inside
and at the back there there's a tech
that we are doing which is nothing to do
with heritage.
>> Yeah. Can I just think how you're going
to fit with OD8 like the material
disabilities act
again?
>> Well your your door is very narrow and
you haven't got a ramp.
There is there is a ramp at the back and
there is a ramp on the bike.
>> Okay. So, you do have an accessible
entrance. Okay.
>> Oh, yeah. There is at the back there
too.
>> Okay. Just wanted to make sure you
wouldn't be coming back to us. Replace
your door to comply.
>> That's that wouldn't go to us though,
Graham. Right.
>> Well, no, but I have to come back to
replace your door again. I always like
to mention stuff like that. That's why I
was just kind of curious. I didn't see
another entrance. Yeah,
>> that's a very narrow door going in.
>> Go up, but it goes on the side. There is
a ramp and there's another door on the
side.
>> Yeah. And we can actually see that in
the photographs.
>> I can see the ramp, but you don't know
what it's going to. That's why we just I
better ask the questions.
>> Yeah. Yeah. No, appreciate that. Okay.
And Sandre, did you have another
question or your hand is still up?
Wasn't sure. No, I have another
question.
>> Okay.
>> The question is, are are the doors the
same size or is one larger than the
other?
>> The doors are exactly the same
double door.
>> The the photo that has been uh shared as
as part of the summary, the door, the
interior door [clears throat] make and
what I see is that the left side is
larger than the right side.
Are they equal in size or is can you
confirm that please?
Yeah,
that is that matters though. If it is
one larger the one smaller, it should be
the same size that as far as I'm
concerned.
>> Yeah, if you look at the interior
photograph, not the exterior so much. If
you look at the interior photograph with
the push bar, the one on the left is
wider than the one on the right.
>> That is to show where the track Yeah.
out. I'm very proud of that.
>> Okay. Thank you. Okay.
Okay. Um is there any further comments
or questions, Mr. Kill?
>> All right.
>> So, we have seen the um we have actually
uh Kira, could you please put up the
conditions?
>> Thank you. So we have here the two
standard conditions the bottom two and
then that the final details and
specifications for the proposed door be
submitted to the satisfaction and
approval of the director of planning and
chief planner and heritage staff for
part of that. So, um,
do I have a mover in a seconder then to,
um, approve, uh, recommend approval of
HP 202622?
Oh, sorry. No, sorry. HA 2026002
uh, subject to these proposed
conditions.
Mover and a seconder.
See Graham and I see Angie. All right.
Thank you. And um
is there anyone opposed?
All right, seeing none, that motion is
carried.
Thank you. Okay, so um thank you for
joining us, Mr. Khalil, and um heritage
staff will be in discussions with you on
next steps and appreciate you.
>> Thank you very much.
>> Okay. All right. Good luck.
>> Thank you.
>> Okay.
Um, moving on to item
6.4 on our agenda, HP 20226022,
uh, which is pertaining to 252 James
Street South in Hamilton, known as the
Griffith's Palatial Home. This is a part
four property and the application is for
repairs to the existing concrete front
steps of the building and removal and
replacement of the existing interlocking
pavers with a sloped concrete pad. Um,
do we have an applicant or
representative of the applicant here to
speak to the uh application this
evening?
>> Yeah, I'm here. I'm the owner of 252
James Street South.
>> Okay. Welcome, Mr. Lou. Um, thank you.
>> Okay. Is there anything you would like
to add to the brief description I gave
um before we go for questions or
comments on?
>> Uh, no. It's fairly straightforward. I
think it's very simple project. Yeah.
>> Okay. Um, so you've all seen the
background information committee. Uh,
are there any questions or comments that
you have for Mr. Lou?
>> Uh, okay. So, Graeme, please go ahead.
>> Okay. It only deals with the steps. Are
they like old original steps or have
they been replacement? Like, are they
actually a stone or they uh concrete?
>> No, they're they're concrete. They've
been repaired many times. So, it's not
original.
>> Okay. That's all my be my only concern.
favors. You can do what you want with I
don't care.
>> All right.
>> Okay. Just if those were stone, I wanted
to kind of protect them, but if been
multiple repairs.
>> No, they're not. They're not.
>> Okay. Thank you.
>> Okay. Is there anyone else feel any
comments or questions?
All right. And from um then just a
comment from me. From what I understand,
nothing outside of the stairs will be
like none of the supporting uh columns
or anything will be impacted, right?
>> No, we're doing we're basically
repairing what it is there now. So,
we're just resurfacing this the steps.
>> Okay.
Yeah. Okay. And
Yeah. All right. Any nothing else from
the committee then? Oh, Graeme, go
ahead, please.
>> So, you're not going to tear them right
out and replace them. You're just going
to patch them up again?
>> We're going to break the top about 3 in
of the surface and then pour concrete.
>> Oh, okay. So, more than just a patch.
>> Yeah.
>> Okay. Okay. I'm glad you came to us
ahead of doing the work this time.
Really appreciate that. Thanks.
>> Welcome. Thank you.
>> Um, Matthew, did I see your hand up?
>> Um, you know what? I had my question
answered. I I was just curious about
whether it was a structure this was an
issue of cosmetics or a structural uh
issue. So I think I have that uh that
answer.
>> Yeah. Well, yeah, it's cosmetic.
>> Okay.
Okay. Um
All right, then. If there's no further
questions, Sandre, your hand is still
up.
Do you want that up or down? No
questions. Okay. All right. Um Okay. Um
may I then have or may we see the
proposed conditions, please, Kira?
So, they are the two standard
conditions. any changes will come back
for approval prior to the commitments
commencement of the alterations and um
it'll be two years expiry date on this
application. So may have a mover in a
secondary to recommend approval of
heritage permit 202622.
I see Sandra and I see Graham. Okay,
thank you.
And is there anyone opposed?
>> Okay, I see none. That motion is
carried.
>> Okay, thank you.
>> Thank you. Thanks everybody.
>> Thank you for coming in, Kevin. And um
yeah, city staff will I heard staff will
follow up on next steps with you. Okay,
thank you very much.
>> Okay, take care.
>> Good night. Bye.
Okay. Our next application this evening
is HP uh item 6.5 HP 2026 021 398 Wilson
Street East Ancaster uh entitled the Mar
House which is a part four property. And
so this [clears throat] is quite an
extensive uh application. I will read it
for you what is proposed consolidation
stabilization of the Mar house in situ.
So, where it stands right now is where
work will be done to stabilize it. Uh,
removal of the existing rear edition,
relocation of the MAR house from 398
Wilson Street East to 17 Academy Street,
which is around the corner, including
structure to be lifted onto steel
framing in one piece, structure to
travel on a newly built path within the
existing parcel land and access the 17
Academy parcel from the rear.
structure to be placed and consolidated
on a new concrete foundation
and restoration and alterations to the
MAR house once located at 17 Academy
Street, including minor masonry repairs
to the entire structure as needed.
Installation of new exhaust vents on the
roof.
Uh installation of new exhaust opening
on west elevation in the relocated
orientation. So, the building is being
turned uh 90° and installation of four
new basement window openings on east and
west elevations in the relocated
orientation and construction of a new
one-story rear edition end deck to be
finished in Cream Stuckco.
So, do we have a representative of this
application here this evening?
>> Good afternoon, members of committee. My
name is Matt Johnston, a registered
professional planner with Urban
Solutions here on behalf of both the
owners of the Wilson Street Lands as
well as 17 Academy.
>> Great. Thank you for joining us. Um,
do you have anything you'd like to Okay,
it looks like you have a presentation
you'd like to give. Um, if that's the
case, we normally ask that you try and
keep it brief. Um, I'm not sure what you
had in mind, how many slides you have.
>> Certainly. Thank you. Um,
you know, the intent of the presentation
is just to provide some additional
context. Um, if you'd like to go through
it in detail um, that's fine. Um, what I
would conclude is that we've reviewed
the proposed conditions of approval and
uh, have no concerns and um,
[clears throat] would be happy to have
uh, those conditions applied as
recommended by staff.
>> Okay. So, I'm at the will of the
committee if they'd like the detailed
walkthrough. Um, it's about a 10page
slide deck, give or take. Um, probably 3
4 minutes and I could roll through
rather quick.
>> That's fine. That's that would be fine.
Please go ahead. Sure. Committee would
appreciate it.
>> Next slide. Lisa, you could skip the
next as well.
So here we have the subject lands for a
residential development application uh
mixeduse project uh highlighted in red.
We have the proposed site at 17 academy
highlighted in yellow and the Marfalippo
house uh highlighted in green.
Next slide.
Uh, I'm sure there's there's uh some
history with the Mar Fleo House that I'm
sure you're familiar with. Um, built in
1850 designated under part four of the
Ontario Heritage Act and um we'll go to
the next slide.
The mixeduse development application
that I was referring to has now received
final approval of the official plan and
zoning bylaw amendment application
necessary to accommodate the proposal.
Incorporated with that is an existing
heritage permit application that has
been issued for the relocation of the
Mar house to the rear of that property
um actually onto Lauren Avenue and it
would form an accessory structure to the
condominium.
So, that permit application has been
approved and I'd say we're um probably
about 80% of the way through the
conditions of approval for that heritage
permit. [sighs]
Now, when the final uh if we go to the
next slide,
um
the reason for the relocation of the MAR
house is primarily related to uh
subgrade contamination.
So in order to remediate the site, the
relocation of the MAR house has to
occur. As I mentioned, the existing
heritage permit application um
accommodates the relocation to 17 MAR.
Now, as we go to the next slide, please.
Um
over the course of the
the existing heritage permit um there
was restoration that has been completed
to date. Uh most notably on the facade
you see on the screen here there was
some bulging at the bottom of the
property. Uh that has been repointed and
secured. And [snorts] we also have a
number of documents. Building condition
assessment, conservation plan,
uh cultural heritage impact assessment,
building relocation methodology and
structural feasibility review. Those
documents have all been prepared and
approved by staff for the existing
heritage permit application. And uh in
keeping with your proposed conditions of
approval would all be updated to reflect
uh the proposed new location. Next
slide.
So it was really with the final planning
approvals and discussions with uh
councelor Casar that uh we explored
other options rather than the existing
heritage permit and that is where uh the
developers for the mixeduse building uh
came across Mr. Ian Bartles and his
desire uh being a heritage enthusiast to
um relocate the structure to 17 Academy
as shown on the screen here. Uh next
slide.
Um as part of the uh the process um
McCullik Building Moving Company has
been uh retained to complete the move.
Uh they're certainly a a well-versed um
heritage
um moving company and um we've got again
conditions of approval with securities
in place for a safe and stable move. Uh
next slide we have uh just a little bit
on Mr. Bartles um being a heritage
heritage enthusiast that he is um has
currently completed some work in
Ancaster over at 44 Gardner Road East.
Uh that's been really well received by
the public and um it's uh it's nice that
um this arrangement's been made as part
of the um planning approvals uh on the
final slide, Lisa. Um
again there were the discussions with
councelor Casar and staff on finding
what would be thought to be a more
suitable location than the existing
heritage permit and and that is uh the
new home proposed at 17 Academy Street.
So, as part of the uh planning committee
and council minutes, um the proponents
made commitments to pursue this location
and this application and submission
processes in response to those
commitments made uh earlier this year
and um as I mentioned uh full support of
the proposed conditions of approval and
would be happy to answer any other
questions. Thank you.
>> Thank you.
Okay. Um All right. So, are there any
questions from the committee?
Okay, we'll start a list. I see Graeme
and then we'll Andy and uh if anyone
else. So, Graham, please go ahead.
>> Okay, there's there is a lot of areas of
brick that has been done with wrong
cement materials and you can see cracks
and stuff. Not brick, sorry, uh stone.
What is being done to secure that before
it's being moved? [snorts]
>> You're muted
>> through the chair. The um
there there was existing masonry work
that was poorly done over the years.
>> Oh yeah.
>> Um more recently there was the the
bulging on the one facade that I
mentioned. Uh that required more
immediate work. That work was carried
out by uh qualified mason uh
subsequently uh inspected by staff. Um
Lisa is now showing a great picture of
the the restored facade. Um and that
work would continue through the balance
of the uh the restoration, but most
recently it was in response to some uh
more immediate work that was required.
>> Okay. Okay. So, that facade you're
showing now, that's not in danger of any
kind of collapse when they pick it up.
>> No. And we've got the structural reports
um that have been updated over the
years.
>> Okay, that's good. Uh now, where it
looks like the window has been removed
off that upper floor, is that going to
be reestablished when it gets moved
over? Is that up to the new owner?
>> Um that is up to the new owner.
>> Okay, fair enough. Well, blow the lever
right there then.
No sense harassing you about that. Uh I
am very glad because I 100% oppose this
building coming off Wilson and that
Lauren Avenue location was a horrible
place to put it be forgotten. It would
be lost, probably vandalized. Now going
at least on Academy, it's going to have
a use. It's going to be seen and that's
I think is pretty important. So I'm very
happy to hear Mr. Bartles and that I
didn't realize that property on Garner
Road was his and I've stopped and
admired it three or four times now.
>> Okay. Thank you, Graham. Um we have a
question from Andy.
>> Uh yes, for the chair. Um just uh um
clarity really. I see the picture now.
There is a uh looks like there is
dwelling on that blue area. What is that
building? Is is there a structure there
now where where um it's going to be
located, where it's going to be moved
to?
>> That's right. There's an existing
dwelling uh at 17 Academy. A demolition
permit has been applied for. Uh so
that's in sequence as well. And um the
the Marfalo House would replace that
dwelling on site.
>> Okay. Thank you. And also uh through the
chair, so that that's not a heritage
building that's going to be torn down, I
take it.
the the one that's in the blue.
>> Lisa, you can confirm that. Correct.
>> It's not.
>> Uh so through the chair, it's um not it
doesn't have any heritage status. And
when we were in talks um uh with the
applicant initially, we did do an
initial review of the building and
determined that it didn't have much
heritage value. Um so we were generally
comfortable with the proposal to
demolish and replace with the Maralippo
house.
>> Okay, great. Thank you. And just one
more thing, when it's located over
there, is the is the frontage going to
be on Academy? Is that the idea for the
placement of the villain?
>> That's right. The front doors currently
fronting on Wilson will will be uh
oriented towards academy.
>> Okay. Um Okay, great. I also like to
mimic uh Graham's uh um comments
regarding where it was initially going
to go. It really is stuck in the back
corner in the middle of nowhere. Kind of
a dead end street on Lauren. And I agree
with Grammo would be kind of lost. Um
being on Academy, it'll be more uh
upfront. So I think that's uh that's a
much better location. And just curious
the um the um work that has to be done
on the original site that that building
is going to be far enough that it's not
going to be affected by the the digging
and the um you know um the re
remiteration of the sorry the um of the
site itself. I know the building's got
to move. They got to dig down deep. Um
so it's going to be far enough away to
not have any kind of vi vibration damage
or anything like that from from that
work.
through the chair. That's right. And as
part of the site plan
conditions of approval, there are uh
really checks and balances to ensure
that um not just for the Filipo Mar
house, but all all residential dwellings
in immediate proximity are are not
[snorts] damaged by any uh earthworks.
>> Uh okay, great. Uh thank you very much.
That's all I have.
>> Okay, thank you Andy.
Is there anything else from any other
other committee members?
Okay. I had a question and um I mean I
was really pleased to see the um
attachment from the moving company with
the photographs of these buildings being
moved. And these are successful moves
that they've made before of heritage
buildings. And it's I mean I couldn't
quite picture how it would work. So it
was interesting to see them all up on
the trucks like that.
They said these are the successful ones.
Do they ever have it when they fall
down? Like you know what I'm saying?
When it collapses in moving. How common
is that? Do we know?
>> To the chair. Um I'm not that familiar
with how often that may or may not
occur.
>> Um we do know that there's a very
limited amount of expert movers that can
can do such a move. Um so who McCullik
is is very well verssed in in this type
of thing and what we do have is um
securities in place uh for 100% of the
costs should anything go wrong there's
still that um financial security to uh
to to reassemble and and you know
complete the move should anything go
wrong.
>> So thank you. Yeah, I did read about the
um securities
as part of that. Then just in the worst
case scenario, will all those pieces
like would the bricks all be labeled
before the move occurs such that in case
anything bad happens, we actually know
where what was where,
you know, like when they took apart the
um the Hermitage, they took every brick
and had it all numbered and labeled so
they knew exactly how to put it back
together,
>> right? I have been involved in projects
where where the facades are cataloged
prior to dismantling and reassembly, but
because that's not happening. Um, in
this case, it it is a lift. Um, I I'm I
don't believe that that would typically
occur um in in such a scenario.
>> Yeah. I wonder Yeah. I mean, I wonder
about asking the moving company whether
that's part of what they do. It just is
just to me it looks so fragile and it's
such a risky move to me. Um I would also
like to echo what Graham and you know
the others have said. It's much better
place on academy out visible to the
public. It's a beautiful building,
right? And having it in the back as an
amenities building would have been very
negative. So this is great, but I just I
I'm still concerned about the move.
Anyhow, was there someone speaking there
for a second? Was that Lisa?
>> Yes, it was Sandra.
>> Sandra. Okay, please.
>> No, I wanted to add that there was a
report that was provided by Odovich and
he's a structural engineer
>> that is uh well-versed in the in the
field of heritage. So, uh oftent times
when we as architects work with you know
structural engineers as well as
McCullik, we do ask for uh the rationale
to be stamped by a structural engineer.
uh you know who have done those
measurements uh to uh ensure that the
building doesn't fall off. So there's
there's a lot of work that's done ahead
of the actual move to ensure that it's
secure.
>> It's not that I'm thinking it's going to
fall off. I'm thinking it's going to
collapse. It it the possibility of
collapse just because it's so old.
That's all. I'm not saying they're going
to make a mistake and it's going to slip
off or anything. That wasn't what I
meant to imply
>> it. They're still they also look at you
know that. So, in ter in terms of the
structural kind of component of it and
how it's moved, how it's held together
>> and all of that, it's it's probably a
very heavy building with how wide those
walls are. Um, so I'm sure that's part
of the calculations.
>> And actually also, um, there was never
photographs of the inside of the
building. So, um, this is to the
applicant. Is it an empty shell right
now?
Um the the interior of the build it's
not an empty shell. Um it it has been um
it has demising walls um but nothing
structural on the interior. So um there
will be sort of substantial uh
renovations to the interior to to make
it a well-appointed home
>> once it's moved. once it's moved and
that occurs after the move and um if I
could just expand on that um the
relationship between uh Orlic the
structural engineer and the building
moving company um the completion of
these reports prepared by and stamped by
professional engineers um you know
there's considerable um work done into
investigating the stability of of the
structure before um the move occurs and
and Mccullik won't take on the move
without having those checks and balances
in place. So there there's quite a bit
of energy spent on um being satisfied
that the the structure can handle the
move before that commitment's been made.
So uh even before we got to that point,
the notion of dismantling and cataloging
and reassembling uh was briefly
considered, but because the structural
integrity is is so sturdy, uh there's
confidence in uh in this
lift and and relocation as opposed to
dis cataloging disassembly and and
reassembly. So, um I think we we need a
little bit of trust in the process and
the securities in place um with those
conditions that we have in front of us.
>> Yeah. No, I appreciate that. Thank you.
Okay. Um
are there any other questions?
Uh Graham, please go ahead.
>> Yeah, more of a comment. If you were to
take a look at the attached
documentations to the Lori McCullik, if
you look at page four, the building they
are moving is a lot more in a fragile
state to move than this one. There's a
lot of openings at the grade level where
they had to support lentils and upper
walls. They've done a really good job of
it. I'm I was a milright in trade, so I
moved a lot of heavy things over the
year and and shoring stuff up really
makes a difference. And the amount of
cross beams they've put into that
structure is phenomenal. Normally you
see a house moved, there might be four,
like a normal wood frame house, they got
one, two, three, four, five, six, seven,
eight, nine, 10, 11 that you can
actually see. That's a lot of uh beams.
So, I'm pretty satisfied by this company
judging by that picture and what you can
see.
>> Okay.
>> Okay. Then, um that being said, uh if
there's no further questions, u may we
see the proposed conditions, please?
>> Yeah. So there um
mentioned there were significant number
um so let's go through the ones that are
the non-standard conditions just to make
sure we've all heard them.
[clears throat] So the final details of
the proposed alterations to the
structure once it's located at 17
Academy including proposed vent covers
basement window specifications
um be submitted. Okay. and that the
proposed masonry restoration work
conform to the city's masonry
restorations guidelines
and that the final details and
specifications for the proposed masonry
work be submitted.
Next page page, please.
that the designating bylaw 78.887 be
repealed in accordance with the
requirements of the Ontario Heritage Act
at the expense of the owner and that a
new designation bylaw be prepared in
accordance with the requirements of the
Ontario Heritage Act for the building's
new location at the expense of the owner
as well. Uh that a new survey be
prepared to accompany a new designation
by law indicating the boundaries to
which the designation applies.
That the applicant enters into a
heritage easement agreement with the
city to the satisfaction and approval of
the director of planning and chief
planner prior to the issuance of any
building permit for demolition or new
construction and that this agreement is
registered on title.
And next page please.
that a letter of credit be provided at
to be held by the city based on the cost
estimates for 100% of the total cost of
securing, protecting, stabilizing,
relocating, monitoring for a period of
three years and the total cost of
restoration. And such cost estimates
shall be in a form satisfactory to the
director of planning and chief planner.
And then the last two are the standard
um [clears throat]
conditions that we always see. So given
those proposed conditions, um may I have
a mover and a seconder to um
to recommend approval of this heritage
permit uh 202621.
>> Can I make one comment on this?
>> Okay. Yes. Okay. You're going to give
them you're going to give them three
years to be monitored. Shouldn't you
give them three years to finish the
permit?
>> This does sound like a big one to me too
as well. Lisa, what do you think?
>> Uh so through the chair, um these are
also conditions that will be put into
the staff report which will be coming to
HMHC. Uh so at that time we can adjust
those dates to reflect um a more
accurate timeline.
>> Okay. All right. So three and um I saw
Sandra Sandra, you had your hand up.
>> Yes, please go ahead.
>> I'm putting my hand for the motion.
>> Okay, that's great. I wasn't sure if you
had a comment on the commissions.
Matthew, same as well. You didn't have a
comment. You were just motioned. Okay,
so do we have a mover in a second to
recommend approval of HP202621
398 Wilson Street East in Ancaster? And
I saw Sandra and I saw Matthew, I
believe. Okay.
And um
is there anyone opposed?
Seeing none, that motion is carried.
Okay, great. So, um yes, Matt, um city
staff will be in continued discussions
with you, I know, on next steps and um I
wish you greatest of luck in this
project.
>> Thank you.
Thank you for taking the time to speak
with us tonight.
>> Thanks.
>> Okay. Um and we have one more and
actually that as well is Mr. Johnston.
So this is a pre-conultation. Are you
leaving? Is someone else coming in your
place?
>> Yes.
So pre-conultation
um item 6.6 6 440 Victoria Avenue North
in Hamilton, which is a part 4 property,
and it's for a proposal for a new
addition on the north elevation of the
structure. And so, um, do we have, uh,
someone who would like to speak to that
application
applicant or representative?
>> Hi, good evening everybody. It's Megan
Hopson. Uh, and I'm here with Rick Glenn
Tac who's the architect and Matt Johnson
who's the planner on this
>> proposal and I have a short presentation
for you.
>> Okay. Wonderful. Welcome Megan. Nice to
see you. And uh Rick and Matt, thank you
for staying with us. So uh did you have
a question Graeme?
>> I I have to make a comment here and it's
going to apply to Sandra as well. We
have to declare a non-conlicting
a non disqualifying conflict with Megan
Hobson because we were on the local
organizing committee together for the
heritage conference this year. I didn't
realize she'd be appearing today. I
didn't make the statement earlier.
>> Non-conlicting sorry
>> nondisqualifying conflict.
>> Disqualifying. Okay. And how long does
that um may I just ask uh Lisa? How long
do those non-disqualifying conflicts go
on once the event is complete?
>> Uh through the chair. I'd have to look
into that and um talk to Matt Gotier
about that.
>> Yeah, our committee's wrapped up. So,
>> yes, but we're still doing the
financials at the end.
>> We haven't ended it. So, until we finish
that, it'll be done. I'll talk to
Bargazian because he Matt can't answer
that. It'll have to be the uh
>> the commissioner that answered that
question for me.
And and just to clarify, this is just an
information item today.
>> Yes. That's why I'm saying it's
non-disqualifying. It just you got you
got to put it on the record. That's all
it has to go.
>> Yep.
>> Okay. So, I want to get feedback on
that. Um
>> All right. Um so, yes, Megan, please. Uh
I understand you have a brief
presentation. U please go ahead.
>> Yeah. So, we're here today just to um
present the development to the committee
um that will be part of a forthcoming
heritage permit application. So, this is
for information. We're looking for um
feedback from the committee tonight.
So, the development is a new office for
Stelco. Um and this is the project team.
And if you go to the next slide, please.
This is a historic photo of the site. So
it was built for Otis elevator company
um later during World War II munitions
were uh manufactured here and then it
was the Studebaker plant. So it's got a
very significant sort of um history to
the industrial sector in Hamilton. It's
located at 440 Victoria Avenue North.
And this is uh it shortly after it was
built. You can see here the original
windows and doors uh that were in the
building and this photo. So that's why I
put that f first. Uh, next slide,
please.
So this is it. And back in 2012, prior
to designation and prior to a heritage
permit that was issued to demolish the
wings, the twotory wings on either side
of the corner block and uh the plant
that was attached at the back as well,
all the industrial plants. So this is
what it looked like in 2012. Um, and you
can see the windows in it are not the
original windows. Uh, and the doors are
not the original doors. Next slide.
Uh, and so this is what it looks like
more or less today. This is a Google uh,
view to capture both um, elevations on
the corner. So on the left is the main
elevation on Victoria Avenue North and
on the right is the shorter elevation on
Ferry Street. Uh, it actually looks a
little bit worse than this today. I have
a couple of photos on the next uh slide
to show you what it looks like. But as
you can see, it's it's been vacant since
2012.
Uh it's boarded up um but it looks to be
uh it looks like most of the windows
have been removed uh or broken. And
there is paint and graffiti on the
building as well. So, it's it's it's um
doing fairly well uh considering it's
been vacant for so long, but uh it has
been vacant for quite some time. Uh next
slide, please.
So, this is a photo that I took uh just
recently and you can see this is looking
at the back of the building. So, this is
where the two-story uh wings along Ferry
Street was demolished. And you can just
see that that exposed sort of side of
the building is is more or less open to
the elements. Uh and then if you look at
the aerial view on the left, you can see
the portion that's been retained, that
corner section. Um and then uh in the
the red dotted line is where the
proposed addition is going to go um to
um sort of finish the composition and
and create new space for steel go.
Uh next slide please.
So here's the sort of floor plan and on
the right is the heritage portion and
you can see that all of it being
integrated uh and then and conserved and
on the left the blue is the new addition
that wraps around on that um side at the
around the back where um there's no
heritage fabric. So the building was
recently designated under part four of
the Ontario Heritage Act and the uh
Victoria Avenue North and Fairy Street
facads exterior masonry are the
protected heritage elements.
Uh next slide please.
So you can see that the addition is um
very complimentary. It matches the
height uh of the existing building and
it um references a lot of the design
elements and the sort of rh overall
rhythm and composition of the building.
Uh and it is um expressed in sort of
contemporary style of materials but with
reference to the original materials and
design elements. So the floor levels are
all matched. Um and the uh first story
uh sort of foundation with the
rusticated elements is kind of
referenced in the new um base of the
addition. There's larger areas of
glazing which is something that um they
need for the new office space and then
the cornice feature and roof are are
again referenced in contemporary
materials.
Uh next slide please.
So if you sort of go around to uh the
side, this is where the sort of new
atgrade entrance will be located
oriented towards the surface parking
area that will be provided for the new
use. Um and you can see how these corner
elements kind of um bookend the existing
heritage building and uh creates a very
balanced composition.
Next slide, please.
So just tracing the lines and you can
see how the horizontal and vertical
lines uh are translated into
contemporary uh design and materials.
Uh and next slide please.
And then looking around. So this is the
Ferry Street elevation on the left. Uh
and then looking around at where um you
saw the earlier photo of that exposed uh
elevation now is going to be all new
materials um and with this large sort of
curtain wall uh look on the side. The
darker elements that sort of match the
brick uh of the original building are is
a steel cladding. And um Rick is here to
talk more about materials if there are
any questions. Uh, and this just kind of
ties in with the existing sort of pallet
uh, but in a contemporary material
and also appropriate for Stelco uh, as a
steel manufacturer. Uh, next slide
please.
Uh this is one of the uh sort of
Studebaker additions to the building,
one of the Studebaker plant that was
formerly on the site and it has uh that
kind of a curtain wall um design
mid-century design. So this is one of
the other former additions on the site.
So um Rico's kind of looking at some of
these uh other buildings on the site uh
as references for the new uh addition.
Next slide, please.
Uh, also you'll note that although it's
fairly subtle, there's definitely a a
setback uh for the addition. So, this is
kind of you can see on the right where
it transitions between the thicker
masonry walls of the heritage building
to the thinner curtain wall buildings of
the addition. Uh, but it's set back a
little bit so that you so that we can
preserve that uh masonry corner detail
where there's a return on the cornice
and the brick.
and also to differentiate the new from
the old but in a subtle way. Uh, next
slide please.
Um, so this is kind of the current
edition of the uh Victoria Avenue North
main entrance on the left and what was
the sort of warehouse entrance on Ferry
Street on the right. Um, as part of the
proposal, the masonry is going to be
cleaned to remove uh salt staining, um,
carbon soiling and paint and graffiti.
Uh, new windows and doors will be
installed. Uh, and these, uh, so the
Victoria Avenue north entrance will
continue to function as a as a as an
entrance to the building. Uh the Ferry
Street uh entrance is is not required
for the new use, but um the intent is to
maintain the masonry open opening to
preserve um the former use of that doors
kind of relevant to the history of the
site. Uh, and then beside the warehouse
door on Ferry Street, you can see
there's been an opening punched through
the wall there in a vent. That'll all be
um removed with new masonry to match
what was there originally to restore it
to its original um condition.
Uh, next slide, please.
Uh so on the left uh the new Stelco um
entrance on Victoria Avenue North uh
retaining all of the heritage features,
installing a new door and then putting
some signage up above Indie Stone. On
the right is the Ferry Street uh
elevation with that door restored with
uh doors based on the historic photos
that we have that clearly show that
entrance. Uh next slide, please.
Uh and then we have this is looking at
it from Victoria Avenue North so that
you can kind of see the full effect uh
and those uh change in materials where
the addition is located. There'll also
be um uh kind of uh skylights up above.
There was an existing kind of skylight
um section there that's going to be in
incorporated into the new design.
Uh next slide please.
Uh so the uh this is just going over um
how it's consistent with standards and
guidelines. The addition matches the
height scale massing and rhythm of the
heritage building. It's clearly distinct
as a contemporary edition and
complimentary to the Edwardian
classicism and brick and stone masonry
of the heritage building through
thoughtful design elements and material
choices. Uh the impact on the heritage
fabric has been minimized by providing a
setback where the heritage fabric
transitions to the new addition. Um and
in terms of the alterations, the
heritage attributes will be conserved
and restored to their original
condition. The main entrance on Victoria
Avenue North will be stored and will
continue to function as a building
entrance. The side entrance on Ferry
Street is not required to function as a
building entrance, but will be preserved
as a record of its past use as an
entrance to the former factory floor.
New doors and windows will be installed
based on archival evidence to restore
them to their original appearance with
double glazing to improve their energy
performance.
Next slide, please.
Uh, and so overall, there's going to be
a lot of positive impacts. The heritage
building is currently vacant and at risk
due to its poor condition. Uh so that
will remedy this. Um the heritage
attributes will be conserved and
restored. The and they're currently not
in great condition. The new use is
compatible with the heritage value and
the heritage attributes and demolition
is limited to interior features that are
in poor condition. The new use as
Telco's office continues a p historic
pattern of use as the office of two
major industries previously Otis
elevator company and student Baker
company and now as a headquarters for
Stelco another important uh industry in
Hamilton and the proposed alterations
are consistent with the standards of
guidelines. So uh I think that's it.
Um when I was Yeah. So, these are my
photos from 2012 uh because I I'd done a
previous report on and that this is what
the condition of some of the interior
elements were then, but that this was a
long time ago. So, we'll have to go back
in again and assess to see if there's
anything that could be salvaged. Um, and
that will be part of the heritage impact
assessment that'll be submitted with the
uh heritage permit forthcoming heritage
permit application.
And then there's also, you know,
potential for interpretive um elements
on the left. Um the site is already part
of the maiden Hamilton Industrial Trail
and there's a marker out front. There's
also a plaque already uh for the
Studebaker Company in the park uh near
beside the site. Um and so perhaps some
of the interpretive features might focus
on the Otis Fence and Elevator Company.
Um since the Studebaker's already been
recognized and the the city installed
plaque. Um so there's some photos from
sort of the extensive industrial
buildings that were on the site formally
in the fire insurance plan in the center
there. and then uh a look at the factory
floor from uh years ago
on the right. So that's that's
everything for today. Thanks.
>> Okay. Thank you, Megan. Very
interesting.
>> It was No, it was just on the edge. Um
is there do we have any questions from
the committee?
>> Oh, right. Matthew, I saw your hand up
earlier, so please go ahead.
>> [clears throat]
>> Yeah, thank you for the uh the
presentation.
Um I had a question about uh the figure
of the uh the addition. It looks like
the um you you're attempting to emulate
the curtain glazing of the uh original.
Um
however, there between the first and
second floors there appears to be it
looks like spandrel.
>> Yeah. Um, and I was wondering if if your
team considered utilizing a different
material uh other than uh spandrel uh
one that might be uh might be um more in
the spirit of the uh the original
building.
I think that um that would be open to
looking at different planning materials
if uh we're certainly here to get
suggestions um and get your eyes on it.
Um
currently it's a kind of a a metal
spandrel feature um that sort of
matches, you know, the glazing as
opposed to matching the masonry on the
heritage building. But that that could
be another approach.
>> Did you have any further suggestions,
Matthew, that you were thinking of or
No, just
>> Yeah,
>> I just a spitballing. Yeah, to to as a
potential consideration. Thank you.
>> Yeah. Thank you.
>> Okay. Any thoughts from anyone else?
>> I have question.
>> We'll start with start with something.
We'll go to
>> Graham.
Uh, thank you, Megan. Great
presentation. I really like this
project. Um, I'm questioning the use of
the metal uh butdding up against the red
brick. I I think that uh the reference
to metal is is a good one, but in the
illustration, I found some similarities
between the brick and the metal. And I
wonder if if it's just the way that the
rendering was um presented or is it is
really is the red the right color to
distinguish itself from the brick? Um
I'm posing back you know the question to
the team and I I wondered if also the
the division of the uh the
[clears throat] curtain wall is
appropriate. I I feel as though if if
you want to share the elevation again.
Is that okay, Megan?
>> Yeah.
>> Or or somebody.
>> Lisa will put that up. Yeah.
>> Thank you, Lisa.
So I if if we look at the division of
the the sort of the curtain wall those
the cadence of the windows and the
masonry openings is is not technically
represented here and and maybe that's
where um uh Matthew was going. I I feel
as though those those units are much
larger than the windows. uh the punched
openings. I I don't feel that kind of
being echoed. Maybe there's a an
opportunity for another horizontal to be
incorporated to actually represent the
right proportion of those punched
openings, those windows.
>> So, you mean the like the vertical bays?
>> Yeah, those seem very tall in comparison
to the windows, Megan. And I I just
wondered if there was another maybe
another uh Yeah. horizontal kind of at
the top.
>> Yeah.
>> I wish I could draw on top of this.
>> Yeah, I know. I know what you mean to
[clears throat] bring it up to the
window sills of the of the heritage.
Yeah. Okay. Well, we can we can look at
that. Um it's a good suggestion.
>> Thank you.
>> Okay. And uh we'll go to Graham next.
Yeah. Uh I like it overall like the the
design looks pretty good. But you were
talking about the honoring of the
companies that used to be in there and
you made no mention of the uh the
buffers plant that actually Studebaker
was built for originally. Otis Venom was
bought the building from the government
of Canada because that was a buffer
anti-aircraft gun plant and I hear
nothing about the commemoration of that
part of it.
>> Sure. We manufacturing of uh munitions
during World War II. I did mention that
at the beginning, but yeah, that should
be uh commemorated as well.
>> I think overall is a pretty good deal.
I'm just kind of curious what's going to
happen to the old Stelco office building
now.
>> I can't speak to that.
>> That's [laughter] really not part of
this. I'm sorry.
>> Okay. Um thank you, Graham. Matthew, did
you have a further question?
No, thank you. Okay. Um, anybody else
have anything they'd like to ask or
comment at this point?
Okay. I mean, I can say when I saw this
project, I was thrilled, too. I'm I'm
just It's a beautiful building. I would
love to see this happen. So, yeah. I'm
starting to sound like Graham.
[laughter]
>> Okay. So, that being said, then this is
>> that's not a bad thing. [laughter]
>> It is just a consultation. So, um, may I
have a mover and a secondary to receive
the presentation?
Okay, I see Andy and I see Matthew
and Matthew. And anyone opposed to
receiving?
>> Nope. Okay. So, that motion is carried.
All right.
>> Your time.
>> Yes. Thank you all for uh taking the
time to speak with us this evening. Much
appreciated and hope to see you soon
with the formalation.
Okay. Take care.
Thank you, committee. So, as there's no
further business, I adjourn this meeting
at 6:19 p.m. And our next meeting is
scheduled for September 15th, 2026. So,
we'll see you in a month. Okay. Thank
you again. Appreciate all your time.
Decent.