← Back to summary
Full Transcript
Council Approves Herb Street Zoning Bylaw - 11 May 26
Waterloo · May 13, 2026
Welcome back everyone. We're going to
get started with the 6:30 p.m. part of
our meeting on uh this is May 11th uh
2026
and this is a formal public meeting to
consider item 11A. But before we get
started on that, are there any
disclosures disclosures of pecuni
pecuniary interest or the nature of the
I should have done my mouth exercises
before I came up here.
Okay, no one has anything to declare.
Thank you very much. We will just move
right on to uh the public meeting then.
So um formal public meeting to consider
item 11A. Um, this is the housing
accelerator fund community planning
permit system initiative. Uh, zoning
bylaw amendment Z2606,
final Herb Street corridor community
planning permit bylaw. Any persons who
want further notice of this application,
including the passage of any bylaw,
should sign the appropriate register in
the binder located on the desk at the
rear of the council chambers. If there
is more than one binder, please make
sure you are signing the appropriate
one. Will the clerk please advise
council of the method used to give
notice of the meeting and the dates
notice was given?
>> Notice was advertised in the Waterl
regional record on April 16th, 2026 and
mailed or emailed on April 14th, 2026 to
all property owners within 120 meters of
the subject property to public agencies
and to all persons who requested notice.
>> Thank you for that. Uh so the
consultants David Riley and Justine
Giancola will now give a brief overview.
So get yourselves comfortable there.
Make sure you can uh lift up the podium
if you need to or lower it.
Thank you very much.
So oh the presentation is up.
Uh so uh good evening everyone. Uh my
name is David Riley with SGL Planning
and Design. I'm joined here by Justine
Jenola from Dylan Consulting and we're
uh the consulting team. You know, many
more of us that couldn't be here right
now, but uh working on the city's uh
community planning permit system for the
Hurb Street corridor. Uh so today we
wanted to provide a very brief overview
of uh the bylaw that is before you this
evening. um explain how it works,
summarize the engagement process and
outline really the next steps which is
the implementation.
So, uh what is this project about? So,
this is really about implementing a
community planning permit system along
the Herb Street corridor and it's
intended um really uh to apply to the
strategic growth area or one of the
strategic growth areas within the city
of Wateroo. Um the whole initiative um
is part of the city's housing
accelerator fund uh commitments and it's
intended to support housing delivery as
well as implementing a more streamlined
development approvals process.
The way that the CPPs,
which is a short form for community
planning permit system that you'll
probably hear me say a lot, um
streamlines approvals is by combining
several different uh planning
applications into one more coordinated
process. Um this improves efficiency and
it allows the city to address other
matters such as urban design,
landscaping, and community benefits in a
more integrated way. Really an important
thing is that the proposed CPP bylaw
builds on the city's already established
official plan policy and zoning
framework rather than replacing this
broad uh planning vision that you
already have in place. Um
here we have a a bit of an overview of
uh the community planning permit system.
It's um
a little bit different than the
traditional planning framework that
exists today. So under the current
system, an applicant that comes for a
development application uh may apply for
separate applications for zoning bylaw
amendments, minor variances, and site
plan approval. A CP combines these into
one process and this is how it creates a
more streamlined uh process, transparent
for applicants, staff, council, and the
community. It also provides
municipalities with the uh greater
flexibility to address other things like
urban design, landscaping, vegetation
removal, site alteration, things that
traditional zoning bylaws can't address
or comprehensively regulate. Overall,
it's about balancing growth, design
quality, and community needs while
reducing approval timelines and
improving certainty.
So the proposed CPP bylaw has three
classes of development applications um
and they're based on the various scales
of of different proposals as they come
forward. So class one applications are
more straightforward um proposals. they
fully comply with all of the regulations
of the of the bylaw and um they include
uses that are already permitted um or
ancillary uses that are already
permitted and these applications will be
approved by staff. Class 2 applications
involve minor variations we call them or
discretionary uses.
Staff would also approve class 2
applications provided that the variation
is considered minor in nature and class
three applications involve larger
variations which would come to council
for approval.
So the notification requirements for
these various classes they do differ um
and they increase in complexity based on
class. Um class one requires no
notification. It's similar to the
existing site plan approval process.
Class two, akin to um a minor variance
application where you'd have u notice
posted online and physical signage on
the property. And class three where
you've got online notice, physical
signage on the property and a letter
mailed out to uh applicants or residents
within 120 meters.
And the structure of the bylaw, um, it's
very similar to your existing zoning
bylaw, um, including all of these
sections that you have here today and of
course, uh, or that you have in front of
you here and schedules and appendices.
One of the key objectives in preparing
the structure of the bylaw was to make
it easy to navigate, userfriendly,
and being consistent with the city
zoning bylaw because you're going to
have a zoning bylaw and a CPP bylaw.
I'll pass it on to Justine now. Thanks
Dave. And so um when we think about the
process under a community planning
permit system um there would be an
application an applicant would have to
come in and do a pre-conultation with
the city and any agencies at the onset
to try to understand the requirements um
of a complete application. Um there also
is um uh a single application single
review. So this helps uh to David's
point address matters of zoning or minor
variance along with site plan matters
through a single review um and approval
process. And then um as it relates to
decisions, there are some nuances in in
what this tool provides. There's a
broader range of conditions available to
the municipality um that can be um
required in advance of a permit being
issued or attached to a permit before
building permit. And on the right hand
side we have a little bit of an example
here where um you know a development
under the current system would have a
separate minor variance and site plan
process. Um under the new system it
would be combined into one application,
one approval and um interested um uh
local residents um would be notified
through uh those notification processes
that David previously mentioned.
Um we've got uh we've done a
comprehensive uh uh round of community
engagement. Heard from lot lots of local
residents and stakeholders that are
actively involved in planning this
community and um we've got we've gone
ahead and made a number of edits to the
bylaw to help reflect some of that
feedback and input that we're um looking
for further feedback and input tonight.
Couple of the key things I'll highlight.
Um the boundary initially this included
uh Uptown. We've now scoped it to the
Hurb Street corridor. um we have um uh
brought in the exemptions for up to four
units and up to four stories um to try
to uh make sure that we're right sizing
the process for those larger types of
applications. Um we've also proposed to
um defer the affordable housing in
exchange for additional heightened
density recognizing that there wasn't a
lot of additional density explored
through this tool and the challenging
market circumstances. Um and we've also
uh looked at um some modifications to
staff limitations under the tool u more
aligned with the current um committee of
adjustment limitations under a minor
variance.
And so um we are at the process we're at
the statutory public meeting tonight. Um
we have received a lot of feedback and
input throughout the process and we
continue to work with stakeholders and
look um as we uh close out the project
and bring forward a recommendation as
part of the final step
and um the broad engagement did include
a number of different rounds and
individuals. Um there was a uh city
staff have been working very tirelessly
to meet with um uh industry and
development. Um there's been uh open
houses um that we've got quite a bit of
um uh interest in and had lots of
conversations, a lot of folks involved
through the website and online
engagement materials. Um and we've also
got some uh some survey results that
have fed into this analysis. And all of
that has compilated in the um the bylaw
that we're bringing forward today to get
some additional thoughts and feedback.
And on the final slide, um we just
welcome any questions um and appreciate
uh your consideration this evening.
>> Thank you. You still have a well you you
had a minute and a half. That was
excellent. Um thank you very much for
that. Um so does any counselor have any
questions for the uh consultants at this
point?
Okay, seeing none, um, thank you very
much and we are going to open it up to
questions of staff. Go ahead, councelor
Bro.
>> Thank you, uh, through you, Chair. I do
have four questions, so if you want me
to break them up, I can do that like two
and Okay.
>> Um, so thank you first off for your hard
work on this. I know it's been about two
years, I think. Um, and it's
considerable amount considerable amount
of public engagement and uh hard work.
So, thank you. My first question, I just
wanted to make uh ask some clarifying
questions because I've been listening to
residents who have concerns and I
thought it would be helpful to maybe
review a few points um so that it's very
clear where um things are in the CPPS.
Um the first is um if you can confirm
that the CPPS does not change height
permissions that currently exist because
I know there's seems to be a
misunderstanding that that this changes
what um our minimum heights are right
now along Herb Street
>> through the chair uh to councelor row.
Um you are absolutely correct that
through um the proposed CPP bylaw that
you have in front of you, we have
carried over existing heights and
densities um that uh were permitted uh
today under the existing zoning bylaw.
Um I will note um that um there is one
caveat in that um right now the official
plan regulates height in stories. So, if
somebody wants to um
modify height, they would need to go out
of this process and uh get an official
plan amendment. However, the bylaw does
allow for some minor uh amendments uh to
height in meters. Um the most common
situation where that'll happen is where
you have an existing site that typically
has grading issues and that's just to
kind of reflect it, but it has to uh
still comply with the height and
stories. Um so I can definitely confirm
for you and any residents out there that
the heights and densities that are
reflected in the existing zoning bylaw
have been carried over into the CPP
bylaw.
>> Great. Thank you. Um my next question um
also is I'm I'm wondering if you can
just give a brief historical review of
intensification along Herb Street and
sort of what the changes have been in
terms of height and density
>> through the chair to councelor Row. Uh
so back in the early 2000s in
recognition of that uh in the future the
city would be coming to its boundaries
the city adopted a nodes and corridors
framework. Uh in 2003 uh the official
plan amendment to adopt nodes and
corridors was implemented and two years
later in 2005 uh the implementing zoning
bylaw was implemented. Um, as part of
that framework, um, this, uh, portion of
the Herb Street corridor, which is
primarily a minor corridor, was
designated as a minor corridor. And, um,
so
these kind of permissions have been in
effect for essentially 20 years. And the
identification of this portion of the
Herb Street corridor as a corridor has
been in place for 20 years. It is not
new through this process. Um we just
focused on this area in terms of a pilot
uh in terms of the half grant
initiative.
>> That's helpful. Thank you. Um my third
question is about um residents
participating in the process if they
wish to leave comments um and how that
would look in each class.
>> Uh through the chair to councelor row.
Um thank you for the question. Um so
yeah according uh as uh David mentioned
in the presentation the different
classes do have different uh
notification requirements. So um in a
class one situation which again is akin
to the current site plan process there
is no notification um since the
development is seen to uh comply with
all regulations. Um in the case of class
two uh where we have a um a website
notification as well as signage on the
property. Um so basically a resident
wanting to get involved in that would
look at those notices and there would be
a staff contact as well as link to the
engage page where they could submit uh
comments. Um where this does differ from
the current process is since there is no
um committee of adjustment meeting,
there's no public meeting to show up to
to provide those comments. But those
comments will still be welcome um to be
submitted uh you know in writing or if
you want to call the the planner on file
and and express uh concerns or comments
um staff can then take those under
consideration. Um and then with a class
three very similar um the final decision
will come to council. also any comments
that are provided through that that
process um uh either from people, you
know, seeing the ad or getting a notice
mailed to them if they're a resident
close by. Um again, that would go to
staff for consideration uh when we're
making our recommendations to council.
And then any of those comments, should
the person submitting them wish them to
be forwarded to council as well as part
of that package for council's decision,
u we would certainly do that as well.
>> Great. Thank you. That's helpful. And my
last question um is just about
clarifying that the process um
still requires the same amount of
diligent work from the staff, right?
That this isn't some fast track that it
requires a lot of work from staff and
also a lot of upfront work from the
applicant.
>> Uh through the chair to uh councelor.
Absolutely. I can confirm for you that
um the streamline process does not mean
no process. The same quantity, quality
and depth of review will continue albeit
in a a different process uh and an
accelerated process in that regard. Um
but I can assure you that the same
quality of review that staff have always
done will continue under this uh
process.
>> Great. Thank you very much.
Does anyone else uh from our counselors
have a clarifying question about the
presentation before we move on to other
delegations
>> after? Okay. Um so I I'm going to invite
um we have another delegation, Ryan
Muny. Um
and Ryan, you have 10 minutes if you'd
like to come to the podium.
And if you could just uh introduce
yourself and your city of residents.
>> Thank you, acting mayor Wright,
counselors, staff, and audience. Um, my
name is Ryan Moundsy. I'm CEO of Urban
Insights Incorporated, small boutique
planning firm in Uptown Wateroo. I have
over 25 active applications in Kitchener
Water Cambridge with four clients along
Herb Street corridor. Uh I am here today
uh next slide please.
Uh to present
my own thoughts and opinions and clients
thoughts on this process.
This is a development tool. This is
about citybuilding. This is about
intensification.
And so what I'm going to talk to you
today about is my honest opinion about
what I think about the process.
And I'm here today to talk about the
support for streamlined approvals and
housing supply in Waterlue. The whole
process of the half is to streamline
housing and it's to make it quicker, not
longer.
However, the proposed CPP risks
introducing a new layer of financial and
regulatory burden at the exact same time
our community is experiencing a
development freeze due to water capacity
constraints
and rising demand for more affordable
and attainable housing. This is all
about costs and the process must be
designed to facilitate housing at lower
costs, not increased costs. Next slide
please.
So while I want to be fully in support
of the process, I have to raise a couple
of items that is worth conversation to
share with you in public council as I
raise some of these comments through the
process as a development industry rep.
This is all about half funding. What is
the purpose of halfunding the housing
accelerator funding program? It's to get
more housing to market faster
is about a streamline process and I took
these notes directly from the website in
the report by the way. So this is exact
verbatim the points of the program is to
provide streamline approvals process
streamlined.
It's to replacement of zones with
precincts. It is to broaden definition
of development. That's a double-edged
sword.
It's to provide more flexibility. It's
to provide enhanced process controls. Is
that what we want for a faster
streamlined process? And it's an ability
to secure community benefits while on
face value seems like it's going to
help. But will it actually add cost to
housing?
Next slide please.
So in terms of
the context as I talked about the
housing accelerator fund is the driver
for many of these initiatives.
There is a housing shortage. There's
provincial housing targets that everyone
is falling behind on. So this isn't a
wateroo issue. This is an Ontario issue
for the most part. There is a housing
crisis going on.
And this relates to affordability, a
condominium collapse,
an escalating construction costs and
development fees. And there's a
provincial mandate in legislation to
promote housing supply at the exact same
time. And the most important factor of
them all right now is the water crisis.
Not a single brand new net new building
permit has been issued for any net new
water supply since December 6th.
So, how is additional costs and process
going to help with housing cost? Next
slide, please.
The main issues in my summary, and I
only have a couple more slides, and then
I'll lighten the tone up in a little
bit, is that the application fees are
outrageous.
A minor variance application is five
times 5x the cost under the new process.
Ask a small person to do a minor
variance right here and they have to pay
over $10,000 for a fee. That's a new
bylaw. An official plan amendment is
almost $40,000.
I hope the process is quicker to earn
that fee. That's almost half a salary.
So this new process that you're talking
about about expediting and streamlining
a process is a very expensive process in
my opinion. Exemptions. I'm going to ask
for a series of exemptions to be added
on to this process because there's
loopholes in this and people are going
to get stuck
any and ensure all existing site plan
approvals are exempt and with
amendments. I have clients in here that
have site plan agreements that might be
coming back for amendments. Do they fall
under the new process or not as an
amendment?
A minor variance application that's a
year and a half year old and they come
in, are they caught in the process or
not? So I want to make sure that the
detailed criteria in the reports clarify
all the types of development that are
fully exempt. And so there are pieces of
the process where people will get caught
and I hope they don't have to pay the
new fees. The new costs, this
contradicts the program goals.
All new costs should be deferred until
at least 2032.
That's the date. It's not 2027. It's
2032. That's when we have full water
capacity in water region that will allow
development to move without hindrance.
But we have until 2027 for the new CCC
to come in place.
What does that mean? Next year there's
tremendous cost. Do we have development
allocation capacity right now? No. But
what does it mean for new developers?
This is a development permit process.
They're going to be stuck with fees
adding on next year with a dead
development community.
Affordability. How do we defer costs and
include CHC
MLI select program? We have this archaic
definition of affordability.
Make it easy.
Include CMHC MLI select funding to be
part of the program.
80% of apartment building construction
is funded through CHC.
If they can't qualify, who can? And then
if you have to add on a new layer of
affordability, that's going to increase
cost housing costs for all.
Exempt 10 units or less from the CPPS. I
have been repeating this comment since
day one of this program. The planning
act was amended to exempt 10 units or
less from site plan control, but this is
a workaround to put 10 units or less,
which is only four units exempt from the
CPPS.
10 units or less will have to go through
a CP program that has to go through a
process, pay the outrageous fees, and
add more time and costs. The whole
process of the planning act through bill
23 was to exempt this. And I'm not
sensitive or sympathetic to the
regulations that allow the process. It's
adding cost, time, and a layer of a
process. This is wrong. But this is the
process that you're going through with
with small infill development.
And I wrote a very lengthy letter that
outlines all these points and comments.
So next slide, please.
So when you look on the left hand side
of this table, these are the current
cost. What does it cost to build? Run
the proformas. Run the costs. The city
of water is running their own
development project on the west side of
water. You know what the costs are.
Construction costs, application costs,
parking costs, development charges,
parkland fees, servicing, engineering,
urban design. Those are all basic costs.
What this new process does is add on a
series of new costs on top. A 4% CCC
2027.
New fees, higher fees, affordable
housing costs, additional processed
layers for 10 units or less. The result,
reduced viability, increased housing
costs, delayed housing, and lower
investment confidence. That's what I'm
reporting to you directly from my
clients in the development industry.
This is not the direction that is going
to streamline approvals and make it less
expensive. So they ask next slide
please.
Reduce or defer application fees. The
fees are just simply too high for a
streamlined process for someone coming
into this and hopefully others won't get
caught is going to be expensive.
Expand exemptions to ensure all existing
site plan approvals, future site plan
amendments
and existing committees of adjustment
approvals are exempt from the CPP
process. There are elements of this that
is covered already in the program, but I
think there's other elements in there
that are missed.
>> Ryan, you have one minute.
>> Yes, thank you.
>> New costs. All cost related to CCC 4%
land value be deferred to 2032 when the
land moratorum opens up for water
affordability. Defer costs to 2032, not
2027 and include CHC MLI select programs
to be eligible. This is the most
cost-effective way to stimulate
attainable housing.
This is a 10 This is a six-story
building, not a 30story height
development corridor. So, you got to be
proportional to those asks and exempt 10
units or less. Those are my comments. I
got 20 seconds to spare. And on a softer
note, you have professional,
excellent staff and consultants that are
guiding you through this turbulent
times. I have the confidence that we
will get through this, but those are my
honest comments. Thank you for the time.
>> You are right on. It was amazing. Thank
you very much. Okay. Um, so I'm going to
open it up to council. Do you have
questions of the delegation this
morning?
Thank you.
>> No one. Okay. Um, so I'm just going to
open this up to the uh the full gallery
here. Is there anyone else present
tonight who wishes to speak to this
application?
Okay. No one. Um, so,
uh, if there are no more delegations,
this formal public meeting is concluded
and the application is now open to
council for motion and debate.
Okay. So, Council Hammer, you have
questions?
>> I do. Okay.
>> Thank you. Three, uh, chair right to to
stop, can you just remind us or or talk
a little bit more about the
implementation plan uh, with this
particular bylaw? Um and the previous
delegate uh raised a couple of issues
about those that are already in the
pipeline and how will those be handled.
So two questions in one
>> through the chair to uh councelor
Hanmer. Um so uh provided that uh
council approves the community planning
permit uh bylaw this evening, we would
uh proceed into uh working on the
implementation pieces which uh includes
uh releasing a how-to booklet for
residents and others uh to help educate
them and help guide them through the uh
CPP uh bylaw, the differences and the
similarities. Uh we also have some uh
training sessions for uh for staff to
get them familiar with this and we are
also working on the implementation
pieces in terms of um you know we will
be making updates uh to the city's
website uh planning applications uh
engage page uh working on application
forms and whatnot uh so that we can be
ready so when the bylaw is uh in fully
in effect um that uh the system would be
ready to accept applications. So we do
have a plan uh we are working on it. We
have been working on it um uh and uh we
will continue to to work on on on that.
Um in terms of uh the second question uh
which asked about exemptions
um so in the uh CPP bylaw that you have
before you um this evening to approve uh
in section 1B2 uh is a se a section on
exemptions and right now uh 1B21D
identifies that development consistent
with an approved site plan uh would be
uh exempt as would uh development
consistent with a minor varian
experience approval uh would be exempt
um as well. And there's some other um
exemptions as well, including you know
four up to four units for stories
um subject to um complying with the
provisions of the bylaw and there's a
couple of others. So our exemptions have
taken uh we feel those matters into
consideration and have accounted for
them.
>> Thanks Tony. I think that is important
for public to know that that those that
are in the pipeline right now, wherever
they might be, would be exempt from uh
this new bylaw coming into into effect
based on uh what's in the bylaw and that
they meet those exemptions.
Uh sorry just to clarify um it's if
somebody has an approved uh site plan um
or an approved minor variance um if
somebody should have an existing
application
um uh either a a formal uh complete site
plan application um a formal uh complete
zoning bylaw application or a complete
uh minor variance application. those can
continue through the process and we have
transition provisions um which are
identified in 1A uh 9 of the bylaw. So
we have both transition provisions um to
uh speak to applications that have a
complete application either zoning b
amendment, minor variance or site plan.
And then we also have a sec second
section on exemptions which say if um a
development uh has approved site plan or
minor variance approval uh they would be
uh exempt.
>> Exempt.
>> Thank you for clarifying the two the two
different scenarios that we have. That's
all for me.
Thank you. Other counselors, uh,
councelor Roach.
>> Uh, thank you through you, Chair. Um,
this question is for staff. Um, based on
Mr. Mounz's excellent presentation, the
staff report acknowledges that
development market along the corridor is
currently challenged
to the point where we're first forced to
defer uh, affordable housing
requirements
until 2027. Is it not counterproductive
to implement a new 4% community or
complete community contribution fee
today?
I am wondering if we're not risking the
shovels in the ground progress that we
need to secure our remaining um half
installments
>> through the chair to councelor Roach.
Um,
what I can confirm for council is today
development applications have to pay
community benefits charges. That applies
citywide. Um, and it's the exact same,
which is the 4% of of the land value.
Under a CP framework, um, a community
benefits charge does not apply. rather
it has something called facility
services and matters which is a handful
but it's essentially the same thing.
It's benefits to the community and so as
noted um the the fee is the same. Today
development applications are paying a
community benefits charge that's 4% of
the land value. Under this uh bylaw, we
are proposing for equity with the rest
of the city that developments would play
a 4% complete community contribution
instead of the complete benefits
charged. So they are it would be applied
the same. The fee would be the same. It
would be calculated the same. It's just
under a community planning permit
system. It's called facility services
and matters and it's called a complete
community contribution which once you
see that you know that you're dealing
with a community planning permit system
whereas under a zoning framework you
would be paying a a mere fee but it's
just called a community benefits charge.
So I hope that is helpful.
>> Well just a followup. So you're saying
that there is it's not an increase.
there's no increase and um that yeah we
there is not an increase in fees
>> through the chair to council roach that
is correct
>> thank you
>> other counselors
any other questions oh yeah there you
are go ahead councelor Bley
>> excuse me through you chair right can
you maybe speak to the to the commentary
from the applicant around the co the the
fees themselves not the not the 4% but
the fees themselves and how those
compare uh and contrast to the current
fee structure and framework. Uh is it
substantially more similar? Um would
love to hear your feedback on that
>> through the chair to councelor Bodley.
Um, as indicated in the report, the fees
for the class one, class 2, and class 3
applications under the proposed CPP
bylaw have been informed by existing
minor variance uh, site plan and zoning
bylaw fees. So for example um under the
class one which is it meets all the
standards. It's essentially equivalent
uh Canada site planning there's a minor
application fee which is $1,550
which is similar to the minor variance
fee today. There's a standard fee uh
which is akin to the existing site plan
fee uh $10,680.
That's the existing standard site plan
fee. It's exactly it mirrors it. And I
can go through the list for the class
one, class two, and class 3es is it's uh
it's it's taken into account um the
existing fees uh for minor variant site
plan and uh zoning bylaw amendments. Um
as I had indicated uh based off of the
question at councelor row, a streamlined
process doesn't mean uh no process.
there is still review and process that
will happen and as a result there is a
cost to that and somebody has to pay for
that. Um at the end of the day as staff
we believe that the applicant who is
coming in who is requesting to do a
development redevelopment and expansion
and improvement to their property should
be the one that should be covering those
fees as opposed to city of water
taxpayers. So I hope that answers your
question.
Absolutely it does. Thank you. And just
as a follow-up if I may through you
chair rate
uh or not a follow-up but a second
question um can you speak to the
commentary around exempting less than 10
units and uh how we are um exempting for
unit four stories uh whether
consideration was given to exempting uh
other developments, why we settled on
where we settled and uh what uh the
process would look like in the future if
we were to um if if council or staff
were to feel as though uh exempting 10
units in the future was something that
we wanted to do, you guys highlighted
that this is sort of a pilot project for
us. So I imagine that we're not
necessarily going to get everything
right exactly the very first time. So uh
if you could speak to that process and
sort of uh speak a little bit to how we
got to where we are today
>> through the chair to councelor Bodley.
Um, as was noted by our consultants,
this has been a two-year process and we
have uh given significant thought and
consideration to the parameters and
provisions uh in in the bylaw. And uh we
have had two drafts before we have
reached this final. And as we have
indicated uh in our staff report, you
can clearly see um how and where changes
have been made directly in response um
you know to the feedback received. Um in
terms of um that decision, uh we gave it
uh a lot of consideration and the
decision was made to exempt four units
and four stories given council's recent
decision to allow up to four units and
four stories in line with another half
initiative. Uh we also gave further
consideration about the five to 10 units
and at the end of the day um
we felt that they shouldn't be exempt
because they are more substantial
developments in the form of apartments
stacked town houses and we see value in
the site planning process to address
important matters um that impact your
constituents and residents that will
occupy these developments such as where
snow clearance is going to go where is
utilities and hydro loading, parking,
accessibility, lighting. Those are all
the things that impact quality of life
for residents. Noting though that the
bylaw does have a provision that gives
the director of planning the authority
to exempt uh developments with 5 to 10
units provided it meets all the
provisions of the bylaw.
Um so uh we have provided the
flexibility but I wanted to uh note that
we gave significant consideration to
this and as noted we felt that these
more substantial developments 5 to 10
units uh especially if they were not
meeting uh the provisions of the bylaw
should be going through a site planning
process.
Thank you.
>> Other questions from council?
Uh I just have a question about
timelines. Uh so currently um we're at
60 days plus 45. So that would maybe
make a total of 105
days that we're we're trying to get
through uh these applications. Um how
generally speaking um are we are we
meeting those timelines at this point?
And the reason I'm asking is the
likelihood of actually meeting a 45day
window as we've proposed in the CPPs
>> through the chair to the chair. Um
that's an excellent question. Um so as
was noted uh this is a brand new process
for the city of Waterlue. Um there are
legislated timelines which essentially
state that uh staff have or council uh
depending on the class of application
have 45 days to make a decision after
which if a decision is not made an
applicant then has the ability to appeal
to the Ontario Land Tribunal.
um you know as staff uh with this being
a new process it will take us some time
uh to to get used to it. So you know I
would ask people for some grace as both
uh applicants and us you know work
through through applications. Um but at
the end of the day what I can say is you
know we will do our utmost best but
there very well may be cases where
unfortunately
maybe we're waiting for an approval from
another agency or something of that
nature
um
where we may not be able to meet the 45
days in which case the legislation says
that the applicant can appeal to the
Ontario Land Tribunal for a
non-decision. Um I have uh noted and it
is noted uh in the report that Tristan
and I have uh advanced um that uh we
plan to monitor this process and uh we
plan to um uh update council a year
after the first application is um you
know processed and uh you know to kind
of monitor the system um and uh see you
know if there's room uh for improvement
which there definitely will be and then
try to you know realign and make
improvements as as necessary.
>> Thank you for that. And I I'm assuming
just as a follow-up to my own question,
I'm assuming that you've u uh spoken to
planning staff and in other regions that
have uh piloted their own uh community
planning permit systems uh about their
uh lessons learned
>> through you uh madam chair to the chair.
Um uh yes um so uh Dylan Consulting and
SGL have been involved in many of these
CPP uh bylaws across um many
municipalities including other midsize
cities like Waterlue. Um and these
discussions particularly with waterlue I
will say um we because of like you say
lessons learned. We started right at the
beginning talking with not just um this
team that we have here but also all of
your development planners who are also
talking to the other departments um and
thinking about how this gets implemented
in terms of process efficiencies. how
can we better circulate applications and
request comments in an efficient manner?
Um, and we've had some really productive
uh discussions over the past two years
about this. Um so as it rolls out and as
we continue this implementation u over
the next couple months um should this
bylaw be passed and as it rolls out um
we're going to keep um implementing
those ideas and evaluating them as as
Tanya said and across those these other
municipalities
um much like Tanya said it is um you
know a learning curve uh changing the
process completely but um we've found
that in many municipalities uh they've
had lots of success where they've
implemented in terms of dealing with the
majority of the applications within the
45day timeline. Um sometimes that's with
the the additional benefit of this tool
is that you can do conditional
approvals. So maybe there's a minor
thing that you need addressed like an
update to a landscape plan for example
that you can meet your 45day timeline by
issuing a conditional approval that uh
relies on one of the conditions may be
an update to the landscape plan and that
can happen after the 45 days and they
will not get their permit until the the
city is satisfied that it is correct and
it's what they've asked for. So this is
just another way that the tool can work
to I think everyone's advantage to get
development there quicker. It gives the
municipality water in this case the
assurance that you know it's checking
all the boxes but also it gives the
developer the applicant assurance and
comfort that their application has been
approved. They just have to address
these technical issues. So we think it's
a win-win. Um and um that was a lot but
I hope that helps you know just to set
the stage that um other municipalities
are are there. They also find that um I
will say those those applications that
do go beyond 45 days because the
communication is so vital between a
municipality and the applicant and
that's what we've been talking a lot
about. If there is progress in an
application and it goes beyond the 45
days, it is we haven't found one example
where an applicant has appealed yet in
any of the municipalities because
they're moving towards an end goal which
is an approval or a conditional approval
uh which happens at at some point. So
appealing something for lack of decision
would extend the process much longer uh
than maybe you know a few weeks past the
45day deadline. So just something for us
to remember in the context of planning
in Ontario.
>> Thank you. And councelor Ro, you had
another question.
>> Thank you through you, Chair. I just
wanted to circle back um to what you
were asking about the timelines and
Tanya um in the conversation that we had
last week. I think it would be
beneficial for anyone listening who's
wondering how we're going to push this
into 45 days, right? These three
different um processes into one. And can
you just explain the shift from coming
like how the applicant is applying and
what the requirements would be to start
the process from the applicant at this
point
through the chair to councelor row. Um
yes so uh as uh there was a slide that
uh indicated what the application
process would be uh with one being a
mandatory uh pre-conultation meeting um
where information would be uh provided
in terms of you know what class of
application uh the application would be
um as well as um any and all information
that the applicant would need to uh
provide in order for an application to
be deemed complete and then they would
need to make a formal submission um and
which we would review against that
pre-conultation checklist uh and if all
that information was provided
um along with the fee then the
application would be deemed complete and
then we would undertake the review. Um
one of the one of the benefits of this
tool is is that it does combine the
three processes together. Uh currently
site plan minor variance and uh zoning
bylaw amendments are three separate
processes and um sometimes what I have
seen with some development applications
is somebody will come in you know with a
with a zoning bylaw amendment they get
approvals they end up at site plan and
then you know there's issues or changes
that have to be made with this it's one
application where somebody is now
advancing minor varian zoning ball
amendments and site planning all at
once. And so you have that combined
package of information. Typically
sometimes, you know, with a zoning bile
amendment, we don't have a full site
plan concept, which would have been
helpful. Um, and so that's one of the
benefits I think as a staff person um
with this with this process is is
when an application is coming for you,
you are getting all of those combined.
So then that you have a a wholesome
picture of what that application is. You
have the information that you need
whether it's staff or council to make an
informed decision.
>> Thank you.
>> Councelor Hanmer, did you have a
question
>> through you chair? You asked my
question. Oh,
>> I would.
>> Sorry to preempt.
Do we have other questions?
Anyone else?
Okay, I'm just collecting my thoughts to
see whether there's anything else that
uh I had on my list,
but I think we did. I think uh other
counselors have asked the questions that
I had written down.
Um okay, so we are if there are no
further questions from council. Oh, I'm
remembering the question I was going to
ask. Here we go. Um, okay. So, uh, the
delegate did mention, um, a 2032 date
regarding, uh, the region's water
supply, and I'm just wondering if staff
could just, uh, speak to that briefly,
how that factors into, um, what we're
dealing with tonight.
uh through your chair right um to the
chair. Uh the water capacity um
constraint that's currently existing
within the Manheim service area is
certainly a challenge for development
within the community. Um as Mr. Moundsy
indicated, very little uh development is
moving forward as a result of uh the
freeze that's in place. But I will say
the region is making progress on working
towards allocations to start to free up
and allow some development to move
forward. So, we're hopeful that will uh
progress as quickly as possible and we
will be able to again start to approve
applications. In my view, this process
is very different. We're setting up um a
an application or or a system here to
advance development applications through
a process. So, similar to to today where
we have minor variances and we have site
plans that are advancing through the
planning process. Yes, they can't pull a
building permit because of the Manheim
uh constraint that's in place. Again,
we're setting up a system that allows
zoning and site planning to move
forward. And when um capacity is
available, uh we will be able to issue
permits 2032, 2031, 2032. Hopefully,
there is a robust supply of capacity
within the water system to allow
development to freely move through the
market. Um until then there will likely
be allocation buckets that are being ma
made and I think that's the reference
that Mr. Mali is making is is to get
back to that um fully robust uh time
frame when development can freely flow.
Uh that time frame exists and until then
there will be constraints and there will
be certainly challenges um that many
developers are are facing in terms of
carrying costs and other costs that they
have to to bear. And uh we we recognize
that our goal here is to simplify
um the approvals by combining processes
and trying to expedite those approvals
uh through a condensed system, if you
will, um to get those that are able to
build and wanting to build in a position
to build as quickly as they can. There
were there will be outside circumstances
like water um that may influence that
and we'll tackle those one by one as we
get to uh get those in front of us.
>> Thank you for that. Uh okay. So that was
my last question. Anyone further? Okay,
I think we're ready to move on here. So,
um we have um a recommendation uh
available to us right now and I'm
looking for there's actually seven seven
>> seven
>> there are
seven recommendations as part of this um
this uh um item. And so I am looking for
a mover and that's councelor
>> Hammer
with comments.
Uh yes, moving with with comments, but
I'll make the motion first. Uh whereas
council has considered all written and
oral submissions and whereas council has
considered the professional opinions of
planning staff. Therefore, be it
resolved that council approve report
IPW2026-21.
that council approve zoning bylaw
amendment z-26-06
to implement the community planning
permit bylaw as follows. A that zoning
bylaw 2018-50
is hereby deemed to be repealed with
respect to the Herb Street corridor as
shown in map 1 in accordance with
section 9 of Ontario regulation 17316
as amended from time to time. And B,
that the community planning permit bylaw
for the Hurb Street corridor be approved
as set out in appendix 1, the bylaw to
IPW 2026-21.
Three, that council permit city
initiated amendments to the official
plan amendment 58 bylaw 2024-097
policies before the fifth anniversary of
the first day of the passing of the
bylaw. Four, that council permit any
person or public body authority to
request an amendment to the community
planning permit bylaw before the fifth
anniversary of the first passing of the
bylaw. Five, that council deemed that
any city bylaw that refers to zoning
bylaw 2018-050
and/or site plan control bylaw 2013-124
be taken to also mean the community
planning permit bylaw for the Hurb
Street corridor. Six, that council
approve and amend to bylaw number
2025-080
being a bylaw to delegate authority to
execute documents as set out in appendix
2 to IPW2026-021.
And seven, that council directs staff to
create a new complete community
contribution reserve fund and to
establish an accompanying policy as part
of the reserve and reserve fund annual
update report in December 2026.
I'm happy to make this this motion. We
are all hoping to have new housing
developments um start and hoped that we
would be further along. And one thing
that we need to be doing as a city is
looking at the processes that we have in
place. And if there is a way to improve
the processes, streamline the processes,
I think that's uh a good direction for
us to be heading. And I I think the work
that staff have done with the help of
the consultants has got us on a path
that will see that uh to fruition. Uh
the water issue aside, hopefully we will
get that resolved. But I think this is
the process that we need to need to be
looking at. So, I'm pleased to be
supporting this amend this motion.
>> Thank you, councelor Hammer. And is
there a seconder? That's councelor Row.
Any comments?
>> Yes, thank you. I would like to echo
what councelor Hammer said, just that
this is um a process that we do uh need
to facilitate development. I've heard
concerns uh from residents about
concerns about height, about um reduced
public input, but I'm reassured by
staff's um comments and clarification
that these items um remain the same
within um some a little bit of change
for uh public input, but it is still
there. So, that's reassuring. So, um I
also thank you again for your hard work
>> and any other further comments before we
call about Oh, councelor Roach.
>> Yes, I I am
I'm just concerned about a little bit of
a contradiction. I think you know the
staff's using market hardship as a
reason to delay affordable affordable
housing, but not as a reason to lower or
or delay
the 4% fee and if a replacement for a
fee that's already difficult and you
know I think we called it challenged in
the report challenged projects to pay I
don't know if we should be locking it in
uh right now and uh and maybe we should
provide temporary assistance uh
temporary incentive uh to get those half
required building permits moving
>> I think we're beyond the point when um
staff answer questions. So, okay.
>> Okay. Just a comment. Okay. Um any other
comments?
Okay. Then, uh we're going to call the
vote. All in favor?
That is uh not quite unanimous. And so,
the yays and nays. Do we want to record
that? Okay. Okay. So, we had uh in the
yays we had councelor Vaset, coun
councelor row, councelor hammer, uh
councelor Wright and councelor bodily.
In the nays we had council roach
and that is passed.
Okay, we are moving on to our next items
in the agenda.
Um we have consideration of notice of
motion given at a previous meeting.
None. Um, we have notice of motion. Are
there any counselors that had issues
that they wanted to raise at this time?
I don't think so. Okay. Um,
communications and correspondence. None.
Unfinished business. None. Questions.
Council.
Seeing none. New business. Councelor
Vasic.
Yes. I have two things. Last Saturday,
the Button Factory had their Bloom and
Grow open house and fundraiser. Um, it's
been a long road to get the facility to
where it needs to be with its lease,
with accessibility upgrades, and also um
um just figuring out some of the details
of the lease. Uh it's been really
complicated, but staff and the Button
Factory have worked really hard together
to get it to where it is. um with a
beautiful revamped space uh and
programming that's taken off. Uh new
accessible washrooms upstairs. Uh and uh
it's just you walk in there and it's
like it it has a community art center
feel. So it's like really homey and um
has a grassroots feel and it also feels
like a fancy gallery. you know, it has
somehow has incorporated this um uh uh
everything uh that you'd get in any art
gallery and also keeps that community
feel. So, really beautiful space. I
would encourage you to go and the fund
it's a it was also partially a
fundraiser for um some upgrades for a
theater space on the main floor and um
so there's a a silent auction still open
on the site right now. There's some
really good things there so you can
check it out or share it with people.
Um, and I would definitely go check out
the space. The members uh exhibit is up
right now and you can get to it by going
up the elevator and then it's right it's
like the upstairs foyer. It's it's
gorgeous. Uh, so that's one. And second,
uh, the this is also personal, but uh
the KW water polo team, the Kraken, did
really great uh in the last few weeks.
Uh the girls under 16 team played in
nationals not this past weekend but the
weekend before and came in sixth
nationally and uh they were the second
top Ontario team. So really impressive.
And then last weekend was the under 10
and under 12. Under 10's get a super
honorable honorable mention and they
played really well and uh fought really
hard but didn't win any uh medals but it
was a really lively pool uh with the
under 10's very enthusiastic parents.
Um, and then the under 12, uh, there's
two teams, a girls team, they won se
silver and then the co-ed team won
bronze. So, good showing from our
Kraken. Yeah.
>> And councelor Ro.
>> Uh, thank you through you, chair. Yes. I
just wanted to mention that I attended
on Wednesday evening reception house
waterlue regions recognition banquet
which was really fantastic recognizing
um community organizations, faith groups
who support reception house and the
incredible work they do and also the
volunteers um whether they volunteer at
reception house um or out in the
community. I think it is really
important at this time to recognize um
the incredible contribution that
newcomers make to Canada and to our
region. Um the
um
dialogue out there is not positive right
now. It tends in times of economic
strife that there has to be an other and
that often most often uh tends to be
focused on newcomers. So, it was a
really um enlightening and wonderful um
banquet and just a real celebration of
the contributions of newcomers. Thank
you.
>> That's exciting to hear. Thank you for
that. Um other counselors, Yep. Council
Hammer,
>> thank you. Uh, councelor Roach has
reminded me that council Roach and I had
the privilege of being at Adventure for
Change celebration, the gala, which also
was a celebration of newcomers, but also
entrepreneurs. They were launching and
talking about what started out as a the
sewing circle, women sewing circle,
which now is an a thriving business
operating out of St. Jacobs, as well as
their their site ated adventure for
change. So it it's just fantastic seeing
the community support and the input that
not just the older people have but the
younger group and we saw a lot of that
uh at the celebration. So kudos to
Adventure for Change as well.
>> Thank you for that. I was uh on the
weekend um I went out to the Grand
Filermonic Orchestra's fundraising
uh walk and run in Wateroo Park and they
exceeded their fundraising goal by the
time they were ready to uh start on
their run walk um which was really
encouraging. I think they used to be a
beneficiary of the Missasaga Marathon
and uh with with programming changes in
the marathon world uh they had to
convene their own event and uh so it's
just really really great to see
communities wrap around their uh their
local organizations and and help them
meet their fundraising goal. Um so that
was really encouraging to see. Um, I
also want to shout out to um a number of
local basketball teams who were in
Ottawa the weekend before last for
provincials and um in my son's division.
I'm just going to like shout out to
Waterl Wild Hawks. Um it was the top two
teams were Kitchener and Waterlue.
Yeah. So, um they the unfortunately they
faced off um before the championship
round and so they uh one team took the
other team out, but they still came gold
and bronze and there were a number of
other KW teams that did extremely well
in the U14 category. So, watch out for
those those boys. High school basketball
is going to get interesting. Um and I
think with that we are on to
uh we run enactment of bylaws. Oh,
that's councelor Bodily and councelor
Row. Um, all in favor? Okay, that's
carried and then we are on to
adjournment. Councelor Row, councelor
Vasik, all in favor. We are adjourned.
Thank you very much.