Victoria Park Heritage Review and Designations - 2026-05-05 - Heritage Kitchener
Kitchener · May 08, 2026
Good afternoon and welcome to our May
Heritage Kitchener meeting. Um this
afternoon we're uh pleased to have with
us um our reps who are going to talk
about um Victoria Park and um I uh just
encourage everyone that um you know um
if you have questions we know the rules
and um how we do our uh reports and so
on and so forth. So um again for the
audience, people interested in
participating in future meetings can
register online using the delegation
registration form wkitner.ca
delegation or via email at
delegation.ca.
So first item uh of business we would
like to know if anybody has a disclosure
of pecuniary interest and the general
nature thereof.
So are there any
pecunary interests? Seeing none we'll
proceed to the delegation.
Um and um what we're going to do is um
go straight to um this presentation on
Victoria Park. Um it's and you have as
your agenda item heritage consultation
memo for Victoria Park master plan.
And we have uh two of our staff who are
going to um
present because they've both been
involved in in this item. Uh we have
Michelle Drake, our senior heritage
planner, and uh Karen Lisa, landscape
architect. So each of them will prevent
will present and we do have a fivem
minute presentation. However, I would
think that this item may take longer
than the five minutes. And since we
don't have a long agenda, I will um open
it up and you do what you have to do to
present. All right. Um so, Michelle, are
you going to present first?
Uh we're going to present together.
Karen and um Meliss and Michelle please.
Thank you Jean for that introduction.
So, uh, both myself and, uh, Miss Lear
are here tonight to talk about the
Victoria Park master plan and the
heritage review, uh, that was undertaken
by, uh, the firm of Archaeological
Services, Inc., ASI. Um the purpose of
our presentation today is to not walk
you through every single recommendation
of the draftmaster plan, but rather to
sort of highlight the the theme areas
and the findings as they relate to
heritage um with respect to ongoing work
with the overall Victoria Park master
plan review process.
So, as I mentioned, uh, ASI was retained
to assess how the draft Victoria Park
master plan recommendations
aligned with, as you know, the Victoria
Park area heritage conservation district
plan policies and guidelines. The review
identified uh, a few different things.
one being um or I guess the purpose
sorry of the review was to identify if
there were any potential conflicts. Um
but it also identified and looked at
opportunities where we may be able to
strengthen the heritage character that
we see in Victoria Park today and in the
broader heritage conservation district
throughout the process.
In terms of context, uh, this committee
should be fairly familiar that Victoria
Park is the city's oldest park. It was
established in the 1890s
and forms a central feature within the
Victoria Park area heritage conservation
district. The plan that applies in that
district identifies the park as an
romantic landscape. And then it mentions
that it's characterized by things like
the naturalistic forms, the meandering
pathways, wooded areas, open lawns,
framed vistas, and then it mentions the
uh lake as a focal point within the park
and the district.
And I'm going to turn it over to Karen
for now.
All good. Okay. Thanks, Michelle. Um,
good afternoon. Uh, thank you for taking
the time to uh to hear about the master
plan and the progress we've made um
since we last met in November of 2025.
Um, I just wanted to bring some
additional information uh to the
committee um in terms of um the
recommendations that we've brought forth
and um how it relates to what Michelle
had just mentioned about the heritage
review. As far as the process for the
project um since we last met, we were
working through um draft
recommendations. So we'd finalized phase
one and phase two um and we were
validating all the data we had collected
from those two phases and drafting
recommendations based on uh capital
policy and strategic initiatives.
Uh we uh worked through an internal
stakeholder process where we verified
that information and basically circled
back to those folks in our working group
and made sure that we weren't missing
anything. uh and then we're looking at a
prioritization of those um
recommendations.
So um in terms of the internal
stakeholder verification, we worked
through um uh like I mentioned the
internal working group, but also um
feedback from our CLT, our corporate
leadership team. Um, and then as
Michelle mentioned, we uh jointly
retained uh ASI to look at the overall
recommendations and are here today for
our second update. Um, and concurrently
are working on the document in the
background just to make sure that we
meet our June 1 deadline for council.
Next slide.
So um in terms of the internal
stakeholder verification
uh that was in March that we went
individually to heritage planning staff,
economic development, our park per parks
operations um staff as well as
transportation. Those four were sort of
key groups that we had heard from um uh
in our engagement process but had a lot
of um input uh when it came to some of
those recommendations. and we wanted to
make sure that what we were presenting
um aligned with uh with staff's thoughts
and strategic goals as well. Um and then
CLT came in April um where we confirmed
support andor revisions to some of those
recommendations keeping in mind that the
43 recommendations that we presented uh
in our memo to this committee as well as
to ASI have since been refined. Um but
we will move forward with the original
list that we had presented just so we
can have that discussion if there's any
specific questions. Um and then again in
April we were working with ASI to make
sure that we had um that reference point
for committee today. Next slide.
So as I mentioned the 43 original
recommendations there was 25 capital,
nine strategic and nine policy. um of
those they're um covered under the
topics to the right. I know that's kind
of small text, but uh it gives you an
understanding of the depth of the
engagement and the the feedback we
received last year um and how we've sort
of grouped those topics and and move
forward in providing recommendations
that um align with with what we heard
internally and externally from the
public. Next slide.
So, I'll pass it back to Michelle.
So, in terms of the overall findings,
uh, what ASI reported back to us was
that the majority of the draft
recommendations found in the draft
Victoria Park master plan were not
inherently in conflict with the policies
that this committee is familiar with
within the Victoria Park area Heritage
Conservation District plan.
Many of the um recommendations actually
present opportunities where we may be
able to uh restore andor improve and
enhance the character within the park
and the broader district. The primary
risk that they did share um was the idea
of like cumulative impacts. So the idea
that if there are numerous um small
andor uncoordinated
changes in the park that their
collective impact could be um a concern
and specifically with respect to um the
idea of cumulative visual clutter.
So some of the key considerations that
were outlined were related to focusing
on protecting the Victoria Park in terms
of its landscape elements. So looking at
maintaining views to from and around the
lake, preserving the open grassy sweeps
such as uh the commons and the meadow,
retaining the wooded areas, and then
protecting the important vistas.
Also of interest is the pathways where
we would like to continue to see them
meandering in their alignment instead of
being um perhaps you know straightened
or hard angles. Um and ideally not over
widening of the pathways as they exist
today and where new structures may be
proposed that there be you know
thoughtful consideration to the need and
then careful consideration of the
appropriate location for those new
structures.
And so with respect to some of the
details around uh these changes, the
guidance emphasized compatibility rather
than a replication of historic styles.
So looking at new or replacement
elements um that are high quality
natural materials, muted tones um
historically appropriate tones like
those suggested in the Heritage
Conservation District plan and gave
these examples of like park furniture
and signage looking to sort of
coordinate how their design happens and
vegetation strategies that can also help
us reinforce that romantic landscape
while still integrating some of the
ecological and forestry best practices
that the city would like to achieve.
And with that, I will turn it back to
Karen.
>> Great. Thanks, Michelle. Um so this next
slide references uh the active play zone
in the back like southern portion of the
park. Um in in speaking to Michelle's
previous slide about um designing with a
thoughtful approach and in context of
the space um we had some conversations
about prioritizing work and um uh with
the picnic shelter that has recently um
come down and some of the other capital
life cycle replacements um at the back
end in this zone that we're referring
to. Um, we were looking to find
efficiencies and making improvements and
for lack of a better phrase, getting the
most bang for our buck in terms of that
that space. Um, we know the following to
be true currently in the that existing
location uh in Victoria Park. So, the
picnic shelter was removed last fall due
to its age and safety concerns. Um, the
splash pad needs a complete overhaul.
It's at the end of its life cycle as
well. Uh the playground's rubberized
surfacing needs repairs and a few minor
play elements need to change. Uh the
trail surface needs repairs and uh
there's some user conflicts there as
well. Uh seating improvements and
basketball court improvements were all
sort of highlighted as initial
uh targeted capital work that uh can be
we can look at funding within a
shortterm period.
Next one.
So, it's hard to see from this slide up
uh that high, but um we've tried to
outline the like general area in con in
context of the entire park itself. Um
really just including the playground,
the splash pad area, the picnic shelter,
the existing um basketball court, the uh
access lane on the other side of the
machine shop. Um it's all sort of
working together um in conjunction with
some of those life cycle um efficiencies
that we're are looking at uh moving
forward.
Next slide.
Um so with that um we're really focusing
on uh for the master plan bringing
forward a bit of a conceptual um
overview of that space. uh we don't have
specific uh finalized design to be
presented in the master plan itself, but
it's more of a conceptual um
understanding that we'd like to move
forward with. Each one of those
individual uh capital projects will talk
to our colleagues in heritage uh
planning and understand if the process
would be to bring that forward to
heritage each like in an individual
sense or um as a collective. uh we want
to make sure that the the point that
Michelle made about cumulative impacts
that we're being cognizant of that and
that as a whole um we are making good
choices in terms of the design and the
the final impact to the park itself. So,
the picnic shelter, um, we're looking at
upgrading that to match the aesthetic of
existing park buildings, similar to the,
um, uh, recently renovated bandstand.
Um, and shifting that structure away
from the machine shop as it's it's not
in an ideal location currently. It's
kind of pushed to the the farthest back
corner of the park. uh the summer
kitchen, considering potentially a new
use there or location to support um the
indigenous people's gathering space and
the active play zone that I referenced.
Um for the play area specifically, we'd
like to move the swings a little bit
closer to the existing play area because
currently they are not meeting
accessibility requirements. Um and open
up that vista. Um, as the heritage
district plan references vistas and
sweeps of grass, we want to um alleviate
some issues with accessibility and um
consolidating those play areas,
improving um uh maintenance for our
staff, but also kind of uh improving
that Vista at the same time. Uh and as
well as the seating options uh around
the playground and the splash pad that
would kind of concurrently work in
tandem with those upgrades. Uh the
splash pad replacing uh what's existing
um but adjacent to the playground.
The basketball um look at that as more
of a dedicated team um area close to the
outdoor exercise um equipment that's
existing. And then the trail piece,
keeping in mind the the point made about
meandering pathways and um not expanding
widths where um absolutely you know not
necessary but looking at um mitigating
pedestrian conflicts and improving the
surfaces um where we can. Next slide.
Uh so this is uh just an example and I
believe Heritage might have committee
might have seen this previously but um
we're looking at a a Canadian supplier
Shade View that um could potentially uh
provide a replacement for the existing
picnic shelter. Um we've discussed
materiality and like wish list options
with our facilities management staff.
So, they've given us an understanding of
what they'd like to see in terms of
power, lighting, durability,
uh, specs as they relate to a new
structure in the park. Um, but we'll
also obviously be considering the
aesthetic to be consistent with, um,
like Michelle had mentioned, the
existing buildings and structures in the
park,
whether that be cedar shingles or stone
cladding um, of the base, something that
really fits within the context of the
park. Uh, next slide.
And this is just another alternative
with a metal structured roof. Um, but
there's, you know, there's a lot of
different um opportunities to work with
this supplier to um achieve an aesthetic
that's agreeable to to Heritage and uh
to all those stakeholders as well. Next
slide. I think that's I'll turn it over
to Michelle.
And so, uh, I guess in conclusion, what
was came out of the heritage review was
that, um, as the draft recommendations
are presented now, um, they will not
detract from the heritage character, um,
and in some instances will actually
create these opportunities to enhance
the heritage character.
Most of the changes um that Karen had
described are located in that south end
of Victoria Park. Um and you know when
we move forward with um implementation
of the recommendations we we will need
to consider you know what is the right
process so that we're have that um
bird's eye view of the park as a whole
and can understand sort of the
cumulative impact of changes that might
be more um minor over time but
collectively you know could have a
larger impact.
Um and then depending as well on the
scope of change, you know, whether those
changes are things that would be um
considered uh under our delegated
approval authority by law and or whether
the scope of change requires
consideration
um through the heritage committee and
potentially council. So that is the
conclusion of the presentation um by
staff. We do have uh our consultant here
if there are questions um with respect
to the memo um that she you may want to
address to the delegation. Um Karen and
I are obviously available if there's
questions of staff. Um but generally we
just like to open it up to the committee
for comments and questions.
Thank you. And uh that gives us a really
good overview
um of both the uh practical and the
heritage items. So I will open it up to
committee um for questions or comments,
observations
and sure councelor Chapman.
Yeah. Thank you and thank you for this
report. Um I just have a few questions
and maybe it's too early to answer them
but um there was mention of signage
um I hope we can keep that to a minimum.
Can we
uh through the chair? I think what the
recommendation is is to have a
consolidated and comprehensive approach.
And I think that idea would be to sort
of minimize the signage, but also um
likely have sort of a a consistent
approach where we do introduce signs so
that we reduce that visual clutter both
in terms of number but also in terms of
like design or style if that makes
sense.
>> Okay. Um, yeah, just I'd hate to see the
park full of signs, right? It's it's a
large park, but it's not that big, I
guess. Um, you mentioned that the
basketball area um would be closer to
the outdoor exercise area, and I was
just wondering if that would in any way
impact the the parking in that area
right now.
>> Yeah, I can take that. Um, so we're
looking at kind of adjacent to the
existing parking lot. Um, it won't
impact the parking specifically. It's
just a kind of a a shift closer to that
space. So, it reads as more of
consistent youth focused space. Um, but
yeah, no no specific um concerns about
parking impacts.
>> Okay, great. Um there's no mention of
barbecues
um or outdoor I don't know they're not
called barbecues but um pits fire pits.
Have we decided not to do that?
>> Uh so that's kind of come in tandem with
the um like picnic shelter I believe. Um
we have
sort of dedicated coal locations.
There's a lot of um independent uh sort
of multigenerational
gatherings that we've seen over the last
few years um in the park and people
bringing their own um uh facilities with
them to the space. Um we do have a um
the park's master plan does provide some
information in terms of like moving
forward with a pilot for that piece as
well. So, um, I don't know if Marky
likes to speak to that in more detail.
>> I think there's room for minor
improvements s such as that. So, we
didn't hear an outcome specifically for
barbecues. We know it's used, but a
permanent facility like that, we can
certainly add it after the fact. It
doesn't necessarily have to be part of
the larger strategic plan. So, if it's a
grassroots initiative or something you
hear from constituents, we're happy to
um place it in the location like that.
>> Okay? because I do think as as Karen
said, there are, you know, a lot of
multigenerational families that do use
the park and
>> will, you know, hold parties and and
that sort of thing. So, it' be nice if
they had that that um infrastructure
available to them.
>> Um I can hold off if others have
questions. No. Okay. Um what about the
multi-use trail? Um what what ideas do
you have for that? Because I know it can
be um
there is conflict with pedestrians and
ebikes in particular
scooters.
>> Um we are looking at uh as part of that
southern portion in the the active play
zone uh to have a a sort of bypass trail
um around the backside of that space if
we can consolidate it closer together.
um still meandering in a way, but I
think that um that would really help the
conflicts we're seeing with uh
pedestrians and e- scooters and the
entrance from the parking lot near the
pavilion. There's a lot going on in that
space. There's a lot of crossover to the
washroom facility if that becomes um you
know a change room in the future or if
we look at you know a retrofit for that
building. there's even more sort of
crossover of pedestrians in that space
and we're seeing that through our like
sensor technology as well. So, I think
that that provides even more um
data behind making a a change there in
in terms of the pathway and um providing
a better connection from the Iron Horse
Trail around that space um to
neighboring uh side streets and to the
rest of the park.
>> Right. Okay. Um, and what about the
indigenous people's gathering space? Um,
I know one concern when it was sort of
an impromptu arrangement was the
um close proximity to the kids play
area. So, would it be moved back
slightly to avoid that conflict? Um so
our colleague Carol Bacon is managing
that piece and um the location is
indigenousled in terms of um citing that
appropriately. Um and it's quite a
distance away from the the playground in
an open green space that I think we're
going to have a communication of that
publicly in the next couple days. Um,
so, uh, yeah, we'll have a a better
understanding publicly of where that
will be and where it'll be cited and
what the materiality and the the design
will look like.
>> Right. Um, my other question had to do
with the um, Victoria Park working
group. They haven't seen this yet. Um,
will they be seeing it before it comes
to council in June? I forget when the
next meeting is. the entirety of the
master plan or
>> well at least uh like
>> we can I was aiming to for post heritage
committee to forward uh ASI's report if
um um I think that that we can keep that
internal to the um working group but um
I think if if need be we would share
that as well.
>> Okay. Thank you. I I think it's you've
done a great job. Thanks.
Thank you, councelor Chapman. Are there
any other questions,
comments?
>> Yes, arms.
>> Um, I just had a question about the it
was noted that there was potential for
land acquisition and expansion of the
park beyond the railway. Um, keeping in
mind that it should be differentiated
from the rest of the park if that
happens from like a heritage
perspective. Um, I wondered if that is
something that is being actively pursued
or is it just a a hypothetical depending
on how things work out for some of these
these plans.
>> It is being pursued but as part of the
larger city initiative just because the
uh resources to acquire properties is
finite. So it's not just Victoria Park,
it's across the city. So it is being
considered uh realistically and actively
just as part of the larger picture.
>> Okay. Thank you.
>> Thank you Preston. Any other questions?
Um I have one or two with respect to the
picnic shelter. I I'm sure that's
capital cost. Um is it planned for this
year or um Is this when the uh plan is
finished?
>> That's the first one out of the gate.
Once we're through council approval,
assuming it is approved through council,
that is our first project uh to replace
that function and service uh as quickly
as we can.
So further um you showed a few designs
um and I'm wondering if um like how you
will um work on the design in
conjunction with our heritage committee.
Um
and
I I've seen now the two designs and I
think I have a preference on one of
them. Um however I don't know what the
other members of the committee feel
about the design. So uh how will that
proceed?
>> So specific capital projects we will
come back to heritage committee similar
to bridge replacements and any other
major capital works. This would fall
under that same process. So, uh, we're
not here to talk about the specifics of
the design, although we alluded to it
and showed a nice picture about it and
and what we're thinking about it, but
the specifics of the materiality, the
design, the size, we will come back to
this committee with specifics and
receive feedback accordingly and balance
with our own facilities management, our
own operations team, too. Um, in years
past, um, it seemed to me that, um, we
did have committee reps, um, sitting
down with staff in building projects
like this. And I wonder if, um, this
might be um, a project that would be
worthy of um, maybe a member of the
committee. And it sounds like there's a
working group or of the Victoria Park
community group, something like that to
to talk and have some discussion on this
picnic shelter since it's part and
parcel of their neighborhood.
>> Certainly will include the Victoria Park
Working Group. They are um like you
said, part and parcel with the park
itself, the neighborhood. uh they are
part of the uh one of the groups that we
will uh speak to once the u the design
is underway.
>> Thank you.
Uh another item that uh was brought to
my attention and um I have wondered
about this as well. For instance, you
have a road um carries a fair amount of
traffic through the park. Um and I
wondered like has there been any thought
of how one would um instead of maybe
having the stop and at one point like a
different way of of dealing with the um
of the traffic and the crossing and I
don't know That's a concern.
>> Sure. Um, so we had a pretty substantial
engagement phase last summer um that
included um internal and external
engagement. We had a um a transportation
sharet. So staff um internally from our
transportation department
um talked about a lot of these these
pieces in terms of uh crossover of
active transportation
um parking the connection along Jubilee.
Um there's even in some of the um like
older documentation that Rich Mills had
shared with us um there was reference to
closing Jubilee back in like the 70s and
the 80s and like it seems to come up
every decade. Um
so there was there was a lot of
conversation about um is the park for
cars, is it for pedestrians and and back
and forth about um how we're managing
that overlap. I think that we've landed
um on a point where we're we're focusing
more through this master plan on um over
the next 10-year period on pedestrian
circulation through the park space. Um
we have a parking strategy that we're
looking at and strategic items that
we're bringing forward over the next um
10-year period that try to get at the
the crux of some of those conflicts. Um
but yeah, I think that that's that's
become a an ongoing dialogue in our
engagement and you'll see it represented
in the master plan as well.
>> Thank you. Uh one last item. Um, we've
got mandering pathways
and I do believe in the script I read
about um perhaps sand and gravel um
finishes and
I think that might be a bit difficult.
Um, and I wondered whether um there
might be some cons like I'm just trying
to think of the romantic era or the
landscape era, the late Victorian period
and and how you blend that. Um, and I I
I will be honest, I abhore I abhore
and I don't think it has a place in the
park for it. Um, but I wondered whether
something like um an aggregate or a
brushed aggregate brush stone might work
on the paths where you are suggesting
the um the gravel and the sand. And then
again, I don't know where those paths
are, but I just put it out there for
your consideration
if you want to respond.
We should probably hold off until maybe
we do that work. But um I know any
asphalt installations there, they use a
different type. It's a rougher uh
category of of asphalt to uh maybe elude
to that sand and gravel finish. Um but
beyond that, it's typically a cost uh
decision really. it if we're speaking of
concrete to uh brush concrete or expose
aggregate concrete or something to that
effect. Uh to do it in mass quantity is
costly. So asphalt is the better is the
balance I say of uh of both of those
where we get the accessibility benefits
of a firm stable surface and um
uh not quite as expensive as as
concrete. So uh we'll consider that. I
mean, I think it it's part of the the
cost considerations, but um doing this
under budget is also part of it, too.
And there are modifications we can do to
asphalt to to help the the visual or to
help the uh um what it what what it
appears like.
>> Thank you. Are there any other
comments?
So staff, have you any concluding
remarks or do you feel you've exhausted
what we need to know? Michelle and
Kieran
Karen
>> uh through the chair do we just wanted
to present the information to the
committee today and acknowledge that you
know parks and heritage planning will
continue to work together as um the
broader master plan moves forward but
also as some of those implementation
pieces um are sort of targeted to to
start work on. Uh and absolutely, you
know, where um a heritage permit is
required, we will um you know, seek
advice from the neighborhood
representative to see, you know, whether
those permits need to come to committee
or whether they can be processed um at a
staff level under delegated approval.
>> Very good. Thank you. Any further
direction?
Great. All right. Uh we'll now uh
proceed to our bill 23 municipal and
thank you again for coming. Um Bill 23
municipal heritage register review. So
it looks like we have two properties 130
Weaver Street West and 10517
Onward Avenue. Uh and I assume Victoria,
you're going to be working on this and
presenting. All right.
Uh thank you, Madam Chair. Uh so the
first property um that we're bringing
forward to you this evening as part of
our municipal heritage register review
uh is 130 Weber Street West.
Um the property uh contains a two-story
early 20th century um brick building
constructed in the industrial vernacular
style um with subtle art deco
influences. Um I just wanted to note to
the committee um that the statement of
significance refers to um the building
um having subtle uh classical revival
influences um but after some
reassessment um these appear to be more
aligned with um the art deco uh
architectural style. Um, so the building
is situated on a um 0.59
acre parcel of land located on the north
uh east corner of Brideup Street and
Weber Street West uh within the
warehouse district um cultural heritage
landscape. And the principal resource uh
that contributes to the heritage value
um of the property is the commercial
building.
Uh so the property has uh design
physical value as it is a representative
example of um industrial vernacular
architecture um with subtle art deco
influence.
Uh the property has historical and
associative value. Um so Charles Door um
or Dare founder of Dare Foods uh was the
original owner of these lands. and the
property formerly housed um the Dare
Foods factory uh before a fire um
destroyed the building in 1943. Uh Dare
Foods um has since relocated um to its
uh location on Kingsway Drive. Um so AB
Kaya of Kaya Fabrics um purchased the
property and uh relocated uh the company
to uh 130 Weaver Street West in 1947.
Uh Kaya Fabrics is well known is a
well-known entity uh in the Canadian
textile industry. Um the company
collaborated with a Danishbased designer
and artist to produce um textile art
prints that helped shape Canadian art
textile styles. And the company also had
exclusive rights um to a line of fire
retardant fabrics um making Kaya fabrics
a lead leading supplier um to schools,
hospitals, and other institutions um
throughout the 1960s and 1970s.
The current building at uh 130 Weber
Street West uh was designed by BA Jones.
Um Jones worked with WH uh Schmaltz and
assisted with the design of the um 1922
2020 20 or 1922 23 uh Kitchener City
Hall building. And uh Jones also
designed the 1932 um public public
utilities building and the 1936 37
Church of the Good Sheeperd.
And this property um also has contextual
value as it contributes to the
continuity and character of the Brideup
Street and Weber Street West
streetscapes as well as the warehouse
district CHL.
Um, so that concludes my presentation on
this property. Um, Madam Chair, would
you like me to just move to the the next
one? Um, and we can consider them both
together or do you want to pause here
and have discussion?
>> Perhaps we can pause and um, we can take
them together, but I'll ask the
question. Are there any questions for
Victoria on this property?
Well, I have one. Um, it's a bit of
nostalgia.
Um, does anyone remember buying Kaya
fabrics
or having someone make clothing of Kaya
fabric?
I do.
I was really sorry when that fabric
company left um our city. Uh, and it it
was kind of a pleasant surprise to read
this in the in the script and I hadn't
realized where this was made. Good. All
right. Are there any other uh comments
or questions?
Um, all right. We'll proceed then to the
onward property.
All right. Thank you, Madam Chair. Um so
the second uh property that's being
brought forward uh this evening is um
the property municipally addressed as
105 to 117 Onward Avenue. Uh this
property contains a three-story mid 20th
century brick apartment building uh
constructed in the structuralist
architectural style. The apartment
building is situated on a 1.19 acre
parcel of land uh located at the corner
of Onward Avenue and Weber Street East
in the Onward Avenue neighborhood
cultural heritage landscape. The
principal resource that contributes to
the heritage value of the property is
the apartment building.
Uh so the property has design physical
value as the building is a
representative example of the
structuralist architectural style. Uh
the property has historical associative
value given its association um with the
original owner and builder Michael
Krauss. Um and it also has the potential
to yield information about um post-war
development within the city of
Kitchener.
So Michael Krauss um was founder of
Krauss carpet mills and Strudex fibers
um and was a prominent member of the new
apostolic church. Uh his religious work
and his work as a builder were
intertwined. Um he served as the
contractor for the church building at
182 Victoria Street North and helped
build uh the current new apostolic
church uh at 160 Margaret Avenue. Uh
Krauss was the founder and president of
Stam Investments, a company owned by the
New Apostolic Church of Canada uh which
was involved in apartment construction
and land development. Uh the company's
proceeds were partly dedicated to uh the
church's missionary work in Asia,
Africa, South America, and the
Caribbean.
The building at 105 to 117 uh Onward
Avenue illustrates the role of apartment
buildings in addressing post-war housing
needs in Kitchener. Uh this building is
part of a series of several apartment
buildings uh constructed by different
owners on the same uh or modified plans
um around 1948.
And the property has contextual value as
the building contributes to the
continuity and character of the Onward
Avenue streetscape. Uh the building is
in its original location and maintains
its original use as an apartment
building. Prior to World War II, the
area around this property represented
the limits of Kitchener's urban
development. Uh and there is a link
between this building and the nearby um
H plan apartment buildings at 14149
Bordon Avenue and 265 uh Weber Street
East.
Um, so that concludes my presentation on
uh these properties and I'm just going
to put the recommendation up on on the
slide for the the committee. Thank you.
>> Thank you, Victoria. Are there any
questions about this?
>> Yes. Uh, councelor show,
>> thank you. It's nice to see this
apartment being put on the list. Um, was
there not another apartment beside that
of the same
heritage at one point? I'm sure there
was two.
Uh, through the chair, I don't know if
there was one like directly beside this
property, but on um 265 Weber Street
East, which is very close to this
property, there is an H plan apartment
building. And then the um the two uh
properties that I mentioned uh at Bordon
Avenue are also um sort of H plan blocks
as well.
>> Yeah, I thought there was one up closer
towards um going towards East, but
that's okay. It's nice to see this.
Thank you.
>> Thank you, Councelor Michelle. Any other
questions for Victoria?
Well, seeing none, um I'm going to read
the motion
that pursuant to section 29 of the
Interior Heritage Act, the cultural
heritage value or interest be recognized
and designation be pursued for the
following properties. 130 Weber Street
West, 10517
Onward Avenue. Are there any questions?
Who would move this?
Magda. Thank you. Any further questions?
All right. All those in favor?
It's carried. And this will go to
council for approval June 29, 2026.
Uh now we have the information items,
our heritage permit applications
tracking sheet. Are there any questions
about that one?
Seeing none, who would like to adjourn
the meeting?
Thank you, Councelor Chapman.