LRT Infrastructure Handover Protocols Approved - 21 Sep 26
Hamilton · September 23, 2026
Sound check. One, two, three.
Good afternoon and welcome to the final
LRT subcommittee meeting for this term
of council held today on September 21st,
2026. We have quorum present for today's
meeting and I'd like to call the meeting
to order. A reminder that all electronic
devices to be switched to a non-audible
function during committee meetings. Um
clerk, are there any changes to the
agenda? No chair net. There are no
changes.
>> Wonderful. Then may I please get a mover
and seconder to approve the agenda as
it's presented. Thank you, councelor
Wang. Seconded by a non- voting member.
No. Can a non- voting member second?
>> Why did I just blank on procedure right
now? Yes, we can. Member Mayo, please.
Uh all those in favor show hand vote.
That carries. Thank you. On to
declarations of interest. Are there any
declarations of interest at this time,
committee members? Seeing none, we'll
move on to adoption of the minutes of
our previous meeting which is held on
July 13th, 2026. Mover and councelor
Crutch, secondary and councelor Moren
Wilson. Any discussion on our minutes?
Seeing none, uh we'll continue with a
show a hand vote for approval.
All those in favor? Thank you. That
carries. Uh before we move to
delegation, I do want to acknowledge
that we do have members in the room and
those online. Online, we have non-
voting member Emily Walsh from the
downtown Hamilton BIA. We have uh Tom
Cooper from Hamilton Round Table of
Poverty Reduction. We have councilors
Casar and Councelor Francis. And then in
the room we have councelor Huang, uh
non-member non- voting member Mayo, uh
non- voting member Andress, and then
councelor Crutch and councelor uh Maren
Wilson. So, we are on delegations
and before we begin, Carl, you're well
aware of the five minute. If you need
more time, just let us know. We can make
that happen. Um,
and a reminder to the rest of committee
members, we're here for asking
clarification questions only.
It's okay. Take your time. We have We
have some.
>> Hello. Is that There we go. All right.
Uh hello chair, LRT subcommittee, staff,
press, and anyone else tuning in to
watch at the dwindling days of summer
during a municipal election. I am still
Carl Andress, executive director of the
Hamilton Community Benefits Network and
non- voting member of this committee.
I'm really proud to be here at our last
LRT subcommittee meeting of this season.
Now, that being said, I'd hope to bring
forward a lengthy presentation to this
term of the LRT subcommittee, a report
HCBN has been working on with community
partners and local artists for quite
some time. a report that looks at the
intersectionality of design choices and
rapid transit around the world
historically in Hamilton
along with engagement data, lived
experience research and best practices
to provide a framing for this committee,
Metroinks, city staff and council as a
whole of what stop and station level
design choices can have on the daily
lives of Hamilton residents for
generations to come and literal design
considerations for possible mun
municipal betterment considerations.
Today is not the day for that
presentation. It will not happen. And
there are a great number of reasons,
none of which is the fault of staff or
this committee. One, there's a municipal
election going on right now. And no one
needs to be talking about the Hamilton
LRT. It's coming. Construction's
underway. The exact shape and form of
the development of that system will be
decided by Metroinks staff and the
future work of the members of this
committee. So instead, what I want to
talk about is a process issue. I have
noticed
this committee has made great strides
this year. Its vote uh and its voting
members and council as a whole have
recognized for great work that you have
all undertaken to welcome more voices to
this committee and to try and bring the
lens to this project simply beyond one
of transportation and infrastructure.
And I want to thank every one of the
committee members for doing that. You've
done a lot of made a lot of changes to
this committee, listened to a lot of
presentations, and considered a lot of
voices this term of council. My
challenge for you today at this last
term of the LRT subcommittee for this
council has been the uneven way in which
presentations from non- voting committee
members are treated. Staff have been
very helpful over the years, and I
always thank them for their guidance in
struggling with what I believe is a
procedural hole. Sometimes presentations
from members are treated as delegations
and time require time extensions
graciously provided but not always
assumed. Sometimes they are general
information, sometimes there are
something in between, sometimes they are
full-on agenda presentation items. My
challenge for you today at this last
term of the LRT subcommittee for this
council has been the uneven way in which
presentations from non- voting members
of this committee are treated. Staff
have been, as I said, uh very helpful.
We have presented uh with educational
and community partners a great deal of
in-depth information we feel this
committee needed for decisionmaking and
good governance on the Hamilton LRT.
We've partnered with city staff, local
organizations, and educational
institutions to bring forward a series
of informed educational policy for your
consideration of you and your council
colleagues.
believing with the best information, you
all as counselors and our mayor can make
the most informed, best decisions for
all Hamilton residents. To that effect,
HCBN and a few other organizations have
found themselves uh found ourselves
often using delegations and asking for
extra time to bring forward items which
might be better discussed on other areas
of the agenda needing more than five
minutes.
Council has a history of having special
information sessions inviting informed
experts on critical subjects shaping the
city like data centers or affordable
housing.
HCBN and myself have sometimes presented
with city staff directly on major
subject issues of note. Basically, I'm
jumping all over the place trying to
perhaps to staff's headache pro find
procedurally which is the best place to
bring forward critical information and
policy. The just recovery coalition, we
made many presentations delegations and
we worked directly with staff on some of
those recommendations that came forward
to you as reports for deliberation.
With the role of citizen advisory
committees rapidly changing and
evolving, the need for, especially with
a project as large as the city shaping
Hamilton LRT, a place for resident
voices to engage and Metroink's long
delayed process in providing a forum for
community benefit conversations, this
committee has become essential for
resident voices. However, the procedural
bylaw is antiquated in in terms of its
its form, shape, and policies that it
provides for the types of engagement
that this committee demands from its
non- voting members. To that end, I have
three quick asks as my 20 seconds counts
down. Could the Hamilton Community
Benefits Network be afforded an agenda
spot at a future post-election Hamilton
LRT subcommittee meeting to make a
formal presentation on the agenda? Could
this committee motion to staff or
forward a motion to AFNA for review of
procedural bylaw with mind to updating
it to council's new renewed interest in
greater resident participation, a more
inclusive governance models, and changes
to the advisory committees? And could
exact rules be created specifically for
this hybrid committee consisting of
voting and non- voting members to
clarify rules for delegations,
presentation, information, and time
frames? Thank you very much.
>> Thank you. Uh, we do have some inquiry
and questions. Councelor Crutch,
ahead of the last municipal election, I
was standing where you were, Carl,
talking to the governance review
subcommittee about issues just like
this. So, I appreciate you doing it and
appreciate you making sure that we're
aware of these things. I think the best
thing to do, if it makes sense to you,
is actually refer your delegation to the
governance review subcommittee. The
worst decision I think we could make
would be to have a one-off set of rules
for this committee when there are so
many more that are like it and that are
emerging that are like it. We need to
find a way, I think, and I've I've
raised this with the city clerk for your
edification and knowledge and said that
we need to have a more standard way of
understanding our committees. We need to
look at them and categorize them better.
Uh there are too many weird one-off
hybrid uh situations here and then
people end up scrambling and to try and
make their voice effective or figure
things out. So what you say seems
reasonable, but I think we should have
governance looking at it the next term
in terms of make, you know, cleaning it
up so that things are clear for people
and it's more predictable and there's
easier way for everyone in the
legislative office and and everyone
trying to get through these things to
have guidance. Does that make sense to
you?
>> I appreciate that. That it does make a
lot of sense to me. I was kind of hoping
where I was going except maybe for my
first request which was I would like you
guys to maybe put a motion forward to
add us to a future agenda for a
presentation. Well, the
>> the FNA committee works on some of the
deeper issues.
>> Um, at the board of health today, there
was a motion to defer an item on the
agenda and I just said I'm deferring it
>> uh till later in the agenda. I didn't
ask for a motion. A special rule that no
one seems to know about and I'm just
going to say it out loud here is the
chair can do whatever the chair wants to
do full stop period at the end of the
sentence unless the people in the
committee say I object to that. And so I
really don't think it's a big issue for
us to deal with here from a governance
perspective. Meaning like if someone
comes forward and they want to bring
forward a presentation and the chair's
okay with that happening, then that's
how that happens. But I think we do have
stricter rules about that, right? Like I
don't think we need to grant you
permission as a committee, right? I
think that that's not a big deal as far
as I'm concerned. But I think in terms
of procedurally how it works, right, we
should have a better procedure for those
kinds of things. If if individuals are
appointed to a committee on behalf of an
organization and that organization wants
to make a presentation to the committee,
there should be a process for that and
there isn't one that exists right now.
Mhm.
>> So that's I think the more um irksome
thing. Also, we don't know when the next
LRT subcommittee is going to be yet. I
don't think because we're still working
on the calendar because as you may know,
the strong mayor powers dictate that the
mayor has some say over how committee
organization works. So we have to wait
for a mayor to be elected before we can
do some of those things.
>> Does that all make sense? Yeah. I just
don't want to prejudice the process in
the future um by not knowing what will
happen and what the new mayor will
decide. But I just want to say out loud
chairs can make those decisions.
Um I would leave it to the decision of
the chair and this committee. Um at some
point I would like you know 20 minutes
to make a presentation and perhaps not
have to come and and beg for an
extension of a delegation time and to
have a properly formatted agenda item to
bring forward a presentation and a
report
and then have the other issues handled
by FNA in future.
>> Thank you. Uh seeing no other speakers
on the item, I'll pass the chair to uh
vice chair and say that um appreciate
that in the delegation you referenced
AFNA. Uh I think council crutch is
correct in terms of having this go to
the governance review subcommittee and
then of course that one refuses to AFNA.
Um and then um at the appropriate time.
So councelor Crutch if you want to move
that motion as it relates to this
delegation that'd be great. And then in
terms of the future agenda item
including the betterments, I tried to
clarify during the chair's procedures
about what is correct, what is not
correct. Uh and I was told about the
procedural limitation here. Um and so
the clerk has advised for everyone's uh
public awareness that uh this will be
addressed in the next procedural bylaw
update as well. So having this motion
helps support that work, but the work is
also under review on the clerk's agenda.
Um, so I'll take back the chair and uh
at this point, Council Crutch.
>> Yeah, I'd like to have this item
referred to
the governance review subcommittee,
including all the recommendations that
you have there because I think if I
recall correctly, in this term of
council, we changed the review periods
for the procedural bylaw to be both the
beginning and ends of term. So there's a
chance where the procedural bylaw is
being reviewed like nowish. So this is a
good time to bring this up and get it
addressed and likely your points will be
addressed before the next LRT
subcommittee happens so that it won't
it'll be a moot point. But yeah, I'll
move that if someone wants to second.
Well, councelor Hang. Thank you.
>> Thank you both. Okay, it's been moved
and seconded before committee for
electronic vote.
>> Oh, hand vote for referral. We don't
need to do an electric vote.
Thank you. That electronic. Um, that
carries. Thank you. Uh, thank you. And
now a motion to and a seconder to
receive the delegation. Councelor Hang,
Councelor Crutch. Thank you both. All
those in favor, show a hand. Thank you.
And that carries. Before we move on to
the next agenda item, which is items for
information, I do want to address
further procedural clarification, which
was why I blanked. I was like non-
voting member, therefore cannot second.
Therefore, uh, non- voting member Mayo,
you cannot second the agenda.
It must be one of our voting members
that the agenda. Therefore, may I have a
seconder for our agenda. Thank you,
Council Crutch.
>> A riveting time for procedure, but uh in
moment corrections are always welcome.
Right on to items for information. First
up is peed 26176, light rail transit
agreement update. Uh, this item was
referred from the general issues
committee September 20 September 2nd
meeting. Um, may I please get a mover
and second to put the report on the
floor. Moved by councelor Hang, seconded
by councelor Kasar. Thank you both. Um,
and I'll turn the floor over to Abdul
Shaker, director of the LRT project
office.
>> Thank you. Good afternoon through you,
Madam Chair. My name is Abdul Shikh,
director LRT project office. Uh the LRD
agreement of the report before you today
was initially presented at council
mansion to general issues committee on
September 2nd. At that meeting council
referred to this this report to the LRT
subcommittee for information purposes.
So following consideration by this
subcommittee the report will return to
general issues committee on September 28
for council's consideration and
approval. I will provide a brief
overview of the report. Then I will turn
it over to staff to provide an overview
of the two agreement protocol for which
we are seeking council authorization to
execute.
As members are aware the city enter into
a memorandum of understanding what we
call with metro links and the ministry
of transportation in 2021 for Hamilton
project. The MOU identified 11 schedules
and protocols to be negotiated and
finalized following execution of the
MOU. To date, the city has executed five
of these schedules and protocols. The
first one is a staffing agreement. The
other one governance protocol, then real
estate protocol and dispute resolution
protocol and the communication protocol
for the pre-procurement phase. They are
all executed as of today.
Through the report before you today,
staff are seeking council authorization
to execute two protocols. The first is
the commissioning and acceptance
protocol which establishes the framework
for the commissioning, testing,
acceptance and handover of cities
infrastructure which are being
constructed as part of the LT project.
The second one is appendix B into this
report is communication protocol which
will apply throughout the design,
construction, delivery and warranty
period of the project. So this
communication protocol will replace the
previous communication protocol which
was specific to a pre-procurement phase
as the project has uh has advanced into
the design and construction phases.
staff have worked extensively with Metro
Links over the past several years to
negotiate the terms of these both
protocols. The negotiations involve
staff from a number of city divisions as
well as the legal and uh project
representatives.
Staff have now reached agreement on the
proposed terms and the necessary staff
level approvals have been obtained from
both city and metroing sites. The
proposed protocol have also been
reviewed and endorsed by the city's LRT
steering committee which include senior
representatives from various city
divisions involved in the project. So
staff are satisfied that the proposed
protocols provide the necessary
framework and clarity for the city as
the projects move into the design and
construction phases. With that, I will
turn it over to solicitor Dave McKenna
to provide an overview of the commission
and acceptance protocol. And following
today's presentation, Elanie will Elenie
Jalput uh she will provide an overview
on the communication protocol. Thank
you, Madam Chair.
Through the chair, David McKenna,
solicitor legal services. Thank you
Abdul and good afternoon everyone. As
Abdul mentioned, I will provide a brief
synopsis of the commissioning and
acceptance protocol, including what it
applies to and generally speaking, what
cover what topics it covers. Beginning
with its application, as part of the LRT
project, Metroinks will be constructing
certain infrastructure on behalf of the
city that the city will subsequently
own, operate, and maintain. This
infrastructure is referred to in theou
as new city infrastructure and
additional city infrastructure.
New city infrastructure is
infrastructure that will be built for
the city at Metroins's expense to
replace infrastructure and assets that
must be replaced or relocated to
facilitate the LRT project. Additional
city infrastructure is primarily
infrastructure that the city requests
Metroinks build on behalf of the city
that is in addition to the base scope of
the project.
For ease, I'll refer to both categories
simply as city infrastructure.
City infrastructure includes items such
as water manes, sewers, roads,
sidewalks, and street furniture. It does
not include trains, train tracks, and
other light rail related infrastructure
and infrastructure that will be owned by
Metroinks.
Moving on to the topics covered by the
protocol. The protocol sets out the
terms and conditions governing the four
following categories. Number one,
inspections.
Pursuant to the protocol, the city shall
employ inspection staff and is permitted
to inspect city infrastructure both
during and after construction.
Number two, non-conformances.
Defects and deficiencies are referred to
as non-conformances in the protocol. The
protocol specifies two different types
of non-conformances.
standard non-conformances and critical
non-conformances
which as the name implies have an
additional component typically
characterized by a serious threat to
health, safety or security. If the city
identifies a non-conformance during
inspection then the suspected
non-conformance will be jointly
inspected by the city metroinks and the
contractor. If all parties agree that a
non-conformance exists, then the
non-conformance will be classified in
accordance with the protocol and
formally registered on a non-conformance
list for future rectification.
In the event that the parties cannot
agree on whether a non-conformance
exists or how a non-conformance should
be classified, then such dispute shall
be settled in accordance with the
dispute resolution protocol.
Number three, acceptance and or
commissioning and acceptance. The
protocol sets out the various
requirements and obligations that govern
how city infrastructure shall be
commissioned by Metroinks and
subsequently accepted by the city. Only
when Metroinks has fulfilled all of the
requirements set out in the protocol
will the city be deemed to have accepted
city infrastructure.
For example, city infrastructure must be
inspected and fully and finally
constructed
built and comp built and commissioned in
compliance with the required standards
and requirements.
All previously identified critical
non-conformances must be rectified and
all the required documentation, drawings
and certificates as applicable must be
provided to the city pursuant to the
protocol.
Number four, warranties. According to
the protocol, Metroink shall warrant to
the city that city infrastructure shall
conform to the specifications set out in
Metroink's contract with the contractor
and shall be new of good quality
material, of merchantable quality, and
free of defects in materials, equipment,
and worksmanship for a 2-year warranty
period.
If the city believes that a
non-conformance exists, then it may
request a warranty inspection at any
time during the warranty period.
Additionally, prior to the expiration of
a warranty period, Metroinks will
instigate a warranty inspection to be
conducted in the presence of city staff.
Following any warranty inspections,
Metroinks shall prepare and submit to
the city a report which summarizes the
results, including a non-conformance
list if required. So with that, I'll
recruit I I will conclude my remarks and
I'm happy now to address any questions
you may have. Thank you very much.
>> Thank you so much for the overview.
First up on the speakers list, we have
councelor crutch.
>> Thank you. My questions are not about
the communications protocol but the
other one. Two questions.
In my experience, when we enter into
negotiations or agreements, the
correlative impacts of those
negotiations and agreements aren't
always thought the full way through. In
section 3.2, it references city
inspection staff.
It says that Metroinks acknowledges that
the city will employ city inspection
staff for the purposes of assessing,
inspecting, and construction of city
works with the basic standard of city
standard where applicable. Okay. The
word employ there doesn't mean employ,
it means use. But my question for you
is, will we actually be doing this?
Because the city doesn't have the
capacity at the moment with its current
inspection staff to manage a project of
this scope. So, will the city be hiring
additional staff to manage this
specifically?
And when will the city be hiring that
staff?
>> Through you, Madam Chair? Yes. Uh uh uh
as you remember councelor there is a
staffing agreement already in place. The
staffing agreement has identified future
city staff required for LRT project and
we have already identified three
inspectors just on roadway side and
there are also three uh other inspector
for Hamilton water. Right. So they are
already identified under the uh staffing
agreement for future staff which uh the
cost will be reimbured from metro links
right and for your information through
our annual work plan for 2027 we have
already requested one inspector to be
recruited in 2027 starting January which
will be again fully funded by metro
links so the first we are hoping that
you know subject to metro disapproval we
will have a full one full-time inspector
working on this project starting next
year and then following years when major
construction start we will have probably
two more inspectors uh on roadway side
uh which will be fully funded by metro
links as well.
>> Thanks and that brings me to my second
point then I have one more. One of the
things we've tried to do in this term of
council I understand that doesn't really
work everywhere easily and seamlessly is
and we've done a pretty good job of it.
I really commend staff on this is when
there's a motion from a counselor we
attach that motion to things and put it
in the agenda. If there's a reference to
another document, we include that
document in the agenda. There are a
number of references in these agreements
to other documents that exist that I
don't know how to find. Like they're not
it's not like a quick simple search to
find the staffing agreement schedule E
or the uh tree removals and compensation
strategy 2026. So I'm asking that there
be some way to to include those things
before council so that they're on the
public record. they're all itemized
there as appendices um if they're
referred to here because it's not it
shouldn't be up to the public's job or
anyone here's job to try and go back and
forth and try and find these other
documents to understand what they say
especially as we get to my third point
which is 3.5 requirements for streets
trees and other softscape all it says is
all requirements specified in section
1.1 of appendix 8 shall have been
completed and the city of metro link
shall adhere to the requirements
outlining the tree removals and
compensation strategy um I think we
should have a copy of the tree removals
and compensation strategy attached.
That's my last question. My
understanding, this is from memory
because I don't have a copy with me of
that compensation strategy is a little
fuzzy from from my understanding and
it's remains a really important point
here because it seems that the way that
we're approaching this is by removing
trees and then and then providing some
type of compensation or having a
compensation strategy for those trees to
be removed. But we haven't yet
identified how
we're going to deal with shade. So I
think what I'm trying to say is that the
language here doesn't reflect the
outcome. It talks about what we're going
to do in terms of removing trees, but it
doesn't talk about shade infrastructure
or talk about providing shade or
providing cooling like that. That's
missing from everything I can find about
this. So how are we going to try to
embed that language in these agreements?
Embed that language in the documents we
have because it's not just about trees.
We want to have those oxygen-rich
environments where trees help, birds
live, trees help, people breathe, trees
help with the air pollution downtown.
That's an important part of why trees
are there. But this but there's
something else that they do, which is
provide shade. And so when we take them
all away, how are we going to continue
to provide shade? Because there are 150
million ways to do it. Um the question
is which one are we going to pick
>> through you madam chair? Maybe I will uh
try to respond to the tree information.
For your information, counselor, there
will be another protocol coming very
soon about permit, license and approval.
I think that will be an appropriate time
where we can discuss about that and that
protocol we will list all of the city
requirements
uh which will include the tree
compensation uh which we met needs to
address along with city approval
process. So uh you know so metro links
will have to submit all the design
information for city review and
approval. So that protocol will come to
the l subcommittee for endorsement and
that will have more information about
how the permit are being undertaken by
metro links and how the design
information will be flowing to the city
for approval and process. Right? So I
would probably suggest that you know we
should wait for that protocol. This this
protocol what we have before you today
is is about commissioning and acceptance
you know once metronics complete city
infrastructure how we going to take over
those infrastructure and then what that
are the warranty protocols and how we
are inspecting per the design standard
and all those kind of things right so
that's really I would say that you know
that you know what you were referring
maybe we can wait for the PLA protocol
and then we can mention about those one
in terms of administrator ative uh we
have tried to reference the key uh uh
references in our append in our
appendices right so they were linked to
the report especially where the
agreements were uh like was included in
a I would say in our appendix and then
the other agreement when we executed
those were referenced and the link were
provided yes I agree you know not all
the details were included for example
tree compensation strategy and those
kind of things right so We will take
that information and then we will
improve upon in the next uh uh agreement
reports going forward.
>> Yeah, I'm most just mindful of the fact
that you live and breathe this stuff. Uh
I don't every day secondarily I do as
the vice chair of this but everyone
accessing these public materials wants
to be able to see the whole context
every time so that they can make sure
that they have a question they can just
click in the next file, the next file
and it's there and they can find it. So
I appreciate that. Thank you very much.
Thank you, councelor. Next up, we have
non- voting member Kalera Andress.
>> Uh thank thank you very much. Um I have
just a couple of of quick questions
around um um city infrastructure uh
replacement. Um I'm going to use the
same term whether that be net new or
replacement like for like uh
infrastructure and how that relates to
city's existing um perhaps procurement
contracts and procurement policies
specifically the fair wage policy which
exists. Will Metroinks be bound to
follow city's existing procurement fair
wage policies when they are replacing
city infrastructure based on agreements
the city has already signed as well as
any other agreements with regards to
procurement for city infrastructure that
may be in place while Metroinks takes
over the pro that procurement
>> through you madame chair member Andrews
Metroinks will uh required to fulfill
all the cities standard and
requirements.
When it comes to procurement, I would
say probably they will use their
provincial
uh you know uh requirements in terms of
procurement but but rest of the
standards guidelines and all those
metrones has committed to uh to use and
uh fulfill those requirements. So in
terms of procurement I think metronics
will be using their provincial standard
because they are uh you know upper
government and uh but rest of the
requirements agreement standards and
bylaws they will fulfill all these
requirements going forward
>> and has there been um any report given
to this committee or to the GIC on what
the differences between those
procurement standards are for the
consideration of voting members on the
implement uh on on the impacts on both
city agreements on policy and their and
their decision-m abilities
>> through you madam chair like we haven't
really provided uh those information to
the LRT subcommittee uh but if you wish
we can I think that's already an
extensive exercise which uh metink has
also provided some information about
what they are going to include in their
presentation for example community
benefit uh plan they have and uh their
requirement into the procurement And so
they have already provided through their
presentation
uh but it's going to be a very extensive
exercise to look into it what the
differences are and those kind of but it
is given that all the procurement
procedures will be used through the
metro link standard processes right but
if you need more information we can
bring more information on that part
>> I I you know through the chair field
that would of course be uh important
information to have especially given the
work that's gone into this term of
council in the fair wage policy update.
rates um for wage schedules and to see
that Metroink's contractors and
subcontractors will at least be paying
the same rates that the city has agreed
to for its own infrastructure on
infrastructure that's being replaced on
the city's behalf. And then I look
forward to future presentations on
community benefits and on city
agreements around permitting for things
like trees as councelor Cretch asked.
Thank you.
>> Thank you for that. Next up we have
council moren Wilson.
Thank you. Um my question actually is
specific to communication but I will
take this opportunity to just maybe ask
a general high level question because
of course from here it goes back to uh
GIC and council. Um, so I I think I
would love uh perhaps from solicitor
McKenna a clear articulation of what
public interest is being served by
having uh
these matters set out in in a protocol.
Now um how are we protecting and
advancing uh the interests of
Hamiltonians through the chair
>> through the chair to the counselor. So
counselor the the protocols are critical
components critical legal documents
uh relative to the project. So as you're
aware we have theou when theou was
executed the intention was that there
would be a number of additional
schedules that would subsequently be
negotiated and executed by the parties
which would delve into further detail in
relation to all of the major categories.
So that is the primary purpose of these
protocols is to provide the additional
detail that was not covered in theou. So
I think to answer your question I I
would say that these protocols are
critical components of moving forward
with the project because they set out
the roles and responsibilities
obligations and whatnot of the parties
and provide the relevant level of detail
that we need in order to actually
further the project.
>> Thank you. So in non-legal language I
could I might conclude um that it is
actually good governance and the
responsibility of the stewards around
this table regardless of one's opinion
about LRT to have a protocol like this
in place so we have clear um and
transparent lines about uh how we how we
define and how we resolve uh issues that
may be outstanding um and that there's
no guesswork around that and there in
embedded in that process is how we
uphold um the public interest. Could
that be a fair comment
>> through the chair to the counselor? Yes,
I think I'd agree with that.
>> Thank you.
>> Thank you. And next we have member Mayo.
>> Hi. Um my first question I just to
clarify there's no one from Metro Links
here, right? It's just city staff,
right? Um so I'm I very much uh like the
communications protocol uh the the um
section on the principles I think is
very good and and um about the open and
transparent uh communications and being
proactive and maintaining positive
relations and protecting the credibility
of the parties and building trust.
That's all very good and I hope that in
the implementation of this protocol
um section three that the communications
and community engagement plan that that
plan is brought to this committee um um
so that the transparency of of that plan
uh be uh implemented and then as well
I'm I'm glad to see uh that there's
going to be the communication the the
construction liaison committees with um
uh at the neighborhood level that will
definitely be needed. And I wonder in
that whole section six that Metroinks is
in charge of stakeholder communications
whether that means they will start
coming to this committee because if they
continue their practice of ignor mainly
ignoring this committee I feel like
they're not going to be implementing um
their number six community outreach and
stakeholder engagement if they if they
don't take the time to to listen to
stakeholders here at this committee and
also that they could provide the
feedback they're getting at the CLC's to
this committee which would be very
helpful for this committee
>> through madam chair I would suggest that
you know like elen once we are done with
the committee commission and acceptance
protocol then uh elen will provide an
overview of the protocol and then we
going to get into the question if it is
okay member mayo if there are no
question about communications commission
and acceptance we can move to
communication protocol
>> councelor hang on that point is your
question on the communications or the
commission's communications. Perfect.
Okay, so over to Ellie.
>> Thank you through the chair. I'm Eleni
Jalboot, senior communications advisor
with the city's LRT project team.
So this updated communications protocol
is intended for the duration of design
and construction of the Hamilton LRT. So
today I'm speaking to the highlights of
the communications protocol as outlined
in report peed 26176.
Some of these highlights I'm going to go
through today include the communications
group media announcements and events and
the city's ability to respond to
inquiries. I will highlight those and
other communication items today found
within the updated protocol.
I do want us to be on the same page
about a few things. So, I'm just going
to go through a few items if you don't
mind. I'd like to first emphasize a few
important points before getting into the
main crux of the comm's protocol.
First, this communications protocol is
based on an already existing protocol
between the city of Hamilton and
Metroinks that was actually brought
before council twice. one time in March
2022 under the title peed 211776A.
The report was entitled LRT agreements
update. And the next was during the
September 24th peed24150
report entitled the Hamilton LRT project
communications and engagement update.
Second, the communication protocol I'm
going through today is one of the
agreements in the memorandum of
understanding. It is not simply a
communication strategy.
To explain further, the communications
protocol is a legally binding document
that lays out the roles and
responsibilities of three parties. MTO
being the funer, Metroinks being the
deliverer, and the city being the
partner.
roles and responsibilities of MTO,
Metroinks and the city on the
communications and engagement. So these
roles and responsibilities are laid out
within this protocol. So an example if I
can go into an example is something like
media announcements for instance would
be MTO's lead and then Metroinks and the
city reshare.
For example, the April 30th announcement
of the contract award this year earlier
this year for the first package of the
work was released by MTO then shared by
Metroinks and then the city shared that
MTO announcement.
Another example is the city can speak to
city-led items and city initiatives
Maine and Ottawa for instance, but
everything else is under the lead of the
province and Metroinks. The biggest
change in the communications protocol is
that the city will provide written
notice to Metroinks when putting out
communications or attending an
engagement event on the project.
Lastly, let's not lose sight of the fact
that Metroinks is responsible for the
project delivery, scope, budget, and
schedule of the Hamilton LRT project. As
part of that responsibility, Metroinks
also takes the lead on communications
and and engagement. That said, this
updated communications protocol has
taken several months of negotiation
between the city, Metroinks, and the
Ministry of Transportation. We have
landed on a spot that the city of
Hamilton LRT team and city leadership is
satisfied with.
So with that out of the way, I'm going
to go into the highlights of the comm's
protocol. This was also delivered uh to
the September 2nd GIC.
So the communications protocol 2026
version schedule I of theou
highlight number one a refresher on the
purpose of the communications protocol
to outline the public communications and
engagement processes that the city of
Hamilton Metroinks and the Ministry of
Transportation will follow respecting
the delivery of the LRT.
Number two, the responsibilities within
that process include um time provide
timely, effective, transparent and
consistent proactive communications with
the public and elected officials.
B maintain positive and constructive
relationships with communities,
agencies, businesses, and other
stakeholders who are impacted by the
construction of LRT.
C. protect the credibility and
reputations of the city, Metroinks, and
the province.
D. Build trust and maximize public
understanding and support for the LRT
project. And these were um I believe
what member Mayo was referring to,
especially this point. Three, public
messages, roles, and responsibilities.
By providing written notice to
Metroinks, the city can respond to media
and resident inquiries and issue
statements or presentations about these
three items. A city initiatives that are
part of the project such as any
betterment item the city is funding. B
matters that are solely the city's
responsibility such as road closures or
HSR related matters. and C project
information that is already publicly
available.
I would like to note here as well this
process has already been working well
all along in a very collaborative way.
We work closely with Metroinks and will
continue continue to do so. The point
about the written notice is to ensure
the community in Hamilton is given the
right information at the right time and
that multiple parties aren't saying
different things from one another like
the province Metroinks and the city as
well as the members of community the
community. We want to remain well
coordinated together to deliver this
project.
Number four, the highlight number four
is the communications governance project
communications group.
Metroinks and the city will each appoint
at minimum one representative to a joint
project communications group, sometimes
called the communications working group,
with additional staff as needed and as
agreed upon.
The group will share updates and
coordinate on the following. A community
relations and elected official
briefings. B. Project milestones and
construction schedules.
C. Emerging issues and local interests.
D. Opportunities to collaborate on
communication matters covered by this
protocol.
Going into highlight number five,
construction liaison committees, CLC's,
which we've already brought up once
today. Metroinks will organize and
manage a construction liaison committee
CLC for each neighborhood or community
along the LRT corridor. The CLC's will
provide a forum for Metroinks to
communicate with local stakeholders
including neighborhood associations,
BAS, and other community representatives
about construction activities.
The city will review and provide input
on CLC membership when each committee is
established and whenever changes are
proposed.
And the final highlight I wanted to go
through from the comm's protocol are
other comms and engagement items that
Metroinks is responsible for with
collaboration from the city. These
include, and I'm just going to go
through kind of a quick list instead of
going into each one independently,
communications and community engagement
plans. So, this can include elected
official briefings,
media relations and events, community
outreach, and stakeholder engagement,
branding and signage, and finally,
digital communications.
So for example, Metroinks can share
posts on their social media channels and
we at the city of Hamilton, our social
media team will accept um their post as
a collaboration and a re-share. And this
a good example of this is the Metroinks
made and Ottawa construction videos that
were recently posted that included our
construction lead from our office Dennis
speaking about what is happening in the
construction zone at Maine and Ottawa.
So, Metro Links have posted that and we
simply accept to collab that post so
that our city followers can see what's
going on at Main and Ottawa. And I'll
end it there. Thank you.
>> Thank you for that overview. Um, speaker
list includes Council Fang, then Council
Me Wilson, and member Andress, but
member Mayo, you had asked a question up
front. So, uh, at this point, did you
want to clarify any further? And then
we'll go on to the speakers list as
you're good to come at the end. Okay,
great. Uh, over to you, Council M.
Thank you. Um, I know that a lot of
people have already looked at this, but
is there any way to tighten up the
language around the construction liaison
committees to include businesses in the
neighborhood because some areas of LRT
corridor do not have a business
improvement area. However, they were
going to be highly impacted. So, um, can
we include that language in here?
>> Yeah, I can take that feedback back to
Metroinks when we start forming those
CLC's.
>> Okay. Um second question then um is
around tracking. So I did see that in
item six it's the community outreach and
other stakeholder engagement organizing
tracking and reporting on all
stakeholder engagement. And then down
towards the bottom it says uh Metroink
standard response time is to acknowledge
the inquiry within a 24-hour and respond
within 10 days. So I just wanted to get
a sense from you as to what does that
potentially look like because tracking
there's going to be a lot. So, I think I
would like to understand because
everything from a 24-hour turnaround
acknowledgement to a 10day response, a
lot could get lost there. So, I wonder,
can you just help me understand that
part a little bit better, just the
operations of this? Uh, because I worry
that we're outsourcing all of our
communications to Metro Links where we
have very little line of sight into how
that stakeholder engagement happens. So,
this is this is of concern to me. Thank
you
>> through the chair. Thank you. I agree
with you. It does get to be more of a
concern, especially as major
construction amps up. Right now, we work
closely together. And please remember
that the senior communications adviser,
whether it's me or somebody else later,
will is always in close contact with
Metro Links. Work in the same office.
We're constantly in touch um sharing
information about the current issue, say
Maine and Ottawa speed bumps. I I can't
answer how that will look like for major
construction. I think that's still to be
decided. But the 24-hour acknowledgement
at least it's there. We are constantly
working together and I don't know if it
will be 10 days or longer. Like city is
different from Metroen in our processes.
There's not like a standard set you must
respond in 10 days kind of thing because
it depends on the division and the
department, right? Forestry could take a
year for something to be resolved for
instance. But for us, we're working well
right now. And I think that shows a good
track record going forward that we're
we're supporting one another to answer
efficiently, but also accurately. And
sometimes that accuracy might take a
little bit longer for a response or a
resolution to an issue. Okay. So, I
think what I'd like to just flag
is that I get that what we've outlined
as the bare um sort of minimum right
now, right? I think what I've been
hearing is it's about closing the loop.
And so, if you've put an arbitrary sort
of time frame on there and then we don't
actually close the loop, I just worry
about it from an operations standpoint.
But ultimately, I just wanted to raise
that as a flag to to show like if we're
going through the main Ottawa stuff
right now. I agree. It's been working
really well. I think that that's where
you're right, the major construction is
of most concern. So, I think that again,
I'd just like to flag this that there is
a concern over these response times and
also it is not very clear as to how how
that will actually work. So, I'll just
raise that as a flag.
>> Okay.
>> Through the chair. Thank you.
>> Okay. Next up, councelor Wilson.
>> Thank you. Thank you for your
presentation. Um just needing a little
bit of assistance on a few items. Uh
starting with the um construction
liaison committees.
Um
just so I'm clear,
we're not suggesting or we're not
um
precluding community groups,
neighborhood groups from perhaps
self-organizing.
If I could just give an example,
um
there are particularly in the lower
city, there are areas where people
um are very fluid. They will they will
live in in one neighborhood, but they
will walk to school in another. Um
uh they will have a they will live in
one neighborhood, they will walk to a
place of worship in another
neighborhood. So it it could be that
some of the neighborhood associations
may get together to self-organize to
appoint members to have a a collective
so that they all get the same
information and can advocate for that
kind of fluidity that mobility. Um I'm
trusting that that would be entertained
uh in this protocol.
>> I think that's a really good point. I
hadn't thought of it before through the
chair. Sorry, I'm still new at this. Um,
thank you. I I can bring that back. I
think the way that the CLC's will look
in terms of who's included from which
organization, how many reps from the
city, for instance, that's still to be
decided closer to major construction.
So, I can bring that back as feedback to
Metroinks for their consideration.
>> Thank you. And um further to that, if I
could just ask you to also consider um
the history of land use in the lower
city uh before we uh added major
highways through the heart of
neighborhoods was to um
have places of worship, for example, and
schools along those main arteries. Maybe
not such a great idea now, but um if uh
there are um not only a normal day of
not normal, that's that's not a good
word. Not only is there perhaps one day
a week of uh going to to worship and
some occasions there are multiple days
and sometimes those days go over 24
hours um the event will go through 24
hours where the parishioner will be in
the place of worship for 24 hours. So
getting to and from could be um
significantly important. So if I could
just put that bug in your ear uh of of
those sensitive land uses in and around
there. Okay. Thank you.
>> Um the other um
um one I'd like to make sure I
understand more clearly is uh community
outreach.
And if I could just perhaps um use ward
one as an example so that I understand
um in the west end of the city we have
some sensitive uses um we have a fire
hall for example on Main Street West we
have a children's hospital we have
Ronald McDonald's hospital so could you
just help me understand in terms of the
stakeholder uh engagement roles and
responsibilities whose responsibility is
it to provide that schedule of work per
perhaps there might be a lane down who
who does that outreach through the chair
>> through the chair that's metro links's
responsibility for the stakeholders
especially around construction
>> you know director shake wants to add to
it
>> through you madam chair council Wilson
uh it's a combination of u as I
previously mentioned that met has to uh
fulfill all the city requirements right
For especially for capital projects, we
do have a requirement. For example, if
the road is being closed, we have to
inform the businesses 4 months or
probably four to 6 months in advance if
the road is being closed, right? If
there's a lane impact, so minimum is 30
days, but if it is major lane closures,
then it's more than 30 days, right? So,
they will have to fulfill those as a
minimum requirement. The good thing for
this project is actually going above and
beyond what the minimum requirements
are, right? So, so they will fulfill all
the city requirements. In addition, we
will be working through those
communication working group that we
probably have to do more here and those
kind of thing and then we will bring
those whole communication strategy as
someone mentioned that we will bring
those strategy to the LRT subcommittee
to provide those kind of information
right but I can tell you that if the
road is being closed it's about four to
6 months if the lane is being closed
about 30 days you know we have to inform
all the resident property or impacts
right but in this one we probably be
doing more and and those information
will be included in the communication
strategy which we will bring to the LRT
subcommittee.
>> Okay. So just so I think my time is near
um just so I understand so engagement
with uh per I'm thinking specifically of
the hospital for example um engagement
if we have a lane due to um some uh work
that we're having to get done that
engagement with the hospital is done uh
by Metroinks the plan itself is reviewed
internally in terms of for example fire
service um to ensure that they have eyes
on the plan and that they aware they
they are aware that the work is coming
up. What happens in the um what happens
as a as an example if we found that um
maybe things aren't going the way we
thought they would? Maybe there's
congestion and an intersection or or
something happens that residents note
and they're concerned that it may
it may delay response times for that
sensitive use in this in this case a
children's hospital. how how would that
work itself out and who would be
responsible for making that pivot um and
who would we contact if we observe that
in our local neighborhood through the
chair? Those are my questions
through you madam chair. uh metro
incident is overall in charge but I can
tell you is highly collaborative
contracting model right so they call
alliance contracting where our staff is
embedded in their uh working groups
right for example if they are
constructing and they are bringing some
lane closure those lane closure actually
now about two years advance we are
discussing those construction strategies
and all those kind of thing so city
staff is highly engaged with the
alliance team in a collaborative
containing model to decide all of these
factors and then at the same time while
they are bringing these what they call
TCPs traffic control plans when they are
discussing these TCPs we are actually
discussing the communication strategy as
well that okay now you are this is a
important lane closure we have to inform
McMaster or the hospitals right so we
discuss at these work setting uh all of
these things our staff is involved but
obviously Metronis is leading, taking
the control, informing their stakeholder
and all those but we city actually tell
them what we need to do as a minimum and
those kind of things right and
continuous lessons learned if there are
issues or something what I have seen
that metings is actually highly
collaborative right the alliance
quantity model they are using they are
continuously improving if there are uh
if something is not uh performing at our
expectations and all those kind of
things right and and later we will
however our own inspectors as well as I
mentioned you know like we will have
dedicated inspector three construction
inspector they will monitor all of these
things as well if something is not
working we will try to rectify as soon
as possible to improve upon
>> and if I can add through the chair sorry
just to add there's um a CRM system I
don't I don't know if you're aware but
metro links logs and actions all
inquiries through the CRM the customer
relationship management system and um as
a bonus I Yes, I'm also being trained on
the city CRM. I'm taking that upon
myself so I can log all um previous,
current, and future inquiries coming
into our office.
I think my time is, but if I could leave
a question with you and if I could go
back on perhaps um I I just need some um
better understanding of um if if the
plan looks like perhaps it's not working
optimally, let's just say in and around
uh a sensitive land use like a hospital,
who is responsible for pivoting? Uh how
are they informed that it's not working?
Who makes that decision? and um what is
the the role of the let's just say
elected individual in feeding that
information like quickly um so that uh
we can course correct. Thank you.
>> Thank you. And then next up we have
member Andress
>> um that thank you. I have a couple of
points I want to address uh around
communication. Um starting with the um
the CLC's uh community or construction
liaison committees having had the
opportunity to serve on Metroink's
community leaison committees um um when
they were initially set up they included
Hamilton in some of the early ones um
along with Toronto Peele and other uh
regions where there was giant projects
and those though just just for this
committee's information those tended to
be quarterly one-sided information dumps
where Metroink sat sat down with
stakeholders and dumped a bunch of
information on us and then left about 10
to 30 minutes at the end for questions.
They were not what is being painted as
the picture in this communication
document um in any way. They did not
provide that ability. They did not
provide that service. and everyone
around the table still in Toronto the
people attending those are left with
those feelings that they are very
one-sided and they don't give an
opportunity for birectional
communication about construction
concerns and ongoing community concerns.
Um my other um uh point that I wanted to
raise through through through the chair
specifically about communication
policies and concerns is when um the
Chamber of Commerce and Metroinks worked
so diligently on the LRT ready series in
the previous iteration of the LRT
project. One of the biggest points that
was raised um from the Edgington cross
town by BAS there and by businesses in
that area was around subcontractor
communication and the Metroinks's
ability to pivot quickly around um
issues regarding equipment placements.
um that provided accessibility issues to
businesses that it provided personal
accessibility issues for residents and
mobility challenges and how that they
they found that there was this this kind
of barrier with Metroinks where there
was literally stuck in a circle with no
one to go to. They couldn't go to their
city counselor. Metroinks filed a
ticket, but it had to go to the
contractor, down to the subcontractor,
down to another. And by the time the um
you know the issue was finally resolved,
it was because the piece of construction
equipment had to be moved as
construction moved and the business
closed. We literally heard a story at
one of these um um LRT ready chamber
events about that occurring to a
business in the Egllington cross town.
So my question for you here is this
communication plan sounds very very very
interesting and and paints an
interesting picture of communication but
it seems very one-sided. Seems that this
city is giving away a lot of the power
of flexibility that future counselors
are going to be dealt with and future
city frontline workers are going to be
dealing with bylaw complaints, parking
complaints, all of these construction
related issues with a reaction time that
promises an email back in 24 hours and
some kind of resolution within 10 days.
But for a senior trapped at at home or
for a whole community trying to use a
major route to get to school uh which
becomes an accessibility issue um which
then becomes a human rights issue. But I
where does the responsibility then
follow with Metroinks and like how does
the city end up bearing the brunt of the
frustration? Well, Metroinks is the one
the party responsible. So I just have a
lot of concerns around the way that this
I know this is the previously agreed
upon this has been the communication
policy. I just want to flag for the
committee that concern. And time and
time again during community engagement
on the LRT, on other constructions of
LRT, on Metro Links projects,
construction, accessibility,
accommodation, communication was always
raised. And Toronto city councilors I
talked to, and you could reach out to
your peers, express similar frustrations
around those communication policies that
they get calls from residents and they
can do nothing, that there is literally
no one to go to. So, I just want to warn
the committee while we're debating
communication policies and city policies
that these are some some of the
challenges that can occur because you we
won't know about them until serious
construction gets underway, but the
policy will already be signed um till we
start hearing about the serious
problems. So, that's just just my my my
concern as a as a committee member and
also you know my experience on a
community leazison committee. Thank you.
>> Can through you madam chair. I just
would like to add councelor uh sorry uh
member Andrews the example what you
provided more about the P3 project where
is which is a very fixed contracting
model right so it's always a price is a
controlling factor right I would like to
just highlight here this is just
alliance collaborative which makes a
huge difference right contractor is not
worried about costsaving and all those
kind of things right because you know uh
those has not been defined so it will be
different uh you know compared to other
P3 project where the cost is the primary
control right here you know like it's
highly collaborative which we already
experienced you know whenever uh you
know we identify requirement metro links
and their content is open to look into
those kind of things right so which we
have a very positive experience so far
and we continue to see that you know
licensing contracting model is going to
make a huge difference delivering this
project going forward
>> thank you very much to the chair I
really appreciate that comment uh and I
I I'm out of time. Um and I I am looking
forward to and hoping that this project
is different, but um this is a policy
table, not a vibes table, and I just
want to make sure that we've got
enshrined the rights and
responsibilities for the city that will
protect residents during the next 5
years of construction. So, thank you.
I'll leave it there.
>> Thank you, member Andress. Next up, we
have member Mayo.
>> Uh thank you um through the chair. I I
uh apologize for uh making my comments
in the wrong section, but just to
reiterate maybe just um if uh you know
it could be shared with Metro Links that
um now that they have committed that
they are responsible for uh comm uh
community stakeholder relations that
they uh make a point of coming to all
these meetings so that um they have that
feedback from from these uh this
committee which is one the stakeholders
of many obviously and um as well um in
terms of transparency
implementing the transparency um
principle that that I'm hoping that will
that the communications protocol when
you develop it with Metroinks will uh be
shared with this committee as well.
Thank you.
Thank you, member Mayo. And um if I can
just through the clerk and or maybe
director, you might be able to help me
recall that there is a motion that was
passed by this subcommittee that was
ratified by council requesting Metro
Links to come to the subcommittee more
often to establish and enable exactly
what member Mayo had mentioned. Correct.
>> Through you, madam chair. Yeah, we
already have a motion and metro links
actually came to the last LRT
subcommittee and they committed to bring
more information at the key milestone
and then we can request uh we can uh
request these special item like when the
strategy is developed we can bring more
information or member Andrew mentioned
about procurement policies we can
request those information to metalist to
bring those information right
>> thank you and then so for that point uh
member mayo then moving forward the
subcommittee could make special requests
of Metro Links specifically to hear this
kind of input. Uh appreciate that. Um
final and second time. Oh, nope. We have
two final second times. Um I will rec I
will just mention as chair I do need to
leave promptly. Um and at which point
our vice chair can take over. Uh so
second uh speakers list is councelor
Wilson.
>> Thank you. Uh so further to my scenario,
if we had an incident that um all um
adjoining land use uh users were
apprised of 30 days in advance and let's
just say it for whatever reason at site
it wasn't performing optimally and the
elected representative is maybe getting
some calls or emails. Who who does what
at that point? um in course correcting
and and who uh how is that how is that
engagement if if I could just use that
as an example. Thank you
>> through you madam chair. uh obviously
city is issuing the permits right so we
will be in terms of those kind of
inquiries uh I think it will try to our
office that we have issued the permits
we need to make sure that what approvals
we have given to Metro links if they are
within those parameter working whatever
approvals we have given then we city
have to communicate metro no we're going
to revoke the permit or something you
know like those kind of things but
obviously metro buildings is leading the
project and those kind of things but I'm
just trying to mention here that the
city is also issuing the permit right so
city is party to to the construction
work right so if it is a permitting
issue is like a lane closure and this
and that probably we is going to come
through our LRT project office and
talking to metro links no this is not
working we need to improve upon right so
we do have a dedicated staff who are
really uh responsible for safety
modeling
uh all those things right so they will
be talking to metro install to tell them
to improve upon in this area because of
the concerns we have and all those kind
of things right so it's again it's a
collaborative content model but through
permitting we probably have more rights
to engage our discussion with metro
links and contractor on that part
>> so thank you um so let's just go back if
I I'm sorry I'm just having a hard time
with this on site if there is if maybe
it's not working as optimally given some
of the dimensions of the site or there's
there's more traffic than normal. Um
any any scenario, who makes the decision
on site to course correct if if it's
deemed to be a not working effectively
or um optimally particularly for a
sensitive land use nearby like a
hospital
>> through you madam chair. Obviously Metro
links will have to physically correct
anything if if there's a issue with the
lane closure for example the the the the
protection or barrier they are put in
Metro links contractor will have to do
it but we can direct them through the
permitting process right but they will
have to physically do and undertake all
the unless there is a huge safety issue
you know like which metron is not
responding and this and that then city
can go and do it right But uh we will be
requesting to metings to write any
physical measures they will have to do
it right but city will have to request
that part right.
>> Thank you.
>> Thank you. And finally member Andress.
Um very quickly because of of time I um
just wanted to reiterate what um uh non-
voting member Mayo said about the
importance of considering this table a
community community liaison committee
and having MetroLinks attend every
single meeting not on an issue byisssue
basis but being here to hear delegations
to hear the the conversations of the
members that have invited to this
committee and that I think this is as
important or even more important than a
neighborhood level construction leazison
is committee that meets quarterly and it
would be you know my my hope as a non-
voting member of this of committee uh
that you impart that to metinks that
they do need to be coming and I think
that was the spirit of the motion that
was also passed so that's all I have to
say thank you
>> through the chair thank you we'll bring
that back
>> appreciate that thank you all for the
valuable discussion on both of these
information reports that came back to
this committee from GIC at this point um
I do have a mover and Governor and
Councelor Huang and Councelor Casar. It
is a show a hand vote. All those in
favor in receiving the reports.
Thank you. And that carries. Um there
are no further items on the agenda for
us today. So our meeting is officially
adjourned. Thank you all.