← Back to summary
Full Transcript
"Heritage Win, Farm Development Denied" - Planning Committee - May 5, 2026
Hamilton · May 06, 2026
Sound check. One, two, three. Sound
check. One, two, three.
Good morning and welcome to the planning
committee for May 5th, 2026. All
electronic devices are to be switched to
a nonaudible function during committee
meetings.
As we have quorum present, I'd like to
call this meeting of the planning
committee to order at 9:31. In the
chambers today, we have councelor Matt
Francis, councelor Esther Pauls,
councelor Kretch, councelor Nan,
councelor Wang, and councelor Casar. And
on the screen, we have councelor A.
Wilson. There are no ceremonial
activities today.
Clerk Kelsey, are there any addendum
items to the agenda?
>> Yes, chair. The additions have been
noted on the published agenda.
>> Does the committee have any amendments
to the agenda?
Councelor Cretch.
>> Thanks. I'd like to defer items 6.1 and
I believe it's 9.3 or 10.3
uh with respect to the property known as
Philpot Church simply because the report
wasn't ready on time to be considered.
Members of the community wanted to meet
with me. So I said to them, I can't meet
with you to discuss the report if it's
not available. And so this I'm asking to
be referred deferred, pardon me, to the
next planning committee meeting.
I need a seconder for that.
>> Okay. Councelor Francis the seconder.
May I please Oh, we're going to have to
have an east grove eastcribe vote on
this.
>> Go ahead. Thanks, Cher Tess. And I'm
happy to second this motion. And um
yeah, I can understand the council's
point of view for wanting to defer this.
I just am I I know that the deferrals on
the floor, but does that give me the
opportunity to ask staff for the reason
for the delay and what took so long to
get this published?
>> Is that based on the instructions?
Clerk,
>> I would allow it. It's not debating the
deferral, but asking for an explanation,
which I feel is fair.
>> Carry on, counselor.
>> Okay. Yeah. Through you, chair. just
given the sensitivity of this file and
the long-standing history on it and
obviously
the situation that the church is in. Uh
can we get an explanation to from staff
why it took so long to get this on the
agenda for today? I mean the counselor
does have a valid point for deferring
this. I just want an explanation from
staff uh why this is uh why this took so
long to get here.
>> Okay. Thanks counselor. We will look to
the bench
>> through the chair to the councelor.
Anita Fayback, acting director of
planning and chief planner. Uh there was
just some additional time needed to
finalize the report. This the appeal has
been filed. So there is the placeholder
with the Ontario land tribunal. Um and
the the deferral or the referral to the
next agenda does not impact any tribunal
timelines.
>> Thank you. And then is the decision is
staff's recommendation significantly
different than what the com committee of
adjustment
um recommended.
>> Uh I think we're going to
>> okay
>> stop we're going to hold that back
that's something that you can take
offline.
>> Well the reason I asked that chair is
just trying to get a better sense of why
this is t why it took so long. Just some
clarity around that. It's that that's
for my
>> And again, I think when we're talking
about I think we're just supposed to
when we're doing a deferral, isn't it
just about instructions?
>> Yeah, I just wanted an explanation.
That's all
>> part of the explanation.
>> Go ahead.
>> Sorry. Through through the chair, just
to confirm the the ask is what was the
what were staff recommendation what the
staff recommendation was and what the
committee's decision was. Uh staff
recommended that the application uh not
be approved and the committee of
adjustment approved the committee of
adjustment application.
>> Understood. Okay. Thank you.
>> Okay. Thanks, sir. Okay. So, what we'll
do now is we'll go to the eastcribe
vote.
>> Next meeting.
>> Next meeting.
Votes up now for the deferral.
Thank you. That carries 8 to zero. May I
have a mover and seconder that the
agenda be approved as amended? And
please indicate with your hand vote now.
>> Mover and seconder will be councelor
Francis and councelor Pretch. Thank you.
Please indicate your hand vote now. And
that carries. Thanks.
>> Declarations of interest. Members of the
committee, are there any declarations of
interest?
Not seeing any.
>> Oh, go ahead.
>> Thank you, chair. I just wanted
my colleagues in the public know this
week is mental health week. So, they'll
be uh in the foyer uh and I'll have be
speaking to uh about mental health, but
I just want to say that I'll be leaving
in 10 minutes, but I'll be back and then
at 11:00 I'll be leaving again for that.
Okay.
>> Thank you for that clarification and
sharing of that that information. That's
appreciated.
>> Okay. Now, I think we're on to
>> Okay. Sorry.
Councelor
Casar.
>> Yeah, just to follow up on what
councelor Paul said, uh, as deputy mayor
this month, I'll be speaking on behalf
of the mayor at 11:30 at the same
Canadian Mental Health Association event
out front uh, and returning shortly
thereafter should the meeting still be
going, just so everyone's aware.
>> And as things evolve, I think we might
be taking an early lunch just to
accommodate that. Okay. Thank you so
much. because we have a number of people
obviously wanting to attend that.
Okay. So, adoption of the minutes of the
previous meeting 5.1.
Welcome counselor. May I have a mover
and seconder to adopt the minutes of
April 14th, 2026.
Please indicate your hand vote now. This
is to adopt the minutes.
>> Thank you. Pasar and Wayne will be first
and seconding that. And let's have our
hand vote now. Thank you.
There are no items for information and
we are now to the public hearings. The
public has been advised of how to
pre-register to be a delegate at the
public meetings on today's agenda. If a
specified person or public body would
otherwise have an ability to appeal the
decision of council, city of Hamilton to
the Ontario Land Tribunal, but the
specified person or public body does not
make oral submissions at a public
meeting or make written submissions to
the city of Hamilton before the bylaw is
passed, the specified person or public
body is entitled to appeal the decision.
Thank you, councelor.
If a specified person or public body
does not make oral submissions at a
public meeting or make written
submissions to the city of Hamilton
before the bylaw is passed, the
specified person or public body may not
be added as a party to the hearing of an
appeal before the Ontario Land Tribunal
unless in the opinion of the tribunal
there are reasonable grounds to do so.
And first off is 8.1
application for the official plan
amendment and zoning bylaw amendment for
lands located at 471 Moxley Road Flamro.
Does the committee wish to see the staff
presentation?
Okay, I'm seeing a couple Hanads. So
staff please come down.
Okay, thank you. And I believe this is
Abdullah Pasha. Come on down Abdullah.
All right. Good morning, chair, members
of the committee, staff, and members of
the public. My name is Abdullah Pasha.
I'm a development planner for the
planning division west team, and I will
be discussing a rural Hamilton official
plan amendment and a zoning bylaw
amendment application for lands located
at 471 Moxley Road.
Okay.
Oops.
Go. So here we have our site. The
subject property is an agriculture
parcel within the northernmost corner of
the Greensville rural settlement area.
The property has a total area of
approximately 5.04 hectares. Uh to the
east of the subject lands over here is
an aggregate resource extraction use. To
the south is a smallcale rural
industrial use. Uh to the west is a um
residential neighborhood and to the
north are lands that are majority uh
agriculture in nature.
This is a location map of the subject
property which identifies the proposed
land use changes. The lands are
designated settlement commercial and
zoned agriculture. The official plan
amendment application will add
additional commercial uh commercial uses
in the settlement commercial designation
for the subject property. The zoning
bylaw amendment will change the zoning
on the property from agriculture a zone
to settlement commercial S2 zone with a
sight specific modification and holding
provisions. Uh the property is currently
within the Flamborough zoning bylaw
number 90-145Z
and the new zoning will be within the
Hamilton zoning bylaw number 05200.
Uh the modifications include relief to
the vehicle or parking, long-term
bicycle parking space requirements and
relief from the parking space
landscaping requirements. The
modifications also include limiting the
permitted uses on the property to
exclude sensitive land uses such as
daycare or overnight stays so as to
prevent conflicts within uh eastern
neighboring uh um in extractive
industrial operation.
Here
we have the site map for uh the site
plan for the proposed development. The
proposal includes seven buildings with
21 commercial units, 351 parking spaces,
61 of which are located within the MTO
setback along Highway Number five west.
The proposal also contains a communal
septic system, storm water pond, and
will have access to water through
private wells. The property can be
accessed by three entrances, two of
which are located along Moxley Road. uh
over here
and one of which is located uh along
Brock Road. At the moment, the number of
trees that are to be removed is unknown
and an updated tree protection plan is
required as part of a holding provision
uh on the property.
Here we have the general elevations for
the proposed commercial development. The
proposed build form uh can have a
maximum height of 10.5 m as per the
settlement commercial S2 zone. Um the uh
the elevations to the top are showing
the frontage of the built horn and the
elevations on the bottom are showing the
rear portions closer towards the central
uh part of the property.
And now onto our photo tour. Here we
have the photo uh the view of the public
notice along Moxy Moxley Road and the
view of the subject lands from Highway
Number Five West.
Here we have a view looking south and
north along Moxley Road.
Here we have views looking east and west
along Highway Number five west.
Here we have views looking north along
Brock Road and south along Brock Road.
And uh lastly, we have views of the
lands to the east showing the extractive
industrial land use uh from Moxy Road
and to the west showing the residential
neighborhood.
So uh as part of the planning process,
this application was circulated to 46
property owners within 240 mters of the
subject lands. The notice of complete
application was circulated on February
11th, 2026 and the notice of public
meeting was on April 24th, 2026. The
notice were also advertised on the
Hamilton uh spectator and were posted
online. Uh there were approximately 20
comments from the public at the time of
the complete application submission and
approximately eight written submissions
um at the time of the public meeting
circulation. Um majority of the comments
were um not in favor of the development
due to the impact of the development on
existing groundwater or concerns the
impact of the development on existing
groundwater increased traffic and noise
from uh truck activity and the excessive
impervious surface coverage and loss of
agriculture land. We received two
comments that were in support of the
additional commercial uses to meet the
community needs.
In conclusion, uh the official plan
amendment and zoning ballot amendment
have merit and can be supported as it is
consistent with the provincial policy uh
provincial planning statement and
conforms to the green bill plan. The
proposal complies with the general
intent of the rural Hamilton official
plan and the Greensville rural
settlement area plan and is compatible
with the existing land uses within the
settlement area and the surrounding
rural community. Uh the proposal
represents good planning and provides
additional commercial uses that can
support the existing rural community.
Staff recommend approval of the
application with sight specific
modifications and have requested holding
provisions related to an updated storm
water management plan, updated servicing
plan, a hydrogeeological assessment, a
chloride impact assessment, a tree
protection plan, and an updated
transportation assessment. And that is
all.
>> Thanks Abdullah. Are there any questions
for the presenter?
>> Okay, first up is uh councelor Cretch
followed by councelor Wang.
>> Thanks for the presentation. I'm just
trying to understand a couple of things
here and make sure I have them right. My
understanding is that the zoning here is
about 25 years old. Is that right?
>> That is correct.
>> And so we zoned this about 25 years ago
for this intended purpose. And I'm
assuming that this commercial purpose
doesn't allow for there to be housing to
be built here at all or is it just
simply for commercial only?
>> Uh through the chair. Sorry. So the
designation is commercial. So the
designation within the um Greensville
rural settlement area is commercial.
However, the zoning is agriculture as
part of the old flamro bylaw and it's uh
an artifact of the pre uh the pre or not
artifact but it was it hasn't been
updated mainly due to a um study needing
to be completed on the subject property.
This is related to the Greensville
subwaterhed.
>> So this study hasn't been completed.
>> Uh this study has been completed. Um
however development cannot be uh or as
part of the policy within the settlement
area uh does or within the rural
settlement area. Uh essentially it
stated that development will not be
considered until the study was
completed. The study was then completed
in 2016 which is why we have an
application coming forward to amend the
zoning to reflect what the existing
designation is. So, back to my question
about the commercial designation that
you're calling it. That commercial
designation does not allow housing to be
built here. Is that right?
>> That is correct.
>> Okay. And if I understand what you're
saying, I just want to make sure I
understand the time sequence. You're
saying there was a commercial
designation 25 years ago, but then a
study in 2016.
Uh, can you explain how those things are
colliding with each other or informing
one another? Because it's really
confusing to me. If we have agricultural
zoning, a commercial designation and
then a study a study like how are those
things talking to one another to inform
what should be happening with this land?
>> Uh so to the chair I'm just going to do
a correction. Um in terms of the zone,
the zoning is an older zoning. The
designation is a I believe a newer one.
Uh but it's uh essentially
um
within the Greensville settlement area,
the property is designated uh rural
commercial or or settlement commercial.
That designation uh was planned a while
ago. I'm I'm not exactly sure what what
the correlation is between the why the
zoning wasn't immediately uh amended at
that time, but due to main policies
within the within the official plan, it
it indicated that there was a an aquifer
study that needed to be completed before
development can be done on the property,
which is why the zoning wasn't amended
amended at that time.
>> My again these are questions for
clarification. I think I understand the
answers, but you're here. You're the
expert. saw ask you how does this relate
to the urban boundary?
>> Is it within the urban boundary existing
urban boundary, the new one or the the
old one? Can you explain that?
>> Uh this is within the urban boundary to
Okay, thank you. Um my last question is
that you said something about an unknown
number of trees.
>> Um could you maybe make an estimate
there? I've seen the property in terms
of the fact that it's doesn't have a lot
of trees on it, but when you said an
unknown number, is there a ballpark
estimate you have there in terms of
trees? Like talking hundreds? Are we
talking a dozen? you have a sense of
that
>> um through the chair. So in terms of the
trees there uh the tree protection plan
that was provided or that was reviewed
by our staff uh indicated that there
were more trees than shown on the
protection plan. Um essentially the plan
showed uh much fewer trees that were
going to be protected than that were
available on site. So a re-evaluation of
that needs to be done and it's not
within the hundreds but it it's mainly
within the tent. So about like
approximately 20 trees, 20 30 trees.
>> Thanks. And this question may not be for
you, but when I look at the property in
an aerial view, what I see is it's
sandwiched in between two different
types of properties. So different uses
happening across these properties. Is
the intention or the idea that this is
meant to service individuals who are
living on Brock Road from a commercial
perspective, either those adjacent to
this property or those who are south of
this property on Brock Road, isn't that
the intention and the purpose of the
planning here? Is that why this is a
commercial designation? Is this why
we're doing this? Because we're
intending to service commercial. The
commercial is supposed to service the
residents who are living on Brock Road.
Is that the intention
>> through the chair? Um that's part of it.
Yes, that is correct. It's uh this area
is meant to be commercial mainly not uh
as part of the policy. It also indicates
that it's supposed to service the
existing residences uh residents of
Greensville settlement area but also the
broader rural community. So these would
be um residents within the actual
agriculture area, rural lands. Um
basically providing them with a a a an
area or facility with commercial uses
that can be accessed uh in an e in an
ease location.
>> Thanks. Those are my questions.
>> Okay. Thank you, counselor. On to
councelor Wang.
>> Hi. Thank you for your presentation. I
just need to understand um the holding
provisions because if the um neighbors
around are saying that groundwater is a
significant issue then what is the
rationale for the storm water management
plan as well as the servicing plan like
what does what's the intention behind
the um holding provisions I just like I
just don't really understand how we
would get to those particular points so
if you can help me understand that
Thank you. Uh through the chair. So
we've requested a number of holding
provisions mainly service related. Um
these are to uh
essentially address the concerns of the
p uh public related to uh quantity and
quality of the storm water. So uh the
purpose of the hydro geological
assessment is for that uh issue. It's to
address whether or not the site has
sufficient amount of uh groundwater uh
in terms of quality and quantity to be
able to service the site for all the
uses that are will will be permitted. Um
similarly, storm water management
design. Um there's a storm water pond
that's proposed on the site and this is
to ensure that uh the storm water uh
design meets all requirements that are
laid out within our recommend uh within
the uh recommendations provided through
our study
>> that was done. Um for more information
regarding the uh servicing we also have
members of uh our public works uh water
division uh Ahmed he can answer more
questions related to that as well.
>> Okay so that's probably at the report
stage then I can ask those questions.
Okay. So then the question now is uh all
of these because there are several
holding provisions around water. Um I
just needed to understand the the actual
line of how
>> storm water affects groundwater that
affect Okay. All right. I think that
those are questions that I'll ask the
agent and then ask the um water team at
report time. Thank you.
>> Thanks councelor Wang. Next up is
councelor Casar.
>> Yeah, thanks Chair Tatis. Just a
clarification question for the bench
just around the question that councelor
Kretch asked around the urban boundary
and the answer. My understanding is this
is within the green belt and the green
belt is not within the urban boundary.
So just ask the question again to the
bench. Is this site within the urban
boundary through you?
>> Through the chair to the counselor. The
Greensville rural settlement area is
within the rural area. It is a
settlement area um that's located in the
rural area that has a very specific plan
and land use uh schedule developed. Um
the it was approved when the rural
official plan was approved. So back in
2006 the Greensville rural settlement
area plan lays out different
designations. So it's think of it as a
secondary plan but it's a smaller plan
for a rural settlement area. So it lays
out location of residential, commercial,
institutional, parks etc.
>> Yeah. Thank you. And then just one
followup on that. What is the uh
geographical scope of the Greensville
rural settlement area relative to this
uh development? Is this on the edge of
it? Is in the middle? Just just some
perspective. Is that possible?
>> I can answer that.
>> Whoever can answer that
>> to the chair. So it is in the
northernmost corner of the settlement
area boundary segment area boundary.
Yeah.
>> Okay. Thank you, chair.
>> Okay. Thank you, councelor. Next up, we
have online councelor A. Wilson.
Thank you. Apologies, councelor Chair
Tatison. I'm under the weather today, so
I might not be as clear. I did just want
to clarify a couple points. Councelor
Casar just got one of them done there.
Uh my question through you to staff is
during the 20 the 2006 secondary
planning process. Uh my understanding is
that water availability particularly
groundwater was a substantial concern
and that was what led to the lands being
designated but with a condition that a
future study had to be conducted
regarding the um basically the
groundwater impacts of any development
on the site. So these as part of 2006
they were designated to be developed but
they were frozen until it could be
proven that the development could happen
and what standards should be put in
place for that development to happen.
That study came back in 2016 and my
question through you chair is did the
2016 study say the standard should be
that there's no um basically
pre-development change to the impact it
has on groundwater. So in other words um
it should the current state of the site
now should be maintained in terms of its
um ability to recharge and impact on
groundwater at a high level. Is that the
summary of the 2016 um study?
uh through the chair. That's something
that can be answered by our uh
stormwater staff. But from my
understanding based on uh the review of
the um policies, it indicated that the
groundwater um in this area should
maintain or the groundwater recharge
should maintain the existing uh status.
>> Okay. Thank you. I'll have more
questions after we hear from delegates.
Thank you.
>> Okay. Thanks, counselor.
I'm not seeing anybody else up here. So,
may I have a mover and second to receive
the staff presentation? Councelor McMe
and councelor Wang. Thank you. Um,
please indicate your hand vote now.
That's unanimous. Thank you. We now have
uh Rashika Angish from the Angish group
is in attendance today.
Rashika, would you come down and do your
presentation?
Good. Good morning. My name is Ruchika
Angish from the Angish Group. I am a
professional planner representing on
behalf of Winbury Holdings, Inc. Uh I do
have the owners uh and their
representatives in the audience here
with me along with uh Bob Phillips who
from JH Cahoun Engineering who is an
engineer who has worked on this file and
uh our hydrogeeological consultant Chris
Helmer is also here uh this morning. Um
thank you. uh Abdullah has done a great
job in uh presenting uh the the proposal
and the information. So I would not
repeat uh some of that but as uh noted
this property is located at the edge of
Greensville settlement boundary. It is
about five hectares
um with uh no municipal services that
are available meaning no municipal water
and sanitary services. There are no
natural heritage features on or uh
surrounding the subject property as
well.
Uh
there is uh this in front of you is our
proposed development. It we are looking
at an official plan amendment and a
zoning bylaw amendment uh to allow
commercial uses. The official plan
amendment is required to expand onto uh
the commercial uses and uh the current
zoning on the property is agricultural.
So, uh, a zoning bylaw amendment is
required before we can advance the
commercial development in accordance
with your official plan policies. I'll
get into a little bit more details.
Um, as uh mentioned earlier, the the
property is within the rural settlement
boundary of Greensville. It is
designated within the settlement area.
Um, it's designated as settlement
commercial within the Greensville
secondary plan. There are a range of
commercial uses, limited commercial uses
that are permitted within the secondary
plan. So, uh our application proposes to
add three additional uses uh uh the
tradesman shop, a commercial school as
well as an art gallery as a permitted
use. It just provides a little bit
flexibility um when uh renting out these
units. So,
that is where the the proposed official
plan amendment comes in.
The zoning bylaw amendment is required
to change the zoning into a settlement
commercial. The current zoning on the
property is agricultural. It has not
been updated through uh the the
comprehensive reviews uh after the
settlement uh the Greensville secondary
plan was implemented. Uh the uh the
zoning actually limits um the uses on
the property uh in accordance with the
list that is in front of you. So uh very
traditional dry smallcale commercial
uses are being proposed given the site
is on a private well private services
and uh septic system. Uh so things like
art galleries, artist studios, uh
financial uh banks and catering
services, convenience stores, um uh
repair services, things that do not
require ton of water are being proposed
at the site.
In addition uh through the development
of the site plan, it was noted that we
need some sight specific uh zoning
provisions uh with respect to uh the
proposed development. Uh we're seeking a
parking ratio of 2.34 uh spaces per 100
square meters of the uh gross floor area
of the buildings uh in a total of 289 uh
spaces. We do note that there are 61
additional parking spaces that are
provided within the MTO corridor that
are not accounted towards the numbers uh
according to uh what is being required
under the zoning bylaw but uh the number
of actual parking spaces will will be
sufficient. We did complete a parking
study to um to analyze the the parking
ratio as well as other aspects related
to parking. Um for example like the long
long-term bicycle parking uh rate uh
we're providing six spaces whereas 12
are required. However, short-term
parking spaces uh bicycle parking spaces
are fully provided on the site. Um uh a
reduction in landscape parking area um
calculations is also requested at 6%. Th
this does not impact the overall
landscape uh uh coverage. it uh this
parking this landscape requirement sorry
uh this landscape requirement is only
for uh the the parking area landscaping
um and it will not have any any impacts
on on the overall development of the
site.
So we do uh we worked with staff uh to
to address some of the comments that
were received through the circulation of
this development. Um uh and the holding
provision that is being proposed is uh a
result of the review of the technical
studies that uh were submitted. So the
holding provision will require us to
update the storm water management report
uh the traffic impact analysis based on
uh the comments from the ministry of
transportation uh hydrog uh assessment
uh uh for a detailed report has been
completed on the hydrogeeological
assessment. So through the holding
provision we will work with staff to
ensure all city uh guidelines are are
being met. Uh there were some technical
comments on the servicing plan as well
as the tree protection plan. Again,
those uh things will be addressed
through the the uh holding provision uh
when we come in front of council to to
remove the the holding uh that will be
on the site.
So again, as uh noted uh a list of
studies that were submitted as part of
this official plan amendment and zoning
pilot amendment applications. Um we have
thoroughly worked with staff over the
last couple years with respect to
ensuring the application is deemed
complete. Um and uh and has no adverse
impacts on uh the existing surroundings
or the surrounding uh land uses that are
that are existing and planned for
future. Um
there was an open house that was held uh
in July uh of 2024 about 2 years ago.
There were 71 notices that were sent to
uh 500 meters of the site. There were 27
attendees at at the site. Main concerns
were related to uh the with the water
and the traffic uh that have been
reflected in in the comments that have
been received through this circulation
as well. Um I would note that the the
traffic impact analysis uh was completed
has been submitted. It has been reviewed
by the ministry of transportation and
the city staff and again through the
holding provision we will address the
the balance of the comments uh that we
have received through through this uh
circulation uh with respect to the the
water situation. So uh a very thorough
assessment of groundwater analysis was
completed by uh our hydro ge geologist
uh Chris Helmer. Uh the hydrog report uh
did analyze the underground water
conditions as well as any impacts on the
surrounding residential areas
specifically and it does note that there
will be no uh further uh impacts on on
that groundwater. We will uh wait for
the staff review through the formal
resubmission of the entire all the
studies and the drawings and uh we'll
continue to work to address any any
other questions that come through uh as
we continue the process on on getting
the approvals for the commercial
development.
So uh again I'll keep it brief uh with
uh looking at the committee's support
with respect to uh the proposed official
plan amendment and the zoning ballot
amendment applications as the
development is within a designated area
of uh city's official plan. It is
designated for commercial. Uh it is
consistent with the provincial planning
statement. Uh it it is in conformity
with the green belt plan. Uh it conforms
with the policies of uh the city of
Hamilton rural official plan as well as
the Greenswell rural settlement area
secondary plan. Um it also conforms with
the policies of the Mid Spencer
Greenswell rural settlement area
subwater uh watershed study sorry 2016
and is internally in keeping with the
regulations of the zoning pilot. So we
are looking for support uh on on this
application. Happy to answer any
questions you may have.
>> Okay. Thank you, Rashika. First question
I have is um are you in support of the
staff report?
>> Oh, thank you. Yes, we have read the
staff report and uh we are supportive of
of staff recommendations.
>> Okay, thank you. We have a number of
questioners. It's councelor Kretch,
councelor Wang, and councelor Makin for
now. So we'll start off with councelor
Kretch.
Thanks. In your
description of what you're doing here,
you described it as very traditional.
My understanding of the planning
situation we're faced with in the
province is anything but traditional.
Why is that your approach to planning
here?
>> Through the chair, I might need some
help in clarifying the the question. So
um when you meant it's a traditional
planning approach, could you please
elaborate?
>> Sorry,
>> you said that it was your those were
your words. You said that we're using a
very traditional commercial approach
here. Um those were your words. I'm
asking you to explain your words. Thank
you.
>> Sorry. Thanks for the clarification. So
my uh what I was trying to say is these
are the traditional commercial uses that
we are proposing on the site uh there uh
to because the property is on private
well and private septic system uh that
we are very limited on what type of
commercial uses can go on the property.
So uh things like convenience stores,
banks, very small scale commercial uses.
That's what that meant uh that word
traditional meant uh in in this
particular scenario.
>> And I'm not suggesting the next
question. I'm not suggesting that I
support us getting into green belt
lands. And I think that the staff answer
this is not in the urban boundary. And
so that's a separate discussion.
Notwithstanding that, my question for
you is, is it possible for you to make
an application for zoning differently
here to support um non-traditional uses?
For me, one of these one of the things
that everyone is saying they want to do
is see non-traditional uses, something
where we're having a little bit of
density, those kinds of things in models
where there is building. So, I don't
quite understand why you wouldn't be
applying that approach to this um
applying to try and do something that
would support future growth. um not a
traditional approach.
>> Thank you for the question through you
chair. Um it's uh I think our biggest
limiting factor for uh not going
full-blown on a on a commercial
development is uh lack of municipal
services. So if there were municipal
water or sanitary services that were
available then yes th those things can
be explored further uh to uh there's
only limitation on how much we can
provide based on the technical
assessments that have been completed on
the site without impacting any of the
natural environment and that is the
reason why we have to keep it at at a
smaller scale. In future if there are
again this is going to be a phase
development. So in future if there are
uh any um expansion of services that are
contemplated by the municipality then
certainly there could be expansions that
can be looked at at that time.
>> Do you have the right to apply to ask
the municipality to expand the services
>> uh through your chair? uh we can ask but
again that is something that is within
uh this is a rural settlement area and
uh based on their capital projects I
believe that that would be an answer for
for staff to um help me out here that if
there are any plans in near future for
the development to be on or expansion of
services in that area.
>> Thanks. My last question for you is just
that you've chosen this path forward,
right, to go forward with this. You had
other things you could apply to do, but
from your perspective, those aren't
realistic, I think, is what you're
trying to say from your perspective
>> through the chair. Yes, you're
absolutely right. The the lands have
been sitting vacant for a very long time
and uh and uh it it's the right time to
get, you know, uh the studies and and
get the development going. There is
definitely a need in that area and uh it
is it is given the present scenario it
is unrealistic to wait for longer. If
the services were contemplated within a
very short term then it makes the
development more um we could have waited
but we don't see that that is within the
books right now.
>> Thanks for the answers to your question
my questions.
>> Thanks councelor Cretch. Next up we have
councelor Wayne.
Hi, thank you. Um, just a question
around again the water taking because I
do recognize as you answered to
councelor crutch a lot of these are
traditional type supposedly very minimal
water taking um type businesses.
However, on the preferred or sort
permitted uses case, there's things like
catering services or an artist studio or
there might be some sort of trades
person shop. Some of those are
waterheavy because they might need to.
So, how are how are how is your
proponent how is your client going to um
keep true to some of the holding
provisions because of the fact that um
these are some it depends on whoever's
in those spaces and you're going to
build for whoever's going to be in those
spaces. So I think the water taking is
my primary concern and how do we ensure
that those holding provisions stay true
and that we are preserving or trying to
maintain the water table as much as we
can. Uh I'm going to ask for our
engineer to help me out a little bit
here if if Bob Phillips can please uh
join me but I can address some part of
of your question. Uh with respect to the
list of the the list provides a little
bit flexibility to retain uh tenants and
as part of our permits um we would we
would need to monitor how much water
taking is uh
for that well and then also the septic
will be an MECP the min the ministry of
environment approved uh septic system as
well. So uh those things will be
regulated heavily under the ministry
guidelines as well. So it we would as as
owners would have to be cautious in
terms of how much water usage, what type
of uses and we don't overload the site
with uh heavy water users as well. So
that's
>> Thank you. I think that that's all my
questions is really just around the
water taking. Thank you.
>> Thank you.
>> Thank you, councelor.
Councelor Ted McMe questions.
>> Thanks uh chair. Um,
is there any farming going on on the
land at the moment
>> through the chair? That's correct.
Currently, the the property is being
farmed.
>> The properties what?
>> Property is being farmed.
>> Yes.
>> You know, we lose about 350 acres of
prime agricultural land every day in
this province. You aware of that?
>> To the share? Yes.
>> Okay. Um a lot of people in the area are
already installing sistns because of the
water concern. You're aware of that?
>> Uh through the chair. Um my
understanding from our hydrogeeological
report that was completed that there are
no issues with the water uh taking for
the site.
>> You might have trouble convincing.
Anyhow, we won't debate that here. Um
now maybe later with staff. Um,
you're aware that there's a plan to uh
change the plan around the north quarry
from uh restoring it uh as a as a as a
lake, a vista, a fishing place to
filling it with soil.
>> Uh through the chair, my understanding
of extractive industrial in general is
they have to rehabilitate after the
extraction is completed. So I'm not
aware of their plans like what would be
to what extent it will be rehabilitated
back to.
>> Well, let me fill you in just just
quickly um because it's uh it's an
important point. Um it was to be
rehabilitated uh as as a water waterway
place where people could go and uh
recreate. Uh that was part of the the
saw off around the Greensville against
serious pollution group that negotiated
a deal with Lefarge. Uh now it's a
different group. Um the estimate uh um
my understanding from doing a little bit
of research is that there'll be 3
million truckloads of soil traveling up
and down uh that area in the road. Uh if
that plan goes through or were you aware
of that? Was that raised at the public
meeting?
uh through the chair uh again our
technical assessments included all the
information that was available at the at
the time. So the the traffic study was
completed. It has been accepted um and
it assessed the current traffic flow
with respect to the current developments
and also the future projections based on
uh what that area um uh is is potential
to grow into. So, uh, the the traffic
study was completed. So, I'm assuming
the the technical details would have
accommodated all that information what
was available.
>> 3 million trucks. That's a lot of
trucks.
Okay. Thanks.
>> Thanks, Councelor McMaken. Uh, councelor
A. Wilson.
>> Thank you. Through you, chair. Um,
Rashik, I believe on your very last
slide, uh, there was a list of policies
or things that you were saying you were
compliant with. We're compliant with
this plan. We're compliant with this
plan. We're compliant with this one. And
then one of them was the 2016
subwatershed study. Given that that
hasn't been reviewed by staff, and I
understand that's the intention of the
holding provision, are you saying that
you intend to be compliant with that
study? You believe you're currently
compliant? Could you just help me unpack
that bullet point where you're saying
you're compliant with the study? My
understanding is that because compliance
hasn't been quite determined yet, that's
why staff are suggesting you're far
enough along or we think that we could
work this out with you via holding
provision, but we don't currently have
compliance at this time. Um, could you
walk me through what your understanding
is of what you say when you say you're
compliant?
>> Yeah, through the chair. Thank you for
the question. So we did complete so the
okay so the green swill subwater uh shed
study it was uh completed in 2016 as it
was noted by by staff. So the it it
talks about the new development areas
that are to be constructed within the
rural settlement area which uh the
subject property is part of and uh the
the preferred strategy uh that came out
of the subwaterhed study. It included
combination of low impact development
measures uh along with traditional storm
water man storm water measures like
storm water management ponds to address
issues uh related to flooding erosion
and water balance and things like those.
Uh the study also addressed related to
nitrate loading. So I'm I'm just giving
an overview of the study for everyone's
benefit. the the purpose of these
strategies was to include the quality of
the groundwater and to protect uh the
and improve the reliability on the
existing wells. So uh looking at that
information that is where how we
provided uh we completed some of the
technical assessments as well. And uh
and based on the comments uh we
understand that we need some additional
work on the storm water management as
well as the hydrogeeological
uh report needs to be reviewed uh by
staff um to address that that big
component of the subwater shed study so
that um we are fully compliant. Uh and
the holding provision protects uh that
as well that until the the sta until all
staff and agencies are satisfied with uh
the studies uh that are submitted or
will be submitted um as resubmissions.
Uh until those are satisfied, we will
not be able to advance with uh removal
of the holding and the site plan control
application and obtain building permits.
So there are a few steps before us uh
before we can we can get the the
construction started. So which includes
um ensuring that there there is
compliance with the subwater watershed
study.
>> Thank you. I appreciate that expansion
through the chair. Just wondering you
spoke about storm water management ponds
and low impact development measures as
some of the recommended solutions from
the strategy. Could you talk about at
present what solutions this development
application is using? Is there a storm
water management pond in this
application, for example? Could you
discuss what the low impact development
measures you've you've incorporated
right now? And it sounds like if there's
going to be a change or a resubmission,
what are those plans maybe that you
could highlight where you think you're
going to get into compliance or where
you're trying to get in compliance?
>> So, I'll I'll touch a bit on that again
uh through your chair. So, yes, there is
a stormwater management pond that is
proposed uh on the site. So the the
preliminaries stormwater management
brief that was completed uh by uh JH
Coahon Engineering um it it noted that
their their site will include I'm
reading off the report uh will include
quality controls through the use of a
dry stormwater management pond that will
outlet into a ditch. uh the quality
controls will be achieved through the
use of oil grid separator and uh the the
site will not have any impact downstream
on the or on the adjacent land owners.
So um the um again my understanding is
that there there is some additional
comments that we have received through
the report and we will address those. Um
in terms of low low impact development
um there will be a number of elements
that will be included through the site
control application process. So through
the detailed design we will be looking
at some additional information with
respect to uh these low impact
development and then uh those will be
again through the approval process. at
this time uh you know the the very
detailed design of of the site has not
been completed knowing that we have a a
long uh ways to go before uh getting
full approvals on on the process itself.
>> Thank you. Last question from me through
the chair. Appreciate um you offering
some of this information. Where on the
site is the dry storm water management
pond currently anticipated?
It is.
Sorry. I'm going to just pull up the
site plan.
S. Can we have the site plan pulled up?
Okay, thank you very much. So, It's on
the east side along Moxley Road as uh
I'm not sure
there's no pointer. So um the the storm
water management pond is located along
Moxley Road along with uh the communal
septic bed uh that is shown as well as a
big block.
>> So just for clarification, I'm looking
at the screen now. Councelor Wilson, can
you see that screen? Yeah, my
understanding is the agent is talking
about between the two driveways is the
intended location of the stormwater pond
on Moxley Road.
>> Okay. Thank you, Mr.
>> Chair. Yes, that's correct.
>> Any more?
>> I I have no other questions and I
appreciate the answers. Thank you.
>> Okay. Thank you, Councelor Wilson. Uh
thank you. May I have a mover and second
to receive the delegation from the
agent? I'm going to assume it's
councelor Wilson and councelor McMakin
as first and seconder and please
indicate your hand vote now
and that's unanimous carries. Thank you.
We do have registered delegations
and our first delegation is Amanda
is Amanda Andrews followed by Mark
Osbbor
and we do have some other delegations
that will come forth and that's Jane
Lewis and Tara and Felix Pisen and
they'll be pre-recorded.
Okay, Amanda, welcome. You have five
minutes. Um, you'll hear a ding and then
you have one minute at that after that
ding. Okay. Thank you.
>> Good morning, chair and members of
committee. I may need an extra minute or
two if that's possible. My name is
Amanda Andrews and I'm here to speak in
strong opposition to the proposed
resoning at Moxley Road, 471 Moxley
Road. I want to begin by acknowledging
that staff have recommended approval of
this application. However, I
respectfully submit that this
recommendation relies heavily on future
studies and holding provisions to
address fundamental issues that should
determine whether this development is
appropriate in the first place.
At the same time, the report frames this
proposal as providing necessities
to the local community with respect that
characterization is not supported by
what is actually being proposed. A
tradesperson's shop, a commercial
school, an art gallery with a large
multi-building commercial plaza do not
cons con cons
constitute essential day-to-day services
for residents. Labeling this as
necessary risks justifying a scale and
intensity of development that is not
appropriate for this location,
particularly given the unresolved
concerns around water servicing and
environmental capacity.
At its heart, this is not a zoning
technicality. This is a decision about
whether a large-scale commercial plaza
with seven buildings, hundreds of
parking spaces, and private servicing
belongs in a groundwater dependent rural
community.
And based on the evidence before you,
the answer should be no.
Water is not a condition. It is a
constraint. Staff acknowledged that this
development will rely entirely on
private well and septic septic systems
and that further work is required
through a hydrogeeological assessment, a
storm water management redesign, a
chloride impact assessment. These are
not minor details. They are core risks.
The fact that these studies are being
deferred through holding provisions mean
that means that council is being asked
to approve the use before confirming the
land can safely support it. that
reverses the proper planning sequence.
In a community where residents rely on a
shared aquifer, water is not just
another servicing consideration. It is a
hard environmental limit. We already
know from lived experience in this
community that wells are declining and
in some cases failing. Residents are
already trucking water in. That is a
baseline condition today before this
development is built. and we have to
look to at both quantity and quality.
This proposal presents yet another
significant risk of contamination to an
already vulnerable community surrounded
by quaries and dewatering operations. So
the real question is not whether impacts
can be managed later. The question is
should additional demand be introduced
at all.
The scale of development contradicts
smallcale rural commercial.
Staff described this proposal as
supporting the rural community with
necessities. But the actual proposal
tells a very different story. This is
12,000 square meters of commercial
space, seven buildings, 21 units,
hundreds of parking spaces, private
servicing infrastructure and storm water
facilities and bike storage. I'm not
sure who bikes in that area, but I
wouldn't recommend it. That is not
smallcale local servicing commercial.
that is a regional scale commercial
plaza inserted into a rural settlement
area.
And importantly, the proposal even
requires reduced parking standard,
zoning modifications, and multiple
technical exemptions. If this were truly
compatible and appropriately scaled, it
would not need to be adjusted to this
extent to fit.
Holding provisions do not eliminate
risk. They defer it. The staff report
relies heavily on holding provisions to
address groundwater impacts, storm water
design, chloride contamination, and
servicing feasibility. But holding
provisions do not solve these problems.
They simply postpone them. And once
zoning is approved, the principle of
development is established. At this
point, there is significant pressure to
resolve remaining issues in favor of
construction. Council is effectively
being asked to say, "We'll approve it
now and figure out if it works later."
This is not precautionary planning,
especially in a sensitive
hydrogeeological area.
Cumulative impacts are being ignored.
The report acknowledges that Greensville
is already experiencing growth pressure
and references the subwhed study, but
this application is still being
evaluated in isolation. There are
multiple proposal in in this area,
residential and commercial, all drawing
from the same aquafer, all adding
imperous surface, all increasing runoff
and contamination risk. Individually,
each project may appear manageable, but
together they represent a system level
risk to groundwater supply, water
quality, storm water capacity, and
long-term environmental stability. There
is no comprehensive cumulative analysis
before you today. Without that, it is
impossible to conclude that this
proposal represents good planning.
Loss of agricultural land has already
been mentioned today and that is
permanent. This proposal converts 5
hectares of agricultural land into
commercial use and once that land is
paved, it is lost forever.
Agricultural land in this area is not
just about farming. It contributes to
groundwater recharge, natural drainage,
and environmental balance. replacing it
with a high impervious commercial site
directly undermines those functions.
This decision sets a precedent. It app
if approved, this will not be the last
application of its kind. It will
establish that large-scale commercial
uses with private servicing and
groundwater dependent areas are
acceptable and that precedent will be
extremely difficult to contain.
In conclusion, the staff report
concludes that this proposal represents
good planning, but good planning
requires more than policy alignment on
paper. It requires respecting
environmental limits, protecting
essential resources like water, and
considering long-term cumulative
impacts. Right now, those tests have not
been met. This proposal asks you to
approve the use before confirming
service feasibility, the scale without
proving compatibility, and the impact
without understanding cumulative
effects. This is not a low-risk
decision. It is a high consequence one.
For this reason, I respectfully urge the
committee to refuse the resoning
application for 471 Moxley Road or at
minimum defer it until cumulative
groundwater and environmental impacts
are fully understood and demonstrated to
be sustainable because once this is
approved to and built, the impacts are
permanent and in a groundwater dependent
community those impacts cannot be
undone. Thank you for your time.
>> Thank you Amanda.
We have some questions. So, one moment
will populates.
First up is councelor Casar.
>> Yeah, thank you and through you chair.
Thank you very much for being here.
Amanda, um you mentioned holding
provisions a few times. I just wanted to
get clarity on your understanding of the
holding provisions and why the um report
has already obviously been proposed with
asking for approval and uh having
holding provisions. Just wanted to get
your understanding of the holding
provisioned feature and what that means
in this application because it sound
like you said it's it's just delaying
something that's inevitable. If you
could clarify your understanding.
>> Sure. Through the chair. So my
understanding of the holding provisions
is that they are um a set of conditions
that need to be met or um that need to
be proven to be met.
>> Right. Okay. And to carry that forward
then if they can't meet the conditions
then the development cannot proceed. Is
that your understanding?
um through the chair simplicity uh that
might be oversimplifying things. I think
I don't know that if the holding
provisions if some or all uh need to be
met in order for it to be approved. So I
think I would seek more clarity on that.
>> Great. Okay. Yeah, that helps to line up
a question for staff later on which
we'll get asked. So thank you.
>> Thank you.
>> Okay. Thank you councelor Casar. Good
point. one of my questions that I was
going to bring up to staff later. Um,
Amanda, there's no one else right now,
so thank you for your delegation.
>> Thank you.
>> Apologies, chair, if I could just
>> uh councelor Wilson, sorry.
>> Apologies, Amanda. Thank you so much and
thank you for your very eloquently
worded delegation. I think just picking
up what councelor Kasar was asking. Um
there's a question I think that we're
going to explore with staff later in
this meeting and you just don't have the
advantage of being a delegate later in
the meeting which is what is the risk um
in a cont contentious appeal. So you've
come forward and you've said you have
legitimate concerns, you have serious
concerns with this application
um wherein we're in that technical
process there and so holding provisions
is one way to handle that. Um there's
also potentially if we said no today
there is the opportunity for an appeal
and that could be uh the decision then
ultimately made by OOLT. I think I know
where you stand, but are you just able
to answer that question for committee
and maybe offer a little bit of a
justification as to, you know, what is
your perspective and why is that your
perspective um on what your concerns are
and how you'd like them to be addressed?
>> Thank you, Councelor Wilson. Um through
the chair, so if I understand your uh
question correctly, it's um even with
other provisions, would I approve of
this proposal?
Um my question is if we reject the
proposal today um the applicant has a
right to appeal uh and take that to the
Ontario land tribunal and get a second
they basically have appeal rights. You
would as well as other committee members
who have delegated could also follow
that process. Just asking there's a
there's the process withholding
provisions which is a city process and
then there's a process that kind of
leaves the city's hands a little bit and
the OOLT becomes the adjudicator.
They all have different right. There's
no guarantees of an appeal. I'm just
trying to get your sense of one of the
one of the potential consequences of
saying no today is that this application
could be appealed to the OOLT and then
council does not have the final say on
it. I again I think I I know your
opinion regardless, but I'm just
wondering if you could offer that um and
maybe a bit of a justification as to how
you got there.
>> Thank you through the chair. Um so yes,
I understand the process and um and I I
guess the associated risks of a no today
and where uh the proposal can go from
there. Um but I think making a statement
today um representing the constituents
from this region and understanding what
the sensitivities are for this area um
sends a signal and and I think every
signal is really important in this
process. Whether it will be approved at
the land tribunal or not remains to be
seen but I don't think that's a good
reason to um not listen to what you
think should be done today.
>> Thank you. I appreciate your answer
there.
>> Thank you, Amanda. And I'm not seeing
any more questions. You may have a seat.
Thank you so much.
>> Okay. Our next in-person delegation is
Mark Osborne.
Morning
everyone.
>> Good morning Mark. And just letting you
know you have five minutes from the time
you begin and then uh if you need any
more time, do you think you can pull it
off in the five minutes?
>> Hope so.
>> Okay, good stuff.
>> I hope so. I may ask for a few extra
minutes if that's okay. But uh yeah, if
we could just uh My name is Mark
Osborne. I live in Greensville on
Harvest Road. I've been there for over
40 years and I have a private well that
has
the the levels of the aquifer declined
over the years. Uh if I could have the
first overview of the the area as you'll
see here Greensville is sandwiched
between these quaries and the edge of
the escarment and generally the water
flows from the north to the south. Now
during EA hearings back in the late 80s
uh we know that that is generally the
flow but it is so intricate and
intertwined that even uh certain um
hydrogeeological firms can't agree on
how it flows. So if we could have the
next slide up please.
There we go. Okay. So, I'll just turn my
thing on here.
So, here is the processing. This is the
processing area here. This is the
subject property over here. And this is
Greensville here. And this is Taylor
Crescent over here. And there other
there are other areas of residences in
the area.
So
the decision is being presented as a
routine planning matter. It is not.
It is a decision about whether a fragile
interconnected environmental system,
one that sustains our homes,
our water and our identity,
can withstand further stress.
We already have quaries that are
dewatering every minute of every day.
Those dewatering activities in the
Duffren quaries and the Lafarge, they're
now called Amorids, have already lowered
the water table in our area. And we know
that for a fact by examining our pipes
and our wells.
Okay. We are also we are also part of
the UNESCO Biosphere Reserve, meaning
Webster's Falls and Tws are there.
And we also sit within a city
designated, as I understand it, a
designated water protection zone.
There is a sign coming into Greensville
that states that
these are not symbolic labels. They
reflect real ecological sensitivity.
The city itself has acknowledged this
through its investment in a city
waterfall master plan. As you're all as
you you're all aware where the
consultants that you have hired
have stated very clearly
long-term sustainability of the aquifer
and watershed is essential for the
attractiveness of those waterfalls and
tourism.
And yet we are here considering a
development that directly increases
pressure on that very system.
From a hydrogeeological perspective,
Greensville sits on a carsted limestone
aquifer.
A fractured, unpredictable system where
groundwater movement is difficult to
model and even harder to manage.
multiple expert firms such as Golder
Associates, Konesoga Rovers, and other
firms that we have dealt with over the
years regarding a prior landfill have
historically disagreed on how this
aquifer behaves.
This alone should signal caution.
But more importantly, we have something
more valuable than models. We have real
world evidence. So water tables have
dropped, wells have been deepened or
abandoned, residents are relying on
sistns and trucked water, and residents
have to manage what they have. On Taylor
Cresant, people struggle to complete
basic daily tasks like running a wash
cycle. And I mentioned earlier, I've
been here for 40 years and my levels
have dropped.
From a technical standpoint, this
proposal introduces multiple stressors.
Increased groundwater extraction,
extensive imperous services,
preventing recharge of the aquifer and
chloride loading, construction
dewatering for foundations.
They are not isolated issues. They
interact.
The staff report relies on future
studies. hydrogeeological storm water
chloride through holding provisions. But
those studies are not confirming safety
before approval. They are being used to
justify approval before certainty
exists. In an acryer system this
complex, you cannot rely on limited
point in time data to make long-term
decisions.
You cannot assume a bore hole drilled in
December gives you any supportive data
on any wells in our area.
Add to this drought and climate change
bearing down on all of us,
especially when we know the system is
already under stress. From a
transportation perspective, the location
is already compromised. Highway 5 is
heavily used by quarry traffic and has
documented history of serious accidents.
This proposal adds multiple new access
points, increased traffic near a
residential area and a school, and
significant truck activity from 11
loading docks in their proponents plan.
These new movements will directly
conflict with existing quarry truck
routes, increasing both congestion and
safety risks. And this is happening in
the context of additional pressure from
large-scale quarry operations proposing
3 million dump trucks over time to fill
the Amids North Corey realation project
with over 39 million cubic meters of
soil along Highway 5.
This is the this is the definition of
the our impacts.
But the aquifer, roads, and the
community experience them together.
This is a classic case of cumulative
impact failure where no single approval
causes collapse, but each one moves the
system closer to it.
And right now there is no clear
threshold, no capacity analysis and no
safeguard in place. If groundwater
becomes unreliable,
residents cannot remain on wells.
At that point, the burden will shift to
the city to provide municipal servicing
even if it is feasible.
That is a significant financial
liability for the city.
So in closing, water is not just another
servicing consideration in Greensville.
It is the foundation of our existence
from a planning perspective, from an
environmental perspective, and from a
human perspective.
The system is already under stress.
Approving this development adds pressure
where there is no capacity left.
You can always approve development
later, but you cannot rebuild an aquifer
once it has been depleted or
contaminated. If we get this wrong, the
circumstances are permanent. I urge you
to make the only decision that protects
our community and its future, and I ask
to reject this proposal. Thank you.
>> Thank you, Mark. I see that we have
councelor Mikin waiting to ask you some
questions.
Thanks, chair. Good morning.
>> Morning, Mark.
Um I was around in the late ' 80s as you
know it was quite a battle to uh to uh
share information and um to elicit a lot
of common sense in uh some of the
settlements in including u
a commitment to promise that the north
quarry wouldn't be filled with land. it
would become a
potentially a water resource, not a not
a not a liability. So, I want to begin
simply by thanking you for your
leadership over the years. I've learned
more from you than you'll ever learn
from me and um so I I've appreciated
that. Um,
can you
tell us um a little bit uh more about um
you know the the guts,
the heartbeat of a community that's
anxious about
the impact? When what are you hearing
straight up from people?
What we're generally hearing from
Greensville is that we're Greensville
feels like it's targeted all the time
and the residents are quite um fed up
with us being targeted. Uh back in the
late 80s, early 90s, uh the quarry
company, Steely at the time, wanted to
fill the South Quarry, which was 200
acres, with Toronto's garbage. and we we
initiated a a a group called GASP back
then to study uh that proposal uh with
regards to water regards to the aquifer.
Um and we had all kinds of consultants
that come in and and uh from from social
studies to hydro geological studies to
all sorts of all sorts of other studies.
Um, and that took seven years out of our
lives,
>> I remember,
>> in order to in order to go through that
EA hearing process. Um, and you know, in
the end it was a um, the environmental
assessment board said no to that and but
the ministry of the environment appealed
and uh, it was a political decision at
the end that actually canned the
proposal. So, and then we have an issue
with tourism in the area with streets
being clogged with tourism cars and
vehicles. That took several years with
the Hamilton Conservation Authority to
to get that rectified and um we are
pleased to be part of the City of
Hamilton waterfall uh management plan.
We've been very active in that as well
and we think there they've done a super
job of of conducting public uh meetings
on that. Um and then we had Carmuse
which were two kils on site in the south
processing area that wanted to burn
waste.
>> So the community had to fight that. So
um overall our community is tired. We're
stressed. We're frustrated that all of
this happens to be pointed in our
direction. And like I said earlier,
water is our it's our lifeblood. I mean,
it's without it, we don't have any life
at all. And we know again that that you
know, drilling a hole in the ground
does, you know, and pumping and um
trying to find out how many gallons per
minute you can pump out of that hole
does not relate to any of the private
wells in the area. it's specific to that
location only. And I think uh another
resident, Amanda, alluded to that that
there needed to be a cumulative study of
the entire area in terms of aquifer use,
quality, quantity, all of that sort of
things. Hope that answers your question.
>> Yeah, very good. Very um it's been fight
after fight after fight after fight.
>> Um gasp Greensville against serious
pollution.
Um I'm two-time former mayor up there as
some some of you may may recall was
probably the single um in the last 40 50
years the single most important
community
uh collaborative advocacy against the
potential environmental disaster that
that I'm aware of. And um Mark, I I just
admire you and the gasp team and the
people that led that fight. Um and I'm
sorry you're tired getting tired. I
understand. But hang in there. Thanks.
>> Thank you.
>> I'm just looking up to see if uh
councelor A. Wilson has any questions.
He's there's no one else on the list.
>> I'm I'm good. I appreciate the
delegation substantially. Thank you.
Okay, thank you Marky. Mark, thank you
very much.
>> Thank you.
>> Our next delegate is Jane Lewis. Is Jane
here?
>> Virtual.
>> Virtual.
Okay.
>> Yeah. Jane, if you're with us online,
could you turn your camera on? And
when you do that,
Yeah.
So Jane, if you're unable to connect
with us right now, what we'll do is
we'll go to a pre-recorded delegation
and then we'll come back to you after
the pre-recorded delegation. Just
prepare yourself to go live in about 3
or 4 minutes. Thank you.
So, is this Jane or is this Tara?
>> Okay. So, this is Tara and Felix Bizen.
It's a pre-recorded message. Thank you.
S
direct.
Hi there, concerned citizen. Thank you
so much for taking the time to hear from
me today. Um, I live right here in
Greensville. Directly across from the
proposed development site. In fact, you
can see it just behind me. That is the
proposed development site at 471
Moxley Road. Every morning when I have
my coffee or when I'm enjoying my
workday, I get to overlook a beautiful
green space. a main reason for why I
purchased in this area and of course
that development would certainly change
the atmosphere in this community. What
you see behind me is not just open land.
It is a part of a protected water source
area that supplies wells for hundreds of
homes here in the community. And that
well is sensitive. That well is shared
and it's under a ton of pressure as it
is today. I noticed that the proposal
does not include dedicated water source.
And so that means it's going to draw
from the same well as hundreds of homes
here in Greensville. And hundreds of
homes depend on that well today. And so
it's putting our water security at real
risk. And once that system is
compromised, it cannot easily be fixed.
In fact, many of our neighbors on our
road today have water trucked in because
there isn't enough water for them to
access the well. And now we're talking
about a new commercial development
coming in tapping into that same well
resource. Beyond water though, this is
going to be an impact on daily life. I
already mentioned how it would selfishly
impact my daily coffee. But the reality
is this area is not designed for
commercial traffic, which means there's
going to be increased trucks, increased
deliveries. It's going to increase
congestion and affect some of the
safety, especially for families,
walkers, cyclists, all of who live
around this area. This is a quiet
residential area, and it's why people
like me and my neighbors chose to live
here.
I think most importantly though, this
development is not needed. Within 10
minutes of where I live, I can access
everything I need. Dundas is just down
the hill, 4minute drive from here. It
has all the local shops, grocery stores,
and Waterdown is about an 8 minute drive
from here where there are tons of these
commercial developments that has
everything from Canadian Tire to Walmart
to gas stations
and there's everything in between. Not
to mention the fact that we've got
farmers markets around that are able to
supply us with things that we need
within a 3minut drive.
This community is not lacking on
amenities. No one in our neighborhood
has asked for things like an art gallery
or commercial school to be here. This
proposal is not responding to community
needs.
And then finally, this land is zoned
agricultural for a reason. It sits
within the green belt in an area that I
think must be protected.
It must we must protect our natural
systems, our water sources and that
rural character for long term. Reszoning
this area is going to set a very
dangerous precedent. The one that
protected land can be converted for
short-term development regardless of the
environmental risks or all of our
community input.
Thank you. I'm asking for you to protect
this community, the one that we live in.
I live in with my neighbors, my husband,
my dog. I'm asking for you to protect
our water and protect the integrity of
our neighborhood and the green belt and
I hope that you reject the proposed
reszoning at 471 Moxley Road. Sincerely,
a concerned citizen. Thank you so much
for hearing from us today. Take care.
Okay, with that
S, do we have any contact from Jane?
>> Okay, Jane. Uh, Lewis,
if you can come online, put your camera
on so that you can make your delegation
at this time.
>> Yeah. So what we have at this time if
Jane can't come on is we have some
nonregistered delegations and the first
up is Natalyia Kosonovich
and she's virtual. Natalyia
and Natalyia is here. Okay, welcome
Natalyia. You have five minutes. You may
begin your delegation now.
>> Wonderful. Thank you. Hello everyone. My
name is Dr. Natalyia Kasabovich. I'm a
naturopathic doctor in the community.
I'm a resident of Greensville and I have
lived here for over two decades now. My
opinions align very closely with that of
the other community members who are
concerned. U Mark and Amanda especially,
thank you so much for your presentations
and your very eloquently worded um uh
comments that you had. So, I'll start
off. Greensville is a rural community
that depends on wall water for drinking
and local farmland for food production.
The proposed commercial development at
471 Moxley Road would permanently remove
valuable agricultural land and
contribute to urban sprawl in a small
hamlet that lacks infrastructure to
support this scale of growth.
Residents are already concerned about
traffic, noise, air quality, and water
availability. Highway 5 is a two-lane
road that is already heavily impacted by
truck traffic from nearby quaries.
This proposal must also be considered
alongside the Amry's quarry re
rehabilitation project that we already
discussed which is expected to add
millions of truck trips along Highway 5
over time. The cumulative impact of
safety congestion noise and particulate
matter cannot be ignored. Many homes in
Greensville rely on private wells and me
many residents have already needed to
install sistns and get water delivered
regularly due to limited water and
concerns with the water table.
Before approving a commercial plaza with
seven buildings and hundreds of parking
spaces, the city must carefully assess
the long-term impact on groundwater
demand, storm water runoff, and the
sustainability of our rural water
supply. We asked the council to protect
Greensville's rural character, farmland,
water resources, and quality of life by
projecting or by rejecting or
reconsidering this proposal.
Um, a few other notes I have here. So,
this is kind of a rhetorical question,
but I'm curious um about Rashika and the
others from the Angish Group. Where do
you guys live? Do you guys live in
Greensville or the surrounding area? Are
you aware of all the concerns that we
face? And would this be impacting your
day-to-day life? It's alarming to hear
you say that this is going to be a
phased development. Those were the words
that you used, Rashika. That sounds like
more development can be expected in
future years that we do not want as we
do not want this development at all.
As Mark mentioned, Greensville residents
are already so fed up with having to
take unpaid time away from work and our
families to fight these ongoing concerns
to protect our community. This is only
one concern in a whole other list of
concerns that we're continuing to have
to address. Submit comments for attend
meetings like this on work days during
work hours to try to get our voices
heard. It seems that every time we
submit comments and vocalize our
concerns, we're kind of shifted and
things go to the next stage despite the
things that we vocalize.
So something that's interesting to note
is um Amry and Lafarge Corey have
already had issues simply with staff
using the water for washroom purposes at
their property which is very close to
471 Moxley Road. So how can we guarantee
that these businesses in this commercial
plaza are not going to be overusing
water? I think it's going to be very
difficult to actually keep track of how
much water is being used and to police
their water usage.
I'm curious why this land is not able to
continue to be farmed since it's zoned
as agricultural.
As previously mentioned, and I'll echo
this concern, um the bike spaces would
not even be used in this area because
it's not a safe space to be biking.
There's a lot of truck traffic and that
could be very dangerous for people who
are biking.
Um we do not want or need any of these
proposed commercial services. the ones
that were listed, we already have things
like that a short drive or walking
distance away. We all moved to a small
country hamlet for a reason. So, we're
not looking for a bank or for other
commercial services to be located within
walking distance or very close by.
Um, many residents have already
vocalized that we are opposed to this
and we do not want this and we will not
utilize the businesses that are going to
be put into this plaza should this be
approved.
It's a busy commuter route, so it's
doubtful that others that are kind of
driving along the Highway 5 corridor
there will even utilize these
businesses. They might not have time to
stop there.
I believe that the parking spaces will
likely be used mainly for tourists who
are coming to the area to hike and that
will take away from paid permit parking
that is set up at the conservation areas
and the waterfalls which is also income
for the city. Residents are concerned
that the groundwater testing that has
been conducted may not accurately
reflect normal site conditions as the
area was reportedly used for excess snow
storage during this past winter where we
had a ton of snow.
Snow melt and road salt runoff could
affect groundwater levels and water
quality measurements. So, we ask whether
this was accounted for and whether
further multi-season testing will be
required. I believe that third party
testing should be required and not
someone that Angish brought in
themselves. As Mark mentioned, we live
on a complex aquifer. Some people, even
in my neighborhood, have regular water
access, whereas myself and many of my
direct neighbors do not. So, it depends
on what side of the street you live on,
what hill you're nearby. Like, there's a
lot of factors that come into play with
the groundwater. So, one bore hole and
one isolated measurement during one
season of the year is not an accurate
reflection of our groundwater access.
Um, in closing, Angish, I believe that
you would be doing your tenants a
disservice by renting out space in this
commercial plaza that will likely not
receive enough business due to the
community's rejection and the
inconvenient location. I will reiterate
that there is no need for these services
in our community and our community from
what I've gathered so far, we do not
want these things. So to finish off, I'm
curious why you want to proceed with
this. You are going to continue to
receive a lot of community push back and
frustration for land that has very
limited proposed uses. Thank you for
your time.
>> Thank you, Natalyia.
Uh, I'm not seeing anybody with any
questions for Natalya.
So, Natalya, you can um stick with us,
but just take your camera off and we'll
go to the next delegate.
>> Awesome. Thank you.
>> Thank you.
This is Elena Gravener and she's
virtual. Elena or Alana?
>> Okay. Well, let's try for Jane again.
>> Jane, are you available?
Calling Jane. Jane Lewis.
Okay. At this point, no Jane. No. Alana.
Okay. So, I will call out. Are there any
members of the public that wish to speak
at this public meeting?
You may come on down.
Once you get to the podium, please
identify yourself. There'll be some
paperwork there to sign.
Okay. First thing you're going to do is
you're going to share your name with us
and then when you begin to speak, you'll
have five minutes. You get a one minute
tone. I think you've seen what's going
on. So, okay. Okay. Uh, hi. My name is
Barbara Gild. Um,
sorry, this is all really emotional for
me. Um,
I'm not well. I have, uh, several
conditions going on and we're still
trying to diagnose some of them. Um, I
have lived across from the quarry in
that field.
I am probably the closest one to it. I'm
right smack in front of this thing uh my
whole life. So almost embarrassingly 60
years almost. Um I've always felt safe
that nothing would happen because
who would want to build beside a quarry?
And the field has always been comforting
just because it's it's an open space. As
was said before, people move to this
area because it's quiet, it's rural,
they want to raise their little kids in
a place that's safe, that doesn't have a
ton of traffic.
I am
well, first of all, I was a little girl
when uh it was just old Brock Road. That
was Brock Road. I remember when they
built
Brock Road, the new Brock Road, and um I
remember how difficult that was just
building the road as far as the noise
and the trucks and the air pollution.
I am terrified to think
of the building and the environmental
impact, the air pollution, the noise
pollution, the emotional impact that it
will have on people,
changing that field from agricultural to
anything busier. Um, I am so used to
going into my living room every day and
it comforts me to just look out and see
the emptiness. I watch the trees. I
watch the little birds. I watch all the
little animals.
And it's my home.
If this thing goes in,
I mean, it's staggering the uh depth of
it. Um,
I am and my doctors actually are very
concerned that it's going to have a
severe impact on my health,
on my breathing, on my heart disease,
um, and the rest of my things that
haven't been diagnosed yet.
Um, I don't think you can even
imagine the amount of noise and dust and
pollution and
insanity that would go on to build
something like that. And I was
personally offended
when the
woman
from the English group
said something along the lines that this
was a necessary thing. It was time to do
it. I've never heard anything so
ridiculous in my whole life.
There is no need for it. As was said
before, we can get to Dundas. We can get
to water down quickly. Nobody wants this
thing. Nobody who lives there.
I cannot imagine looking out my window
like I do every day and seeing
buildings and people and traffic and
parking spots and everything else. The
additional traffic is going to mean more
accidents. As things get built up,
usually crime follows. They see houses
that weren't on their radar before and
now we will be.
Um it's um
it's it's upsetting to me that
the first thing that this group sent out
was um technical questions that we were
supposed to answer
about our water. It was the water that
was the big deal. And the water is the
big deal. Believe me, I have myself run
out of water. I have a well right in
front of my house, right across from
this field, the closest one.
I know people right behind me, as was
said before, cannot do a full load of
laundry in the washing machine without
running out of water. How can anybody
possibly be thinking that this is a a
good idea? This is a stupid idea. I
don't know who came up with it. Clearly
people who need some more money.
As I said before, it's offensive. Um,
it's painful. It is
It is It is
painful
to my soul. without sounding ridiculous
that the first thing we think about is
the money and these people wanting us to
draw maps of where our weeping tiles
are.
Rather than asking the people
who live there, who have chosen to live
there because it's quiet,
nobody asked us if we wanted it. Nobody.
Nobody said, "What do you think about
this?"
It was, "Tell us about your water." It
wasn't,
"Do you think this is a good idea? How
do you feel about it?" I can tell you I
am sick about it, physically sick.
Every time I think about it happening,
I have physical symptoms.
As you can see, I'm very sad about it.
If it happens, I will be devastated.
And I don't understand how people can
live with themselves knowing that they
would be hurting another human being
like that. And I cannot be the only one.
Um, I did send in a giant letter for the
planning committee was several pages. I
won't read it all off to you now.
Um
>> Barb,
>> yes.
>> At this time, I'm the chair up here. You
have passed your five minutes.
>> That's fine.
>> And I just wanted to say that your
connection to the land is obvious, and
we do feel that. So, thank you for your
delegation. And I'll see if there's
anyone who wants to ask any questions.
>> Thank you very much.
>> Thank you. Councelor M. Wilson is up
now.
>> Hi.
Good morning. Thank you for being here
and I'm sorry to hear that you're not
well. I wish you only good things in
recovery. Um I just wanted
clarification. You you mentioned that
you received a a letter asking you some
questions about
>> Oh, I think we received three or four of
them.
>> Oh, okay. Um could you just elaborate a
little bit about the what the letter was
from and what
>> they seem to be sent out by the English
group um to all of us in the community
and they were I wish I brought it with
me. I could have. They were asking for
to scale drawings of our property where
our wells are situated, where our
weeping tiles were, where
Everything associated with water was and
it was to be to scale. They asked
technical questions about the wells that
nobody
understood. Unless you worked in in
water and wellwater, you wouldn't even
know what those terms meant. And
they sent out I I would say three or
four of these things. And they kept
asking and asking and asking and finally
they sent out one that was less detailed
as if they were like I'm sure they got
some interesting responses
and then they asked for one that was
less detailed but um they were just
badgering us about the water over and
over and over and every time I got one I
was like are you freaking kidding me?
Nobody knows the answers to these
questions. I am not doing your work for
you. I'm not drawing to scale my my lot
and my water and my situation. It is not
up to me to do that. It was insulting.
>> Thank you.
>> No more questions. Counselor,
>> Barb, thanks for your delegation. Take
your time. Take a bre a deep breath and
then you can make your way back to your
seat.
>> You need me over there. I apologize for
being so emotional, but I can't help it.
Everybody's emotional about where they
live. We understand.
>> I would ask you to imagine this
happening across from where you live
without your consent. That's all. Thank
you very much for listening to me.
>> Thank you.
>> At this time, I'll ask for a second
time. Are there any members of the
public that wish to speak at this public
meeting?
One final time. Are there any members of
the public that wish to speak at this
public meeting?
Did your hand go up, Mr. Coleman?
Just joking. Um, I'm not seeing anyone's
hand go up or anyone raising up to
speak. So,
may I have a mover and a seconder that
the public submissions were received and
considered by committee and that the
public meeting be closed. And I'm going
to look up to councelor A. Wilson and
then I think I'll go to councelor Ted
McMe
for the first and seconding and this
will be an escribe vote now.
Or should we be talking at this point
with questions for the staff? Okay.
The vote is up.
Okay, that that carries 12 to zero.
The public meeting is closed. May I have
a mover and seconder to approve the
report recommendations? At this point,
we'll just take the mover and seconder
and then we'll have questions to staff.
So again, councelor A. Wilson.
>> Uh, chair, I don't I won't be supporting
the main recommendation today. So, I
think it's a little awkward for being me
to be the mover. Happy like if you can
help navigate that on the procedure
side, but I think it just makes things a
little harder than it needs to be.
>> Excellent point, Councelor Wilson. Um,
any takers here to move and second to
approve the report recommendations?
>> Okay, we'll put it on the floor. Okay,
we're going to put it on the floor first
and we'll have we'll populate the list
for questions.
>> Councelor Wang's putting it on the
floor.
Looking for a seconder.
No, no seconders. Councelor Casar
seconds. Thank you.
Well, this is for an important aspect
that
our committee members can ask staff for
further clarifications at this point and
we will go to councelor A. Wilson.
>> Thank you uh through you chair. I just
want to thank all the delegates and
again apologize for not being able to be
there in person today. Uh just still
recovering from some illness over the
weekend.
I think it was really clear hearing from
residents today uh some of the concerns
specifically regarding water that we
hear as well as the concerns that we
hear when any any development happens
and people are concerned about the
growing pains related with the
development. I do have a question for
staff specifically about how the holding
provision and the 2016 watershed study
get to that I think level of confidence
that the community is looking for which
is that there's no adverse impacts and
I'm wondering if staff could elaborate
um through the process of clearing the
holding provisions what standards are
being used so for example are we coming
up with standards that are sight
specific based on previous studies are
we using ministry standards that are
handed to us are we using city of
Hamilton standards, but how are we
assessing uh no negative impact and how
what is the actual process of clearing
that holding provision look like as the
recommendations currently propose
>> uh through the chair to the counselor.
Um maybe I'll start and then perhaps
turn it over to growth management um
staff just uh at a high level in terms
of the use of of a holding provision. So
that's a fairly common planning tool
that's available under the planning act.
And so a holding symbol can be used um
to identify the ultimate use of land,
but really what it does is it prevents
or limits the use of that land or
development of that land until certain
criteria are met. So certain conditions
are met. Um, and so in terms of the
holding provision that's in front of
planning committee today, um, I can ask
staff to elaborate a little bit more
specifically um, on the specific
details, but when you look at the
standards that are being applied and how
they're to be cleared, uh, they're based
on different uh, approved uh,
requirements. So there are um, city of
Hamilton guidelines for hydro geological
studies. So that's one aspect. So that's
a council approved document. And then
there are also Ministry of Environment
uh requirements that have to be met. So
ultimately development cannot occur and
a building permit cannot be issued until
all of those requirements are satisfied.
They cannot be satisfied in part and
they cannot be satisfied for a portion
of the property. So development on the
entirety of the lands cannot occur until
all of those criteria are met.
>> Thank you. Through you chair. I'm not
sure if development engineering is going
to jump in, but maybe I'll ask a
follow-up to just target the question a
little bit more carefully. In this
specific
case, one of the criteria that the
holding provision should meet from the
2016 subwaterershed study is basically
no further impacts than what what is
operating as appeal. I'm being a little
bit late in my language, but that's
essentially it shouldn't be any worse
for the groundwater than it is today
tomorrow after development.
Between the ministry guidelines and the
council guidelines for hydro geologic
studies, how will that standard actually
be looked at on a sightspecific basis?
because I think residents are concerned
right now that that result won't be
satisfactory. And so I guess could more
spec specificity be done on either what
the studies are done or to what
standards those studies will be done um
given the technical nature of especially
the first two to three delegates we
heard and some of the feedback they were
bringing. I'm just hoping we can kind of
match that technicality in the response.
Um if that works through you chair
>> through the chair to the councelor I
believe source water protection staff
are available so I'll ask um them if
they're able to provide a response
>> so through the chair my name is Ahmed
I'm a PM in source water protection um I
can certainly answer your question so uh
for this specific application uh we
requested the applicant to complete a
hydro geological study
for the site. Um, following the city of
Hamilton hydrogeeological guidelines,
uh, which essentially adopts the the
approaches and methodologies that the
provincial ministry of environment
guideline D54 and D55 outlined um,
industry standard for assessing uh,
sustainability of private services for
both water and sewage. Um and so
essentially we'd be looking for that
hydrogeeological report once completed
um to make sure that it followed the
guideline and the approaches and it
confirms that confirms two things. One
is um it can it demonstrate that the
intended use can be serviced uh for
water and sewage privately and the and
secondly the use of those services does
not result in adverse off-site impacts.
>> Thank you through the chair. Final
question for me on this. I believe how
are cumulative impacts to a larger area
or an aquifer considered either in our
um city specific standards that were
discussed there or through given that
they're it sounds like we're largely
borrowing from the ministry. Um the
various ministry standards that are
being used to assess this. Um I think
that's the from what I've heard from
residents the base of the concern is
that those ministry standards basically
don't meet the mark of what they're
experiencing. Um can staff comment about
how cumulative impacts are currently
considered um under those kind of
templates that have been given us to us
from the ministry?
So through the chair um so in this case
we do have a Greensville subwaterhed
study back from 2016 and part of that
study amongst many things uh the
assessment of cumulative impacts from
future sort of uh impact in the rural
settlement area of Greensville was
assessed uh from two major uh sort of
elements. number one is the complete
buildout of the Greensville RSA or rural
settlement area and secondly
um from uh climatic sort of conditions
such as extended drought conditions that
could be encountered and so what is the
impact on the local groundwater
resources across the entire
RSA uh if those sort of scenarios would
play out. Um and so what we would be
looking for in the hydro geological
report are two things. One is the sight
specific assessment to understand how
this specific development again would
you know confirm if it can be feasibly
serviced for those services. And
secondly how this development would
result in any on-site and off-site
impacts. And secondly um uh then we
would require that assessment to uh
review and consider the outcomes of the
subwatershed study and the impacts uh
for the RSA in their assessment and
build upon the sight specific um
assessment to essentially confirm you
know um uh to confirm what are the
long-term water level declines and water
quality impacts and and confirm you know
look uh whether those dry conditions uh
that are accounted for in the subwater
study, will this development make it
worse? Um and will this development be
able to provide the water even when
those strike conditions are being
encountered? Um so so once we received
the report uh for our review we'll be
we'll be uh reviewing against those sort
of two uh I guess lenses. One is the
site specific and the other one is um
how does how were the results of the
subwaterershed study um incorporated.
>> Thank you. Um final question from me on
this chair just if staff could talk
about um if this went to appeal. I think
that's a pretty standard answer like
this happens anytime there's a
conversation about not following staff
advice but just so that could be added
as part of committee's broader
decision-making. I think I've I've let
everyone know where I'm at on this file,
but
um if it would be possible to have a
comment about if committee did not
approve the recommendation today, what
are the next steps um and any potential
risks or outcomes or benefits that come
from that? Through you, chair.
>> Thanks. Thanks, counselor. Um who's
going to take that?
>> Thank you. Through you, chair. So uh if
this uh the decision is denied or uh
decision made for denial then it is up
to the applicant and uh to appeal the
decision of the committee um to the
Ontario land tribunal and from there uh
city staff would then or the city would
then have to u acquire the assistance of
a uh private uh planning consultant not
a member of the city staff because the
city recommend or the staff recommend
commendation was for an approval whereas
the decision was for a denial and then
from there it would the decision would
go to tribunal and through the process
of the tribunal.
>> Councelor Wilson, any final comments?
>> That that was my final question. Thank
you.
>> Okay, thank you. And now we'll go to
councelor McMaken who is a bit rushed
here because he has to be at another
engagement 11:30.
Thanks. So I'll try to keep it brief but
um let me just say that uh uh the
concern I have um
um this is a statement not a question
chair
um is the multiplicity of holding
provisions. Um um there was a time and a
place when um it was expected that
people making a presentation
particularly a dramatic presentation
would do their homework and we come
together with all this information
together. I'm not comfortable with a
multiple series of holding provisions. I
think the point that was made before is
once the horse is out of the barn is out
of the barn and uh I'm equally concerned
the the process that may may lay ahead
for these folk at OOLT tribunal which as
we know isn't always as sensitive to uh
to some of the uh rural um interests. Um
it's in the green belt. It's in a water
protection zone. Um um you know there's
a history of bait and switch here. You
know you're going to do a nice nice
water course, you know, rehabilitation.
Now it's going to be landfill. You know,
3 million trucks trucks of dirt. God
knows where it's going to come from. I
know we by laws to protect that. I don't
know we're going to get that kind of
soil here. So So there's a there's an
integrity issue here for me and for the
citizens who have been through a lot
over the years. uh and some hypocrisy
that's coming home to roost in terms of
previous uh um hard-fought victories in
the community uh to now be faced with
a a massive proposal from a a group that
has legitimate economic interest. I
don't I don't dispute that. But uh
I'm I'm worried about the development
crawl on once the once you open it up,
we're in trouble. So I I I'll just make
those comments. U and uh I I really I'm
really very concerned about generically
the process that uh we're trapped in as
a as a horseshoe when it comes to
something as simple as listening to our
our community and their struggle and uh
and uh responding u it's not meant to
offend anybody but responding
cumulatively in a sensitive and
thoughtful way. Thanks.
Thank you, councelor.
I think you're going to make your way
down to your presentation at this time.
Councelor M. Wilson. Oh, sorry. Sorry.
Councelor Jeff Bey is next.
>> Thank you, Chair. And uh apologies I
couldn't be there in person. And a lot
of my questions I think have been asked,
but um it's it strikes me similar to I
think the last speaker just how wildly
out of place this application seems to
be in this particular setting. I'm I am
familiar with uh this part of West
Flamro. uh been in that area several
times, familiar with the property,
understand the dynamic at play here. But
if I could maybe just get um a a um
restating I think of Director Fayback's
comments if I just think I understand it
correctly and again not having the
benefit of being in the room. Um, there
are a tremendous number of holding
provisions on this uh application, but I
didn't hear any particular confidence in
the ability of those holding provisions
to ever be lifted in in any short amount
of time. So, I'm just trying to
understand the rationale why why an
approval recommendation would come
forward given the substantial number of
challenges that that this development
would face. Um, and so I guess two-part
question. Do I understand correctly
staff's concerns with the number of
holding provisions? And then number two,
is there any insight into staff's
thinking as to why a recommendation
would be presented here given the number
of uncertain elements associated with
it?
>> Okay. Thank you, counselor. That's quite
clear. We'll turn over to staff
>> to the chair to the counselor. I'll
start with the second part of the
question first. I think looking at the
official plan and looking at the
Greensville uh settlement area plan um
which was approved through the approval
of the rural Hamilton official plan back
in 2008. These lands have been
identified for development. So they've
been settling commercial since that
time. Um the zoning has not uh been
updated while we've done the rural
zoning. These lands have not been
brought uh into 05200.
um nor have they been updated to reflect
the intended land use.
So in terms of uh the analysis um
keeping in mind what that vision is for
the Greensville settlement area and
these lands in particular um and in
terms of understanding the uh unique
circumstances in the rural area, staff
are recommending approval with the
holding provision which would allow the
city and um
um would allow the city to be able to
assess the required studies. Had this
been a draft plan of subdivision, these
requirements would have been dealt with
through a draft plan of draft plan of
subdivision conditions. Uh the tool
that's available to us to ensure that
those um studies and assessments are
completed is through the use of a
holding provision. Um, so staff are
supportive of the application with the
application of the holding provision and
as I indicated in an earlier response,
development cannot occur until those
requirements are completely satisfied.
>> Did you get the answer to the first
part?
>> Yeah, I think I I understand the the
framework of the decision- making here.
Um, I'm I'm just going to kind of um
save everyone the trouble and and vote
in opposition to this. I don't think
that that this is um appropriate at this
time. I don't think that uh there's a a
feasibility of being able to proceed in
an appropriate way in this area given
the constraints. So, I'm just going to
vote in opposition.
>> Okay. Thank you, Councelor Bey. We're
going to go for questions to councelor
M. Wilson and then when councelor M.
Wilson has finished with her questions.
We'll go to anyone who wants to make
general statements.
>> You're up, counselor.
>> Thank you, chair. Uh, two questions. Uh,
the first one, uh, there was reference
by the agent about um at site plan the
capacity or the the will to install low
impact development standards in the
design. And I just need some
clarification uh from city staff.
There's been so many changes
to the planning act and the capacity of
municipalities to a for inform and
affect development. If I could just have
some clarity on the capacity of the
municipality to instruct that low
impact, please. And thank you.
>> Uh through the chair to the councelor.
Um there's been previous legislative
changes and proposed legislative changes
that are restricting municipalities
abilities to require green building
standards. So there there is a new er
posting out uh for consultation. Staff
are currently working on preparing a
response. Um the the province is um
through this most recent Euro posting
providing additional clarity on what
municipalities can and cannot require uh
as it relates to green building
standards and as it relates to the site
plan process as well.
>> Thank you. So it's fair to say there is
some lack of definition and certainty
but is it also fair to say that there
has been a further restriction in the
capacity of municipalities to um
require LI at site plan
>> through the chair to the counselor.
That's correct. We we um are being
restricted in our ability to require. Um
it would not it could not be a a
requirement but it could be um a
voluntary those could be voluntary um
elements but municipalities cannot
require them through zoning bylaw or
through any other uh bylaws under the
municipal act.
>> Thank you for clarifying that. My second
question is just one of um obligation
and capacity building for reasons of
full transparency. Uh one of my
colleagues asked a question of of the
first delegate who by the way was
extremely eloquent. Thank you. Of um one
of calibrating risk and often in um
these settings uh we are asked after the
effect after the effect what happens
next? What is my role? How do I? And to
that end, uh I heard that if uh this
committee and subsequently council votes
to not approve the staff recommendation,
the onus is on the applicant to appeal,
they have that right. Um could you
through the chair again because there
have been so many changes. Um I believe
the former chief planner advised at
least 28 to 40 changes to the planning
act since 2018. Could you um advise on
the capacity of residents to participate
in in an appeal through the chair?
>> Um good morning Patrick McDonald legal
services. Um through the chair uh
residents are permitted to apply for
party or participant status in any
appeal. Um and is up to the tribunal
whether to grant those statuses. A party
would be uh expected to provide evidence
and call witnesses uh whereas
participants would be uh able to provide
a written statement to the tribunal for
consideration in their decision.
>> Thank you for that. Um my final question
just on the on the uh theoretical
process is bless you. Um if an OOLT
delivers a ruling, is there a capacity
thereafter uh for someone or some agent
or some minister to overturn that ruling
or to change it in some regard? Through
the chair.
um through the chair.
No, there's no there's no mechanism um
in the planning act that will allow for
that. Um the
minister may issue a minister's zoning
order um for a property which can
supersede any OOLT or municipal zoning
if they so desire, but that's a separate
process from the normal appeals route.
>> Thank you. So that would be in the hands
of the government of the day uh to act
that if they so wished
>> through the chair. Yes.
>> Thank you for bringing that clarity.
>> At this time, I'm not
at this time, I'm not seeing any other
questions, but at this time then I will
accept comments from the group and you
can populate that list now if you want
to make comments. First up with comments
is councelor Cooper.
>> Thank you, Chair. Um, you know, we've
heard a lot of um concerns about water
and traffic and it's really material in
terms of what's happening in this
neighborhood. Uh, I believe when people
move into a neighborhood, there's an
implicit contract. You know, people know
what they're moving into and when we
surprise them with uh developments that
they didn't know about, um, it is
lifealtering. Um, I've seen in my own
ward, you know, and uh, I really believe
we have to give residents a voice and
that's what we're doing today. And
that's what's good about this process.
And I think we have to respond to what
residents concerns are because truly
they live there. And I've seen the power
of that in my ward where we've listened
to residents voices and we've been able
to impacted. So I'll be voting no for
this today. Thank you, Chair.
>> Okay. Thank you very much for that,
Councelor Cooper. Councelor Kretch.
>> I'll keep it brief. I'm not going to
support this application. I understand
the complexities of the planning file,
all the things the province is up to,
the various pressures and levers they're
putting on us, but from a local planning
perspective, it just doesn't make much
sense to me to add a storm water impact
in a place where there isn't one,
changing something that's currently
being farmed into a parking lot and
doing what the developer themselves
called a very traditional plan or use
for this. Look, these are the most
untraditional and conventional planning
times we're faced. The province is at
one hand forcing us to grow and the city
is struggling to maintain an urban
boundary. There's all kinds of
complications here. Uh traditional just
doesn't make sense. I know it's more
complicated to plan um non-traditional
uses uses, but that's what we need here
um in this space specifically because
it's part of the green belt lands. I'm
not in favor also of expanding
regardless if there's some technical
sort of excision that allows us to do
so. Um these are still green belt lands
and they're still not within the urban
boundary. Um, I think that this needs to
be rethought entirely. Thank you.
>> Thank you, Councelor Cretch.
Councelor A. Wilson.
>> Yeah, I want to start just by thanking
residents again.
I think the story Mark specifically told
about just the 40 years of impacts in
the area. I think speak to how some of
these decisions feel like surprises to
residents. Um, back in 2005 when the
green belt was coming together, all of
us from a city-wide perspective
understand that the white belt lands are
the bits of the what could have been the
green belt that just wasn't included for
various reasons at the time and a lot of
those were financial political reasons.
We can look back at and go, okay, so
there are some lands left out and then
we had to come back in 2020 and make a
decision about that. in the 2006 to 2008
process around the same timeline when
the Greensville Secondary Plan was being
considered and then in 2008 when it was
incorporated into the city's official
plan. Um these lands were designated for
development and were designated as part
of the community. As councelor Casar
pointed out, they're also at the very
corner. Um if they were just on the
other side of Highway 5, if they were
just over there, just over there, just
anywhere else, uh they would have been
treated like a traditional agricultural
lands and this wouldn't have been
appropriate. this wouldn't have been
considered. It wouldn't have moved this
far. It's because in 2006 we drew a line
in a shape file that had this land and
this subject property on one side of it.
Um that now so many of these decisions
are there. And I think that's just
something to recognize when we think
about the impacts of these decisions and
these kind of zonings that we make that
sometimes it's not actually coming till
20 years down the line is when that
development application comes in and
we're basing it by the standards and the
rules that came in back in 2006 to 2008.
Um I agree with other speakers. I don't
think when you look at this conversion
of farmland to a parking lot, when you
look at it being on the edge of a
settlement area, when you look at the
fact that there's two other commercial
plazas in Greensville serving a similar
function for a community of under a
thousand residents uh with the community
of Dundas and Waterdown right next door,
like I I think there are planning
arguments that this doesn't fit into the
broader picture. Um and most
compellingly, I think it's the fact that
not only are residents opposed, but
residents are substantially concerned
about the impacts. um that I know it's
our job to proceed with facts, our job
to talk about what these standards are,
but I think there's a substantial
concern um regardless of just process
familiarity that the provincial process
and some of these standards don't do
enough to protect residents over the
long term across multiple development
applications. And that's the concern
that they're raising coming forward. And
I think it's an important concern to
take to heart as we consider navigating
a provincial process um with these
residents that doesn't necessarily
consider these things as as serious as
residents are asking us to consider
them. Thank you.
>> Thanks, Councelor A. Wilson. We're going
to councelor McMegan.
>> Yeah. Yeah. Thanks. Um I I was to speak
at the mental health to start a mental
health week. I I've jettisoned th those
plans to come back to speak on this
because I find this uh proposal so uh
totally offensive.
Um, it's as if rural lands don't matter.
You know, they're uh if you're growing
stuff on it and that's all you're doing,
it's it's valueless. You know, it it and
frankly, I think that's nonsense. Um, I
long for a day when uh those who come
with plans actually take the time to do
their homework and not have to rely on
uh on a a multiplicity of holding
holding provisions in order to get into
the door and and perhaps hope hoping
it'll be turned down so they can go to
the OOLT and get something that they
wouldn't ever possibly get around this
horseshoe given the abusive and
intrusive nature of
of the proposal. Um, this is
embarrassing for us to even have to deal
with this uh here given the history of
the community and what's been going on.
And and I'm saddened. I I really am
saddened to uh
to understand Greensville,
to understand the struggles, to
understand the protected water area that
was fought for and and acknowledged, to
understand the importance of the farm
community and the relationship
between thoughtful development and
support of the farm community. All that
stuff is like it can just be cast aside
by somebody who's uh manufactured
uh some economic hyperbole
uh to justify something that in my
opinion is totally unjustifiable. So I
will not support this today.
Do your homework. come back. If if you
if you can answer the questions,
legitimate questions that that our
esteemed citizens have asked, then then
we can have a thoughtful and honest
discussion. But unless and until that
happens, we shouldn't be dealing with
this. Thanks.
>> Okay, counselor. Thanks for those uh
comments. At this time, I'm looking
around the room for a mover and a
seconder to approve the report
recommendations.
No, I thought we just put it on the
floor from counselor. We put on the
floor and counselor Okay. So, so listen,
counselor Casar is not here. So, we need
someone to step up and put it on the
floor or we have an alternative. We can
Okay.
Okay. Councelor Wang has moved it and
you're second, Councelor Nan. Thank you.
So with that
we can go to the escribe vote.
>> recommendations.
>> So this is on the report
recommendations. What's going to happen
is if you vote yes, you're supporting
staff's recommendations with all the
holding patterns. If you vote no, you're
denying the application and it will move
through the processes of whatever
happens with that.
And with that, the voices of the
community have been heard. It's a 0 to10
defeat and the recommendations are now
passed.
>> So now,
so now we require a vote to deny with
reasons with planning reasons.
>> Can I just ask, can you explain why we
need that vote to deny if we've already
just rejected it? because the planning
act uh requires that when there's a
refusal that there are planning I know
I'm not using that wording correctly but
there's planning reasons that go along
with that denial.
>> Okay. Thank you. And I'm going to turn
it over to
this.
>> Oh, councelor A Wilson.
>> If the venture slt had something ready
that was fine. I was going to ask two
questions. I was going to propose that
the language I heard from residents was
particularly the subwaterhed and the
groundwater impacts. I also heard some
residents bring up traffic analysis if
that's a reason we'd like. But my main
question is is this something that staff
could bring back to council with
polished language. Does this have to be
done at this moment right now? Um in
which case I'd be happy to let staff
maybe propose some language based on
what they've heard today and we could do
that in a more professional matter than
on the floor.
>> Okay. Okay. So, we're going to go to um
chief planner on that.
>> Uh through the chair to the counselor.
Um considering what has been um raised
today, I could suggest initially two
reasons. One that the scale of the
commercial development cannot be
supported. And secondly, issues such as
storm water management design, hydro and
hydrogeeology have not been
satisfactoriily addressed to ensure
there are no impacts and and should be
addressed before development occurs.
>> I I nodded but happy to give a verbal
affirmative if that works with other
folks in the room. I think that does
encapsulate what we heard from folks and
does encapsulate what's been mentioned
in the debate personally.
address.
>> Okay. So, we're going to have a mover
and seconder for the denial. And we're
going to go to councelor A. Wilson.
Councelor McMakin.
Um, let's just get our votes straight
here. If we vote yes to the denial,
we're supporting the denial. If we vote
no to the denial, we are not supporting
the denial. Thank you.
Yes. Is in favor of denial.
>> Vote is up.
Okay, that carries 10 to zero
and that completes 8.1. At this time,
it's uh 11:50. We're going to break for
lunch until 12:30. Thank you for your
time today. Thank you to the delegates.
Thank you to the proponents that put
forth their applications. And thank you
to staff.
Thank you. We're late due to a few
technical difficulties getting back
online. We're at 8.2 peed 24140C.
Recommendation to designate the Melville
Park West Heritage Conservation District
under part five of the Ontario Heritage
Act in Ward 13. Does the committee wish
to see the staff presentation?
>> Councelor A. Wilson, it's in your hands.
>> I I've reviewed the presentation ahead
of time, so if committee would like to,
I think it's a helpful overview of what
a conservation district is generally,
but I have sight specific questions, not
general questions, so I don't I don't
need it.
>> Perfect. Okay. So, basically what I'm
seeing is there's no wish to see that
presentation. So, may I have a mover and
a second to wave the staff presentation?
We'll go with councelor A. Wilson and
we'll go with councelor Cretch to wave
the presentation. Indicate your hand
vote now. Hands up to wave the
presentation. Councelor Pauls. Thank
you. Good stuff. Okay, that was defeated
or that was carried. Sorry. Here we are.
Something happened there.
I shouldn't be calling out councelor
Pauly. Councelor Paulet. Sorry about
that. Are there any members of the
public? Okay, so may I have a mover and
seconder to receive and Okay, so we wave
that now at this. Are there any members
of the public? So I'm just kind of
>> Are there any members of the public that
wish to speak at this public meeting
now?
Not seeing any. Are there any members of
the public that wish to speak at this
public meeting?
And finally, are there any members of
the public that wish to speak at this
public meeting? And not seeing anyone
raise their hand or get up to speak.
May I have a mover or seconder that
there were no public submissions
received regarding this matter
and that the meeting be closed.
Councelor Wang, Councelor A. Wilson, um
please indicate your escribe vote now.
It's coming up always. There it is. It's
Okay, that carries 12 to zero.
May I have a mover and seconder to
approve the report recommendations?
Councelor A. Wilson, Councelor Kretch.
Okay, at this time, are there any
comments or questions to staff?
And we'll let the list populate, but I
do see councelor A. Wilson wishes to
speak. Go ahead, councelor.
>> Thank you. Uh through you, chair. I
think just I'll start with a process
question or two and if I have to go on a
second time after process, happy to. But
just on process, uh appendix E is an
objection letter for residents um are
opposed. I'm wondering if staff could
comment uh procedurally, what are the
next steps or the implications of that?
So as we move forward through a very
kind of formal heritage process just
what does what can they discuss a little
bit about how does appendix E relate to
that and what are the next steps in this
process.
>> Okay so you're looking for basically a
little bit of the road map ahead.
>> Thank you.
Go ahead
>> through the chair Alyssa Golden Cultural
Heritage Program lead. I'll also note
that we do have our consultants from
MHBC on the line uh Dan and Nick who are
also available to assist with any
questions that the committee might have.
Um, so if approved by council, uh, a the
formal heritage conservation district
plan will be adopted and a bylaw will be
passed to designate the new district.
Uh, staff will then be required to serve
notice of passing of the bylaw on all of
the affected property owners as well as
the Ontario Heritage Trust and public
notice of that bylaw passing as well.
And that initiates a 30-day objection
period. Any appeals that we receive
would go to the Ontario Land Tribunal
for consideration. Uh, as the councelor
noted, we did receive one objection
letter uh signed by four separate
property owners within the district. Um,
so they would be able to appeal because
they did provide that notice in advance
of this public meeting. Um, and we would
uh I guess follow the standard process
in terms of the Ontario land tribunal
appeal in terms of the merits of the
appeal and then whether that proceeds to
a hearing.
Counselor,
>> thank you. Um, I know this was included
briefly in the presentation. Would staff
be able to characterize uh some of the
general themes they had from public
consultation received over this? I know
this appendix E starts with some of the
residents who were opposed. Uh there's
been throughout the appendices maybe
conversation about how we can ensure
that trees are protected, solar panels
go in. So some comments about climate
sustainability
um in how that works in the district,
but could staff maybe at a high level
talk about what was the public's
reception to the process? Um were there
any kind of highle themes that came out?
>> Yeah, through the chair. Um so the
consultation on this overall project has
been a number of years. started with the
heritage conservation district study uh
started in earnest in 2023 and then
moved on to the plan phase which we're
currently wrapping up. Uh throughout
that process generally the public open
houses and online surveys as well as
just general call for input has been
generally supportive. Um there is the
one objection letter that was mentioned.
Um and then in terms of some of the
feedback at the plan stage in terms of
the the policies and guidelines
themselves that would be proposed to be
in the plan and help guide change within
the district. There were a number of um
comments and questions ensuring that the
scope of those guidelines and policies
are appropriate. Some of the questions
were around ensuring that there's um
policies that help ensure the retention
of mature trees. So that's spoken to in
appendix D that the counselor mentioned.
Um, there were also some specific
questions about clarifying what is
exempt or does not require a heritage
permit. This is our first new proposed
heritage conservation district since the
Ontario Heritage Act was amended. All of
our existing seven districts don't have
that provision. So, it's really great to
be able to include that within the plan
policies and there were some wonderful
comments from uh residents and property
owners to clarify those exemptions. Um,
so the appendix D comment response
matrix speaks to some of those. uh and
those were very helpful in terms of
refining the final plan that's in front
of you today.
>> Thank you. Um last question for me is I
think if you're just able to
characterize some of those questions um
broadly seeking as the community I mean
I think I'll just say staff have been so
many public meetings and consultations
on this event. Um but I think just being
able to generally speaking I know
there's always concerns with heritage
process about how does this impact me
and my property. We have appendix E. I
think those are very legitimate concerns
from the property owners about how
they're going to be impacted and what
their concerns are in this process. But
generally speaking, um there's been
hundreds of conversations. Uh staff are
bringing this forward with a positive
recommendation. Has the community been
broadly seeking supportive of a like of
a community designation like this as
opposed to the individual designation
approach? This is a bit of a new
process. Um what has staff's experience
been with the community overall?
through the chair. I would say in terms
of all the public engagement we've
conducted as a part of this overall
project, it's been primarily positive.
Um, as you know, when we're dealing with
individual property designations, we're
dealing with just that person's property
and that can often be a more challenging
conversation in terms of sort of an
individual designation. Um, the approach
for a heritage conservation district is
more broad. Um, it does just look at
exterior alterations to the landscape,
to buildings, additions, new
construction, and it applies to everyone
within the proposed district. It does
differentiate between properties that
have been identified as contributing to
heritage value and ones that aren't. So,
there's a reasonable scope and
expectation of the types of um
alterations and changes uh that are
recommended to be um that are
supportable within the district. And
that kind of approach uh through this
first new Hish conservation district in
the last 20 years um staff found to be
quite positive in terms of um policies
applying to everyone and there being a
consistent expectation for all of the
property owners within the proposed
district.
>> Thank you. I really appreciate staff's
uh ex like a lot of work has gone into
consulting the community and being with
the community and explaining these
changes. Um, I understand that not
everyone is completely supportive and we
may get some official appeals throughout
this process, but I'd say I I echo the
comments just made there and I think
there's been a lot of work done by staff
to answer questions along the way and
really supportive of the work they've
done because this is a new process the
city's undergoing and going slowly and
going with a lot of collaboration and
communication um is certainly something
I've seen from heritage staff. So, a lot
of thanks to them on this file.
>> Duly noted, councelor A. Wilson. Thank
you. and we're going to go to Councelor
Tammy Wang.
>> Thank you. Uh I also echo the fact that
you can see the amount of work that
staff have put into this uh program. So
I'm also thankful to see this kind of
come to a bit of a fruition. Just a
question around the designation area. Um
putting on my ECD hat. We have these
community improvement seas and sepas go
through a review every 5 years. the
incentive programs kind of change
according to how the the area kind of
changes. Um the this designation area
would it be similar to a sepha in that
regard where it we would potentially
take a look at it every 5 10 years for
example because I do recognize that it's
heritage but um how do we how do we set
up for success? I think that if the
incentive programs are geared towards
that financial assistance aspect of it
for the house or for the the built form
um do we do any type of like feedback
mechanism or some sort of evaluation
through the chair. Uh great question. I
will say that our existing seven
heritage conservation districts uh with
the exception of one have not been
reviewed since they've been implemented.
Now, policy frameworks have changed and
been revised over the years. There was
an initiative to review one of our
existing heritage conservation districts
a few years ago. Um, but we've seen sort
of sequential
provincial legislative changes since
then. So, that's been somewhat put on
hold while we wait to see where things
will land with that. Um, it's not a bad
idea to review the effectiveness of our
conservation districts. It's not
something that we currently have within
our work plan or long-term strategy. I
will note though there have been um
initiatives more broadly across the
province in terms of evaluating the
effectiveness and satisfaction levels of
property owners in heritage conservation
districts. In particular um um a study
called heritage conservation districts
work out of University of Waterl
Heritage Resources Center and that
looked comprehensively at all heritage
conser conservation districts in Ontario
and found very positive sort of
satisfaction levels. Um so in the
absence of I guess a direct request to
review um a particular heritage
conservation district, we would be
looking for any specific issues that
might arise from property owners and
take those into account. Um to date that
isn't something that we've had with the
exception of that one district in St.
Clara that there was some direction to
review. Um, and just to speak to sort of
the SEAR related connection when it
comes to financial incentives. Um, just
noting that our designated heritage
properties um, now have our two revised
um, financial incentive programs. We
have our heritage re revitalization
grant and our heritage revitalization
loan programs. So, those would apply to
all the contributing properties within
this proposed new district.
>> Okay. Thank you for that. I'm just
thinking about how um it's very
different sort of situation because
we're talking about development charges
for new builds and that sort of thing,
but it's it is quite expensive to
continue to keep up um to a certain
extent um the heritage value of
different homes. So, that's where I was
just kind of wondering what our
incentive structure kind of looks like.
And that's not something I want to
explore today, but it was just one of
those uh musings when I was thinking
about this. Uh thank you for that. And
then moving forward beyond this
designation and next what are the
potential um
is there more opportunity to add on to
this designated area or this is it is
what it is that outline is where it is
and that's it.
>> Through the chair. Um yes. So as a part
of the legislative process to designate
a new heritage conservation district,
there's two phases. The first phase was
the study phase and that is where um a
larger study area was evaluated and um
the historical value and significance of
that area and the heritage features and
attributes that contribute to that value
were identified and the boundary was
defined at the study stage and then that
would progress to the now planned stage
after council approved the findings of
the study and the proposed boundary. So
that boundary is a defined boundary that
would not be expected to change unless a
wholesale a whole scale review of the
entire district was done. Um there is
the potential to amend existing
districts generally and maybe Dan or
Nick from MHBC might have a follow-up
response but um best practice wise it's
usually good to designate a new district
rather than amend and open an existing
district because you are opening it up
to potential appeals from an area that
you already have protected. Um so as a
great example uh there is an existing
heritage conservation district just east
of this one. So that district was not
expanded. A new district study was
conducted. Um different significance uh
values heritage values and significance
were identified different heritage
attributes. So they really are two
defined separate areas that are
protected. Um and I'm not sure if Dan or
Nick have anything to to add on that
regard
>> through the chair. No, I think Alyssa,
you you answered that question very
thoroughly. Uh, I would agree with you.
>> Okay, thank you. Those are all my
questions.
>> Okay, thank you. And I'm not seeing any
other people populate the list. We've
had our mover who is A Wilson and our
seconder who is Cretch. And we will
indicate our Eastrobe vote now.
Thank you.
>> Okay, that carries 12 to zero. We're on
to items for consideration. 9.1
PEED25248
comprehensive neighborhood plans review
status update citywide. Does the
committee wish to see staff
presentation?
I'm looking around. Nobody's engaging in
eye contact. A few are actually. So, we
are going to see the staff presentation.
Come on down. And I think this is
Dimmitri Karena.
And just correct me if I pronounced that
wrong. Okay, thank you Demetri.
Okay. Thank you, chair, members of
planning committee, and those in
attendance. Today, I will be presenting
staff report PD25248A,
which is a status update to the
neighborhood plans review.
Today's presentation is an update in
response to direction given by planning
committee during the November 14th, 2025
meeting in which staff were directed to
provide a complete communication and
public engagement plan and provide
planning committee with copies of all
neighborhood plans. Some previously
non-digitized maps have been digitized
in color format for easier readability.
As a reminder, staff report PV25248
provided an overview of the neighborhood
plans review process and recommended
initiating public consultation on the
draft review criteria.
As a reminder, as a reminder, these are
the proposed set of criteria that we are
looking to consult on. So historic
context, official plan and secondary
plan policy alignment
um and plan road network.
And the last criteria is special
characteristics which would be looking
at whether other planning documents or
city initiatives and strategies address
planning for a given neighborhood.
Uh, as a quick refresher, neighborhood
plans are tertiary level documents at
the neighborhood scale that were
developed from the late 1960s to the
early 1990s in the former municipalities
of Hamilton, Dundas, and Stony Creek.
They are usually a standalone map but
sometimes accomp accompanied by a text
document containing details on local
demographics, the consultation process
for the plan, direction and actions for
implementation on matters related to
property standards, traffic, local
environmental concerns, social programs,
recreation and crime. While they do
while they do not form part of the urban
Hamilton official plan, they are
referred to in parkland policies and an
urban area general provisions as well as
in chapter F implementation.
Neighborhood plans can be implemented
through the official plan, including
secondary plans, through zoning bylaws,
and through other strategies and
initiatives.
As part of the proposed public
engagement and communication plan, we
have set out the following communication
goals. Uh to provide a clear
understanding of what neighborhood plans
are to inform the public about the role
of neighborhood plans within their land
use planning framework. Explain the
impact of provincial and federal housing
initiatives on traditional residential
neighborhoods uh land use policies and
how current neighborhood plans are not
consistent with recent changes
introduced to the urban Hamilton
official plan. We will be explaining why
it is important to review the
neighborhood plans, explain the
rationale for the proposed criteria, and
clearly identify how input will be used
in the decision-making process.
Uh, and we will be communicating the
following key messages on screen. Um, so
just for the sake of time, I'll quickly
read over them. Neighborhood plans are
older planning documents. They are not
part of the official plan, but are still
used for when reviewing development.
Many neighborhood plans are more
restrictive than current land use
policies in the official plan and
zoning. In some cases, a proposal may
meet may meet current zoning rules, but
still require a neighborhood plan
amendment, adding extra steps and
complexity. The city is launching a
comprehensive review to determine which
plans should be kept and updated and
which should be removed. The city is
consulting with the public on a proposed
set of criteria to be used in evaluating
whether to retain an update or to repeal
a neighborhood plan.
And on screen are the proposed target
audience, communication and engagement
methods for the proposed public uh
engagement. So we would be targeting
residents, landowners, counselors,
neighborhood associations, the
development industry and business
improvement areas. Our communication
channels would be the city social media
uh channels, Hamilton spectator,
community partner mailing list, city,
the city builders group, counselor
outreach channels, and we would be using
in-person public information centers as
well as a virtual community meeting and
an engaged Hamilton page for the
project.
Uh in terms of next steps, uh this uh on
screen is the proposed timeline for the
engagement. In a given direction, staff
would begin preparing for public
consultation, holding in-person and
virtual engagement sessions during
quarter 2 of 2026, referred to as phase
one. And we would be incorporating
feedback into a set of draft
recommendations to be recirculated for
public comment in quarter 1 of 2027,
referred to as phase 2. We are targeting
to have final recommendations provided
to planning committee in quarter 2 of
2027.
Um, so in summary, staff are
recommending that a the planning
division staff be directed to consult
with community partners and the public
on the draft criteria for evaluating
existing neighborhood plans as contained
in appendix 8 to report PD25248,
the original staff report on the matter.
and B that planning division staff be
directed to report back to planning
committee with the results of the
consultation the final criteria for
evaluating existing neighborhood plans
and the results of a preliminary review
of the neighborhood plans against the
criteria.
Thank you for listening uh to my
presentation. I'll be happy to take any
questions.
>> Thanks Demetri. And there are a number
of counselors who will be asking you
some questions. We'll start off with two
counselor Cameron Gretch.
Thanks. I'd like to use an example of
one of the maps here to ask a couple
questions specifically. It's for the
Duran neighborhood. And so it looks like
based on some records the Duran
neighborhood has actually the plan here
that says 1973, they actually have a
1987 plan that was approved by council
somewhere. And so at some point we'll
send that information over to you folks.
You can look at it and make sure it's
updated. But I noticed when you had
census data on the map, it said 2001 or
2006 was when the population data was
listed for those. Why didn't you go all
the way to 2021 and put the census data
for 2021 there?
>> Um,
I'd take it to the bench for that one.
>> Sure.
>> The point I guess is you want to repeat
the question about jumping from 2002 to
2021. Is that your question?
>> The population data on the map is really
outdated. We have it on that map
specifically. It says it lists 2001 and
2006, but we have data on the city's
website that's later than that, 2021 and
2022. So, why wouldn't we include that
information there?
>> Perfect.
>> Hi, uh Melanie Fam, uh community
planning program lead and sustainable
communities. Um through the chair, u
most of these maps, they don't uh
normally get updated unless there's a
change uh approved by council for
property. Um so whatever's on there
would be essentially um what was there
uh at the last time of any change.
>> Okay. Thanks. So that's why this current
population data is not there for that. I
was just trying to understand the the
timing, right? You have 1973 map, but we
have 2006 census data. So I was trying
to understand how that worked. Thank
you. That's helpful. My basic
understanding about this is they could
be a useful tool. That's my general
understanding. They could be a useful
tool if they were kept up to date,
modernized, and used regularly, but
otherwise they have no real planning
power or effect. Is that a generally
reasonable understanding? Uh, yes,
that's correct. They're not part they're
not an instrument granted to
municipalities like secondary plans.
They're extra tertiary level document
that could be used to coordinate land
uses.
My only real question I guess then is
about their potential future use. One
thing I think that is very difficult for
neighborhoods and neighbors in
neighborhoods and as a place with the
most neighborhood associations that are
active is more too. I get questions
semiconstantly at neighborhood
association meetings about things with
respect to land use planning. One of the
things I understand these maps to be
able to do if they were updated to 2026
would be able to show someone just their
neighborhood and just the planning uh
things, instruments and things that are
happening in their neighborhood to give
them a sense of how it applies there.
Otherwise, they're asked to go to
several secondary plans, official plans,
other plans, then try and look for their
neighborhood in there and make some
understanding of it. Is that a
reasonable understanding of what the
potential use of these things could be?
uh through the chair. Uh yes, I think
that that is a reasonable understanding.
Um through this review process after uh
finalizing the review criteria that we
would use to evaluate neighborhood plans
if a neighborhood plan uh is identified
as worth keeping and updating, that
updating process would be part of that
um potential future use for the
neighborhood plan. s such as as you
mentioned coordinating and identifying
all the other uh documents and
strategies that might be relevant to a
specific neighborhood at that level. Um
as part of our proposed public
engagement process, we would also be
educating the public about the different
city initiatives, strategies, and master
plans that kind of work together to
address planning in their in a given
neighborhood. Um a lot of some of these
plans talk about transportation. We have
various transportation master plans. Uh
some of them talk about property
standards. We have property standard
bylaws. So I think that's a great idea
for future use of neighborhood plans is
to make it easier for uh residents to
understand what's going on in their
neighborhood specifically.
>> Since you mentioned it, I'll ask about
engagement specifically. Just want to
make sure you're really clear about what
that looks like or what that might be.
You're not going to be going to
neighborhoods and sitting down with
neighbors from neighborhoods and talking
about them about planning their
neighborhoods. That's not the activity.
What is the activity? Because I think
people think there's a neighborhood
plan. We're going to do consultations
about neighborhood plans. And I can see
all 120 plus neighborhoods getting
excited. Oh, great. The city's coming to
my neighborhood. We're going to make a
plan. Uh that's not the activity as far
as I understand it. Could you explain
what it is?
>> Yeah. So the activity is educating the
public about uh what are neighborhood
plans, where did they come from and the
need to update them uh or to uh look at
the set of criteria and and u review
neighborhood plans to either update them
or repeal them and get the public
involved in that process. Um, and to
help kind of frame that, we would be
there would be a education piece about
the planning framework itself, official
plans, secondary plans, zoning bylaws,
master plans, other city strategies, how
to how do they all work together to fill
the role that neighborhood plans used to
have um, when they were created.
>> Okay, thanks. Those are my questions. I
have comments later.
>> Thank you, councelor. Next up, councelor
M. Wilson.
Thank you. And I'll I'll certainly take
any guidance if these questions are
better suited for the report. But on
that, if I could begin where you ended.
Um
when I was first elected, uh we tried to
do something called uh planning 101. And
so we have a f a focus group of
residents from uh throughout Ward One uh
to digest and dissect the the planning
act and how it's exercised.
And it was through my experience that
folks just really want to understand and
have very immediate access to the plans
that are informing their neighborhood.
And um if
my a little bit of discomfort I'm having
is I really wish
we would do that and that was the
objective. Um because I I think um
because of uh the significant change
that the planning regime is undergoing
across Ontario,
the confidence of people that they have
in the decisions is being undermined.
And I think we have an obligation to
start there as opposed to that kind of
being um these are my words, not yours,
a a side benefit. Um, so if I could ask
in your research to date, have you been
were you are you able to share with me
any neighborhood plan that you believe
has recently informed and affected a
planning recommendation?
Uh, yes. I just have to consult the list
here.
through the through the chair to the
council. Perhaps I can assist a little
bit. Um, and I may have to come back
with more specifics, but I think the
Sheldon neighborhood is a really good
example, and if you're interested, it's
on page 80 of 129
uh, in appendix C. um it's a
neighborhood that's not completely built
out yet and outlined a very specific
road pattern. And so in terms of the
usefulness of the of the plan, that's
one in particular that staff refer to I
in particular refer to fairly often when
we receive inquiries. Um this
neighborhood plan and some of the road
pattern actually came up when staff
brought forward the um most recent I
think it was the mid-rise zoning as
well. So it is they are useful tools.
They do lay out uh planned road patterns
which are not contained within the
official plan and which are not
contained in secondary plans and staff
use that in order to evaluate um a
proposal and what was the planned
transportation and uh pedestrian
function of that neighborhood.
>> Thank you. If I may just seek further
clarity on that and you're suggesting um
that that would be helpful in that case
and therefore would I be able to
conclude that that's
not a framework that would be informed
by say a transportation master plan or
an active trans excuse me active
transportation plan that would set out
the existing and the perceived future.
Is that not where we would get the
information from? uh through the chair
to the councelor. Um I may ask director
Mallaloy, but maybe before I turn to
him, I would just say I mean when when
I'm speaking of road patterns, I'm
speaking of the local interior road
pattern. So generally not evaluated at a
high level through transportation
assessments.
>> Okay. Thank you for that clarity. Um
uh could you just um could you help me
understand I I don't know the status of
it but I think we were apprised a number
of meetings ago that the government of
Ontario um indicated that it it may be
eliminating secondary plans as a an
intent to build more homes faster. So if
could you speak to the status of that
and if we're if they're going in that
direction what might then even be the
status of something that is not doesn't
have any planning piece in an OP or
zoning through the chair. Uh yeah, so
through the chair um uh I'll refer to
the bench for further comment, but I do
believe the province has heard um that
they might be walking back that concept
of eliminating secondary plans, but um
I'll turn it to the bench for more kale.
>> Hi, uh through the chair. Yes. So there
was an ERO posting last year that we had
commented on as staff uh and had brought
forward a report to planning committee
on um which was looking at potential
changes for the official plan framework.
Um and one of the items that um we were
asked to comment on was about
potentially deleting uh secondary plans
and area specific policies within
official plans um and sight specific
policies.
We had uh raised some significant
concerns in our comments on that last
year. Um and this year um as part of the
the bill 98 uh posting um and other erro
postings uh that just got posted last
month. Um there has been an update to
that. Uh so we staff will be bringing
forward a report in June on that. Um and
uh we have staff level comments that
have to be submitted by uh May 14th
deadline. Um but essentially uh the the
province has now uh as Dimmitri noted
walked back that initial um suggestion
that secondary plans may be deleted. um
they're still asking some questions
about um developing a framework for
secondary planning of where it should be
used and um some guidance around it. Um
so that's what our comments will be
focused on. Uh but at this point they've
they've walked back that and they are um
acknowledging that secondary plans are a
very important tool um and that there's
not an intention to get rid of them at
this time. Thank you.
And my final question is and it may be
more appropriate for the report. I think
this committee has been is understanding
that we need to get houses built and um
we're trying to encourage within our own
might how to do that. So, how would how
are you going to address the idea or the
proposal that just this is just adding
another layer of maybe false protection
or at least another layer in which
developers are are going to have to um
attend to? Those are my questions. Thank
you.
Uh so through the chair um so part of
what initiated this uh review of
neighborhood plans was a uh direction
given uh to staff for in 2024 from staff
report PD22154A
uh which uh which expanded permitted
uses um which was looking to expand
permitted uses in neighborhood plans as
part of the lowdensity residential zone
project. So this is seen as an
incremental step to um implementing that
and involving the public and letting
them know how we are expanding uh
residential options within their
neighborhoods. Currently neighborhood
plans do pose a barrier to that. So in
this review uh we would be looking at
first um working with the public to
finalize a set of review criteria for
transparency purposes and then apply
that criteria to repeal neighborhood
plans and retain and update those that
might be crucial to keep such as ones
that have a local road network shown on
their maps that aren't shown in other
documents.
Thanks, Demetri, and thank you,
councelor. Uh, councelor Nan.
>> Thank you, chair. Thank you for the
overview. Um, just a couple of quick
questions. Um, in one of the
correspondences, the second one that is
on this item today, uh, there's a note
by the resident that neighborhood plans,
building off of where councelor Wilson
left off, um, are influencing
development outcomes in a manner that
impacts housing delivery. according to
this correspondence introduces
additional timelines and uncertainty and
may impose financial burden on
applicants through amendments related um
processes and fees. Could staff comment
on
on those points and um how the plan
going forward around neighborhood plans
um either address these concerns,
mitigate these concerns or
continue these concerns.
So through the chair um certainly uh
um so to clarify uh typically what
happens with the neighborhood plans
amendment is that it's done in
conjunction with a zoning bylaw
amendment. Uh in our review in updating
these neighborhood plan maps to get them
digitized and um accurate up to date
based on amendments that have happened
uh over the years. Uh this seems to be
almost always the case. I think there
might have been like four instances
where um in and we're talking about like
since 2007 where only a neighborhood
plan amendment might have been needed.
Uh we can't conf uh it's a single-digit
number under five for sure. Um, and so
this process that we're looking to
engage with in the public would uh
update neighborhood plans that we
identify as worth retaining so that
they're in alignment with the urban
Hamilton official plan and zoning bylaws
that allow for uh more flexible
residential uses.
>> Thank you. Um, and
so the goal I just maybe I need clarity
on the goal of the outcome of the public
engagement. So cuz what's proposed here
is quite robust and my concern is that
you know there's already a lack of
public awareness of all of the land use
planning mechanisms and processes that
exist in a municipality. And then on top
of it we're adding clarity around hey
there's this tool from 50 60 years ago
that we're seeking to update uh which
doesn't necessarily have authority
because it's not a statutory tool. It's
a planning tool. I'm just concerned that
we're adding more confusion to the pot.
And I appreciate what you said earlier
that the goal here is to create that
clarity for those who participate in the
program. But maybe if you could just
outline the outcomes that you're seeking
from the public in this process because
I'm concerned about public fatigue in
terms of engaging them on so many things
when there's so little um awareness of
all the different planning tools.
>> Okay. So through the chair certainly. Um
so in terms of outcome uh this process
is very much driven by uh council's goal
around transparency and getting the
public involved in these decision making
processes um due to to the age of these
neighborhood plans. I can't comment on
how um inclusive they were when they
were created,
>> but um this uh public consultation
process that we're proposing would is is
a in a way a remedy to that. Um I I'll
also turn it to the bench to comment
more on the outcomes of this public
engagement
>> uh through the chair to the counselor. I
think um one of the key things that
Dimmitri mentioned was um it's more
education and helping people understand
um as you said the planning 101 um
elements of how those different plans
work together um and what role
neighborhood plans have within that. Um
and I think um so part of the outcome
will be uh just get getting that
understanding and then within that um
trying to understand from people whether
the the criteria and the way that we're
reviewing the plans makes sense to them.
Um if there's things that we're missing
that we should be considering. Um and in
terms of applying the criteria, um are
there things that are more important
than others that we should be
prioritizing or um giving a heavier
weight to in terms of importance? Um and
then that will feed into our uh
subsequent review of each neighborhood
plan where we we'll be taking a look at
that criteria against the neighborhood
plan and then making a recommendation
about um is it worth it to keep? Are
there specific things that uh maybe
provide guidance that are outside of
other plans? Um and if so, we'll we'll
look at what are the updates then that
we would need to make um to reflect
that. And then um in terms of plans that
may may not be so useful anymore um is
if we apply the criteria um would be
would we be recommending that um those
plans be repealed?
>> Thank you. And then just to follow up on
that one, so is is and I appreciate that
the entire exercise is seeking to answer
this question, but if staff could just
um provide your pre-thought on it, uh
what kind of circumstances could you
anticipate that say a neighborhood plan
is no longer useful? Is it that the
points for the neighborhood needs are
assessed and are already considered
within a secondary plan for example?
>> Uh yes. So I I would say that would be
um one of the key considerations. Um
maybe as another example, I would note
that um some of the more suburban type
plans were created when those areas were
not built out. Um and they are now built
built out and they're primarily um
low-rise uh types of residential uses
where we would now be expanding the
types of uses that are allowed um within
that area. Um, so if we're no longer
differentiating between things um like
uh street town houses and singles and uh
semis in terms of the neighborhood plan,
um there may not be a a use um for them
in particular anymore. So um we'd be
looking at those sorts of things as
well.
>> Okay. Thanks.
>> Thank you, counselor. I'm seeing
councelor M. Wilson for a second time.
Thank you.
If I could just pick up to make sure I
understood um that last point by staff
is is it
if our goal has been to provide
um a a greater
supply of housing and a greater choice
of housing in more places
so that we're not
so segregated. ated in our city. Is it
did you just submit that in the absence
of doing that exercise were not able to
realize
um those goals
through the chair
uh through the chair to the counselor.
Um, so right now as the neighborhood
plans stand, they still show those
distinctions between those low density
uh different types of uses that we've
we've now expanded. Um, so the the
zoning is in place um based on the the
residential zones project.
>> Um, but our our neighborhood plans are
now out of alignment with that. So if um
we're keeping uh certain neighborhood
plans, we would have to definitely
update to reflect that range of uses
that's now permitted in by the the
lowdensity residential zones.
>> Thank you. I I I just need to finish
this off though. So we have updated our
zoning. We are allow allowing for a
greater type of uses,
but the neighborhood plans I thought I
heard you say
um do not have any statutory effect. Um
they couldn't be used in a in a in a
tribunal for example or by this
committee for planning grounds for a
denial.
So could I just get clarity on that
whether that's a correct statement I've
made or an incorrect statement please?
to the chair to the councelor.
The neighborhood plans are approved by
council and while they not they do not
form part of the official plan, there
are still policies contained within the
official plan that require
um uh conformity or amendments to the
neighborhood plan when there's a change.
So, they do have status in terms of the
official plan. They're just not part of
the official plan. And what I would just
add to what Miss Fam um indicated is
they're not a um a hindrance and they
don't um
they don't specifically um direct
development. Staff would generally not
uh recommend denial on the basis of the
neighborhood plan, but they are still
referenced. And because staff still
reference them, this is an opportunity
to create that alignment to ensure that
um the neighborhood plans are reflective
of the current direction of the official
plan that they are a little bit more
broad in terms of use. So for example,
some of the neighborhood plans will say
single and double residential.
>> Our our current designations go beyond
just single and double. So we want to
make sure that there's alignment but
still recognizing that there's still a
valuable tool that are utilized in the
in the evaluation of development
applications but we just want to make
sure that there's alignment between the
documents.
>> You're pausing counselor in deep
reflection.
I'll um
still not uh clear to me but thank you.
>> Okay. Thank you
councelor Kretch.
Thanks. I think as the discussion has
gone on, I had another question I wanted
to ask about this because I think one of
the things that's interesting or
problematic about this is I think what
you're saying is that there are like a
vestigial
kind of residual impact that some of
these neighborhood plans have, right?
There's a vestage of a road. There's
this residual nature of something that
used to exist before and in keeping some
neighborhood plans, we're preserving the
history of that that doesn't exist
elsewhere. Though I assume we also could
just incorporate the information that's
vestigial or residual and put that in
the actual other plans we have and
eliminate neighborhood plans. It seems
like the vast majority of the plans are
outdated. They themselves would have to
be updated with the other instruments we
already have. And so if there's just a
collection of a certain number of these
plans that have information that's
useful in them, why wouldn't we just
take the information from those plans
and put it with everything else instead
of doing this backwards activity which
seems like let's update all these
neighborhood plans to conform to or
repeal or not or keep some like and then
we don't have a complete set and so on.
This creates further confusion. So maybe
the the director could answer that
question
>> through the chair. I'll try to to
clarify. So the way that that I look at
this and the way that we've looked at
this is we recognize that there are some
plans that are perhaps not required
anymore and some that are of value and
importance. The purpose of this exercise
is not to make that decision just yet.
It's to determine how how and under what
criteria we would use to evaluate these
the need for these neighborhood plans.
At the end of the day, the decision may
ultimately be as as you've indicated,
that could be a recommendation to say we
don't they shouldn't stand, they should
be repealed and the but the
recommendations should be reflected
through OP policy or some other
mechanism. It's so that may be the
outcome, but this process is to
determine what criteria are we going to
use um to be able to evaluate and make
those decisions.
>> Okay. Okay. And thanks for clarifying my
misunderstanding on that. I I appreciate
it very much. I misunderstood part of
the exercise. So things like having
future plans or future neighborhood
plans for every neighborhood because we
have that PDF on the city's website if
everyone's not familiar with it of all
the neighborhoods across the entire city
and it's just a PDF with a bunch of
squares on it and there's no detail
there. And the thing I hear from
neighborhoods a lot is it'd be great if
we had a really up-to-date comprehensive
look at our neighborhood and what those
planning instruments have. So if you get
feedback from neighborhoods about that
through the consultation, you might
bring that back here for the discussion,
but we're not making a decision about
what that what happens today. So I can
leave that. Thank you very much.
>> Yeah. And just so from my thinking as
the chair here, we're ensuring that
there's public participation and it's
transparent as we make these decisions
about the um neighborhood plans. And
they're also trying to bring it in
alignment with current land use policies
so that they aren't outdated. So whether
or not we utilize them down the road or
not, I think the important part is that
we as a council and as a committee here
have always encouraged public
participation and transparency and I
think that's what this is seeking to do.
If I can speak on behalf of staff. Um,
okay. So at that point, Dimmitri. Oh,
sorry. Third time. Councelor M. Wilson.
>> Yeah. No, I'm sorry. I don't mean to be
difficult about this, but um
uh land use policy and practice has
often been infused with bias
um in large measure due to privilege.
So, um, when we're doing public
consultation, could you speak a little
bit to how we're going to perhaps
address um the capacity of different
people to engage in in this depending on
how they live and where they live. And
um that we're not going to be using it
as any kind of thing in which we're
going to further seek to, you know,
How shall I say uh
in in enable exclusion through the
chair?
>> Yeah. So through the chair um
this pro this our proposed public
consultation process is looking to
remedy some of those past wrongs. Uh in
our engagement strategy there's
essentially three streams of engagement.
We have the in-person uh engagement that
we would be doing. There would be three
of them um to geographically cover the
areas where neighborhood plans exist.
There would be a virtual engagement for
those who cannot attend the inerson
engagement and there would be a Hamilton
uh engage Hamilton page for people to
also engage at their leisure. Um we have
done preliminary work to look at the
different uh wards within uh in which
neighborhood plan areas are located in
to look at the demographics and the
percent of um uh marginalized groups uh
as compared to the city averages uh with
within those words. Um
as part so so as part of this process we
would be we have those three channels to
consult with people. Um
and uh there has been some discussion
with the public engagement office about
the relevance perhaps of the
accessibility committee in in
neighborhood plan planning. But um as
mentioned by this committee uh these
plans don't have much legis legislative
authority. So uh I I can't comment to
the extent that they can create future
exclusion and we are really doing this
exercise to update the neighborhood
plans so that they're in line in
alignment with the more inclusive
policies that are now in effect through
zoning and the urban Hamilton official
plan. Um uh if there's anything else
that the bench could add to that
comment, um uh
I open it up, but um those are my
thoughts on the matter.
>> Thank you. I appreciate your thoughts.
Thank you.
>> Okay, I think that ends it for now and
and basically Dimmitri, great job up
there. Thank you. Um we're going to have
a mover and secondary to receive that
staff presentation. I'm going to go with
councelor Cooper and councelor M.
Wilson. Is that okay? and have a hand
vote now, please, to receive the staff
presentation.
Okay, thank you. That passes.
May I have a mover and seconder to
approve the recommendations report and
receive the written submissions?
Councelor Wang, thank you. Councelor
Paul's, is there any discussion on item
9.1?
Populate that list now if you're I know
we exhausted it pretty much.
Councelor Wang, thank you for answering
the call.
>> Um,
I'm uh I'm torn on this because it just
kind of feels like from our conversation
that this is not necessarily a statutory
tool. Um, I know that it is helpful in
some instances, but not in most. Um, in
Ward 4, there are only five neighborhood
plans of which they are in the very
established urban neighborhoods that
don't at all will not see any type of
new development or anything like that.
So, for me, the Ward 4, there's no value
in doing that engagement in W 4. Um, so
this is where I'm I'm extremely torn
chair on this. uh this is a significant
amount of staff time and resources to go
out to educate a public again in Ward 4
where we will not see any value or
benefit in this work. So um for me I
think I'm going to be voting this down
because there's no reason I don't see a
value or benefit for W4 residents here.
Thank you.
>> Thank you councelor Wang. Any other
comments?
Okay,
we have our mover and seconder.
>> Well, if there's no more discussion,
let's indicate whether escribe vote now
whether we support this ongoing process
or not.
>> Oh, do you do you have something to say,
Councelor Bey? We can always take it
down.
Okay, Councelor Bey has a question for
staff and I'm going to allow it.
>> Councelor Bey,
>> thank you for your indulgence, Chair,
and I apologize to members. Um, I would
like to just get uh an indication. Um,
and maybe I missed it. It seems that
there may be an appetite around the
table to perhaps decline the
recommendation here and not continue
forward. And I'm trying to understand
what happens next. Should this be the
direction from this body? Uh what would
staff do next? Where would this lead us?
Uh I think that that's an important uh
key consideration before our votes are
registered.
>> Great question.
Go ahead.
>> Uh through the chair to the councelor. I
would um suggest that an alternative
would need to be moved. The reality is
staff, the neighborhood plans need to be
updated or
um repealed. There needs to be some
action taken because as they stand in
some cases they are not up to date. So
the alternatives lay out options that
exclude the public consultation
um that we you know that uh staff would
just be directed to amend the
neighborhood plans to comply with the
official plan. So it would be more of a
staff level
exercise
and developing our own criteria to do
that evaluation as opposed to engaging
with the community. But there needs to
be some direction in terms of how how do
we proceed with these neighborhood
plans?
>> Are you finished councelor bey?
>> Thank you. So um in the in the absence
of that direction then um you there well
there is no direction. So staff just
kind of stop and await further direction
from this body. And so um I'm not sure
if we've considered moving an
alternative or something like that. I
I'm seeing some nods from across the
table. So I'll seed the floor to uh
perhaps one of the other counselors that
have some idea of where we may go as an
outcome of those. Thank you.
>> And before we go there, I'm going to
Well, I saw councelor Clark had his hand
up.
Okay. So, we go to councelor Wilson.
>> Councelor M. Wilson. Uh thank you to
councelor Bey for um his question um on
the methodology and to councelor Wang's
point about um
um
established neighborhoods that
to use the example that the chief
planner was uh brought to the the table
all the road networks are fully
established.
Was there any consideration in your
methodology of doing a preliminary um
assessment of
of
in those very urban places perhaps
we know with great certainty uh that the
neighborhood plan is um is dated and
in its present circumstance and given
the circumstances just wouldn't make
sense to have um and then to perhaps
divert your efforts to I'm all in for
the planning education piece and for
delivering a product which enables
people to see their neighborhood and the
active plans that are that are active
there. But it just seems like that is a
product at the very end as opposed to um
something perhaps that could be done in
another way, shape or form andor the
methodology of all the neighborhood
plans could be further called. Just
that's my question on the methodology.
Thank you.
>> Uh through the chair to the counselor.
Um I believe in the original report and
staff have done a like a high level
preliminary evaluation. There were some
I say draft criteria that have been
established. Um and a completion of a
neighborhood I would say would be one of
one of those criteria that a
neighborhood could be evaluated against.
Um so yes I mean that that work has been
done to a certain extent. Um it the the
purpose of this was to ensure that you
know all the criteria would be
identified. Um but certainly staff have
done a prelim preliminary review and
could do that review um in terms of the
criteria that we have um and then be
able to report back to council on that.
>> Thank you counselor. Um, we're going to
go to first time speaker on this,
councelor Critch.
>> Well, probably like 11th time speaker,
but anyway. Um, kidding. I want to put
number two as the option here, the
alternative. And I want to speak to why
that is based on the alternatives in
front of us. Number one seems like what
would happen is if we did that, then
staff would not be able to align the
current official plan policies or other
council approved plans and strategies
with neighborhood plans. So, it would be
kind of a mess. basically we'd be left
with a bunch of things that um weren't
aligned with currently. Option two,
which I think makes the most sense is
that um it allows for a public process
but just not a public process in every
single plan. So where there are
secondary plans already, right, or where
there are areas where there are already
more mature instruments, I guess is a
way of putting it. We wouldn't be
looking at those specific plans. What
would be left would be. So my question
staff is that my basic understanding is
if we went with option two, we would
take the plans out of there that already
have secondary plans that are way
outdated. We'd be left with a group of
plans to consult on that would would
more meaningfully require some public
impact and some updates. Is that right?
>> Uh through the chair, yes, that was the
intent of that second alternative.
>> I think that's what I'm hearing my
colleague saying basically is we don't
want to do a ton of extra work and be
asking the public to go and consult on
things that have no meaning. This would
allow staff to go ahead update those
plans to meet the secondary plans, take
those out out that we don't need, and
then engage in the ones where there's
meaningful work to be done. So, I'm
going to put that forward and probably
need a secondary, but that's seemingly
will solve. And councelor Bey's is going
to second solve the problem we're all
having.
>> We're going to go to councelor clerk
first and then we'll come to you. Uh,
councelor clerk, thank you for your
patience. You're up now.
>> Um, my pleasure, chair.
Um, so I I'll procedurally I'll be
speaking to the amendment now and I
agree with councelor Cretch's
um observations.
I can speak specifically to W nine. uh
our ward is predominantly
planned through secondary planning
processes. So what that means is every
neighborhood that we have, every
development that has been approved over
the years went through a secondary
planning process which had um broad
public consultation on that secondary
planning process.
the neighborhood plans introduces
something that is a bit confusing to
people
um because it is not
a statutoily required
uh process
um and I think if we're reviewing
secondary plans
uh we can provide statutoal
prescribed processes that really become
a part of the official plan. I'm
still a little bit confused on even the
concept of a neighborhood plan given
that it really does not have any
authority
um in law. And so I think what councelor
Cretch is proposing
is the the the middle ground. And as for
the concern from staff that it would
circumvent wholesome public engagement,
I would suggest that we're not at the
point where you want to have that
wholesome public engagement. We may be
after we have this uh review done. Um
but I don't think going out to the
public to engage them. I think that is
going to confuse many members of the
public as to what a neighborhood plan is
and why are we doing it if we already
have secondary plans in my community.
And given that the province has changed
the rules with regards to uh
applications that are coming forward and
whether or not they comply with the
neighborhood character, it kind of seems
like the neighborhood plans have been
thrown out the window by the government
of Ontario. So those are my thoughts. I
think item two would make sense and uh I
would support that at council. Thank
you.
>> Thank you, councelor Clark. We're going
to go to counselor weighing for some
procedural messaging.
>> I think that since I was the person that
put it on the floor, so I think I will
withdraw my um my motion and whatever.
>> Consider it withdrawn. Uh councelor
Cretz, you have anything to put forward?
At the sake of repetition, alternative
to seconded by councelor Bey.
>> Okay. Thank you, councelor Bey. So at
this point, now that we have some
direction for staff,
um please indicate is it.
>> Hold on a sec.
>> Councelor A. Wilson, sorry. Go ahead.
>> Sorry, but I hope this is a simple
question. Chair, could staff just
explain what's going to happen to the
neighborhood plans in areas where
there's not a secondary plan under
alternative 2. Do they still need
updating? It just seems like that gets
the the plans fixed where we want to
update them. Is this also just
effectively walking away from those
other plan? I'm just looking for clarity
on what's happening with those ones
where there's not a corresponding
secondary plan
>> uh through the chair to the counselor.
Um I think the intent of alternative 2
would be um a immediate repeal of all
the plans that are within secondary plan
areas. Um but then the continuation with
this engagement plan for any of the
remaining sec or neighborhood plans,
excuse me.
>> Thank you. That wasn't clear to me
whether the engagement continued or not.
So that I appreciate that being
clarified.
>> Okay. At this point, I'm not seeing
anybody else. We have an I guess we have
an alternative number two on the floor.
There's no more discussion. Please
indicate your escribe vote now.
That's great. 12 to zero. Thank you.
Thank you to councelor Bey for his
pausing the momentum of the meeting to
have sober second thoughts. Okay, I
think we're on to 9.2 2 PED26095
request for direction to proceed with
appeal of committee adjustment decision
to approve consent to sever application
B25
087 for lands located at 117 Lowden and
Avenue in Ancaster. This is in W 12.
So may I have a mover and secondary
to put it on the floor. Thank you and I
was coming to you councelor Casar. I'm
very conscientious of people's wards and
where things happen. Okay. And we'll
have a seconder. Councelor Cooper and
anyone wishing to speak to this item?
Councelor Casar's first up.
>> Yeah. Thank you, Chair. I'm supportive
of the staff recommendation here and
just thought it might be good to get on
the public record for staff to express
the reason for uh the recommendation to
appeal and specifically the three
conditions that were not um that were
not required by the COA for this
application and why those conditions are
important to staff. Thank you.
staff is gathering as you wait at home
with baited breath for the answers. Here
we go.
>> Thank you. Identify yourself and share
your information.
>> I was going to say through the chair.
That's the quickest I've done stairs in
a long time. Uh Jennifer Katarino, area
planning manager for the West
Development team. Um and hopefully
councelor Kazar will answer your
question. Um the reason for the appeal
is the lands have recently been zoned uh
R2 in Ancaster through the low density
residential work that has happened. They
were previously zoned um in the ER zone.
Sorry, the stairs got to me.
Um previously zoned ER zone in Ancaster
and there's a bit of history in the ER
zones with in Ancaster in terms of
severances. So there was a number of
concerns regarding lot drainage and
grading storm water um their flooding
concerns. So when
the zone changed to R2
um our staff still consider those
grading and drainage issues on the
properties when people consider consent
applications. So in this instance,
development engineering staff uh
requested that the conditions that we
pre previously would have requested when
a consent application happened in this
part of Ancaster be applied. Um the
committee of adjustment did not apply
those to the approval. So it's important
for us as staff to ensure that the
grading and drainage
uh can be accommodated
um for the new house. So we think it's
imperative that we proceed um to address
those concerns and to ensure that the
applicant will provide development
engineering with the necessary studies
to ensure that um drainage can can
happen on the site.
>> Okay. Thank you
councelor Cooper.
>> Thank you chair. Just following up what
do we know what the rationale was from
the committee of adjustment
>> uh through the chair I can't speak for
the committee I can just speak to the
flavor of the meeting
>> okay
>> um and so the conversation that that
sort of happened um the applicant
requested that the conditions be removed
uh they did note that through the
building permit process a grading plan
is typically required when you get a
building permit um and I believe the
committee of adjustment and thought that
that was adequate in order to proceed.
Um,
so I I think that's where they landed.
>> Okay. Okay. Thank you. Thank you, chair.
>> No more questions.
Not seeing any more questions.
I guess the mover and the second to
approve the recommendations. Councelor
Casar and Councelor Cooper,
please indicate your escribe vote now.
It was up and it was fast
uncharacteristically.
That carries 12 to zero.
Item 9.3 has been deferred.
We're on to item 9.4, HMHC 260004,
Hamilton Municipal Heritage Committee
minutes dated April 17th, 2026.
May I have a mover and secondary,
Councelor Kretch and
councelor Casar, to approve the
recommendations that are contained in
the report. And are there any
discussions at this time?
Not seeing any. Okay. Please indicate
your escribe vote now.
>> We're We're good. We're good.
That one moved rather fast, so no
apologies necessary. I'm still waiting.
It is up now.
>> The heritage committee minutes have been
as we wait.
I'm gonna say he's going to make
>> Okay, working out the robots. We have it
at 12 to zero. Thank you. The municipal
heritage minutes carried. We are on to
motions.
10.1 Infill cost recovery from public
damage. Councelor M. Wilson, please
introduce your motion and your seconder.
Oh, I'm sorry. It's not up here. Hold on
a sec. Thank you.
>> No. Uh, thank you. And I forgot to
confer with the chair. I can withdraw
this motion. I found out that there was
direction given in previous years, but
that the bylaw to enact the direction um
hadn't been exercised. And I've received
a commitment that staff will be
initiating the necessary amendments to
the bylaw by year's end um to ensure
that when development takes place on an
infill basis and there's damage to the
public realm that um we will recover the
cost of that damage. Thank you.
>> Much appreciated. Thank you, counselor.
So, we'll move on to notices of motion.
So 11.1
public participation in land use
planning process. Councelor Nan, please
introduce your notice of motion.
>> Land use planning processes. Um it's
moved by myself and seconded by
councelor Crutch. And I am seeking to
wave or suspend the rules so that we can
address the motion today. And I will be
seeking if my colleagues permit me to
suspend the rules and bring this motion
forward today to defer the motion till
after in camera.
>> Okay. And your seconder? Okay. For sure.
So it's councelor Cret as the seconder.
Uh we're going to ask for a vote on
suspending the rules in order to for the
to allow the introduction of the motion
at today's meeting. Please indicate your
escribe vote now.
What was the reason for
>> I'm sorry I can't hear you.
>> Oh, reason for
>> um emerging um
it's an emerging issue. Uh and I'll get
into the details in camera
>> from councelor crutch.
And now we will indicate our escribe
vote when it comes up.
Vote is up.
>> Okay, that carries 12 to zero. Um
I guess you're gonna introduce it now or
>> I can.
>> Okay. And then we'll defer to after
>> now and then defer it to after closed.
So whereas meaningful public
participation and engagement are
fundamental principles of good planning,
transparent governance and accountable
decision-m and whereas land use planning
decisions made under the planning act
can have lasting impacts on neighborhood
character, housing, infrastructure and
quality of life. And whereas the city of
Hamilton's official plan recognizes
public engagement as an essential
component of an effective and inclusive
planning process. And whereas public
confidence in the planning process is
strengthened when residents understand
their rights, opportunities to
participate, and how their input is
considered. Therefore, be it resolved
that staff be directed report back to
planning committee with a an overview of
the importance of public participation
and engagement throughout the planning
process and how public input is
received, documented, and considered in
decision-m including before the
committee of adjustment and Ontario land
tribunal. B that opportunities available
for public involvement at various stages
of planning applications, including but
not limited to the official plan
amendments, zoning bylaw amendments,
site piling control applications, and
committee of adjustment matters. and see
the course of action the public would
have should an applicant interfere with
the public's ability to participate in
these planning processes.
>> Thank you.
At this time, I think we'll
I don't know if we're going to go into
discussion now or just go to to the
close for that. Okay. Thank you so much.
Uh
Councelor Clark has his hand up. Um,
okay. Councelor Clark,
>> councelor Clark, you are muted. Sorry.
>> Sorry. I uh chair I might have missed
the motion to include this in camera and
that may be a separate motion that
you're bringing later on. Um but I'm
intrigued by the motion enough that I
would like to hear um um
the challenges that are being described
um put to our lawyers in CRA.
>> Okay. So, I'm I'm assuming you're
supportive of that's going in camera at
this time. Oh, like at the appropriate
time to hear it. Correct.
>> Yes. I just wanted to make sure that it
was included in the in camera. That's
all.
>> It is.
>> Thank you.
>> Thank you, sir. Thank you.
At this time,
committee is going to go into close
session
for items 12.1, 12.2, and this item as
well. Um
motion.
Do we need a Okay.
>> Go ahead. Go ahead, councelor Nan. I'm
still figuring this out.
>> Yeah. And I apologize. I think we're all
conferring on making sure that we're
procedurally correct and that we are
stating a reason to go into camera. Um
so from that perspective maybe seeking a
little bit of support from clerk that um
seeking to go into camera in order to
get legal
>> advice.
>> Thank you. Advice that is privilege to
solicister client privilege I believe
was something along those one extra
privilege privilege in there but aside
from that yes.
>> Thank you. I just
>> And do we require a motion to do that or
is it do we just go into it
>> publicly?
>> Okay, thank you. So that's stated
publicly. So now we have the reasoning
why we're going to go into close for
that particular issue. We also are going
to close for a few other issues. So at
this point um do we vote to go into
closed?
>> Oh page 15.
>> 16.
>> Does the committee wish to go into close
session?
>> Yes. If yes, may I please have a mo and
seconder to move into the close session
for items 12.1 12.2 and councelor Nan's
motion. Councelor Wang, councelor Nan.
Um pursuant to subsection 9.3,
subsections E F and K of the city's
procedural bylaw 12-021
as amended and section 2392 subsections
E F and K of the Ontario Municipal Act
2001 as amended. As the subject matter
pertains to litigation or potential
litigation, including matters before
administrative tribunals affecting the
municipality or local board, advice that
is subject to the solicitor client
privilege, including communications
necessary for that purpose, and a
position, plan, procedure, criteria, or
instruction to be applied to any
negotiations carried on or to be carried
on by or on behalf of the municipality
or local board. Please indicate your
hand vote now. I see mine. I see
everybody's. Thank you. We're going in.
Members of the public, the meeting will
continue following the close session
portion of the meeting. When you see the
members of committee rejoin the meeting,
the committee will wait up to 5 minutes
upon reconvening and open session before
proceeding with the meeting to provide
members of the public and the media to
return. Thank you.
Welcome back from close session. 12.1
Appeal to the Ontario Land Tribunal of
Urban Hamilton Official Plan Amendment
Number 232 and Rural Hamilton Official
Plan Number 44, Framework for Processing
and Evaluating urban boundary expansion
applications citywide. May I please have
a mover and seconder to approve that the
directions provided to staff in close
session respecting report LS260003
be approved. B that close session
recommendations of confidential report
LS2603
remain confidential until made public as
the city's position before the Ontario
Land Tribunal. And C that the balance of
the report LS260003
remain confidential.
Councelor Wang, Councelor Casar, let's
indicate with our Eastcribe vote now.
>> The robots.
So, we're indicating our East Grove V
Eastribe vote now for 12.1.
>> We're doing a a hand vote. Councelor
Francis.
>> Okay, that's looks like it's unanimous.
Okay. 12.2
LS24020.
Appeal to the Ontario Land Tribune for
lands located at 9285-9445
9511 9625 and 975120 Road West and 555
Glancaster Road. Glambert for lack of
decision on urban Hamilton official plan
amendment applications and
you
>> okay so UHOPA 20018
UHOPA 2019 and UHOPA 2020 in word 11 may
I please have a mover and secondary to
approve that
councelor Wang going to go to councelor
Paul's
and um we're going to basically Please
indicate your hand vote with a hand vote
right now. Thank you. And that's
carried.
I'm going to
page 15.
This is a motion that came forward
today.
Uh 11.1 public participation in land use
planning process.
May I have a May I have the movers?
Councelor Nan. Secer will be councelor
Cret. Please indicate your escribe vote
now.
>> Okay, the vote is up. All those in
support say yes. In disagreement say no.
Submit it.
Yes.
>> Yes.
>> Oh, we're waiting for the vote to be to
come up.
I don't know.
>> Was it 10?
>> Yeah.
>> Okay. So, the computer froze, but it was
indicated by the clerk that that vote
passed 10 to zero. At this time, it's
adjournment time. It's 4:14. There being
no further business, we are adjourned
>> somewhat.