Downtown Infrastructure and Safety Updates - 11 Jun 26
Hamilton · June 13, 2026
Sound check 1 2 3. Sound check 1 2 3.
Hello and welcome to the downtown
subcommittee for Thursday, June 11th.
I'm your chair, war I counselor Cameron
Crretch, and joining us today in council
chambers, uh, vice chair Susie
Braithweight, member Emily Walsh, member
Karen Row, member Megan Edmmonds, member
Andrea Hzerafa, and member Ryan Moran
joining us online, member Elizabeth
Wakeford, and I see you there, councelor
Wilson, Ward One, and we have non voting
members Dino Mazik and AnuTo, and I
believe Sonia is also depos online.
We have a quorum for our meeting. So,
I'm going to call it to order at this
time and get to our first item of
business, which is the approval of the
agenda.
Can I have a mover and second to approve
the agenda for today? Moved by Vice
Chair Braithweight, seconded by member
Row. Any questions,
amendments,
comments, or feelings about the agenda
you want to share at this time?
I'm not seeing any. So, all those in
favor by show of hands.
Thank you. That's everybody. On to
declarations of conflicts of interest.
Does anybody have a conflict of interest
they want to declare for today's
meeting? Only applies to voting members.
Nope. Okay. On to the adoption of the
minutes of our previous meeting.
Move and second to adopt the previous
meeting's minutes from April 9th.
Moved by member Walsh. Seconded by
member Wakeford. Any questions,
amendments, changes, or housekeeping
things you want to note about the
minutes of our previous meeting?
Seeing none, all those in favor by show
of hands.
That's everyone. Thank you. That
carries. We have two delegations for
today's meeting. We'll start those
delegations now. Just as a reminder
before we begin our delegations, members
are reminded that questions of the
delegations are for clarification
purposes and not for debate. So, you're
welcome to ask a delegate a question and
they're welcome to answer the question,
but if it gets into debate territory,
I'll ask you not to do that. For
delegates, you have five minutes to
complete your delegation. You will,
depending on where you are, if you're in
the room, you will hear a tone after
four minutes, and then you'll have an
additional minute to finish up. If you
get past 5 minutes, I'll just say, "Uh,
could you wrap up?" And then you will.
So, we have delegations respecting
report PW2609A,
which is about urban pest control
information for Core Park. And we have
one delegation as a for Doris Clayton,
who's virtual, and B for Allison Hansen,
who's virtual. We'll start with Doris
and I'll ask if Doris is online
and if you could turn your camera on
Doris and you have five minutes whenever
you're ready to go.
>> Thank you uh councelor coach and I would
like to thank the subcommittee for
giving me the opportunity to speak
today. I will be sharing a personal
story of how rodenticides affected my
own family.
Jasper joined us in January of 2020.
He was around 6 months old, a rescued
black lab mix from northern Ontario.
Whenever I was outside, he was my
shadow, laying in the grass or sunning
himself while I worked in the garden. A
few months after Jasper joined us, I was
in the backyard when I noticed what I
thought was a green plastic toy. I
didn't recognize it. I wondered how it
could have got there, given that the
entire yard was fully fenced and the
gate was always kept locked. On closer
inspection, I realized it was not a toy,
but it was green dog poop.
Confused, I wondered what could have
caused it. A quick Google search made my
blood run cold because it was rat
poison. I immediately called my vet and
told him what I had discovered, only to
be informed that because of the CO
situation, they could not see Jasper and
they directed me to another clinic.
I rushed him there and had to leave him
at the front door as I was unable to
enter during the shutdown.
What seemed like hours later, I was told
that Jasper had been given activated
charcoal to clean out his system, had
had blood work done as well. He was sent
home with a bottle of vitamin K to be
administered daily to prevent excessive
thinning of his blood. I was instructed
not to let him run around in or outside
the house and prevent him from jumping
on furniture. Not an easy thing to do
with a young, active dog, and I had to
do this for a month. When Jasper was
back home, I started investigating how
this could have happened. The yard was
completely fenced and always locked. How
could rat poison have gotten in? I
scoured the yard for evidence and I
found a small cellophane package with a
few green pellets left in it. It was rat
poison, something that can easily be
purchased at hardware stores or online.
I informed my neighbors, who also had
dogs, to check their yards for it. One
of them commented that another neighbor
had recently put out rat poison, but
when confronted, they assured me that
what I had found was not what they had
used. Although they did say that it had
disappeared from their yard, I strongly
suspect that an animal such as a raccoon
found that poison and brought it into my
yard. Having no proof, there would no
there were no actions that I could take
to hold anyone responsible for what had
happened, including payment of the vet
bill that ran well over $1,000.
When a month had passed, Jasper returned
to the vet for additional blood work. I
was told he could go back to his active
life, but it was forever changed. Even
though this happened 6 years ago, not a
day has gone by that, but I have not
thought about it. Whenever Jasper's in
the yard, I fear that he might find
something when I'm not looking, even in
an instant.
No dog should ever have to go through
what Jasper did. Nor should any dog
owner feel that their beloved pet is not
safe in their own backyard.
Now, I recognize that it is not in the
jurisdiction of the city of Hamilton to
prevent homeowners from purchasing and
using rodenticides.
However, I see this as an opportunity
for the city to lead by example.
By adopting alternative methods of pest
control, the city is providing citizens
with options other than rodenticides.
I thank the subcommittee for examining
these alternatives and I hope that the
proposed changes to pest control in Gore
Park can be implemented as soon as
possible. I thank you again.
>> Thanks very much for your delegation. I
don't see anyone with questions at this
time for you. Thank you for sharing your
story with us and you can log off and
watch the rest of the meeting on YouTube
and we will go on to the next
delegation. Thank you very much Clayton.
To that end, our next delegate is
Allison Hansen, and who will also be
joining us virtually. Allison, if you're
there, could you turn your camera on?
>> Hi there. Can everybody see me and hear
me?
>> I can see you and hear you clearly. You
can start and you've got five minutes.
Go ahead.
>> Okay, great. Uh, so good afternoon
members of the sub downtown
subcommittee. My name is Allison Hansen.
I'm speaking on behalf of
Rodenticidefree Ontario in support of
Hamilton based advocates including bird
friendly cities Hamilton Burlington and
others calling for an end to rodenticide
use in Gore Park. We appreciate the
subcommittee's recognition that
rodenticides are not an effective uh
rodent management solution and are
pleased to see that public works staff
are focused on reducing access to food,
water, and shelter that may be
sustaining rodent activity in Gore Park.
If implemented consistently and
maintained over time, these measures
should reduce the need for additional
interventions. I would however like to
call your attention to concerning
language uh in staff report PW260009A
which describes rodenticides as typical
and known to be one of the most
effective methods of reducing a rat
population. This framing is misleading.
Rodenticides may kill individual
animals, but they do not address the
conditions that allow rodent populations
to persist. They also pose serious risks
to wildlife, companion animals,
children, and the broader environment
and should not be normalized as an
effective and or acceptable response. Uh
for the same reason, we are concerned
that the report presents carbon dioxide
burrow treatments as the recommended
next intervention if additional uh
additional budget is approved. Lethal
methods, whether poisonbased or not, do
not resolve the root causes of rodent
activity. If food sources, waste,
shelter, and access points remain
available, the same conditions will
continue to attract rodents over time.
We respectfully ask the subcommittee to
direct staff to amend the report's
characterization of rodenticides and to
ensure that future budget request
prioritizes prevention first non-toxic
measures.
As the level of government closest to
community health, land use, and urban
biodiversity, municipalities have both
the author authority and responsibility
to prevent avoidable harm where current
pest control practices fall short.
Hamilton has an opportunity to lead by
moving away from reactive lethal
approaches and towards strategies that
address the conditions driving rodent
activity in the first place. We
respectfully urge the subcommittee to
end the use of rodenticides in Gore Park
and com commit to humane
prevention-based measures that protect
wildlife, companion animals, children,
and the ecosystem health. Um, and just
before I go, uh, I Doris's story, um,
it's it's a little hard for me because I
lost a dog to rodenticides. Uh, and this
was, uh, a year after my sister's dog
was poisoned as well. And this these
stories are just not uncommon. They
happen all the time. So again, I thank
you so much for the opportunity to speak
today.
>> Thank you very much. I see a question
here from councelor Morin Wilson. Go
ahead.
>> Thank you, Ellison, uh, delegate rather
Hansen for participating in our
discussion. I'm I'm sorry in case I
missed it. I apologize. Um
are you able to uh share with us um any
urban urban places uh that you think are
leading uh on this front? Any best
practices out there that we should be
looking at?
>> Yeah. Um so more locally in Ontario,
city of Pickering uh has led the way. Um
and what they have done is adopted their
own rodenticidefree policy. So they have
stopped the use of all rodenticides on
the municipal properties and I believe
they did this now shave on me here in
2023
um and have maintained the these
measures with quite a bit of success. um
they are going to be expanding it a
little bit further by also um placing um
owl boxes in places where there's no
rodenticide use and I'd be more than
happy to connect you or anybody here um
within the city of Hamilton to staff
that helped move this forward.
>> Thank you for that information.
Appreciate it.
>> You're welcome.
>> Thanks very much again, Delegate Hansen.
Just to let you know, this committee and
no committee and council, we don't amend
language in reports because staff are
free to give us their recommendations
and and especially if those
recommendations do have or any language
impacts actual recommendations. Of
course, we can vote those
recommendations up or down based on what
we want to do, but we never amend their
language in that manner simply because
we want to make sure that they're free
and unfettered to give their
professional advice as they see fit. But
thank you so much for um coming today
and for delegating. And otherwise, I
don't see questions for you at this
time, so you can log off and watch the
rest of the meeting on YouTube. Um, and
thank you for coming.
>> Thank you.
>> On that, we'll need some folks to move
and second that we receive these two
delegations.
Moved by member Moran, seconded by
member Edmonds, and this is an
opportunity usually to ask questions of
staff, but we have the report coming up,
so we'll do it when the report's on the
floor. So, all those in favor of
receiving the delegations, by show of
hands, that is everyone. Thank you. That
carries.
We're now on to items for information.
Before we get into this section of the
agenda, a couple of things we're going
to do differently. I'm always mindful if
I'm chairing a meeting with counselors
or chairing a meeting mixed with
counselors and members of the community
that not everyone who's doing this on a
volunteer basis is doing it from the
same perspective. We're doing it every
day. And so, we're going to change how
we do things a bit to make this a bit
more accessible. In every one of these
information reports, most of them
anyways, there's a pathway forward.
Sometimes there's options in those
information reports and we're not going
to put motions on the floor today
because those require some crafting. But
at our August meeting, any of the
outcomes from information reports that
we see there and you want to bring
forward a motion, that's a thing to do
to talk to staff, reach out to them
directly. And if you need touch in,
sorry, you need help getting in touch
with someone, you can go through Carrie,
figure out who the right person is. But
every information report at the bottom
has now this is a new thing. It's at the
bottom who it's prepared by and who
signed off on it. And everyone's email
address here is just their first name,
do not do their last name at
hamilton.ca.
So, um, you can reach out to people if
you want to propose a motion or or get
some some advice or those kinds of
things. And please feel free to copy me.
I'm happy to help you through the motion
crafting process. That's thing number
one. Thing number two is what I'm going
to ask staff to do for each information
report is identify whether or not
there's a next step proposed. So,
sometimes in an information report
today, they're telling you we're going
to do X. We're letting you know, we're
going to come back and tell you what's
happening in Q4 2027. But I want them to
identify that upfront so we don't have a
lot of questions trying to get to that
answer. Um secondly, if there's a report
coming forward where there isn't a next
proposed step right at this point or
staff don't have anything they're going
to be doing next. I want them also just
to identify there isn't something coming
up here. Then you know that's your
queue, my queue, whoever's cue to maybe
bring a motion forward based on that. A
great example that is the Jarvis
Memorial clock tower. There's a bunch of
different things that can going on in
there. We've given kind of options but
staff isn't saying pick this one. We're
saying here's the information you asked
for. It's up to us and the community to
figure out what do we think is a
reasonable step. Does that all make
sense? Okay. As we go through these,
I'll stop at each one, get staff to do
that before we get into questions and
answers. First one, 7.1 peed 25226B,
which means it's been back here more
than once. Noise control bylaw street
performance. So, first I need to move
her in second order to put the report on
the floor.
Moved by member Moran, seconded by
member Sarafa. Now it's on the floor.
Staff are here to available to ask
answer questions. Before we do that, I
just want to check in with staff first
to see as we're as we're playing this
game. Um, are you sitting in this
information report what you'll be doing
next and when you'll be coming back?
>> Thank you, counselor. Uh, my name is Dan
Smith. I'm the director of licensing and
bylaw services. Um, so with this
information report, what we're um going
to continue to do based on the
information that's provided within the
report and the data that's been supplied
is continue to monitor some of the
hotspots that we've that we've
identified that have been identified
through conversation and council um and
do follow-up visits where operationally
feasible at those locations. We will
also continue to provide uh updated data
at our annual um our where we provide
annual information on just data in
general from our our our
team and uh that will be shared through
our planning committee reports.
>> Okay. Any questions that people want to
ask
of Dan?
I'm looking here. I see first member
Walsh. Go ahead.
>> Hi. Uh thank you through the chair. I
just wanted to check on the chart too.
Uh shows some numbers about uh different
service requests and then how they
followed through. And I see that there's
11 service requests and eight were no
violation marked. Can you explain what
those typically look like? Are they not
meeting the level of noise or um what's
happening in those situations?
Certainly through the chair. Um I also
have supervisor of operations and
enforcement Tamara Reed here to assist
if there's anything additional to add.
Uh typically when an officer is going to
investigate a uh issue related to noise,
we will go and make an assessment of the
the violation u based on the occurrence
that has happened, the type of noise
that's taking place and
ultimately an a review from the point of
reception at the of the location of the
complaint. So, if the officer is of the
opinion that we do not have a noise that
is deemed to be unreasonable or one that
would be a disturbance to an inhabitant
of the community, uh they would mark
that as a uh a nonviolation and close
file.
>> Perfect. Thank you.
>> Just to clarify um to make sure that you
got the whole answer to your question,
was that also in response to amplified
noise or just in response to noises
where it's about a decibel level?
because I'm sure there's just situations
where people are not permitted to
amplify anything regardless of the
decibel limit. So could you maybe
clarify that point?
Meaning like obviously if you're
amplifying noise and it's very very loud
and is reaching a certain decel limit um
you might be using technology to measure
the limit to determine whether the uh
volume of the noise is the problem.
However, there are some situations where
people are required to have permits for
having noise amplification at all. So in
those situations, how do you how do you
judge between those situations and what
goes on there?
>> Certainly. Uh
so through the chair, if we are
sorry, I'm trying to think of the best
way to answer that question. So there's
some diff there's definitions or some
clarification within the bylaw about
what an unreasonable noise would be. One
of those would be music coming from a
speaker or an amplification device. Just
because somebody's using an
amplification device doesn't mean it's a
violation of the bylaw. It would be an
assessment of the noise that is being
emanated from there or whether it is
associated with an event or something
where maybe a noise exemption permits
been issued. Um but it would just be the
level of noise ultimately that we would
be analyzing.
>> I'll add myself to the speakers list.
I've got a few more questions about
that. But uh do you mind if I ask them
now? Member Wakeford. I know you're next
in the list. Do you mind if I ask them?
Thanks. So my understanding and I won't
get too deeply into it is there's a
report that's out um called the Bergman
report from Pride 2019 and there's a
whole list of different recommendations
about bylaws there and there's an
analysis of the city of Hamilton's
bylaws and some discussion there about
noise amplification in general and
permits from his amplification. So for
instance at that event in 2018 I believe
not 2019 uh there were individuals who
came and they had amplified sound and
they were saying things and so on and so
forth and it was deemed at some point in
that entire process that just amp having
amplified sound in an area where there's
a permit holder or there's it's it's
city property and you don't have a
permit to be doing that activity is in
itself a problem. And you're saying
though it's not you're saying it's only
if that is unreasonable
which is news to me. I'm wanting to
clarify that. Yep. Through the chair.
First um transparency, I'm not aware of
that report. However, the way that we
conduct our our inspections now
operationally based on our bylaw is that
our officer would make their
determination based on the level of
noise that is occurring. An
amplification of noise would certainly
cons be considered as part of what we
would think could be making an
unreasonable noise or noise that would
be um a disturbance. Um, but depending
on the level of noise and the purpose of
it, the officer may make their own
evaluation of what the occurrence is
actually happening and whether it's an
unreasonable noise or not.
>> Great. So, I'm going to give you an
example and I'm asking you to make a
bylaw call on the floor necessarily, but
kind of. So, a routine activity that
occurs is amplification of noise at on
the corner of King and James in front of
Jackson Square. And it's often people
who like to give us a message about
something. and the message they want to
give us is quite loud and you can hear
it from several blocks away um in every
direction. At what point is that
considered a violation and then not
considered a violation? Because I think
that I'm curious to understand some of
these statistics in the context of
frankly maybe the bylaw needs to be
changed to say that you need a permit to
use amplification on city property
period when if you don't have one you
can't do it. And again that was my
understanding based on other reports
that were out in the past. But how is
that determination made? because of
course King and James is a noisy area so
you take that into consideration but um
the entire area is blanketed by vacant
parcels so all the noise echoes across
every part of the downtown area when you
have even someone having a conversation
on a speaker down there you can hear it
up nine floors so I'm trying to
understand how officers are making those
determinations and are they saying
basically yeah 100% of the time when
you're down there doing that it's going
to be a problem or is this left up to
people's judgment as to what they
consider to be allowed
through the chair. So ultimately it's
officer discretion. The officer would be
assessing the situation and making a
determination if they felt the noise was
unreasonable or was disturbing one of
the inhabitants of the community. They
would do that based on uh their
assessment of the situation at hand at
the location plus potentially a point of
reception where the complaint is coming
from. But in short is officer
discretion.
>> Okay. Last question for me. Uh so what's
the best way to deal with this in your
opinion? because I do think it's a
problem. It's a gap.
It doesn't matter if um you're getting a
complaint from somebody on the story of
the building every time, right? It could
be just someone who's in the proximity
of the area who knows about it. Full
transparency, I've called in many times
about this because I happen to be
walking downtown a lot and encounter it
and I say, "What's going on?" So I'm
just asking like is there a remedy here
for
like what's the remedy asking you to
come back and report back on this to get
a sense of what might be changed in the
bylaw with respect to amplified noise or
how to improve that or what? I'm trying
to understand that
>> uh through the chair. I mean it would be
at committee's discretion if they wish
us to look at the bylaw to see if
there's improvements that can be made. I
will say that we do use best practices
and the majority of municipalities that
I'm aware of do use the same type of
evaluation of noise as we do. Um,
so I would say our next step is
continuing to do the enforcement that
we're doing, educating our staff and
making sure our staff are trained to
understand what a disturbance is versus
what would be a nonviolation of the
issue. Um, but I would leave it up to
committee's discretion if they wish for
further work to be done.
>> Okay, that's homework for me. Thank
Thank you. I'll take the chair back over
to you, member Wakeford.
>> Thank you through the chair. I would
like to thank staff uh Dan Smith and
Tamara Reed for preparing both of these
reports. Uh they have been helpful to me
in terms of providing some context and
understanding about noise issues in the
downtown. And those are it's all based
on available data, level of service, and
what our exist existing bylaws are.
However, um to uh counselor Crutch's
earlier point,
so where do we go from here? Um even
though uh I heard earlier from staff
member Dan Smith that we would be
continuing to monitor hotspots and data
would be updated. There are still um
outstanding issues mostly around
religious groups using amplified sound
in the downtown core. Um I think uh
there's sort of the missing piece around
street performance um and what we may
hear back from tourism and culture about
that. Um but where do we go from here?
Because there are still issues. Um, and
I'm perhaps the chair and I could work
on a motion for an upcoming meeting as
to what we might recommend.
Sounds good. I don't think there was a
question in there. Just homework for you
and I. So, I'll copy you on my email.
Apart from that, I don't see other
questions on this report at this time.
So, at this point, we'll go move to
receive the report. All those in favor
of receiving this report. Okay, that's
everybody. And that report is received.
We'll now move from this report on to
peed 26113 Hamilton night guides pilot
project. Can I have a mover and second
to put this report on the floor? Moved
by member Walsh, seconded by Vice Chair
Braithweight. This was a chance for us
to have a little bit more of an in-depth
reporting back on this and so we have
that information before us. Does anyone
have questions? I don't think anything's
being proposed here. I'm just going to
look over to staff. this isn't something
we're we're proposing something, but
I'll turn it to Lisa Abbott for more
information on that first.
>> Thank you. Uh Lisa Abbott, director of
culture and tourism. Um so there are no
recommendations coming out of this. This
report is an information report uh to
give you more information on the pilot
that was run.
>> Okay. So we have any more questions on
the pilot that was run? Thank you very
much for providing this information. It
may at some point lead to hopefully more
pilot programs or a motion from somebody
here who says, "Hey, I've got this
information. What can we do next?"
because I know this has been a
springboard for some ideas from people
here. So, thank you for your report.
All's in favor of receiving the report.
A show of hands. That is everyone. We're
on to PW26125
item 7.3, the updated memorial clock
tower. Can I first have a mover and
second to put the report on the floor.
Moved by Vice Chair Braithway, seconded
by member Edmonds.
I'll turn to staff briefly to see if
they could comment on again if they're
proposing anything in this report or
not. Yep.
>> Thank you through the chair. Uh again,
Lisa Abbott, tourism and culture
director. Uh so uh we uh came back with
some information around the clock tower.
Um some of the things that were in the
motion we are happy to address right off
the bat. Tourism and culture will um be
happy to assume ownership of the clock
tower. Um we have provided in the report
um some information about the
refurbishment of the clock tower um uh
at the at the discretion of the
committee uh if we wanted to proceed
with a procurement uh um exercise in
order to get a more detailed um cost
estimate. Uh we have since the report
was written to today, we have uh done
some work with our um heritage planning
and museum staff uh to determine that
the the clock tower itself does not
necessarily have significant heritage
value, but at the same time is a lovely
asset in the community and I'm happy to
uh uh respond to the direction of the
committee as to next steps.
>> Thanks. Like I said at the top of the
meeting, we have our next meeting to
work on motions there. And frankly,
would probably be good to have some time
to talk to some of the people in the
community who raised this issue and see
what they think because there are
several options with respect to costs.
So just checking in with people if they
have questions about this before we
receive it. Yeah, Vice Chair
Braithweight, go ahead.
>> Um, thank you Lisa for putting that
together. That was really helpful for us
to have. It was the information we had
to, but very helpful to see that it
lines up with what you have. Um, mine's
more of a comment more than a a
question. Um,
looking at the clock tower, you know, we
will be working on a motion to have
something done with that, obviously. Um,
but, you know, just to make it clear, if
it's going to cost an insane amount of
money to repair, there's other ways we
can repurpose, I think, the memorial
that the BI would be supportive of, and
so we can talk about that offline. I
think, um, the other the one thing I do
just want to raise is that a lot of the
wording in the report spoke about
relocating it. I would like that to read
relocating within the boundaries of
International Village. We don't want to
lose that asset. It's become a landmark
for us. It's always been there. It's
something that the residents really
like. So, just just to flag that as um
something that my board was concerned
with. So, but thank you for putting that
together.
>> Thanks very much. Anybody else with
questions or comments? No. I expect
we'll see a motion in August about this.
All those in favor of receiving this
information report by show of hands.
That is everyone. Thank you so much. And
we're moving along to 7.4, waste
receptacles in the downtown core,
PW25059A,
item 7.4 as I said. And again, I'll turn
to staff to see if they could comment on
what they're planning to do or if this
is just again options for consideration.
>> Hi everybody. Uh Cynthia Graham,
director of environmental services. So
this report was in response to a request
for additional information and ideas and
options of how we can do waste
receptacles in parks in the downtown
area differently. So the uh report is
just a a series of information. uh staff
went and and uh thought through what
some different options could be. Looked
at uh costs and um implications for how
frequently uh the different receptacles
would have to be emptied based on uh
capacity and anticipated use and uh the
information is there for consideration.
Uh we do not have a recommendation uh
one way or the other.
>> Thanks very much. I don't see other
people adding themselves at this time.
So, I'll go ahead with a few questions
and comments about this. When I looked
at the report, I saw the various options
there and some seem more costly than
others. One was about repurposing the
steel the steel drums by painting them a
different color and putting a logo on
them. Of course, it doesn't address the
key issue that most people are
complaining about is that used for
dumping. So, it's a lot more difficult
to dump your household garbage in the
Jubilee style cans. And again, those are
the cans that you see in front of city
hall, the ones you see around downtown.
Much more difficult to do that. it's
much more difficult to set fire to those
than it is to with the steel drum cans.
So, doesn't really solve that problem.
Um, I also noticed that we kind of only
had give were given those kinds of
options basically. Um, when I look at
other municipalities and what they're
doing, there's just there's just so many
different varieties of garbage cans out
there. There's some that are housed
together with recycling and garbage in
the same one. Whereas here with the
Jubilee style, you have to have a waste
container and then you have to have a
separate recycling container. And we
have a few of those downtown, notably
King and James out in front of City
Hall. There's a couple others, but not
very many. And I assuming, this is my
question, that the cost would double if
we wanted to add recycling in some
places. So, if there were key areas
where we wanted recycling, if we wanted
a Jubilee container and the cost of a
Jubilee container, it would simply be
just to double that cost if we wanted to
have a recycling container beside it.
>> Uh, thank you, Angela Story, director of
Waste Management, and through the chair.
Um, as you'll recall, the uh recycling
program has been up uh uploaded to the
producers of paper and plastic packaging
um at the provincial level. So to add
recycling to any of the containers,
street side or in parks, uh the contents
would end up in the garbage.
>> I see. So I didn't know that actually. I
didn't realize that the city was also
subject to that. Is that because we're
non-resed non-residential? And so are
you saying, which is I guess interesting
news and I'm sure will generate some
conversation, discussion in the
community now that you've said it out
loud, is that all recycling that's
currently collected through city
recycling bins is going into waste
>> uh through the chair. Uh except for
non-eligible sources. Um so from this
perspective, uh we don't have uh GFL or
contractor that is contracted to pick up
the businesses, the daycarees, the
special events, the city facilities. So
those are still being recycled under the
program that we're under right now. But
the parks recycling and streetside
litter containers was originally
included in the regulation. Whatever we
had at a certain point of time, they
would continue and then they removed it
from uh the regulation through an
amendment.
>> So to simplify this, the one in front of
city hall, yes. The one in a park, no.
The one by a street side, no. So are we
removing those by the street side then
so that we're not creating that
confusion for people? cuz I feel like I
recycled in one recently
>> through the chair. Yes. In fact, uh
because we are asked for so many new uh
Jubilee containers in different
locations, it makes some sense once we
get to the end of our current inventory
to repurpose those ones.
>> Okay. Thank you. That's helpful to know.
So my question for you then about this
is with respect to costs, we're just
looking at what the city of Hamilton's
already contracted to do. So the costs
are associated already with just either
the steel bins that we have those metal
I believe we have metal um containers I
think they're in Durand Park and there's
some on city hall property the fluted
containers and then there's the um the
Jubilee containers and that's the three
options that we have before us because
that's what we're already tendered and
contracted with services to provide. Is
that right?
through the chair. Um when staff took a
look at sort of what the options might
be, they seemed to provide a range of um
aesthetics and efficiency and uh using
material that we already have and that
our staff are set up to be able to um
facilitate the the emptying for. Um as
you mentioned, there's lots of different
designs of containers. Um, essentially
the message in the information though is
the smaller the container, the more
often it has to be emptied. And the more
um maneuvering of the equipment that
staff have to do to get the container to
empty it, the longer it takes and
therefore it costs more. So I think
essentially that's the message of the
report. If there's other designs that um
would be of interest to take a look at,
certainly we can cost those out, we felt
that this provided a range to be able to
start that conversation.
>> Okay, just a brief comment for me to say
that it's helpful to know this. It's
good to know what the province's
limitations are with respect to
recycling and why some things aren't
being collected. My comment is that
yeah, we need to get these replacements
to happen. And I realized there's a bit
of a high price tag on that, but part of
downtown revitalization, part of
supporting people in parks is making
sure that we have garbage cans that are
better than the simple steel drum. Not
just from an attractiveness perspective,
because I think again you can wrap those
and make them look as nice as you want.
And that's obviously a nice option. It's
a cheap option, but it's not going to
stop the problem of people dumping in
them and them not being as secure
because of course the other garbage cans
are much more secure. And I realize
it'll have staffing implications in
terms of having more staff required to
be able to to empty them more
frequently. But that's the reality of a
changing downtown. I was recently in
Stratford, Ontario, and noticed they had
a similar system there um with the GR
with the uh steel steel drums there and
some other cities do it. But again, uh
it doesn't look it didn't look good.
They're dinged up. You know, you have to
replace them when they get dinged up.
And um I don't think it's a a look that
people think feel inspired about when
they're downtown, right? So, I'll be
moving a motion at some point with
respect to this report. Just notice
about that. Um, next up, uh, Ana Leto
member, go ahead.
>> Uh, Ana Leto, I am a member of the BC
Neighborhood Association. I'm also the
school council chair at Dr. Davyy. Um, I
wanted to just maybe provide a little
bit of
maybe information from the Beasley
neighborhood. Um,
you know, all of us kind of use a lot of
the parks in the downtown core. Um, I
find that, you know, the two parks in
our area that are kind of the main paths
throughs would be John and Rebecca Park
and Beasley Park. Um, I live right
beside Beasley Park. I see the impacts
of having the open barrels and I thought
the report was really great. It gave me
some really good insight as to kind of
why we have the barrels. Um, my concerns
with continuing to use the barrels are
that
they're you listed the the mobility of
the barrels as being a benefit. What we
find in the parks downtown is those
barrels grow legs and walk and we have a
lot of difficulty
um also
keeping them in areas where people are
actually using them. So a lot of the
times they end up in the middle of the
playground, they end up along fences.
They end up being tipped over. All the
garbage is blown out. So, we would hope
that if there is a decision to change
the bins, that the bins are ones that
are not open top, are not the huge
barrels,
something that stops garbage from being
picked up, something that stops garbage
from being blown out. Um,
we have
enough garbages right now and I know
there's a lot of transition between
winter and summer garbages,
but over the winter due to the proximity
of these parks, we also still have the
foot traffic through. So, losing those
bins during the winter also is a
hindrance and also creates a whole bunch
of extra garbage. So I would hope
whatever the committee here has decided
that you know you take into effect that
it's not just actually aesthetics it's
also functionality. So I don't know I
can add to that but
if you don't mind me taking a small
liberty just to translate your comment
into a question. So
I assume the report accounts for the
summer positionality of parks garbages.
Meaning if we replaced every parks
garbage that we have in the summer with
a Jubilee can in Beasley Park for
example, then we wouldn't see a
diminishment of the number of garbage
cans seasonally because we don't remove
Jubilee cans. Is that right?
>> Through the chair. Uh if if there was a
transition from the park barrels to the
Jubilees,
we still probably would need to remove
um some of the locations similar to how
we do in winter because uh our staff
complement goes down significantly in
the winter. And uh there are some park
paths that are not maintained in the
winter and therefore would be
inaccessible for our staff to maintain.
And so probably what would happen is we
would have to look at the locations um
adjust the service and figure out where
we would remove uh for winter condition
um similarly to how we do the barrels.
But since they're a smaller container,
we would have to figure out uh which
locations actually would get removed.
>> So that could be something we talk about
in terms of not perhaps not removing
them in some parks because they do have
a high amount of foot traffic. There are
obviously some parks that are a little
more diff that are different that are
smaller that where some internal or
interior pathways you wouldn't need that
garbage can there in a winter because
it's going to have it's going to be
impassible but at a place like Beasley
Park I think what um Anya is saying is
you know that's a main thoroughare
frankly from Canon through to Wilson and
and so on. Um you were going to say
something director story. Sorry go
ahead.
>> Thanks. No no no worries. I just wanted
to um support what Cynthia is saying in
the sense from the install of the
containers, we do need a concrete pad or
a sunken in patio stone, something like
that. So, even if they were removed, you
would still be left with whatever they
were bolted to when they were installed.
>> Okay, that's helpful information and
I'll work on trying to translate this
into a motion at some point soon,
possibly for the budget process, and we
can work together on that. Okay, any
other questions or comments for this
report?
Not seeing any. At this point, we need a
mover in second or two to receive the
report. I didn't get one before. Member
Moran, member Walsh. All those in favor
by show of hands.
Thank you. On a 7.5
and we are going all the way, it's just
you folks from now to 7.8. So 7.9,
pardon me. We're so we're getting there.
7.5 is the followup to the pedestrian
safety at the intersection between
Street and Walnut PW26034A.
Can I please have a move and second to
put the report on the floor? Moved by
Vice Chair Braithweight, seconded by
member Sarafa.
I will now turn to the first person on
our speakers list, Vice Chair
Braithweight. Go ahead. Yeah, thanks for
this report and I'm really happy with
the um decision to to put it on
alternating signals, which is great. So,
my board was really happy to hear that
as well. So, just positive feedback for
that. I think it'll help in that
intersection in the meantime until LRT
is done and then we can reook at it. But
thank you for your work on that because
that's really all we were looking for,
just to make it safer for people to
cross over and not have all cars going
at once and being confused. So, thank
you so much for that.
>> Thank you.
>> Yeah, and sorry, I should have said um
if you want to just maybe Yeah.
highlight what is actually going to be
happening here.
>> U Vincent Fatza, director of
transportation through the chair. This
is a followup to the March 2nd report
regarding uh pedestrian safety on the
intersection of King Street and Walnut
Street. And uh this memo provides a bit
more implementation details around uh
the installation of the split phase
traffic signals which we see in the
report will happen between now and July.
So happen this summer.
Great. I don't see other folks on this
list to speak to this item. All those in
favor of receiving this report by show
of hands. That's everybody. Thank you so
much. That carries on a 7.6 PW26035.
This is pertaining to the work plan for
improving infrastructure around BAS on
King Street and I'll first turn to
Director Saratza for um a brief overview
please of where we're where you're
recommending or not recommending
something happen here.
>> Thank you. So once again Vince Saratza,
director of transportation and through
the chair. Uh this report provides a
inventory of the maintenance and capital
work which will be undertaken this year
in the three subject BI areas in
addition to the downtown core. Um so
there's a table that um provides a
description of all the work that will
happen throughout this year um
irregardless of the upcoming LRT
construction work. Um, in addition, it
also provides details on a new process
that we must now follow as a result of
the LRT uh installation where any
planned capital work will have to be
submitted to Metro Links and the LRT uh
uh group for approval. Um, now in our
conversations with them, they've
informed us that that process should not
take very long and uh would hopefully be
favorable on most occasions. But any
planned capital work will now have to be
subject to this approval process as a
result of the LRT work that has started.
>> Thanks. I'm not seeing anyone join
quickly. Oh, I see someone now. I'll
wait. Um, first up is Vice Chair
Braithweight.
>> Uh, yeah, thanks again for this report
and I do understand uh that Metroinks
needs to be brought into it. I guess
where the frustration lies is that we've
been waiting for these repairs for years
and years and you know LRT was
originally supposed to happen I don't
even know how many years ago now I've
lost track. So we're hearing from our
members that they're literally watching
seniors fall and trip and hurt
themselves on the sidewalks at this
point in time. So, if there's anything
that can be done to escalate it, uh, I
would ask that that be done. Um, I think
at this point waiting around for LRT to
happen when there has been no strong
timelines given to us. Um, it's just
putting more people at risk. Um, and I'm
very concerned with the state of things.
There's some areas of RBI that are fine,
but there's a large chunk of our area
that's heavily traffked that definitely
needs some remediation and needs done
fast. So um I would just reiterate that
it is a safety concern at this point in
time and it should be dealt with as
that. So thank you
>> member Walsh here next.
>> Thank you uh through the chair.
Specifically looking at the appendix B
uh and as you mentioned a lot of what's
uh noted there is uh appears to be
routine maintenance that was already
planned and a lot of it does uh doesn't
appear to be along King Street itself.
So I was curious uh what in the report
was actually initiate initiated or
accelerated based on the motion put
forward
>> um through the chair. Um so some of the
work is capitalbased. It is not just
maintenance. It is work that we had
planned. So some of the sidewalk
replacement work that we identified uh
for instance um along uh H Street uh
that is work that we will be doing that
is capital based. It's not regular
maintenance work. Um in addition to that
uh we do identify some repairs to the
pavers um and sidewalks along James
Street as well. Um, now I'd also just
want to say that any work that is
related to safety, we would appreciate
that be brought to our attention because
that is something that will not be
subject to an LRT review for a permit.
So, that is something that we could
initiate very quickly. But, uh, yeah,
some of the the sidewalk replacement
work that's identified in the table is,
uh, new capital work. I do have with me
as well uh the manager of roadway
maintenance um and senior and
superintendent Peter Snos and Robert
Marcus if there's anything else that
they would wish to add from the table.
>> Okay, I also have another question.
Sorry, did someone want to follow up?
>> Sure. Bob Marx, superintendent of uh
roadway maintenance. Um, just to to add
on to what Vince was saying there, um,
we we've escalated some of the the
concerns in the H Street Village area
and we're planning on completing uh
quite a few sidewalk repairs through
that area. We have taken an inventory of
um, issues along King Street. So, we
will be sending, you know, crew through
to make sure it's safe uh, for the time
being and if there's any permanent uh,
repairs that we can complete at this
time, then we'll look at doing that as
well.
>> Okay. Thank you. I think uh one of the
frustrations is that we specifically
noted things like the flower beds along
King Street where there is permanent
repairs needed and then the report here
just says that um those aren't going to
be taken care of. So that's a little
frustrating to hear. Uh but I was also
just curious about the sidewalk repairs.
What goes into deciding whether or not a
sidewalk's replaced versus just patched
with the ash vault? because we're
getting to a point downtown where we're
seeing sculptural work being done with
the ashvault there to mold these pieces
that are entirely missing instead of
replacing them itself. So, can you talk
to how that decision is made?
>> Certainly. I'll start and then I'll turn
it over to uh Peter and I'll um the
ashalt repairs are usually installed as
a temporary measure to deal with the
immediate safety issue, the trip hazard.
So when you see asphalt applied, it's
because um we do have a service level
that we have to comply with in terms of
addressing the safety issue within that
timeline. So that's where you see the
ash fault applied. Then with respect to
then the ultimate replacement of the uh
sidewalk again it's in based on a
scheduling basis how much planned work
capital budget that's available to us um
and also um again if there's a imminent
safety need for that but I'll turn it
over to Peter Snalis if there's anything
further.
>> Good afternoon. Peter Smolos, manager of
roadway maintenance through the chair.
Just building on what Vince did say. So
there is a provincial regulation that
requires us to inspect sidewalks once
every 16 months. Um there is a threshold
in terms of a trip hazard or safety
issue that when we are aware of that
issue, whether it's through our
inspection or whether that's through a
reported uh issue through the city line,
we do repair it within 14 days. And a
temporary repair could be ashvault, it
could be grinding, as Vince alluded to
there. In terms of the long-term
repairs, we do have a a dedicated budget
of, I believe, $1.2 million for sidewalk
repairs around the entire city. So, that
is uh split up amongst, you know, uh the
various wards around the city and we
replace them when they um get to the end
of their life cycle.
As a followup to that, do you know if
those schedules account for the
increased usage and density downtown
>> through the chair? They do not
currently. Um, this is completely an
assetbased analysis at this time.
However, that has been brought up
through our team and this is under
consideration and has been in discussion
over the past year.
>> Okay, perfect. Um, all I just have to
say is that I think we just didn't quite
hit the mark with this one. I think we
had asked for a costed and um fully um
fleshed out work plan for improving the
assets along King Street that are not
being improved due to LRT and I just
don't think we really got that here. So,
I wouldn't feel comfortable removing it
from the Obl quite yet.
>> Thanks. I'll take back the chair and um
I'm going to speak now I guess because
no other speakers. Yeah, I'm just going
to shed some light on some of this from
my perspective as the war two counselor
because I've been involved in these
discussions for a long time and staff
have helped put some financial
information together for me so I can
give you a sense of the scope and scale
of this problem. When I first took
office there was maybe
80 something thousand allocated of the
$1.2 $2 million to board two based on
the kilome kilometer length of sidewalks
here which I was pretty annoyed by
because it didn't take into
consideration at that time the asset
condition in terms of use like how
heavily are these sidewalks being used.
So through some advocacy internally and
through the budget process that was
increased so now at one point we were
getting $140 $250,000 from the $1.2
million being allocated to W 2 because
of the use. Then I also have $180,000
given to me every year again through the
budget process is something called minor
maintenance money. So combine that
together, right? And you see we have
about $320,000 to spend every year here.
But that amount of $144,000 at its peak
has gone down um since then because
we've managed to improve some of the
sidewalks downtown. F stay with me here.
So in this term of council, I've
invested in total from the sources
available to me more than $2 and a half
million dollars on sidewalks downtown.
So it means the sidewalk assets in
downtown are much better than they were.
And with this kind of investment going
forward, probably for a few more years,
we'll be able to eventually catch up to
a point of where the city's service
standards are. But because before this
period of time about 300 I don't know
$50,000 was was over the whole previous
term was invested in sidewalks period.
That was it. And so there's been
backlogs for years and years and terms
and terms of no advanced maintenance
being done and then the situation
occurring. So this massive investment
this time around has been about trying
to correct that wrong. But then what
it's done has reduced the overall
portion that we're allotted from the
city because sidewalks are in better
repair. So I have a big problem with
that. I also have a problem with the
fact that even though we've asked for an
equity analysis on this and I've asked
for it in public 10 times now, I still
can't get one to happen. And so
hopefully with next year's budget,
there's finally a mandate for equity
analysis in the budget that we might
actually start looking at downtown and
ask ourselves, wait a minute, if the
majority of people are walking on these
sidewalks, if these sidewalks have the
most use, if the most seniors of
disabilities need to use these
sidewalks, and so on and so forth, that
we actually start treating them
differently and start looking at them
differently. I'll put a period there and
say and King Street has always been an
exception until recently. So internal
policy, I was told this by staff was
that basically the LRT corridor was off
the list, off the limits, out of limits
because it was going to be replaced
anyways when LRT came. So why would we
throw good money uh away and have to
replace those assets again if we're just
going to be doing it in another five
years? Well, that five years of course
turned from 5 to 15. And so people now
are understandably upset because early
works have begun for LRT, meaning that
we have no sense of when this cor
portion of the corridor, which LRT
themselves, the Metro Links themselves
called the most difficult to do portion
of the corridor on the entire 14 km,
right? Which means I doubt it's coming
to happen on day one. They're probably
going to want to look at other portions
of the corridor that are less
challenging, work on those, and see what
our conditions at Hamilton are before
they approach the most challenging
section. But who knows? So, my problem
with all of this is that yeah, I think
we need to get the costs. So, I know you
said you'd done um Bob had said he'd
done an analysis of on King Street where
the deficiencies were, but I haven't
seen the costs for that. And I think
this committee should see the costs of
that. So, I think that's something I'd
be asking for to come back to this
committee at our August meeting are what
are the costs to repair sidewalks and
King Street. And secondly, what are the
costs to shave and pave the section from
Wellington
through to Queen? And the reason why I
say that is because that's the section
of these three BAS on King Hes
International downtown BA. That's the
section that um that's the sort of basis
of this motion are those three BAS. And
I know we did shave and pave
um
I want to remember this James to Bay,
right? We did that last year, but we
didn't do the rest of it. And so I
recognize that we're not going to tear
the whole roadway up and reconstruct the
roadway when we're having a
reconstructed roadway party at some
point in the future through LRT, but
getting the roadway into a condition
where it's somewhat drivable and again
looks like a place anyone would want to
be and addressing those ashalt repairs
because I I hear your point, Vince,
which is like well usually we try to um
get to the ashvault repairs quickly. You
went for a walk with me on Main Street
and King Street and we identified some
old ash fault.
That is certainly not within our service
standards. Now, Main Street two-way
conversion is going to take care of some
of these things, and that's really
great. But for King Street, we're still
left in a situation where I'll tell you,
seniors have literally fallen in broken
hips on sections of the sidewalk that
are not in good repair. For those who've
walked on James Street North lately,
you'll see we took all the the concrete,
we took all the concrete away. We made
sure the trees were protected. you put
it back in the right way. We did it in a
way so it was level because there were
problems with the shifting and lifting
because of all the tree branches and so
on. So the King Street needs the same
treatment. There's that section right in
the International Village that's just
famously by the Jarvis parking lot
between that Jarvis parking lot in
Wellington on that side where it's just
like uh you know best of luck as you try
navigating this. Um and many many
seniors use that area. So I just want to
flag that I do think we need to know the
costs of repairing all the sidewalks on
King Street. the costs of doing um that
repaving work in the area. That's the
least we can do to make the BIA areas
look like they're business improvement
areas.
I mean, I think that's if we can't do
every single thing else. And again,
simple things like planting the flower
beds, I think also something we have to
look at like what are the costs of those
things, right? So, I think we just need
to know what they are because it's
difficult for me at this point to bring
forward a motion or anyone here to say
we want to bring forward a motion to
make a recommendation to council if we
don't have the costs. So, that's my
motion. hoping someone a second just to
say that we can bring those three things
back are the costs for the garden beds,
the costs for the sidewalks, and the
costs for um
the roadway repaving.
I'm not chairing right now, so I need
you to to do that. Uh Vice Chair
Braithweight.
>> All right. So, can I get a mover for
that motion?
>> Me,
>> counselor or seconder? Sorry, Emily.
speak.
>> Sorry.
>> Is there speaker?
>> Sorry. Uh through the chair, Cynthia
Graham, director of environmental
services. I just want to give a little
bit of context with respect to the
garden beds. Yes, they aren't
functional, but even if they were, we
wouldn't use them because the trees um
the roots are so compact in those
planting areas that it would damage the
trees in order to restore the irrigation
systems in those planting beds. So, we
can bring back a cost, but it staff
would not recommend at this time to
actually do the work.
>> Okay. Okay, I have a question about
that. If you could expand on that a
little bit more. So, you're saying all
the beds along King Street that aren't
currently planted, the reason they're
not planted is because what you're
saying is that to plant something,
anything there, it would cause damage to
the tree roots that are adjacent to
those beds
>> through the chair. Correct. So, they're
typically uh planted the the trees are
very mature. There is a density of roots
in those planting areas. the um there
have been attempts to have uh ornamental
flowers growing in those beds over time.
They're not successful because there's
not enough light that gets to them. And
uh when watering is required, we do go
by with watering trucks in order to to
give them the water that they need. So
the the watering isn't the issue
necessarily with these planting beds.
It's the density of the roots in the the
beds with the trees.
>> All right, maybe we can take that up
offline and talk to you about what other
uses could be happening with those beds
because right now there are beds with
dirt in them and that looks terrible,
right? So, like if you can't put
something in them that's a certain
thing, u maybe it's mosses, maybe it's
like I don't know, I'm not a plant
expert, but um maybe there's some way to
have installations in those beds. And so
maybe that's part of our report pack is
what is possible there. Um considering
that maybe the types of plants we
typically plant in those beds won't be
suitable. What other type of thing could
be suitable for these beds? Could you
report on that because I think that's
what I think people are asking for is
just to understand what else could be
done with those beds
>> through the chair. I will ask my very
creative team to come back with some
options.
>> Okay. Thank you. So I think we have
that. I'll let Susie get the vote on
that.
Oh, my thing's on. Okay. Uh, can we have
a a vote to receive the report, please?
All in favor? Okay, it's carried.
>> What motion? Oh, sorry. Can I get a All
in favor of the motion?
Carried. Sorry, it's been a crazy two
weeks for me. I'm slightly brain dead.
>> It's okay. I do this for a living. It's
fine. Um, thank you very much. So, the
report's been received and that motion
has been approved. So, we'll come back.
I'm hoping it can come back. Yeah. Uh,
Dre Sarza
>> through the chair. Uh, well, we
certainly can report back on the cost
analysis. Um, I don't know if the motion
identified a date, but uh, we
respectfully request that we report back
to the October 15th uh, downtown
subcommittee
in light of the fact of timelines
getting to clarin to all the approvers.
>> Sure, that sounds fine. And we'll just
make that retroactive amendment. Thank
you for catching that. Thank you.
>> Forgot to include a timeline.
And now we're on to 7.7.
Information regarding the Wellington
Park Fountain PW26043.
This is truly an information report, I
believe. I don't think there's any
action items in here, but I'll look over
in case there are.
>> Through the chair, Cynthia Graham,
director of environmental services. All
the actions that would have been done
are already done. My understanding is
the fountain is functional and was part
of the work plan this year. So, we're
happy to provide the information.
>> Thank you so much, mover. Second will
put the report on the floor. Vice Chair
Braithweight.
Member Moran. All those in favor, a show
of hands. Receiving it. Thank you.
That's carried. 7.8 PW2604
Main Street Renewal and Redesign Project
Update. And I first have a mover and a
second to put the report on the floor.
Moved by member um Moran and then
seconded by members Rafa. So at this
point, I'm going to see if there's any
questions for staff about this report.
There's a lot of information there, but
people have questions they want to ask.
First up is member Walsh.
>> Uh just looking at the different phases
that were outlined in the report, uh it
mentioned phase 2 preconstruction. Can
you share some more about what that
phase involves and when it will begin?
>> Yes. Uh Brian Hauling, director of uh
engineering services for public works.
Um the phases uh identified in the
report uh just for the broader
information includes phase one early
awareness. We're kind of in that now uh
pre-construction then during
construction and and completion. Um
we've been working closely with uh
communications and other partners
including economic development to
develop the strategies. Um there are
some of them are identified in this
report. I will note that we've already
got the web page we call them
storyboards up and running. So folks are
curious about the design, they can go on
there and look at at what it entails. Um
we've also been working um we prepared
uh postcards. Um they're being dropped
off as we speak, 800 postcards to
businesses with a QR code where uh folks
can contact us for further information
and questions and we look forward to the
feedback. Uh there was a council
communications that was uh done uh last
week. And so those are kind of some of
the early activities. As we move closer
to uh construction, which by the way is
planned for September, uh we'll be doing
uh further notices to businesses. Uh we
may have some dropin centers where
people come come in and ask questions.
uh but we're we're trying to go above
and beyond for this project just because
it is it is so significant in terms of
its uh scale and scope.
>> Okay. Thank you. Um and then also I
remember seeing back in 2024 that the
accelerated construction approach was
approved and it brought the timeline
down from 30 months to 24. This now
looks like we're closer to 16. Can you
uh explain the difference there? What
changed?
um you're talking about yeah um we've
been working uh that accelerated uh
process was related to the detailed
design uh so we we retained a consultant
uh WSP group uh who's been uh working
away for the past uh year and a half
preparing the designs uh as mentioned
we're at the tender stage so that that
work is done and uh Mitchell not can
speak to any reasons for any changes I
don't think there was too much of a
change stages of construction.
>> Can I just add I believe in that report
there was also a period of about 30
months for the detailed design and then
the construction itself was cited to
take 30 months reduced down to 24 with
the different um accelerated activities
included in there.
>> Yes, sorry I I thank you for uh
clarifying the question. In terms of the
construction schedule, as mentioned,
we're uh proposing to start in September
um and carry through till the end of
2027. I should um describe the the
different phases of construction, the
different activities um because it's
it's not a full-blown building phase to
building phase road reconstruction. Um
essentially the first phase will be um
repairing all of the curb ramps and
updating them to to meet modern AODA
standards. Uh replacing some of the
broken and degraded uh curbs along the
sidewalks. Uh we're also replacing a lot
of the underground traffic signal
infrastructure which is decades old. Uh
so modernizing that. So that will
involve uh ripping up the road. Uh and
then there's the resurfacing itself. Um
which is probably going to go very
quickly but it'll go in stages. Um so
that's our our broad timelines. Uh
further information will be provided
once we are closer to the tender stage.
>> Okay. I do appreciate all the
information in the report. I appreciate
the web page going up on economic
development. I do just think that we
really do need to get moving on getting
people notified on this even with the um
water main relining. I know as a BIA we
were given under a week notice that that
was going to be happening on Main
Street. And so I just uh want to
highlight that I really think we need
some firm dates, some solid engagement
going on in the next four to six months
before construction actually begins.
Thank you
>> through through the chair if if I may
just comment and and thank you very much
for raising the water man lining. Um
that's the project that folks see out
there that's happening right now. Um
it's upgrading the the local water main
service to you know it'll it'll last uh
hopefully decades. Uh we decided to do
that in advance of the resurfacing
because we didn't want to come along 5
years later and rip up the road. So um
thanks thanks for raising that. We
recognize that it has caused a lot of uh
impacts to the traveling public.
>> Thanks very much. And now I'm on to
member Moran.
>> Uh yeah, thank you. Um so the report
does talk about a business focused
mitigation approach.
>> Hi. Uh so the report does talk about a
business focused mitigation approach. Um
are there more details on what specific
supports will be in place or introduced
to support businesses during that time?
>> Yeah. Um one of the first things is is
early communication uh so that
businesses can start planning around
things and know what's going to happen
uh when. And a lot of that is included
in the story maps on on the website so
people can kind of look at and say,
"Okay, here's here's how I'm I'm
impacted." Uh we're also looking at um
some enhanced signage um you know
similar to some of the things that were
done on on Lock Street uh to let people
know that businesses are open. Uh I
should also note that you know we don't
expect to fully close the road at any
point um even through the resurfacing
we'll do um two lanes come through with
shave and pave and then and transit will
still be moving through the corridor. So
I I think the biggest impacts will be
just on um navigating through the
construction site. Parking impacts of
course um will be another impact.
>> Thanks. And I now see uh Trina.
Go ahead.
>> Thank you. And through the chair, I want
to thank staff for the report and to
echo Emily, it's important to get this
information out to to businesses as soon
as possible. I had a question around the
um area that talked about traffic
capacity perspectives and uh what
performance measurements we're using to
track uh and and use that information to
improve the flow of traffic where we
have that construction happening and
those pinch points.
>> Um yes, so there there will be if if I
understand your question correctly,
maybe there's there's two um stages of
traffic impacts. one one during
construction as and as noted we're going
to try and keep at least two lanes open
during construction um so we keep things
moving not just traffic but also buses
and then post construction um I probably
won't go through the detailed design but
essentially uh from Dunduran to uh
Victoria um coming off the 403 will be
carrying three lanes of traffic
westbound one lane of traffic eastbound
uh with left turn lanes we've we've
modeled that and uh it it should
function uh well. Um and the whole
intent of this court these a lot of
these changes by the way are to calm
calm traffic. Um so that one way to do
that is to uh rationalize capacity a
little bit and then as you as we go
eastward um through the through the
downtown it will narrow down to two
lanes westbound one lane eastbound plus
plus turning lanes which will really
help with traffic movement. Uh there's
also upgrades to the active
transportation facilities from um from
Victoria to Sherman as well. So uh if
that didn't answer your question, um
we're happy to go into more detail.
>> It it partially did. Thank you. Um are
we monitoring the capacity during the
construction phase?
>> Um typically we we don't because it's a
relatively short uh duration. uh we do
on a day-to-day basis monitor how
traffic is doing and in some cases for
example we have to mitigate uh cut
through neighborhoods and the like. Uh
we have a lot of um experience with
managing traffic on York Boulevard which
was a major project last year. Um but I
think in this case we we we've been
monitoring traffic for the last four
years and we'll continue to do so
through construction and and well well
beyond uh and not just traffic volumes
but also traffic speeds as well.
>> Thank you.
>> Thank you very much. And now we're go
back to go to Vice Chair Braithweight.
Go ahead.
>> Uh thank you for the report. I think
it's the most information we've seen on
this for a while. So that's great. I did
just want to ask one question. It says
in the coming weeks you will be sharing
the finalized design. Do you have a date
for that that we can expect it?
>> Yes. So in the report there's a link to
um it's called the I think is we call it
in the reports the story boards. Um but
if you Google the Main Street renewal
and redesign project, uh the story
boards include the designs for the
different areas. And if that's not
detailed enough for you, we'd happy to
drop off a copy to your office as well
and sit down with you and go through it.
>> Well, that was going to be
>> They're publicly available now.
>> That'd be great. That was going to be my
next comment. I think before this goes
public, really public, it'd be great if
you did meet with the TBI with Emily and
myself. Um, we know what our businesses
need. We know what accesses they need
for truck deliveries and things like
that that may have been missed on the
initial design that we saw. So, it' be
great if in the next couple weeks that
could be arranged to uh to like come and
meet with us and go over how our
individual areas will be impacted. So,
we're very clear when we're sending
messages out to our members and we have
answers for them if they need it
>> through through the chair. That that
would be most welcome. Um we also have
we're also coming to the BIA
subcommittee next June 20 22nd and
looking forward to that as well.
appreciate that, but I think seeen as
it's going right through Emily and might
be, we're going to be the most impacted.
We'll probably have need a deeper
conversation about it.
>> Thank you. And back to member Moran.
>> I have actually two questions, so I
don't know if maybe I'd combine those
now rather than pressing the button
again after
>> we got there.
>> Okay. Uh so I guess I mean the first
coming coming off of that question as
well too and and previous one I asked is
this just when it comes to uh the
construction mitigation and and if it's
working for businesses uh will there be
a way to to properly track or a
mechanism to track complaints um or
access issues signage issues or or
business issues in in real time um to
manage that as we go through. So that
would be the first question
>> uh through the chair. Uh yes. Uh once we
move into the construction mode, we have
a construction team uh that includes you
know many folks uh often they go
doortodoor on a regular basis uh offer
opportunity for discussion. They're
really hands-on. Um they're doing that
with the main street relining project
right now. Uh there's also a lot of
notices. Um for this type of project
there would be multiple notices uh about
things like potential night work etc. uh
we often we will be providing um where
there are uh requirements for traffic uh
diversions uh we'll be providing
information to businesses um so and any
other suggestions you have on like
really specific needs we'd we'd love to
hear them as well thanks
>> thank you um and then the second
question is just a larger I guess larger
question related to just kind of the
management and communication I think the
the website and what's been communicated
great and put out out there is great and
proactive. But I I think I mean this
item is is really connected to also
broader kind of political themes, I
think, and and more cynical themes.
Anyone who's been on some of the uglier
Facebook groups or Reddit boards, um the
two-way street conversion can get really
bogged down in in a lot of rhetoric. um
related to the downtown revitalization
strategy, an emphasis on trust building
improvements and and positive spaces and
public realm downtown. Is there a plan
to to maybe optimize some of the the
hoarding, the wayfinding um introduce
any other um you other other signage
that really helps maybe pump up the
messaging around this or storytell the
messaging around this a bit more? um is
even with the the web updates, the
communication on the site, you know, the
person sitting in traffic along the
route is not likely to to be looking at
that or wanting to look at that. They're
going to stew about it in their car and
then complain about it on on Facebook or
on online social media sites. Um so it's
sort of like how do we control the
messaging around this? Um I I should say
I'm a big supporter of this and and
really excited about it. Um, it's
psychotic, but I'm thrilled to be
sitting in traffic in the urban
environment and in downtown because it's
it's a good sign. But, um, yeah, I guess
how do we control the narrative a bit
more to to kind of reinforce the
positive nature of what's being done
here?
>> Uh, through the through the chair, um, I
I didn't mention that we I did mention
that we are working with our partners in
corporate communications. Uh they're
working on a social media strategy as we
speak to get out some of the messages
that that you talked about. Um you may
have noticed a subtle change that we are
now calling the main street renewal and
redesign project because uh it takes
away it it it is much more than a
two-way conversion. Um the the re
renewing the pavement surface out here
will be a a big change for the traveling
public. Um so and we're looking at
things like sign boards and stuff like
that. So, appreciate your support and
comments.
>> And I see now we're back to member
Walsh.
>> Sorry, just as a followup on Sus's
question about the detailed uh design
drawings. Are those the ones that we saw
from 2023 or are they the ones that were
finished in 2025 that are now posted to
the storyboard?
C
>> I just missed the first part of your
question. uh the detailed design
drawings that are you were just saying
were posted to the storyboard. Are those
the ones from the 2023 engagement uh
sessions or are those the ones that were
finished in 2025?
>> Um those those are um our public facing
uh designs. Um they're updated from the
2023 drawings. The the configuration is
very similar to the what was shown in
2023. Um those drawings you see on the
story boards are kind of intended to
help the public view it a little bit
easier. Um behind those we have um
hundreds of pages of detailed design
drawings um which would we'd be happy to
share but they're they're not suitable
for for the public.
>> Okay. I just noted that seeing on the
website a lot of the design drawings do
say that um a lot of things are subject
to change and might be updated kind of a
thing. So, I don't know that we can take
that much information from them
reliably.
>> Uh, I should follow up with you just to
make sure you're looking at the most
updated version. So, if if you look at
the story boards, those those are the
the current designs and um not really
subject to to much change at this point.
The the older 2023 drawings may still be
out there on on a website and thank you
for raising that. We'll try and look
into that.
>> Okay. Thanks.
>> Okay. Thank you very much. I'll just
make a couple of comments and turn the
chair over to Vice Chair Braithweight. I
think one of the challenges with this is
that there hasn't been an opportunity
really for a public presentation on
exactly what's going to happen and
that's made this a bit tricky. So I
think now that the downtown subcommittee
is in existence and I've said the same
thing to the folks at the downtown re
revitalization strategy. If something
has a primary impact or will have a
significant impact on downtown, this is
the place to come. One of the problems I
think with this committee and I'm saying
this to everybody is that it's new. It
also morphed from a very outdated task
force model that was like 23 years out
of date. So we're trying to adjust to
this and most of what comes here,
actually all of what comes here is
committee generated at this point. If we
have that continue to be the case, it's
great for our homework here and we're
all very motivated to bring things
forward. But that's not really
representing I think what the overall
purpose of the subcommittee is is if
there's something impacting downtown,
there should be a report coming here
about it so that people have a chance to
ask questions, see it, be guided through
the presentation, and there's documents
for people to refer to. And so as this
committee evolves, I'm hoping that's
more of what will happen. And so I'm
saying that out loud because I think
that's generally the whole point is
we're starting off by trying to give a
lot of energy to the things that we want
to see being done. But this won't
ultimately be a successful subcommittee
if we don't get reports here from staff
about things that impact the downtown.
Thanks. I'll take the chair back and
we will go to receive this information
report. All those in favor by show of
hands.
That's everyone that's received and we
have one more in terms of information
reports. Then we're on to recommendation
reports. just so you have a sense of
what's ahead. And there are four
recommendation reports. This last one
here is 7.9 PED26018B
ensuring pedestrian access to Jackson
Street West and McNab Street South 2.
Can I have a mover and second to put the
report on the floor? Moved by member
Walsh, seconded by member Edmmonds. Any
questions from the committee about this?
Member Walsh. Go ahead. Yeah. So,
through the chair, uh I definitely I
really appreciate the efforts that are
going in over there. It has definitely
made a big difference. Um but what I do
still see is that despite 122 trespass
notices and over 200 staff hours, the
sidewalks are still blocked. So, I'm
just wondering um that's a lot of city
resources that seem to be going towards
managing a really really small uh
population over there. So, at what point
are we saying that they're not listening
and uh change our tactics?
>> Uh through the chair, good questions.
So,
the information that you have in front
of you is is very early information and
the change that we made in the enhanced
enforcement of the the the work that
we're doing over there. Um
we do still have a number of issues
related to risk and related to um
reoccurrence um that we're trying to
manage and and that's part of what we're
doing with this program is really
understand what the staffing and
resourcing impacts are where it's
successful um where we still need
further uh work to be done where we need
more resources potentially. And that's
what the follow-up report will be
associated with this this this series of
reports right now back to uh GIC at the
next meeting um or at the at the next
report will be through GIC. Um but we're
always actively trying to understand
what the issues are at at that location
and um I'd say through further
investigation there we will make
changes. Uh however, we're what what
we're seeing early is that we're having
a little bit more success in
more quickly gaining compliance at the
location. We're really struggling with
maintaining consistency of of compliance
uh specifically in the evening hours or
weekends. Uh during the days, during the
weeks, we're definitely seeing
improvement for sure. Mondays were
taking a little bit more time because
we're seeing some establishment of of uh
sidewalk blockages from weekend work or
from from the weekends. Uh but as our
team is there as a as we know in the
report three times a day Monday through
Friday we are seeing definitely some
improvements but it's not um at a place
where we're satisfied that we we're
getting compliance regularly
>> for sure. So that leads into my question
my next question about the compliance is
uh it notes about an 80% uh or that
compliance has improved to 80%. But can
you clarify what that compliance means?
Does it just mean leaving in the moment?
Are we tracking if returns are happening
>> through the chair? It it does mean in
the moment is when the officers are on
site and they're u making verbal
requests or issuing orders for
individuals to um cease the obstruction
of sidewalk. So that that's what that
would reference is the is the compliance
that we're g gaining at time. Um we are
definitely recording information about
reoccurrences. Um we're getting a lot of
support from the Hamilton Police Service
associated with um presence at the at
the location. We've been successful
having just our municipal law
enforcement officers um handle a number
of these issues without the police
support. However, when we've asked for
police support, they've been there 100%
of the time we've requested. Um
but yeah, we're still we're we're still
working through a number of things
there, but the compliance is, as I said,
mentioned at the time.
>> Yeah, that's great. Well, I just want to
say again, thank you. It's been a big
improvement over there already and
excited to see more.
>> Thank you very much. And I'll pass the
chair to Vice Chair Braithweight. So
this report seems to indicate what the
problem is, but it seems not to offer a
solution. And I'll just say from my
perspective, there's a lot of
frustration in the community. And I'll
say just from myself about the ability
to deliver a really clear response on
this. What the report says without
saying it is, but if we had staff on the
evenings and weekends, we'd be able to
maintain the stuff we do during the
week, which would give us a better
success. So there's no recommendation
coming forward saying we need staff on
evenings and weekends to this work. We
have 24-hour security at city hall. We
have 24-hour security at White, but the
public is being asked to, I guess, shrug
their soldiers in disbelief that we
can't manage the situation. How can we
explain to the public why we can't, why
we're not recommending doing this more?
Our bylaws say we should be able to
allow pedestrians to use sidewalks,
but we're not able to maintain the
bylaws to say that pedestrians can use
sidewalks. The reason I guess I'm so
frustrated is because this is not the
only situation or place this is
happening downtown and everyone's coming
to me asking so like I don't get it.
You're saying we can't we literally
can't use the sidewalk in our city. And
I'm saying yeah that's the answer I'm
being given because people are at work
usually during the times you're doing
these enforcement. When people want to
use the sidewalk most is when they
commute to work, when they commute back
from work and when they're out in the
community enjoying themselves. That's
mostly the evenings and weekends. So,
I'm I'm asking you, when are we going to
get a clear path to this? And also, why
aren't you making a recommendation to
simply say this won't work unless we
improve our staffing levels in this
area? Or do you need me to make that
motion? So, I'm just being blunt about
it.
>> Yeah, through the chair. Um, I certainly
agree with a lot of the points that
you're making there. The
the purpose of this report was just to
provide some information early on which
was approximately three to four weeks
worth of work just based on reporting
timelines. Um which did identify a
number of key pieces that were being
successful and where we're still
struggling. Again to your points, um we
do plan on bringing back something a
little certainly more wholesome and that
potentially will have recommendations in
it to that GIC meeting which was um the
plan we had put in place with the last
report that we had had. Um so we do
believe that uh continued enforcement
here may lead to a request for
resourcing. Uh however, because the work
that we're doing was so new and the
change in enforcement was so new, we
believe that we just need to ensure that
we're spending the time necessary to
understand the impacts of what our work
is there and following the the new
enhancement that we're putting forward
then come back to committee with
recommendations.
>> Okay. Um, but can you plainly give me an
answer for the public is what I'm
looking for at this point in honesty.
Like what am I saying to people who say
to me, right, we have security 24/7
there. We have security at the YWCA. We
have our own two sets of security. We
have bylaw officers and we aren't able
to keep a sidewalk clear. That is the
just the basic thing I want to be able
to tell people. I hear what you're
saying and I get the challenge. This has
been going on for three and a half
years. So, I understand the pilot you've
got in place now is new, but the problem
is old and we've been trying to manage
it in different ways for a long time
now. It seems like what this report is
saying is that really you're able to do
this when you're there. When you're not
there, you're not able to maintain this.
That's what I'm understanding. So, what
do I how do I explain to the public? Do
I say to them, "Hey, um that's the issue
that we don't have staff enough there to
keep a consistent approach. um that we
don't have a relationship with the
security there to make that that they
can call the police like what what is
the missing piece here because again
this is not a new problem it's just a
new pilot
>> through the chair so
what we're doing is trying to figure out
exactly what mechanisms work and what
mechanisms don't work right so we're
we're making adjustments to the work
that we're doing to see if impacts from
our changes can improve the situation
that may
um currently there. Uh we've done that,
but we're continuing to do that. So,
we're looking for any opportunity that
we have. Um to to speak to the public
specifically is that yes, it we are able
to better maintain it during the hours
of our presence and certainly we can't
maintain it during the hours that we are
not there. And if we had additional
resourcing to maintain or maintain
presence there, we probably would see
more improvement. a a solution and
complete clearance. It's hard to say
just because of the situation. It's very
complex. Um and there's more than just
obstructions of sidewalks occurring at
the location. Um it's it's a result of a
lot of the other issues that are
happening there. And um we're we're
continuing to look for opportunity.
There are security at city hall. There
are security at White. However, they are
limited in some of the enforcement
opportunities and authorities they have
outside of the properties that they're
currently maintained or contracted to
enforce. Um, but we do work with them
and we do have information that is being
collected from them uh related to work
that they're doing to uh assist us where
possible. Um, and the reporting that
they're making to Hamilton Police
Service, which they are doing uh as well
as to our team.
So, if I summarize what you're saying,
yes, having people there in the evenings
and weekends would fill a gap of some
kind. Um, is what you're saying because
I'm trying to get that just clearly on
the record. Yes, that is the major
barrier
>> through the chair. Simply based on the
work that we're doing right now, if we
had additional staffing at the location,
we would be able to maintain the site
better.
>> Thanks. That's really helpful and key
and important. Um, a brief comment for
me. I think the reason why I'm
expressing frustration and doing it that
way openly is because this is also
partly related to the way that we're
managing housing and homelessness in the
city and we're not making a direct con
connection to that. I just feel think
like we're taking we're looking at this
from a very practical or pragmatic or
technical perspective and I get that and
that makes sense and that's your job
frankly as you work in a very technical
landscape but there these are people and
you know we're talking about a situation
where we have conflicting groups of
people who want to be able to walk down
the sidewalk without having to walk into
the roadway makes sense it's not very
safe to walk into the roadway um this is
really a prevalent issue on Jane Street
North specifically because that area of
the roadway is much more dangerous than
this area of the roadway but There are
other places in the city like York
Boulevard, other kinds of spaces where
if there's not an ability to walk on the
sidewalk and people are having to to go
in areas because they live downtown,
they're going to have to go onto the
roadway. And we're we're telling we're
telling pedestrians that is what you
must do. You must go onto the roadway
with your child in a stroller in order
to to walk around your neighborhood
where you live in. And nobody else would
put up with this in any part of the
city. I'm telling you, if this was
happening right now in downtown
Ancaster, this would be an outrage. Just
telling you that that's the truth of the
matter. And so what I'm trying to
balance here and understand here is yes,
we we have created a problem because
we've told the city has the council
frankly has made a policy saying people
have nowhere to go and they're not
allowed to stay anywhere, stop anywhere
on city property or private property and
so they have to keep moving. And so as a
result of that policy um now we're now
we're between a rock and a hard place
because if we dispossess people from um
a sidewalk, they're going to go
somewhere else, right? Onto another
sidewalk. And then the question becomes
what are we doing? This is a
conversation we're not having. I don't
know why we're having this conversation.
This is a conversation I'm hoping will
come forward in the next report. And if
it means you working with folks in
housing and homelessness services, if it
means working with other folks and other
divisions and roadway maintenance with
regards to sidewalks, I don't know what
it is. A holistic response to say this
is why this is happening. This is why we
can't fix it. This is what we're going
to have to do to respond to it. Because
continuing to tell people, well, you're
just going to have to walk into the
roadway with your stroller is not an
answer for people. They can't accept
that answer. And it makes sense. um it's
not an answer. So, I'm thinking
hopefully we'll get to something soon
because this has been going on for again
three and a half years in these
locations. It's getting worse in some of
the locations and people just want to
understand what we're doing outside of
the technicality of it all. They want to
understand how we're how we're helping
manage this conflict between um people
who are trying to walk down a sidewalk
and people who are trying to find a
place to be because they have nowhere
else to be. And I'm very compassionate
for those individuals who are out there
suffering. I'm also compassionate for
the person who's trying to, you know,
navigate the city in a stroller and, you
know, being forced into the roadway. So,
that's where we are right now and I
think the public needs an answer. I'll
leave it at that. Um, members Rafa,
>> you addressed one of my questions, which
is that the report states that um when a
cleanup happens that other areas
surrounding are just flooded like bike
lanes and other sidewalks. So, my
question was going to be about that, but
you addressed it. So, I guess my
question is and and if it's not if I'm
not allowed to ask, that's okay. What
does a a cleanup look like? What is the
verbiage used with the residents when
they're asked to leave? Are they given
alternate areas to go to or places where
they are able to be or are they just
simply asked not to be where they are
currently?
>> Through the chair. So
when we're at the site, our municipal
law enforcement officers are at the
site. So we are strictly at at the
moment looking at what the bylaw
violation is. and that would be a
violation of a streets bylaw associated
with obstruction um of a sidewalk. We'd
be verbally issuing them an order to
remove the obstruction and that's
generally goods that they have there or
their belongings and uh we would expect
that they do so within a set time frame
and it's it's with this specific
location immediately that that takes
place. If they don't a trespass notice
formally is issued to them. uh if they
don't uh adhere to that then we look for
the assistance of the Hamilton Police
Service and then once they have um
removed from the obstruction from the
area then we would have the support from
the parks team uh to come and uh do
cleanups of the location.
>> Thanks very much. So on this report just
going to give me a second to go back.
It's our last information report. We
have a mover in second order already.
All those in favor of receiving this
report.
That's everyone. Thank you. I just want
to pause briefly to say thanks to staff
for getting all these reports back on
time. So, this has been a new committee
process for everybody. As those of you
who were on this committee from day one
know, when we first started here, it was
we didn't have this many wonderful staff
members here to talk to to get questions
answered from. It was usually a couple
of people that came and it was very uh
sort of we'll ask you a question on the
microphone. and we hope someone in the
room can answer the question. And so
this process has been really developing
and evolving in terms of we've got
motions, we're getting reports back,
we're having a chance to analyze things,
we're getting things taken off the um
outstanding business list now, which is
really great. So just thank you for
getting all these reports back on time
because it matters a lot to us to have
this information because we don't meet
very often and the time cycles for
council don't actually line up very well
with this committee. So it ends up being
that we're caught between two and four
months when we're able to get
information. And so getting it back like
this is really helpful. Allows us to
actually bring forward motions at the
next meeting. And so thank you on behalf
of everybody here. I know everyone
appreciates it very much. Um items for
consideration. 8.1 is next. PED25198A
flyers and posters on city
infrastructure citywide. Can I have a
mover in second or to put the report on
the floor? Moved by Vice Chair
Braithweight, seconded by member
Edmonds.
staff is here and we're not going to
continue to go through the
recommendations that might be there
because these all have recommendations
in them. So, we don't need you to go
over those. They're right there on the
front of the page. Any questions for
staff about this and the recommendations
that are in the report,
>> Vice Chair Brie, go ahead.
>> Uh mine mine's just more of a comment.
So, I'm really happy to see this taking
place again, which was exactly what I
wanted to see when I brought this up.
So, um, we did see success with the
pilot pro program years and years ago
with this. So, just wanted to thank, uh,
staff for putting that back on the floor
because I think it's important that we
do as a part of cleanliness in downtown
keep those like adhesive
glue posters off and we'll be able to
tackle those now. So, we really
appreciate the work done on this for
sure.
>> Thank you. Not seeing other speakers.
Their recommendations are before us. We
have a mover and a seconder. All those
by show of hands in favor of the
recommendations.
That's everyone. Thank you. So, we're
now moving on to our next report here,
which is improvement and lighting of
fountain at Gore Park PW260008.
This is item 8.2. And can I have a mover
in a second to put this report on the
floor? Moved by member Walsh. I'll
second this one since I think that's how
we did it on the motion. And I did have
a question. I'm going to ask not seeing
anybody else on the list. So, I'll hand
the chair over to you, Vice Chair
Braithweight. So, I think this is a good
report. It seems like we've got some
plans here to add things to the next
budget. My only concern is we were
hoping for winter lighting last year and
what you're proposing is winter lighting
in 2028. Um, and so is there a way we
can accelerate that somehow? Does that
just mean that it's an area rating
question? Is it something we don't have
in our budget to do? Because I I think
that at this point wanting it for 2025,
then getting it in 2020 just feels hard.
Um so could could you answer that?
>> Yeah, through the chair Cynthia Graham,
director of environmental services, uh
the challenge that we have um with um a
lot of our programs is we just aren't
funded for extra things. And so um as
staff recommending it for a budget
consideration to be implemented in a
future year was the mechanism we had. I
understand that the Wi-Fi is um being
installed soon, which would help with
the connectivity required for the
lighting. So, if there was an
alternative funding source, it's
possible that it could be installed
sooner than 2028.
>> Okay. Because I mean, technically, it
would be installed maybe 2027, but the
point is like it would be active in sort
of the 2027 2028 holiday season is more
so what I meant. But yeah, I can maybe
work with Emily offline and we can talk
about bringing a motion forward about
this to see if we can find an alternate
funding source for it so we can get
expedited and then maybe bring something
back to the August meeting. My only
point in this report that I wanted to
bring up is something I think that just
isn't quite the experience that
downtowners have or the experience I've
had. And so I really want to focus in on
it because I think it does require a bit
of a report back on this one item. So I
don't want to take this off the OBL
quite like quite yet for a portion of it
because it says here the fountain system
is generally
functioning as designed with sufficient
pressure from existing equipment and no
immediate need for mechanical upgrades.
I would challenge that statement. I
would say that on the very very vast
majority of days it is not functioning
at the standard. uh at least one if not
three of the I don't know what they're
technically called but little spiggots
that shoot the fountain water up can't
can't achieve fountain water maximums
and they sort of sadly sputter uh and
this doesn't look very nice. So I'm
wonder and that that I can visually
that's been going on since my entire
time in Hamilton. So, we can fix those,
but it would require us doing something
else is my understanding. But could you
maybe report back on the costs of that
and what it require to do that and keep
it up to up to that level
>> through the chair? Um, if I may, can I
please invite uh, manager Rory Ducet to
provide some context and information
about why staff believe that it's
functioning as intended and with the
additional cleaning should see uh,
improved performance. Uh, the
alternative is we rip out the fountain
and uh, completely reconstruct it. So um
our hope is that the increased
maintenance will ensure that the things
that are functioning can continue to
function and that we won't see the
degradation in performance. But Rory is
uh far more educated on that than I am.
So I'm going to hand it over to him.
>> Okay. If it's magically a cleaning
thing, that's fine with me. I'm just
saying that currently it's just not
getting there. Yeah. Rory,
>> thank you. Cynthia uh Rory De said,
manager of parks uh through you chair.
So I met with the uh city's contractor
who handles our plumbing. Uh we've
tested the pumps, we've tested the
pressures, and everything is operating
as it should. Um the the area that was
lacking, I think, is the cleaning and
the chlorination. So right now staff
just dump chlorine into the fountain and
it's not really done on a consistent
basis. That would help keep it like
think of a a functioning pool. Um, and
that's where the recommendation here for
the 12,500 would be an increased
cleaning plus adding a chlorinator to
the actual system itself that doesn't
exist now. And we feel that these will
help keep the um fountain cleaner, which
the problem that we have now is the jets
um as the counselor was referencing are
very sensitive. So pine needles that say
garbage gets in their leaves, it it gums
up the system. So the additional
cleaning plus the chlorination should
help uh improve the function. And that's
why we we reference it as a trial. Uh if
we can make these changes to see it may
avoid the expensive invasive uh bigger
fix which we wouldn't rule out. Um so
this would be a temporary thing to see
if we can improve that meet back have
that discussion and then if the bigger
fix is needed uh at least then we can
say we've tried at a more cost effective
uh nature. So that was that was the
point of uh the report and our
recommendation to see if we can improve
for 2026 which we haven't added this
stuff yet which is why it may not be
functioning to that level currently
right now. But we think these these
pieces will will help for this year.
>> Okay, great. Let's get it off the OL.
But the question is when will the report
be coming back because it doesn't detail
that in here. So I don't want to leave
us in a weird spot where we don't know
when the report back on the pilot will
come
>> through the chair. I hadn't um I hadn't
added a report back to this committee
with the results of the pilot. What I
had done was uh include a recommendation
to direct staff to include the budget
ask. Uh but we can do a report back to
this committee. Um, I would suggest I
don't know if there's if there was an
October meeting, if there would be a
December meeting, that would probably be
the appropriate time so that we have the
full season's worth of data and then we
can come back with um the information
about whether it was um successful and
what our recommendations are and that
would align with um the budget process
as well.
>> Can I just confirm with the legislative
coordinator? I think there's a November
meeting. I don't remember if there's
December one or not. There's a December
meeting scheduled.
>> That's nice. So December meeting it is.
And if it's friendly to you, you could
add that as number four. And they're
just saying that you'll report back on
the pilot program into the December
meeting. Is that okay?
>> Through the chair. That's that's fine.
>> Just so we know how it went and if
there's anything else we need to do or
plan for
>> through the chair. That's perfect. Thank
you.
>> Thank you. And so on that, I'll turn to
member Walsh.
>> Thank you uh through the chair. I do
really appreciate the effort going into
getting the fountain looking its best. I
did just take want to take this
opportunity for one last appeal for
uplighting. I uh made sure to
specifically mention uplighting in the
motion. I do think it has a different
ambiance than just pointing lights at
the fountain and it really adds
something special. Uh the report kind of
made it seem like the only way to get up
lighting was to fully demolish the
fountain and build it in. Um, I know
that there are lights in there now that
have worked in the past for it. There
was just some overheating issues due to
them not being LED. So, I was just
wanting to confirm that, uh, you have
looked into retrofitting those and that
that is truly not a viable option here.
>> Through you, the chair, uh, absolutely
uh, understand what you're asking. Um,
the lighting that's in those those
casings now is LED and it is overheating
still. um when there's no water in the
fountain. So that system's been designed
to keep those lights at a certain
temperature when it's operational. The
problem is outside of the fountain
season through let's say Christmas or or
any of the the winter holidays, there's
no ability to have those lights on
because they overheat. Um and that was
an issue. So that's why um when we were
looking at our options to it, it was
suggested that we do the the um pointed
lights on the posts around it much like
Niagara Falls does with their lighting
on the falls um because it would be less
intrusive again to remove those lighting
and to rewire it. We would be cracking
into the concrete uh foundation of the
bowl and having to do some major
restoration work. So this was kind of
our our least intrusive way forward to
to meet the goals that you were trying
to achieve. Um, understand that you
wanted the uplighting, but uh, that's a
much larger capital project to do that
>> for sure. I appreciate you double
checking. Thank you.
>> Okay, I don't see further questions
here.
So, on this report, we have a mover and
seconder already. And so, we will move
to receive the recommendations. All
those in favor by show of hands.
Thank you. And Emily and I will work on
funding for the lighting.
on to 8.3 PW260009A
urban pest control information for Gore
Park and we need a move in second or to
put this report on the floor. Moved by
member Moran, seconded by member Zarafa.
Are there questions on this report?
Member Walsh. Go ahead.
>> More of a comment just that I really
appreciate all of the work going into
it. uh just a little frustrated with the
timeline overall and just above and
beyond this report. Seeing that as
somewhat of an ongoing issue that we're
facing in this subcommittee specifically
that it does often seem like we do have
bylaws on the books specifically aimed
at addressing the problems that we're
trying to fix, but that we just don't
have the resources to be able to enforce
those bylaws and that essentially is
making them useless. So, I do think that
we should be looking at that at some
point, but it's a bigger bigger thing
than we're able to tackle today. But
thank you for all the work going into
that uh area. Thank you.
>> Looking around for other questions. Not
seeing any. I'll throw myself on this
list. I just want to get a bit more
information. So, I know that what one of
the delegates has said was trying to get
this to happen as soon as possible with
these other kinds of methods and talking
about removing food sources, those kinds
of things. Based on my reading of this
report, what I understand is that we're
heading in that direction and that
you're going to report back on on a
trial. Could you just be a bit more
specific about what that looks like? I
think I'm just personally confused a
little bit about I think you're going to
try the other methods. Um there was a
method with respect to putting carbon
dioxide in the rat tunnels for lack of a
technical word for that and also some
type of electrification. My guess where
I was confused is when is when and how
are the dentisticides going to be phased
out? What's that look like?
>> Through the chair uh Cynthia Graham,
director of environmental services. So
currently we don't have the funding uh
available to be able to implement any of
the alternative um pest control
solutions. So the report recommends or
direct staff to put forward a budget
sheet as part of the um budget process
in 2027 to try to secure funding to be
able to do that um work. Our current
contract doesn't include that. So it
would be um a request for uh additional
services through a procurement process
with the additional funding. If we were
successful in achieving that funding,
then a report back on the success of
that could be later in 2027
after sort of the active rat and park uh
season is done. um into the fall uh
early winter of 2027 if that was the
desire and if the funding was approved.
>> I see. So you're looking for alternative
funding source on this one as well.
Okay, that's fair. That makes sense. So
what you're saying is you're going to
carry on doing the rodenticides until
such time as you can put a capital
detail sheet in possibly for the
upcoming budget unless you get funding
otherwise and ahead of that. Okay,
that's what I was trying to understand.
It's my fault I read it and didn't
understand that. So I really appreciate
the clarity. We'll take the chair back.
I don't see other questions on this. So
on the recommendations that are in front
of us, all those in favor by show of
hands
and that is everyone.
And we're now going to go on to our last
item of the agenda for today, which is
8.4 amendments to the outstanding
business list. There's one that needs to
stay on here. Unfortunately, I'm not
completely remembering which one it is
at this moment. Um so I'll turn to
legislative coordinators to which one
needs to remain on.
>> E will remain on.
plan for improving infrastructure in the
BAS.
>> Thank you. So apart from E, so A through
D and F through J removing those for the
outstanding businesses. I need a mover
in a second to do so.
Moved by member Walsh, seconded by Vice
Chair Braithweight.
Any comments or questions about the
outstanding business list? It's always a
very debate heavy section of the agenda.
Not seeing anyone. All those in favor by
show of hands.
That's carried. There is no other
business for today. The meeting for
today is adjourned at 3:20. See you
again here August 13th. Have a great
day, everybody.