← Back to summary
Full Transcript
Committee Approves Infrastructure and Service Contracts - 02 Jun 26
Toronto · June 03, 2026
Morning.
>> Good morning. My name is Deputy Mayor
Paul Linsley. I am the chair of the
general government committee.
>> Morning everyone.
We have quorum. So now I'm calling
meeting number 30 to order. Welcome
everyone. Today's meeting is being held
by video conference and in person at
city hall in committee room number one.
This meeting is also being livereamed
on YouTube.com
at Toronto City Council Live. For the
land acknowledgement, I would like to
say on behalf of myself, my colleagues,
and all of our amazing staff that
although we may be meeting in different
locations today, the general government
committee would like to acknowledge the
land we're meeting on is a traditional
territory of many nations, including the
Missosagas of the Credit, the Ana Shab,
the Chipoa, the Honi, and the Wendette
peoples, and is now home to many diverse
First Nations, Inuit, and Matei people.
We also would like to acknowledge
Toronto is covered by treaty number 13
with the Missagas of the credit. For the
committee members, I'd just like to
remind you the city clerk has provided
all of our agenda materials on the city
website at toronto.ca/counsel
and also on the clerk's meeting portal.
Clerk's IT staff are available if you
have any trouble with your electronic
devices. And a reminder to please submit
your motions if you have any to the
clerk at ggcronto.ca.
CA.
Excuse me. Are there any declarations of
interest under the Ontario Municipal
Conflict of Interest Act? Seeing none,
can I have a motion to confirm the
minutes of our last meeting of May 11th,
2026? Moved by Councelor Thompson. All
in favor? That carries.
I'm going to go through the agenda. So,
our first item is GG 30.1 Administrative
Penalty Tribunal Chairs 2025 annual
report.
presentation
>> like a presentation on that.
>> All right,
I will hold that in my name. Uh GG30.2
amendment to blanket contract 47025022
with wintergreen learning materials for
the supply and delivery of children's
furniture, toys, and manipulatives for
various children's services locations.
Move by councelor Burnside. All in favor
that carries.
GG 30.3 amendment to purchase order
6053845
with Maple Reindeers Constructors
Limited for Bioolids master plan
implementation project and the south
facility upgrades project at the
Highland Creek Treatment Plant in Ward
25.
Mover Councelor Holiday on favor that
carries.
Uh GG 30.4 for amendment to purchase
order 6054643
with ACOM Canada ULC for engineering
design services at the Ash Bridges Bay
treatment plant for old primary
sedimentation tanks upgrades projects
moved by councelor Chang all in favor
that carries GG 30.5 amendment to
purchase order number 6055184
with Hari Pantarin Panterini Architects
for the enhanced state of good repair
accessibility and net zero project at
the St. Lawrence Center for the
Performing Arts.
>> I'd like to hold this one, please.
>> Al by number five is being held by
councelor Cheng.
GG 30.6 Six. Award of document
5491818166
to Palmer Low Incorporated for Ash
Bridges Bay Treatment Plant Digtor gas
compressors, dryers, and chillers
installation and an amendment to
purchase order 6052432
for Associated Engineering Ontario
Limited for Construction Administrative
Services.
I have a mover. Councelor Thompson. All
in favor? That carries. GG 30.7 award of
negotiated request for proposal document
4711617964
to CTI working environments for supply
delivery and installation of office
furniture
moved by councelor Holiday on favor that
carries GG 30.8 8 purchase order
amendment for general contacting
services number 6056841
with Palmer Lo Incorporated for general
contacting services for the Toronto
Paramedic Services Multifunction Station
at 300 Progress Avenue. Move by
Councelor Thompson.
GG 30.9 sorry move by councelor
Thompson. All in favor carried. GG 30.8
Eight, purchase order amendment for
general contracting services number
6056841
with Palmerlo Incorporated for the
general No, sorry, did that one already.
My bad. More coffee for the chair. Uh,
number nine, GG30.9,
amendment to purchase order 6049718
with Violia Water Canada Incorporated
for critical capital improvements and
maintenance at the Disco Organics
processing facility.
Moved by councelor Holidayiday on favor
that carries.
>> All right.
Spreading good news across the city
and collecting it. Uh GG30.10
award of document 5398199635
to Alberi Constructors Limited for the
new ultraviolet disinfection and
residuals management facility at the
island water treatment plant. An
amendment to purchase order 6056811
and 6057463
with ACOM Canada ULC for contract
administration and post construction
services
held by councelor Thompson
>> held by councelor Thompson GG 30.11
non-competitive bridge contract with
Arcadus Professional Services Canada
Incorporated for the provision of the
city's congestion management center
operation services.
>> I'd like to hold this one, please.
>> Who wants
>> held by councelor Chang?
>> Uh GG30.12 non-competitive contract with
root smart technologies for the
continued use of collection route
management and service planning software
for solid waste management services.
Move by councelor Thompson. All in favor
that carries. Non-competitive contract
with Service Now Canada Incorporated for
licenses and professional services.
Move by councelor Burnside. All in
favor? Carried. GG 30.14.
Non-competitive contracts for the
provision of the city's traffic
electrical maintenance and emergency
services and traffic electrical plan
capital works roster. All
>> please. Councelor Thompson. GG30.15.
non-competitive procurement contract
with Smart Simple Software Incorporated
for the new configuration of the Toronto
grants, rebates, and incentives portal
for the housing secretariat.
Move by councelor Chang. All in favor
that carries. GG 30.16, summary of an
open competitive awards made by the
chief procurement officer from 11 April
11th to May 12th, 2026.
Move by councelor Holidayiday. All in
favor that carries.
GG 30.17 litigation arising from the
replacement of the water man at the
Kipling Avenue bridge over the Humber
River.
Move by councelor Holidayiday. All in
favor that carries.
GG 30.18
implementation of construction
management at risk delivery model for
the Ash Bridges Bay treatment plant
integrated pumping station construction
contract
by councelor Burnside. All in favor that
carries.
I'm sorry. 19
GG 30.19 delegation of authority for
license agreements to facilitate the use
of published sound recordings in
recreation facilities
by councelor Thompson. All in favor that
carries. GG 30.20 20 Toronto Fire
Department superanuation and benefit
fund funding valuation report as of
December 31st 2025.
Move by councelor Holidayiday. All in
favor that carries. GG 30.21 1141 Blur
Street West and 900 sorry 980 Duffren
Street. Community space tenency lease
agreements and municipal capital
facilities designations for five tenant
agencies in the Blure Duffren Community
Hub.
Moved by councelor Thompson. All in
favor? That carries. GG 30.22 1652 Keel
Street community space tenency lease
agreement with the Black Women's
Institute for Health and Municipal
Capital Facility Designation.
Moved by Councelor Chang. All in favor?
That carries.
GG 30.23 occupational health and safety
report end of year 2025.
>> Sorry, who's that? Councelor Thompson.
Yeah,
>> Councelor Thompson's holding number 23.
>> GG 30.24 non-union separation costs for
2025.
>> I'd like to hold that, please.
>> By councelor Chang. And our last item
that needs to be added to the agenda, GG
30.25 animated Nathan Phillips Square,
which I need a motion. I'm going to move
to add to the agenda and then I'll hold
it so people can look at it.
And then we're going back to
>> Did I miss one?
>> A vote to introduce.
>> Oh, sorry. I thought all in favor of
introducing
carries.
>> Thank you, Matthew. All right, we are
going back to
GG 30.1 Administrative Penalty Tribunal
Chairs 2025 annual report and we have a
presentation from staff.
Morning.
You can start whenever you're ready.
>> Is your microphone on?
>> I beg your pardon, Mr. Chair.
>> Not a problem. You can start whenever
you're ready.
>> Thank you, Mr. Chair. Uh, let me say
that we are very pleased and honored to
have been asked to appear before the uh
committee this morning and to provide
whatever information you may require.
The uh presentation is on file uh with
the committee uh and of course prepared
to provide any questions uh arising. Uh
let me if I may Mr. Chair just highlight
a couple of items. The the signal event
for the administrative penalty tribunal
in 2025 was the adoption of what we
refer to as the camera offenses. as
automated speed enforcement and red
light camera offenses which were
transitioned to the jurisdiction of the
tribunal
uh in February of 2025
and uh have uh well just become part of
the overall jurisdiction of the tribunal
since that point. That did represent a
significant change in the jurisdiction
of the of the tribunal and and led to
series of new trainings, new techniques,
new um u really just simply new
procedures to deal with those specific
kinds of offenses which are somewhat
different in nature than the parking
violations that form the the vast
majority of the of the tribunals's work.
So with that if there are if there are
any particular questions
um arising from the report uh be happy
to address them.
>> Okay. Thank you very much. Questions of
the presentation.
>> Yes. Uh thank you Mr. Chair
>> Thompson.
>> Yes. Thank you Mr. Chair. I apolog Mr.
Somerville. Right. Mr.
>> Chair. Thank you very much for being
here sir. I think it's a important
report and it's an important um uh work
that you and your team do because of the
impact it actually has in our community
and so on. Uh so I wanted just to um
start off by um simply asking you um
with respect to the
uh decisions uh regarding no final no
appeal process what safeguards are
actually in place to ensure that
procedural fairness takes place uh the
AP decisions are final correct
>> uh yes sir
>> right so
>> through you Mr. Sure.
>> So safeguards that are in place, how can
you help the public to understand that
there's a procedural fairness are
actually in place?
>> There's really a rather extensive
procedure that that precedes that final
decision. Uh it starts with a uh an
application by the uh person who
receives a parking violation say um and
they are then invited to appeal that uh
finding um to a screening officer. Uh so
that's a one level of oversight. Uh the
screening officer then makes a decision
and that decision is subject to a
further appeal should the uh person
decide to uh exercise it. That then
comes to the tribunal. The tribunal is a
an independent quasi judicial
uh body that is fully endowed with all
of the requirements and endowments
uh related to fair fair hearing justice
um and independence.
>> Gotcha.
>> So that's there's a fair process that
goes on before uh a final decision is
rendered.
>> Gotcha. Okay. That's very helpful, sir.
Thank you so much. Um obviously you've
seen an increase in the volume of
intakes and the uh processes and so on.
I I'm just wondering do you have enough
staff to meet the demand as such and how
are you with respect to your FTS and um
you know you've got hearing officers
obviously hearing the matters and so do
you have enough personnel to help you to
do it in a more efficient way?
personnel may not be the primary uh
focus for our interest in that uh
through you Mr. Chair the the
one of the key elements is the
availability of hearing rooms.
>> So we currently have eight hearing rooms
that are available which are being
allocated as between parking violations
and the I'll call them the camera
offenses.
uh six to the parking violations and two
to the uh camera offenses. Um
it it is emerging as a matter of
considerable interest that we would want
to have some additional hearing rooms uh
available that will simply help
throughput. Terms of numbers of members
that is also something that we think
about um regularly.
Um it it may be uh that uh that's
something that should be addressed uh in
the near future that we currently have
25 members. They operate on a part-time
basis. That means that they have other
calls on their uh time. They may not
always be available to the tribunal to
hear uh the cases and to be scheduled
and slotted in to the hearing rooms that
we do have. Um so to answer your
question, hearing rooms and and the
issue of additional members is is also
uh in our minds sir.
>> Now that takes me to your slide number
six and I was going to ask you questions
about that and so you've actually
provided some information here in terms
of the number of days waiting for
parking and red light cameras and
automated uh speed enforcement. Um now
it for it takes about six months almost
six and a half months for red light
camera hearing is is do you not think
that's a long time?
>> I do.
>> And so back to the first questions about
you know number of staff you mentioned
about hearing rooms and so on. So what's
the plan then to address this issue?
Because waiting for 6 and 1/2 months uh
for a red light uh camera almost 4 1/2
months for parking and then
corresponding for automated speed
enforcement that's three and a half
let's say four months. It's a long
period of time. So how could we
accelerate and facilitate that in a flow
to give you and your team the ability to
respond to the public?
>> If I may, Mr. chair uh through you. Uh
>> a final question, Mr. Chair.
>> I'd like to refer that question to the
secretariat.
>> Okay.
>> Um that will have a a better idea as to
what all of those days are dedicated to.
>> Uh through the chair, uh Diane Cassy's
executive director for courts. Hello. Uh
yes. So the when red light camera and
automated speed was moved over to the
administrative penalty system, the
average length of time in the courts was
about 18 months. So this is a really uh
a faster, speedier resolution for those
matters. Um, as the APS continues to
expand and there are calls to have other
um, offenses brought into the APS, we
will be closely monitoring the need for
hearing officers, staff, screening
officers um, and we'll present uh,
requirements through budget as
necessary.
>> Great. Thank you.
>> Thank you, Councelor Thompson, Councelor
Holiday. Questions of the presenter.
>> Thank you for your presentation. Um,
Chair Hovville, this is uh very
interesting uh and I'm appreciative of
the opportunity to ask you questions
about it. I'm intrigued about the
thinking process that the um panel
members apply when they consider
hardship. And I I noticed the numbers.
It seems parking tickets just there's
more volume of them, but there's also
more changes to the tickets because of
hardship. and there's more cancellations
than say red light cameras. But could
you tell the committee a little bit
about um the thought process that goes
into making those decisions?
>> If I may through you, Mr. Chair, the the
there were other changes that occurred
uh to the uh jurisdiction of the board
and the processes that we follow uh in
making determinations with respect to
undue hardship. for example, the the
scope of that review is has been uh
limited somewhat and and that won't
necessarily be fully reflected in the
figures that you're looking at here. But
um more I think to your point um undue
hardship is a defined term within
chapter 610 which is our governing
bylaw. Um it it is a defined term. It is
like many defined terms. It's capable of
more than one definition. Uh it it and
the the panel members the the deciding
hearing officers uh have have a
independence and and opportunity to
apply their thinking as as informed by
leadership uh to some degree. um to
determine whether a particular set of
circumstances should give rise to to
some empathy and some reduction in the
amount of the penalty there. Those
things may be a lost job. It may be an
illness. It may be any number of
different
uh financial consequences that can occur
to a person that would make the the
reduction for under undue hardship as is
permitted and mandated by the by the
legislation advisable. So it's it's not
it's not a blank page by any means. It's
a defined term. It is it is capable of
of some um latitude and it is exercised
in order to meet the the purpose of
those parts of the chapter uh chapter
610 that compel us to consider uh
hardship
um circumstances and to reduce
accordingly.
Does that answer your question, sir?
>> Yes. Um I' I'd love to talk about some
practical examples but we might not have
time just to help me understand it but
maybe you could tell me a little bit
more how you as chair ensure consistency
because to me um having tickets canled
or reduced is central to the justice
component and somebody looking from the
outside in says you know how come that
person has to pay and that person
doesn't based on circumstances you know
they own a car that kind of thing but
but maybe even more important is
consistency. between the different panel
members understanding that there's
discretion.
What do they base their decisions on? Is
it just experience or feeling or do they
have more? True through you, Mr. Chair.
We work very hard uh at consistency.
Uh we have um um direction um uh
training that is applied to all members.
uh and we have expectations through
practice directions and other mechanisms
to to enhance the uh consistency of our
work. We consider consistency to be an
important value for us. Um that doesn't
mean it's going to be a
onesizefits-all
solution at the end of the day. uh but
that the considerations that go into
those determinations we do we do insist
are are consistent throughout the
hearing officer uh body. Maybe one last
follow-on question is
is consideration given to someone that
is a repeat offender that repeatedly
asks for uh hardship? Uh, so if
somebody's racking up tickets and keeps
getting off the ticket,
um, at what point do you do you deal
with that? Well, uh, through you, Mr.
Chair, I I don't have a specific, uh,
example. Um, I I'm very recent
appointment. Uh, I served originally for
the AP and I'm now back uh since uh
since May. And so I don't I don't have a
specific example uh uh to to cite. Um I
would certainly expect and I would
expect our hearing officers would uh
regard a repeat offender as u someone
who's not getting the uh message. I mean
in in our work there's there's kind of
some measure of empathy on one side. It
needs to be structured. It needs to be
disciplined. needs to be consistent and
on the other hand we have deterrence. Uh
those are values and finding finding the
right balance in any particular case is
is the is why we have hearing officers
who are expert at what they're doing and
why we train them and why we guide them.
Um so uh through you Mr. Chair. Is is
that a is that an answer to your
question council?
>> Thank you. Thank you. I appreciate it.
Thank you chair. Thank you, Councelor
Holiday. Other questions of staff on
this item
or the presenters? Sorry. Seeing none.
Thank you very much, gentlemen. Uh
questions of staff on this?
>> No.
>> Councor Holiday.
I'll just ask from a staff's perspective
uh how the city approaches
uh the questions I raised about that
balance with deterrence and empathy and
how do we structure our
our policies around that because the
tribunal has to work with what we give
them. But could you tell me a little bit
just from a city's perspective on those
questions?
>> Yes, through the chair. Um so I just
want to uh talk a little bit about
hardship. So when red light camera and
automated speed were in the courts,
justice of the peace make that
determination as well. And it is really
on individual case basis. There is no
sort of standard. Um they they do it
based on the evidence presented in front
of them. That would be the same for the
hearing officers here as well. Um when
we moved red light camera and automated
speed over, we strengthened the bylaw.
Um so we required people to provide
evidence right of medical hardship or
other things. It's not just you come to
the hearing and you say something. There
has to be some evidence in behind and
there is um more transparency in terms
of how these decisions are being made
and um actually accounted for in the
decisions documents that are prepared.
So those are um some ways that we're
ensuring right that there are the rules
are being followed that proper things
are being considered um again similar to
the way that it is in court the hearing
members have the discretion to make
those judgments just like justice of the
peace.
>> Thank you. And just it's maybe more of a
general question. Um the significant
body of work uh for the panel has to do
with parking tickets but I know those
are also the biggest business line right
there's a lot of tickets that are issued
um there seems to be very few uh appeals
to get the get that this level for red
light cameras
and could you give me a sense of why
that is and in fact when I look at the
numbers the vast majority of the 2300
red light tickets like the vast vast
majority were were affirmed uh and like
two were varied for hardship, only five
were cancelled. I can't imagine what the
stories were behind that. And then
there's a category that says adjourned
and I wasn't quite sure what that meant,
but I am a little curious on the story
of the red light cameras and whether or
not that pattern will hold because it
seems to be a very small line of
business uh for the tribunal, which is
probably a good thing.
>> Yes, to the chair, I would say that is a
good thing. Um what that means is when
someone asks for a screening and that
screening officer makes a decision that
people are accepting that decision right
um people will bring something forward
to the tribunal if they disagree with
the decision of the screening officer.
So um from my perspective it's positive
right that the number of appeals aren't
as high. I mean parking is 2 million
matters a year so that those numbers are
higher. Um with respect to adjournment I
will refer back to the chair um for his
um input on that
>> adjournment if if I may through you Mr.
Chair Germans are something that we are
reluctant to uh grant and and certainly
my guidance to our members would be that
that only in the most pressing
circumstances should an adjournment be
permitted.
>> Um
>> what's an adjournment? Maybe start with
that. Like what's the definition?
>> We're not going to hear it today. We're
going to hear it in another in another
day.
>> I see. Okay.
>> It's going to be pushed down the road.
>> Okay.
>> Uh that should be a very rare
circumstance in these cases. If I may
also just suggest in response to your
earlier question uh through you, Mr.
share the one of the key things about
the the camera offenses that there's a
camera and there is a definitive record
of the offense occurring
that limits the imagination,
right? Uh so uh that's why in that's one
of the reasons why the incidence of of
those cases coming uh for a further
appeal. Uh just just for clarification
on that.
>> Thank you. Thank you, Mr. Chair.
>> Councelor Thompson. Any questions?
>> Um yes. Get my microphone on here. Yes.
Through you to staff. Um the chair as
part of my questioning to the chair
we've talked a little bit about the
number of hearing room Mr. Sure. Um, so
I'm just wondering what is the plan from
the staff perspective to increase the
number of uh hearing room or is there a
plan
>> through the chair? Um, the a lot of our
tribuners are still virtual, right? We
are offering in-person um meetings and
so we're carefully balancing the needs
like I indicated as the program expands.
Uh potentially screening officers will
need to expand, hearing members will
need to expand and the facility and
infrastructure around that will need to
expand. So we will be working with Creme
and others to um ensure that we have uh
adequate resources for the tribunal.
>> Oh, fantastic. Thank you. Um the prepaid
um to hearing date reflects about 16% of
those. So those are people who just
automatically pay the ticket and move
on. Is that what that means?
>> Correct. Yes. They've decided not to
proceed with the appeal,
>> right? And the affirm the 1366.
Um what does that what's a what does it
firm mean in this case?
Um, it means that the um original
penalty was held.
>> Okay, that's what it means. Okay.
Um, fair enough. Those are um those are
my questions to staff, Mr. Chair. Thank
you.
>> Okay. Thank you, Councelor Thompson.
Other questions of staff on this item?
>> Being none speakers?
>> Councelor Thompson.
>> Thank you. I'm happy to speak, Mr.
Chair. I'd held this and I want to thank
Mr. Somerville and team for coming in
being here with us today. I think it's
an important um you know area for us to
garner information. This is the chair's
annual report and I guess what we were
going to do last time was just to kind
of say yeah we read it and move on. But
I think there's a need for the public to
be aware and the questions that we've
actually asked about obviously this this
tribunal is I I believe important to the
public to get a sense of understanding.
I'm very encouraged by the executive
director's comment about the fact that
they asked about the timing and and I,
you know, said like 6 months was a long
time and she rightfully pointed out, you
know, well, it used to take 18 months,
right? And so we're obviously moving in
a in a really good direction. Um, I'm
I'm encouraged by the fact that um as
part of the parking aspect, there is
some empathy and then some compassion
utilized. Um, and of course, um, as as
one would obviously recognize when you
have a camera catching you in the act,
it's really hard to say, well, I didn't
do it because there you are. Are is that
you? Yes, that's me. Is that you
committing that act? Um, I didn't
realize I committed it. And so, I mean,
you can make that argument, but that
doesn't really hold a lot of water,
quite frankly. So, at least it's you're
able to at least address it through that
process. Um I think you know just going
forward um when these reports come
forward I think there should be an
expectation that the chair should come
and be provided uh by this committee the
opportunity to make a presentation. I
mean you've done your annual report.
It's a very extensive report. Um it's
it's it's very detailed and it it covers
a lot of the elements or concerns that
the general public would have in terms
of wanting knowledge and information.
But I also think it's important to to be
here to provide the details and so on
because we do get calls, hey, I got a
red light ticket. Um, where can I go to
get it cancelled? That's always the
case. And I say, well, I don't know
where. Maybe in the US, the governors
and or the mayors can cancel those, but
as and and counselors or aldermans in
the US can cancel. We don't have that
authority, Mr. Chair. I don't even want
it either. And so we have a process
where people are able to um have their
issues if there's hardships and uh you
know there's cancellation opportunities
and so on. So I'm encouraged by that. I
can encourage um my residents to
actually seek to work with the uh
varying um elements of the board and and
in the tribunal and the officers who are
adjudicating the case. So I'm I'm very
pleased with respect to this report and
I'm thankful to Mr. Somerville and the
executive director for responding to the
question when I held it. I thought that
this is something that we really needed
to at least have a bit of a dive into to
get sort of at least a highlevel
overview and presentation. And so thank
you for the presentation and I'm happy
to move the item and thank the staff and
the executive director for the work
that's being done. And um that's it.
>> Okay. Thank you, Councilman Thompson.
My button's being finicky this morning.
Other speakers. Councelor Holidayiday.
>> Thanks, Mr. Chair. The the button here
is doing the same thing. Uh but just
yeah, thank you for the opportunity
today that it was a a helpful
presentation and helpful to ask um
someone from the tribunal some of the
questions. Um, but I'd only just um put
an underline under the questions that I
asked about um cancellations and
reductions due to hardship for tickets
uh because it's a complicated thing and
it I think that's part of the public's
confidence in the process and the
answers today were really helpful and I
would just encourage that to be uh
continued to be entered into the reports
that come to us so we as counselors can
can keep an eye on this um and keep an
eye on the policy around it. Uh, you
know, you hear the stories, right, that
that people say, you know, how come that
that person got off the ticket and yet
they're driving a car? Maybe it's an
expensive car. I don't know. You know, I
don't know what all the ins and outs
are, but people see that. And so, I, you
know, I really agree with what the chair
said. There has to be a balance between
disrupting someone's life and and having
justice, uh, but also making sure that
we've got deterrence. But I would add
the the further lens of anyone looking
from the outside in, that they feel
confident that that decision was right
and that there isn't suddenly a pathway
where you can go to get off a ticket if
you just wait the system out and show up
with a story. Um, you know, these
tickets are are are important uh to make
sure that there's order out there on a
on the streets. And some people will
say, well, it's the city making money
off of it. Yeah, I guess some money
comes in, but you know, I'd be happy if
there weren't any tickets because people
were obeying the laws. Uh because
they're in there the the laws are in
place for a purpose, right? You know, I
often talk about that around schools.
You know, how come there's no stopping
or no parking and it's because they're
put in place for safety around the
schools. So, you know, that's why we do
these things as a council. So, I just
wanted to leave that thought that I just
think it's an in a very interesting area
that should continue to be part of the
reports. uh because I think it's
important for council to to monitor this
over time. Thank you.
>> Thank you, Councelor Holiday. Other
speakers on this item
seeing none. So, we have the
recommendations before us. Moved by
Councelor Thompson. All in favor? That
carries. All right. Our next item is
>> Thank you, Mr. Chair. Uh
>> thank you for coming in this morning.
>> Much appreciated.
Our next item is GG 30.5 amendment to
purchase order number 60550184
with Herrari Pontorini architects for
the enhanced state of good repair
accessibility and net zero project at
the St. Lawrence Center for the
Performing Arts held by councelor Chang.
Councelor Chang questions to staff.
>> Hello chair. Thank you. Um I just wanted
to understand the nature of this change
order. So, we originally had this
visionary redesign of St. Lawrence
Center for the Arts, which the city uh I
guess cancelled, and now we're
transitioning to a scaledown redesign
that takes care of SOGR and AODDA. And
I'm just wondering what is the nature
and scope of this change order and how
does the previous design inform what
this work will be?
to the chair. Uh thanks for the question
counselor.
We went from a basically redevelopment
an entire build to a renovation of the
site. So we are transitioning the
original scope of work to this scope of
work and that's how this POA this uh
change in the contract will address that
and the new scope of work will include
all renovations and all state of repairs
on the site including accessibilities
and net zero. So we went from a fully
redeveloped building to a very extensive
renovation is although it's not a fully
redevelopment is still a very extensive
renovation including net at zero and
accessibility
and how much of the feedback that was
taken during that visionary redesign
process will be taken into consideration
towards this still significant
renovation
>> to the chair. There's several aspects of
the schematic design that was completed
on phase one of the forward development
that can be informed can inform the new
design
and what level of consultation will
happen uh moving forward for this scaled
down version
>> to the chair will consult with your life
to make sure that stakeholders are all
fully engaged into the new design.
So, in the past for the
visionary redesign that we're not doing
anymore, there was actually a committee
that spoke into it. They had a vision
for how the St. Lawrence Center could be
a cultural hub and it's still part of
the strategic plan of TOI that all the
locations that they manage would be
cultural hubs. So, I'm just interested
in, you know, we're going to go through
this second design phase. This one is a
scaledown one. And and what are the
connection points between that vision of
empowering the space to become a hub uh
and how this new design is going to
reflect those aspirations
to the chair. Uh through a consultation
done to the stakeholders by EDC that
happened in the fall of 2025. One of the
things that the stakeholders did provide
to us was to focus on accessibility.
That was a big item ticket item for them
on the renovations and that is what we
intend to focus. But as I mentioned, we
will coordinate with T5 to make sure
consultations with the stakeholders are
held and that we take in consideration
their points during the design phase,
including a committee.
>> And will the board of TO live also be
kept in the loop of the progress on this
design?
>> To the chair, correct? He will.
Actually, we have a presentation for the
board this coming June to inform of the
not only an overall state of good repair
um and capital planning update but also
a road map of milestones for the center
of arts.
>> Great. Thank you. Those are all my
questions.
>> Okay. Thank you, councelor Chang. Other
questions of staff on this item?
Seeing none, uh councelor Chang, did you
want to speak on this item?
>> Yeah, I'll just speak briefly. So you
know we should be very proud of to live.
It is actually uh in the top 10 revenue
generating cultural institutions of
Ontario and the model is such that the
use of the three spaces that are managed
by to live mer
and the St. Lawrence Performing Arts
Center uh that the revenue generated
funds the development of art because it
is not for profit. The money that comes
from corporate rentals funds the
development of arts in our city. And so
I know a lot of people who worked on the
original visionary redesign were quite
disappointed when the city uh scaled
back that ambition. But I'm hoping that
in this new path forward, you know, Hari
Ponerini
uh architects are very well known in the
city and they do they create landmarks.
So even if they are doing a scaledown
design, I think it will still be
impactful
uh as an art space in our city. So I
look forward to this next phase of work
as a board member of TO Live. I think
that um having that conversation and
learning more about the milestones and
how this space will be designed so it's
accessible and also can still be used as
a cultural hub in our city in the heart
of our city in fact uh is very
important. So I look forward to that
work and I thank staff for this uh
journey that I think that this creme is
now embarking on with T live to bring
this to fruition. So thank you for this
report and I'd like to move staff
recommendations.
>> Okay. Thank you councelor Chang.
Councelor Chang is moving staff
recommendations and GG 30.5. All in
favor? And those carry. Our next item is
GG 30.10 10 award of document 5389
5398199635
to Alberichi Constructors Limited for
the new ultraviolet disinfection and
residuals management facility at the
Island Water Treatment Plant. Amendment
to purchase order 6056811
and 6057463
with ACOM Canada ULC for contract
administration and post construction
services. Councelor Thompson, you held
the item. questions to staff.
>> Uh yes, thank you very much, Mr. Chair.
Through you to staff, um what was the
original number for the original
contract
was a value?
>> Sorry. Uh to the chair, just
clarification when you say the original
value, the the the construction estimate
or the the award value here is 333
million,
>> right?
>> Right. So the estimate, what was the
estimate? Yeah, our construction
estimate was approximately 250 million
>> 250 or 229 two was it 250 or
>> thereabouts yes I had about 2 I had 229
okay and so the upside now and so the
increase is because of what the number
of days that have been increased and so
on because I look at the number of days
you've gone from 1825 to
2008 so it's about 183 days in terms of
um the increase is that the reason or
>> to the chair uh yes that is one of the
reasons
>> what's the other reason then
>> really u there is significant logistical
constraints when constructing at the
Toronto island um there's restricted
site access uh limited layown areas uh
it's dependent transportation for all
materials
and um there was also So recently some
uh aspects around the potential of the
province taking over Billy Bishop and
there may have may be some risk
allocation that the contractors put for
potential additional restrictions but um
yes our
>> and that's added into the current
increase in terms of the provincial
government wanting to take over the
island airport.
Well, we we're not sorry through the
chair. Um we concern I'm just trying to
learn as well. Yeah. No, we're looking
at um the reasons why the estimate was
low,
>> right?
>> As in the leadup to uh preparing for
tender and for establishing budgets. We
look at all the factors around uh the
work that's been done previously at the
plant. our engineering consultant they
have
significant data and analysis and so yes
in this case uh we were under estimated
uh I think it's rare but I think uh in
this case due to these constraints um
around working at the island uh we did
not u allocate sufficiently but the
market uh and the low bid uh provides
what we believe is and we are confident
in the low bid that we've received.
>> Okay. I think Mr. Lou where you like to
add something.
>> Yeah. I just want to add some things
that we're seeing um with tenders right
across Toronto Water especially the
complex tenders such as as this one.
Some of the other factors that we're
seeing particular when we're buying uh
equipment that's specialized which in
this case we are the ultraviolet
disinfection equipment is very
specialized. Um and as well the
electrical equipment we have to upgrade
the entire electrical substation uh
because ultraviolet technology uses a
lot more electricity. So there's a
significant upgrade uh going on with the
electrical facilities and what we're
seeing is worldwide demand on um switch
gear. Uh a lot of that driven by um data
centers where that are being built all
over the place. They're buying up all
that equipment. So there's been price
escalations in in key components. Um
this tender estimate we put together was
a few months ago. So it was prior to all
of these recent changes and we're now
seeing this reflected in in a lot of our
tenders. So that's something that we're
going back to look at as part of our
budget process. Yeah.
>> Is taking a look at what's happening. On
top of that, um the situation in in Iran
that's driving costs up and
uncertainties that was not factored in
our estimate either. That occur our
estimates were completed before that
occurrence.
>> You don't have a mad man formula as part
of your characteristic to be able to
implement into that.
>> No, we don't have that capability
predicted.
>> Fair enough. Um, this jumped at me
because there's a 32.7%
variance above the estimate, right?
That's kind of as a finance guy kind of
jumps at you. That's sort of part of the
rationale for asking the questions and
so on. So, this is very very helpful.
So, Mr.
You want to add? Yeah, I do want to add
something to that because um uh to be
clear uh we have cancelled some tenders
in the past where we saw significant
variance of this nature. In this
situation um there are two things that
the reason why I I had recommended we
proceed. Um number one was there's a
regulatory requirement for us to deal
with the backwash water at this plant.
We are several years behind in doing
that. So I was cognizant of of meeting
our regulatory requirements. The second
factor too um the reason why we wanted
to push ahead is we had a delay with
another project also tied to other
regulatory changes. So there was
available cash flow for us to reallocate
this year. So that's where we were able
to make it up by just deferring one
large project at Ash Bridges Bay. So
those two reasons of why um I was
comfortable of coming forward to
committee and council to ask permission.
>> Thank you. Thank you Mr. Chair. Okay.
Other questions? Councelor Holidayiday.
Uh what's the catchment area for this
water treatment plant?
>> What does it serve
>> through you, Mr. Chair? The island water
treatment plant services essentially the
the center core of the city. We push
water up through John Street and then
all the way up um the reservoirs. We can
actually take some water um from some of
the reservoirs on the north end and drop
water back down in the west end of the
city as well. So for example, if the
Clark plant is down in in our Tobico
community, we can push the water up and
move it over into those reservoirs and
back feed uh Tobico.
>> How does it compare in proportion to the
other treatment plants in the city? Is
it you know is it is it on significant
footing in terms of the volume it
produces? So it is our busiest plant uh
primarily because of the deep lake water
cooling agreement that we have with
N-wave.
>> So we do maximize production at this
facility. Uh when you look at capacity
utilization, it is the highest uh it has
the highest utilization rate uh because
of the N-wave contract. Um and and so it
is it is a plant. Um that's part of the
reason why uh we are pushing um for for
these regulatory changes in place
because we're producing so much water.
We do about 440 million liters um per
year through this plant.
>> How does the 440 million liters compare
to the other plants in the city?
>> So it it's in fact one of our smaller
plants. It is the smallest water plant
that we have but it is the busiest. So
Ashbury sorry um RC Harris plant for
example um can get up to 600 to 800
million lers okay a day. So it's double
capacity. So we've got lots of capacity
in the other plants but because of our
deep lake water cooling arrangement this
plant has to run um at a higher
utilization rate.
>> Could you explain the link to the deep
deep
lake water cooling through you, Mr.
Chair. Yes, the linkage is is related to
essentially trying to take the the um
the cold the coldness from the water
because we are taking water from um uh
deep in Lake Ontario. It's 5 kilometers
out, four intakes coming into the island
plant. The water is at about 4° C year
round and it goes through heat
exchangers at um the John Street pumping
station which then cools down a separate
closed loop system that Nwave runs. So
essentially we're taking that cold from
the water cooling down um the the glycol
system that um Nwave runs which then
cools these buildings including this
building. And so we're taking um we're
taking that coal to reduce energy
consumption.
>> So because of the uh input from the lake
for the deep lake water cooling, you've
got to do something with all the water
and that's why the plant's so big.
>> That's why we're running it as as as
much as we are running it, which is
triggering the requirement to upgrade uh
to meet regulatory requirements.
>> Okay. And the last question, Mr. here.
This is about a third of a billion
dollars if I read the number right. Um,
what's the overall replacement value of
the plant?
>> That plant probably, if I was to guess,
and if you're building it on the island,
uh, probably be four to5 billion in
value.
>> All right. So, this would be 1112th or
115th of the value of the plant. what's
in front of us
>> probably. Yep.
>> Thank you very much.
>> Significant building upgrade. We're
adding a new building uh new treatment
system and upgrading all the electrical.
So, it is a significant upgrade to the
plant.
>> Thank you.
>> Thank you, Councelor Holiday. Uh
speakers on this item.
>> Can a point of order. Mr. Chair, I I had
forgotten to ask a question and I at
least for me it's important. I just
wonder if you could and this is to would
be to Miss Shy
and
>> Go ahead.
>> Okay. Thank you so much, Mr. Shy. You
you've heard my question to the staff
and water and Mr. um Derano and so on.
The other gentlemen, I didn't get your
name, sir, but thank you very much.
Maybe you can let me know your name now.
>> Yeah, certainly to the chair. Simon
Hopton, I'm the director.
>> Mr. Hopton, thank you, sir. Appreciate
that. Thank you. Um no, through to Miss
Shery. M sher you and your team have
brought in um innovation and u sort of
systematic changes to the procurement
process and so on and you are
integrating with different departments
and what have you and so on you have
assessed this particular contract and uh
your assessment is
>> uh through the chair
>> that's my question Mr. here.
>> Uh we have assessed that a it's a
compliant contract that pricing provided
is in line uh with though not exact but
in line with what we could expect
considering the factors that uh Mr.
Derano had noted.
>> Fantastic. Thank you. Thank you, Mr.
>> Thank you,
>> Chair. I also have a question.
>> Councelor Chang, a question. Go ahead.
>> Yes. Thank you. Also to Miss Sharky. So
often we put out bids and we're looking
for the lowest bidder and then at some
point something changes and it comes
back and we have a lot of these actually
today uh where there's a change in the
order and we have to approve an increase
and I'm just wondering do we keep track
of these changes over time in terms of
certain vendors are bidding low and
getting the contracts and then they may
have a um I guess a a history of
unforeseen circumstances that result in
a change order and an increase in cost
because if cost is a primary factor in
our choice of vendors,
would it not put us at risk if we're not
tracking the number of change orders
that any given vendor
um might have a history of
>> uh to the chair. So I agree that is a
risk which is why in our processes we
actually have a number of
uh processes that we do to ensure we
mitigate that risk. Uh we do um
unbalanced bid analysis for all bids
that come in to again make sure that
prices received all unit prices received
across the board are again in line with
what we would expect. It's not identical
but there is a variance that we normally
tolerate just to ensure that it is not
what we call buying the business. Um on
top of that uh we do also have the
number of change orders and amendments
as part of their performance evaluation.
Uh and both of these factors are
situations that if we see this happen
too often or if we see a bid that is
excessively low and a risk to the city,
we would consider that bid
non-compliant.
Um we do track them. Uh we currently do
not produce um a report or data
regarding the number of change well
number of POAs based on a supplier. Um
but we do keep track of all POAS and we
have been uh working on reporting for
that.
So when a company bids the lowest bid uh
and then maybe there's a 10% variance
with another bidder but then if we look
at the history and the one with the
lowest bidder has a history of change
orders. Is that something that would
create a red flag? and and potentially
cause us not to choose the lowest
bidder.
So,
>> sorry, Councelor Chang, just you're
straying away from the topic at hand
before us.
>> Well, I I'm just curious about this
particular change order, which is
significant. Is there a history of this
vendor having change orders um in terms
of when we chose them, they were the
lowest bidder? if I'm not mistaken.
>> But you're straying away from the topic
at hand. So, if you can stick to the
topic at hand, I'd appreciate it. Thank
you.
>> Yeah. So, I'm just trying to understand
when we evaluated this bid and we chose
this vendor, was there an analysis of
previous change orders to inform this
choice?
>> To the chair. uh we did not review this
supplier for previous purchase order
amendments because purchase order
amendments uh can very much vary on
the rationale. Uh so it would be unfair
to suppliers if we did do so. Um so in
this particular case, no we did not.
>> Okay, those are all my questions. Thank
you.
>> Thank you councelor. Uh speakers on this
item. Councelor Thompson, you held it.
>> Uh yes, thank you Mr. Chair. I mean I
can I can move the item and I want to
thank um obviously the staff for
providing the responses is very helpful
to me um to get a better understanding
as to why the variance was such a
significant variance above the actual
initial
um numbers uh 32.7 is quite uh
significant and obviously I saw the days
um differential which was initially um
uh scheduled for 1825
days and moved up to 2,83
days more. And so it's helpful with the
explanation that's been given and I'm
thankful for that. Part of our job here
is providing oversight and to look and
review and assess and we know how
important obviously this work is and um
the technology while I may not
understand all the technology and so on
we rely on the professional staff to
help us with respect to having a better
understanding of the technology and the
issue around cost and the variation and
so on and I'm hopeful at some point um
uh you know staff may come up with a
category as part of our purch purchasing
process where we have the madman formula
that you have in there that uh talks
about how we can address the issue and
the irregularities with respect to
changes in decision making that is no
fault of our own but has great impact on
uh cost of us doing business cost of the
taxpayers and so on so forth when we are
not uh driving the uh the train plane
and or the water truck quite frankly but
we see the costes uh escal ating. Um I
don't have an issue with the process and
I'm very thankful Miss Shy and team
because the way she's planned it it's
the way it's working and the
conversations we've had. I'm boyed and
encouraged by the process in terms of
the inter departmental working and our
procurement office giving that
confidence that this is the way it's
been designed. this is the way it's
working and while the numbers are sort
of you know um you know quite eyeopening
um the validation and justification and
verification are all supportive based on
increased cost the site work and the you
know underestimation of stuff that's
under the ground and things that we have
to you know the workers have to deal dig
into and so on. So, I'm I'm encouraged
by the uh responses to the question and
I um I'm I'm happy to obviously move the
item. It's a heck of a lot of money, but
um unfortunately that's just the way
things are these days in escalating
costs and so on. So um uh you know 32.7%
variance is quite significant and I just
wanted to bring it to the attention of
this committee that obviously we've
looked at it and um giving the public
the confidence that we are actually
doing our job in looking and assessing
and asking questions about these types
of um um you know uh changes with
respect to these contracts and that
we've gotten solid answers to valid
validate the rationale behind it so that
there is at least a good understanding
in terms of the justification. So with
that Mr. Chair I can uh move the item.
Thank you.
>> Thank you councelor Thompson other
speakers on this item.
Seeing none councelor Thompson's moving
the recommendations in number 10 all in
favor that carries.
And our next item is GG30.11
non-competitive bridge contract with
Arcadus Professional Services
Incorporated for the pro for the
provision of the city's congestion
management center operation services
held by councelor Chang. Councelor
Changen question to staff.
>> Thank you. How many years has Arcadus
been operating our congestion management
center?
uh through the chair for a period of
five years
>> and this is a a bridge so that they can
continue to doing the their work during
FIFA. What's happening on the other
side? Are we intending to go back to an
RFP or is the city going to develop its
own operations?
uh through the chair. We're actively
working right now on a negotiated RFP
contract that we're anticipating will
come out in the fall of this year,
pretty much immediately following FIFA.
>> And who was doing it before Arcadus?
>> Uh prior to Arcadus, it was Parson's uh
corporation that was providing that
service.
So, is this a room where people are
monitoring the traffic across the city
and they're looking at places where they
could potentially adjust signal timing
or address uh arising traffic issues?
>> Yeah, through the chair. The rescue
congestion management center is the
nerve center for all traffic management
within the city of Toronto. So, it's
often characterized through the media as
the room where you see those operators
looking at the wall of traffic cameras.
Um, basically they provide 24 hours a
day, 7 days a week support to monitor
and adjust the traffic signal operations
across the city's 2,500 intersections.
They manage incidents and provide travel
information to the public via tweets.
They uh they provide emergency
maintenance support to signals, signage,
uh, road issues such as potholes and
winter maintenance dispatcher support.
They also provide dispatcher support to
the traffic agent program and the school
crossing program as well too. and and
last year if you recall we've upgraded
our roador's road closure notification
system process. So they administer that
process and they ensure that the fees
are collected in a timely manner. So in
essence the route uh provides essential
services um from a public safety
perspective congestion mitigation and uh
mobility across Toronto.
>> And who owns the technology in the room
that Arcadus is operating out of?
>> The city of Toronto owns the technology
in the room. So it's a hybrid operation
where we have our staff that are
managing uh the operations in the center
and then the highly skilled staff uh
provided by Arcadus basically uh control
the system software and and the tools
and equipment. But uh the city of
Toronto owns all the uh the equipment
that's there
>> and so there's city staff who are also
present in that room uh working with the
Arcada staff to manage the operations.
>> That is correct.
And um is there any escalation in terms
of the I guess workforce during FIFA?
Are there any preemptive measures being
taken to address potential increases in
traffic during FIFA
>> through the chair? Excellent question.
Absolutely. Um the benefit of having the
contracted model of having staff that we
can basically expand the resources in
the room when we need and contract them
when we don't. things are typically
busier in the in the summertime because
of uh construction and and maintenance
related operations, this sort of thing.
Um and again, when we have special
events, we always staff up within the
room to have additional support to
provide support to our staff in
effectively managing traffic.
>> So that increase of capacity is through
the Arcadus staffing. Is that correct?
>> That is correct.
>> Great. Thank you. Well, um I think we
definitely need to bridge this for FIFA
and uh thank you for answering my
questions.
>> Thank you, Councelor Chang. Other
questions of staff on this item?
Councelor Holiday.
>> Thank you, Chair. So, there's 2500
traffic signals. Can you tell me a
little bit more about how the monitoring
of them works?
What are they looking at? How often do
they look at it? How reactive are they?
Yeah,
>> that's today.
>> Yeah. So through the chair, so basically
it's a case where we have a whole bunch
of traffic sensors across the city to
the tune of like maybe thousands of uh
traffic sensors across the city. These
basically provide data on hotspots
around the city in real time about where
we're seeing congestion building not
just regular congestion but
non-recurring congestion sort of oddball
situations which basically provides
recommendations advice to the traffic
operators in the room. The operators
will then look at the cameras within the
specific area and first try to triage
and assess and confirm that the abnormal
building traffic is not just because of
an incident but it if it is an incident
obviously there's a whole incident
response that they go through. uh if
it's regular if it's congestion related
then they'll look at uh the timing cards
that we have divided uh developed I
should say look to see if there's
opportunities or or suggested ranges or
tolerance that they can make adjustments
to the lights and they will effectively
make those adjustments as as they see
fit. So then this that last part I'm
interested in. How quickly does a change
to a light occur? If somebody notices a
problem, building traffic, some issue
that needs an adjustment, you need to
add a couple of seconds to one of the
greens, whatever.
>> Uh through the chair, it varies, but um
for the most part, any of the signals
that have sort of fixed time type
operations, we can make those types of
adjustments fairly quickly. And so by
way of the fixed time operations, that
would be the majority of the signals in
the downtown core. uh signals that are
on the smart signal system, those
basically adjust on their own. However,
it is still possible for us to change
the parameters of operation around
those. It just takes a little more time.
>> But you said fairly quickly and a little
more time. Can you define that?
>> Um changing the signal timings can
happen within minutes. Um very very
quickly. Yeah.
>> All right. So does that happen uh
frequently? Do are you changing timing
every day
>> through the chart? Absolutely. and we
track those performance statistics. So,
um last year, for example, there was
over 1,750,
uh traffic signal adjustments that were
made um specifically related to cases
where they observed um you know,
abnormal congestion building and had to
jump in and make those changes. That
doesn't include the number of signal
timing adjustments that we would
recommend for special events or
construction that we would pre-plan and
then pass those instructions on to the
operations team to implement them uh at
the appropriate times. I'm surprised
because it doesn't feel like it
sometimes, but I'll take your word for
it and I appreciate the work. So, I'll
uh the follow-up question then is um
what percentage of the 2500
intersections are you intervening on? Is
it the top 10%, top five, top 1%?
>> Uh through the chair, um there's I would
flip the question the other way around.
There's about 200 signals that are on
smart signal technology that we rarely
kind of intervene on because they're
essentially running autonomous and
making changes on their own. The other
2,300 were actively monitoring and
changing. I would say that the most of
the effort is spent I would say maybe
about 80% in the downtown core versus
the suburbs. But that's not to say that
uh we don't again if we see an
abnormality in the suburbs we'll
definitely address it as well. So tell
me more where could I see a list of the
top uh 10% of the intersections or 5% or
whatever stat is meaningful
>> through the chair we could provide that
uh information to you sever
independently
>> and then how many of those have cameras
on them where you can have eyes so in
addition to sensors you actually look
>> uh through the chair we have roughly
about 300 cameras within the city of
Toronto
>> um yeah
>> but they're not all at intersections
>> that's correct about 200 of them are at
intersections there's about a hundred
that are on the expressways. Is that
correct?
>> Yeah.
>> Okay. Uh what would it take to get more
cameras on intersections, especially the
busy ones?
>> Uh through the chair, we within our
congestion management plan, we regularly
include a budget for um we refer to it
as intelligent intersections, the the
budget that's allocated there. So that
actually speaks reference to adding
additional cameras, adding additional
detection, multimodal detectors. um
depending on the situation and the
traffic management strategy that'll help
us prescribe what level of of traffic
monitoring we're looking for.
>> The police have access to those cameras
>> to the chair. Yes, they do.
>> They do. And finally, um
cameras uh well, when you put things up
on on poles that are owned by hydro,
that can become difficult because it's
not our pole. Could you tell me a little
bit about the relationship with hydro
and the ability to install this some of
the technology that we brought up in the
I brought up in the questions? Uh does
that is that working for you? Uh is are
they a good partner? Because I you know
I'd like to see this technology get out
easier
>> through the chair. We have an
exceptional relationship with Toronto
Hydro uh and partnership when it comes
to this. So, um, for starters, we have a
number of traffic signal, um, plants in
terms of like master arms and signal
heads that are actually mounted on
Toronto hydro uh, street light pulse.
Um, and that's been sort of a historic
relationship we've had with them. But,
uh, now that we're seeing more and more
of these advanced technologies, um, you
know, the multimotal sensors, this sort
of thing, we've been working very
closely with hydro opportunities if and
when we see the need to install
detection midblock and we don't have
traffic signal poles there. Toronto Hide
would basically allow us to mount on one
of the street light poles. Obviously,
we'd have to do a structural assessment,
all those types of things in advance to
make sure that it's safe. Um, but
essentially, we there's a technology we
use referred to as the whale spout that
essentially gives us power and
communications even midblock.
>> How long does it take?
>> All right, last question, counselor.
>> Last question. How long does it take for
you to go through the permission process
with hydro?
>> Uh, the permission process with hydro
has been expedited. So when we first
started doing this a few years ago, it
did take a longer, I would say about a
month or two to expedite, whereas
because we started doing this more and
more, we've got it down to about maybe a
twoe turnaround relatively quickly.
>> Thank you, Mr. Chair. Thank you.
>> Thank you, Councelor Holiday. Other
questions of staff on this item?
>> Seeing none, uh speakers held by
councelor Chang. Councelor Chang, did
you want to speak?
>> Yeah, just happy to move staff
recommendations. Okay, councelor Chang's
moving the staff recommendations. Other
speakers on this item? Seeing none, all
in favor of the staff recommendations?
That carries.
And our next item is GG30.23.
Did I miss one?
>> Sorry, I scrolled too far. GG30.14.
Thank you, Matthew. non-competitive
contracts for the provision of the
city's traffic electrical management,
emergency services, and traffic
electrical plan capital works roster
held by councelor Thompson. Councelor
Thompson, questions of staff.
>> Uh yes, Mr. Chair, and in fact, Mr.
Brown has answered a number of uh
questions about the number of signals
and cameras and so on so forth. So, um
um let me just see here. Okay. So, I
guess really what I wanted to know
though was about this item. Um, why was
this procurement schedule allowed to
I use a term slipped to this point where
a 12 month um non-competitive extension
became necessary? Obviously, we knew
that this contract was coming due and so
on. So, why was it necessary to have
this extension during this uh situation?
It's uh it's the most um um significant
uh time in our history because we're
hosting the FIFA games which should be
in about 11 days. I'm just curious as to
why we didn't have sort of an advanced
plan. Uh or did we? Thank you. Uh
through the chair. So there's there's a
couple of reasons why um we basically
suspended and wanted to do the
extension. Uh FIFA is one of them. So if
we had a new contractor
um awarded the existing contractor, we'd
want to make sure that they were fully
engaged throughout the game. So not that
our contractors wouldn't act
professionally, but we wanted to remove
that risk just in case. So that was one
of the reasons. Another large reason is
the findings of our auditor general and
the forensic audit associated with the
the winter contracts that we recently
heard through uh IEC. Um there was a
number of recommendations that came
through that and and the division uh met
and we thought given the size and scope
and importance of this contract that we
would pause the contract do a deeper
dive into our terms and conditions to
ensure that they were in line with the
recommendations of both the auditor
general and the forensic audit completed
by KPMG. And and what we've done is
we've uh we're in that process now of
doing a deeper dive into the contract to
sure that we are in alignment that these
uh these uh contracts um are in align
with the recommendations of both the
auditor and the forensic. Um again, it's
a multi-year contract, large value, so
we want to make sure we're getting it
right. So you had great concern about
disruption and the possibility of just
some technological chaos in terms of
making the shift when we're having this
really really important significant uh
event taking place in the city. You
wanted a more smooth uh transaction
>> through the chair. Yes. in particular um
a lot of the sensors that Roger was
talking about monitoring congestion
particularly around the event spaces um
would are maintained by our electrical
maintenance contractors. So um to reduce
any potential risk uh we thought it'd be
prudent to extend.
>> Great. Makes a lot of sense. Thank you,
Mr. Chair. Those are my questions.
>> Okay. Thank you, Councelor Thompson.
Other questions of staff on this item?
Seeing none, uh, speakers on this item,
councelor Thompson,
>> I don't need to speak. I think it's
pretty clear and evident as to the
explanation that's been provided. I
think it's prudent and actually wise,
quite frankly, in terms of taking the
action. Um, and so I can just simply
move the item, Mr. Chair.
>> Okay. Thank you. Councelor Thompson's
moving the recommendations on number 14.
All in favor? That carries. And our next
item is GG 20, sorry, 30.23, 23
occupational health and safety report
end of year 2025 held by councelor
Thompson. Councelor Thompson questions
of staff
>> the chair. Thank you. I'll get there. Um
yeah. So 23. Yeah.
So I I mean this is a really important
report. Uh I just wanted to get a sense.
I don't know where this is that Hi. How
are you guys? Um um Mr. I I wonder would
you mind just introducing yourself? I
don't think we really met before. I just
wonder if you can just That's my first
question.
>> Yes. My name is Toby Matthew and I'm the
interimm chief people officer.
>> Ah fantastic. Thank you. And you are
sir.
>> Hi. Good morning. My name is Afjan
Muhammad. I'm the director of
occupational health.
>> Thank you so much. Thank you. And so my
question to you about what's um driving
the increase in the injured severity um
which are in fact um taking our staff
much longer to recover from
what's driving them? What is the
problem?
>> Um thank you for the question uh uh
through the chair. We have a a couple of
cost drivers uh that are affecting WSIB
costs. Primarily we have two major
components. One is presumptive um
cancers in firefighters and the second
is presumptive PTSD in first responders.
>> All right. And what's causing the
cancers in firefighters? Do we have that
information? I mean cuz it's jobreated
then, right?
>> Thank you for the question. Yes. Um
through the chair. Uh the these are all
occupational cancers. So, these are a
listing of uh multiple cancers that have
been approved through the government of
Ontario that if a firefighter has a
diagnosis of a particular type of
cancer, it's deemed to be automatically
uh workplace related and then uh the
WSIB claim would be approved.
>> So, I I I get that. But um I guess if
medical officer of health was here, I'd
be like asking her like what can we do
to reduce the risk uh for the
firefighters? Obviously, we want them to
retire when they're done their years of
service and enjoy their retirement and
so on, but we know that their lives are
being cut short and because of
occupational issues. And I don't know if
you have that information or you can
provide that at this point. I'm happy to
wait if you don't have it, but I' we'd
like to get a sense of that if that's
possible.
>> Sure. Uh generally speaking, uh through
the chair, um when we're looking at uh
occupational cancers, we're looking at
the hazards that are related to that.
So, a lot of them have to do with the uh
um workplace hazards that the
firefighter would be exposed to. A lot
of them are like with smoke related uh
hazards. Um what control mechanisms
would be in place to kind of uh to
protect workers would include um
upgrades in types of of gear and
ventilation in like specifically like
bunker gear would be um um um relevant
in in in these type of scenarios. But of
course these are just general um
aspects. But if you'd like some more
information we can we can get back to
you. Well, so my question then would be,
are we providing them with the right
equipment and the right gears that they
need to reduce the risk even further?
Obviously, I suspect that there's some
degree of risk in however you slice it.
But is is there an opportunity to reduce
that delta so it becomes a lower number?
We provide a better opportunity, better
outcome for our um emergency personnel
and so on. And I do have a couple more
questions. So, if you wouldn't mind the
shorter answer.
>> Sure. Sure. Um uh yes. So uh uh my
understanding is that the uh science
behind this has evolved significantly.
When we're looking at occupational
cancers, they um uh are always retro
back to like 1960s. So it could uh so
the the science has changed
significantly.
>> Okay, great. And with specifically to um
the paramedics and firefighters in terms
of uh PTSD uh PTSD claim, what are we
doing to kind of help with respect to
these issues? There's more psychological
nature. You help me to understand sort
of the programs that are in place to
prevent these things and uh how are we
helping? And I have two more questions.
So I just have about 30 seconds.
Uh
yes. Uh I I believe that uh there are
actual staff uh psychologists available
within within the divisions and um they
have some programs that are specifically
for first responders.
>> Gotcha. And then why are uh muscular
skeletal injuries uh still increasing in
in sort of particularly the frontline
workers and uh what lessons uh can we
learn from the one single uh workplace
uh fatality that we actually have as
part of um your report in terms of what
system changes may be needed to prevent
that to bring that to zero.
>> So two questions there.
>> Sure. So for muscular disorders, we have
a uh policy and program uh within the
city of Toronto that has been in place
since about 2007. We've been
significantly looking at the hazards
associated with MSDS. So posture force
repetition and uh looking at design
changes, the way that um um posture
force repetition is used in various
workplaces. So that's kind of a major
program that we have at the city. In
terms of the uh fatality that occurred
that was uh that occurred last year in
solid waste management services and uh
there was a ministry of labor uh
investigation as well as internal
investigations. Uh um there's many
factors like behavioral factors and and
and and vehicle related factors. Uh we
can get back to you with those details
if you
>> had a similar one in another
municipality just last week, right? So
yeah. Okay. Thank you.
>> Thank you councelor Thompson. Councelor
Burnside. questions of staff.
>> Yeah, thank you. Um, so regarding PTSD
with first responders, specifically fire
and police, if we can kind of parse
those out. Um, what's the trend? Is it
consistent? Uh, well, let's say from
2018 to now, we'll go through COVID
up to now. It is, that's my first
question. Is it consistent or is it
going up or down?
>> Uh, it's it's consistently an upward
trend.
Um so and it has been uh since the
legislation was introduced in 2016.
>> So okay so the legislation was in
legislation was introduced 2016
um and it's been an upward trend. Any
potential reason or speculation as to
why like now that people know about it
or is there something else going on?
>> Um thank you for the question. Yes, I
think there's also it it's it's in
relation to the health care system as
well like there are uh there's less
stigma related to mental health uh and
uh people are seeking assistance uh as
they should with their healthcare
practitioners and getting the diagnosis
uh through the presumptive legislation.
As long as there's a diagnosis of PTSD
from a psychologist or psychiatrist, it
will be deemed workrelated uh if if if
they fall under the one of those groups.
and the WSIB will approve those.
>> So, could you theoretically work in a uh
downtown and police downtown and
headquarters and have been there 20
years and and really taking on an office
job, but uh then be diagnosed with PTSD
and it would be presumptive or do you
have to actually be out in the field?
>> Uh, so I'm not versed in the police. the
police are not um as part of this
report, but it would be for um for
paramedics and for firefighters.
>> Okay. So, could they be in an office
situation and still claim it or do they
have to actually be out on the road?
>> Um I'd have to look into the WSIB policy
for that for the specific details. They
do list out a number of criteria. That's
uh
>> Would it be possible just to send me
that answer at some point? Yeah. Okay.
Thank you.
Thank you, councelor Burnside. Other
questions of staff on this item.
>> Seeing none speakers on this item?
Councelor Thompson?
>> Oh, I think you're going to speak. Um,
yeah. No, I want to thank staff for the
report and so on and um obviously the
men and women that are working um in
these uh areas of our city uh are
valuable members who do great work and
um
yeah them sort of payment the WSIB um um
you know payment and so on is or the
cost is interesting but I think what is
greater in terms of cost is the costs of
lives, right, in terms of um our workers
um having um being impacted by cancer or
PTSD and so on. And we have to figure
out what we can do to help. And I
there's a lot of moving parts in that.
It's very complex. I know it's not just
uh you know um a wish and that uh things
will change or they will improve. But
I'm I'm encouraged that um a lot of work
is being done and we do provide um great
mechanism for the workers to be able to
be assessed and to get psychological
treatment and uh other uh assistance and
help as they need um particularly
relates to you know the psychological
aspect and um I'm encouraged by the
investment that we're putting into uh
these areas and uh even with respect to
how uh things are done. Many years ago,
Mr. Chair, you may remember this. Um our
um waste collectors used to go and
having to lift all those bins and put
into the trucks and so on. And we saw
the number of people who were suffering
from variety of different elements and
injuries and so on and then the
automated system was designed where you
have this lift the arm picks it up and
put in a truck and so on. We were around
Mr. chair that when we made those
changes and so on, then we've seen an
improvement in the overall health and
well-being of um of some of uh of our
workers and so on. And um while this is
not um um gerine to this, I I learned
just a few days ago, Mr. Chair, that
some of our contracts allow for um some
of our workers to have um in excess of
um and I don't know how true it is. I
haven't investigated, but I'm going to
say it anyways that it's like a shocking
number. It's like up to 100 days you
could have off sick and there's a whole
process that you go through. But I was
um quite um uh surprised at that. And uh
so my my point to that is that those
number of days when you're off sick um
it's interesting if you're sick, you're
sick. But the fact of the matter is that
um when you have situation in terms of
workplace if you could make uh the
workers's lives better by reducing the
situation where you may sprain an ankle
or risks or any other type of um
incidents that could occur um you know
through design and so on. And if you can
reduce the impact of that, I think we
have to make sure that we look at all of
those um issues. And well we saw that
the numbers are you know such that um I
guess in a large organizations like ours
those numbers relatively are relatively
small right I mean that that's my sense
of it right I don't know whether or not
you others will agree but it's
significantly small but if we can make
it even smaller it makes it for better
opportunity for our workers and
particularly you know after they retire
I hear about firefighters who have
hearing issues because of the alarms and
the bells that associated with that. We
we've learned and we've long known about
cancer and I know the provincial
government has made changes to make it
easier for those individuals suffer and
their families and so on and I'm all for
that. But if there is a way going
forward that we can actually improve the
system to make it better and safer for
all of those workers and so on. I think
that um we we should and obviously
encourage it. I'm sure everybody's in
agreement with that. I think we can all
agree to that. But I just wanted to ask
the questions uh as it relates to this
report to get a better sense of
understanding and um there's a high cost
um you know although the numbers have
come down as you've said in this report
there's it's only like a million dollars
plus or something that's still uh you
know 71 plus million dollars that we're
spending on WSIB and so on. So if
there's ways I want to make sure that um
and and I'm not suggesting that it's not
being done. is being done. But I'm
encouraged by the fact that we are at
least talking about this today. We're
learning more about what's actually
being done to help those men and women
who are all stars in terms of the work
that they do to make this city function
and work better. And so um with that,
Mr. Chair, I can move the item. Thank
you.
>> Okay. Thank you, Councelor Thompson.
Councelor Thompson moving the
recommendations in number 23. All in
favor? That carries. Our next item is GG
30.24. 24 non-union separation costs for
2025 held by councelor Chang. Councelor
Chang, questions of staff.
>> Thank you, Chair. Actually, I had my
questions answered offline, so I'm happy
just to move the recommendation.
>> Okay. Thank you, Councelor Chang. Any
other questions of staff on item number
24?
Seeing none, uh moved by councelor
Chang. All in favor? That carries. Our
next item is GG 30.25 25 animate Nathan
Phillips Square. So, um there's a letter
before us that I sent in just I'm asking
facilities and real estate staff to look
at the installation of more chairs and
benches on Nathan Phillips Square.
>> Sure.
>> Chair, I have a question.
>> Sure. Councelor Holiday.
>> Oh, okay.
>> Councelor Chang, you can't hear me off
mic, but I I promise I did ask first.
Um my my question is actually uh I think
easy. Um are is the city
uh able to
uh have discretion on the type of
fixtures it puts in the square or are
there restrictions uh for heritage
reasons or architectural considerations
or anything else that we need to know
about?
Uh to the chair, uh there are multiple
considerations on Nathan Phillips Square
for fixtures or amenities that we might
install, including heritage, uh among
others, security, uh a number of them.
Yes.
>> Okay. Um do we have the the right to
reproduce uh some of the fixtures that
are already there? Like there's existing
benches by the
by the the reflecting pool. Are we able
to to build new ones that look the same
if we wanted to or are they are they um
copyrighted or locked down?
>> To the chair, to the best of my
awareness, we can replicate those. Uh
and we certainly do so as they're
damaged and need to be replaced. Uh so
additional ones would follow the same
kind of path. Um, and just based on what
you see in the the letter before you,
this is something that's achievable that
you can navigate those complexities,
right? So, you have to take a lot of
considerations uh into account including
the uniqueness of the square. So, it's
it's not like just a city park where you
can put a fixture in there. There's a
little bit more to the decision making,
but do you feel confident to the
committee that you can you can achieve
what's been asked?
Certainly we can examine the issue with
the sufficient time to consult our
internal stakeholders. Um we would need
to make sure we can attend to urgent
issues like FIFA at the moment. Uh but
certainly with a bit of lead time we
could look into those issues and and
report back. Yes.
>> Thank you.
>> Thank you councelor Holiday. Councelor
Cheng questions of staff. Actually, I
have a question of the mover if the if
he would be um open to friendly
amendment to add Mel Lassman Square for
consideration. And I don't know if
councelor Thompson would want to add
Scar Bro Civic Center, but we have our
highest number of summer permits this
year. And there is also um some areas
that could use some additional seating.
And this is very creative. It looks very
relaxing. and just wondering if uh you
would be open to that amendment.
>> Yeah, I'm fine with that amendment.
Councelor Thompson, did you want to?
>> I'm fine. Absolutely. Anything for Scar
Bro. Any investment, I'm happy to
receive it.
>> Thank you.
>> So, hold on. Can I ask a question? This
is a an added I it's yours is Nathan
Phillips Square, then you're adding Scar
Bro, then you're adding North York, so
we can vote on them separately.
>> No. So, this is this was originally for
Nathan Philip Square. Councelor Chang
wants to move a friendly amendment for
me last one square and believe councelor
Thompson's adding on Campbell Square.
>> Can I ask a question
>> of me?
>> I don't care. Anyone that can answer it.
>> Fire away. I'll do my best.
>> Where are we getting the money?
>> Sorry.
>> Where are we getting the money
>> at the moment? I don't know. That's why
I'm asking staff to report back.
Okay.
there's no money like
look at doing it in 2027 if it's
feasible. I'll speak quickly. Can I
speak? Yeah. Okay. Like
>> we're going into an election and we're
asking staff to do yet another report. U
there's a cost to doing reports and then
to add North York and Scar Bro and
everybody else. This is just to me a bit
of a fool's game. I get the Nathan
Phillips square, but let's all add let's
all just add our little pet project for
money we don't have. So staff will come
back. They'll take uh 3 days to
investigate. We'll tell us what we
already know, but I guess we can all put
it in our newsletter.
>> Thank you, councelor. For the record, my
newsletter is already out. It's too
late.
>> Mine's ready, too. Yeah.
>> Thank you.
>> Yeah, just to speak. I mean, look, um,
you're asking staff to take a look at it
and so whether or not it's feasible or
not, I don't know. Um, we have lots of
benches in Scar Bro, like we're pretty
good, but look, if somebody if you want
to take a look at that area, Albert
Campbell Square as well to see if
there's any additional things that can
be done as in North York's case. I mean,
obviously, give us the information. We
may or may not be able to do it. And to
the counselor's point, I mean, I think
it's it's it's a good question like
where's the money going to come from? we
may get this report and it says uh well
it's going to be you know rather costly
and we say oh okay we we shelled that
for now but at least let us have the
information I think then we can make the
decision.
>> Thank you councelor Thompson other
speakers councelor Chang.
>> Thank you. I just want to thank Deputy
Mayor Aninsley for bringing this motion
because I think we need to inject our
civic squares with some uh I think
creative furniture and this definitely I
think would draw more people into our
spaces and I do believe that our
Scarboro Civic Center and North York
Civic Center as well as the future
Tobico Civic Center are important civic
squares. They're not just uh you know a
pet project or a pet space of any one
person and in fact many people for many
people these are the spaces where they
experience their city. So I think that
this report hopefully it won't be too
much work will be an important
opportunity for us to consider how to
inject some fun as well as some
usefulness to our squares. Thank you.
Thank you, Councelor Chang. Councelor
Holidayiday,
I
>> I'll just add what I hope is a
constructive comment is to first look at
what is already there at the facilities
and find out if you can move any of the
benches first to a better location
before we go and buy a new one.
>> Thank you.
>> Thank you, Councelor Holiday. Um, and so
I just I put this motion forward not for
my newsletter or
Sorry.
>> Yep. Yep. So, uh, part of my comments
around this, so if you look up at Nathan
Phillips Square, most of the benching is
around the reflective pool or or on the
sides under the walkway. Um, I get
comments often about um why there's not
more seating, why we can't be a little
more creative. um often over the past
couple years I think that's also played
out um because the band shell or the has
often had fencing in front of it. So
there's been very little seating on
Nathan Phillips Square other than on the
parameters of it. So I think that you
know there's an opportunity here that we
could look at for more seating, more
creative seating. Um so that's why I put
this forward. Thank you.
All right. So we have the amended motion
before us. All in favor?
Opposed?
And that carries. Thank you.
>> Item as amended. All in favor?
Opposed? And that carries. Thank you.
Bills. No bills today. Motion to