← Back to summary
Full Transcript
Building Permits: Rules and Compliance - 01 Oct 25
Oakville · October 03, 2026
All
right.
Yeah.
All right.
It's still
simply by the
Yeah.
Wow. Interesting.
Yeah,
Yes.
Thank you.
You don't have any
I don't know about
Thank you.
All right, guys.
Good afternoon everyone. Nope.
>> Congratulations.
>> I didn't Oh,
>> thank you.
I'm just
>> okay. And then will you tell me when I'm
actually
>> Okay. Thank you.
>> Okay. Test. Test.
Good afternoon everyone.
>> No.
>> Yep.
>> Do you want me to speak with my voice?
No, please make a seat.
>> And I'll then I'll walk you.
>> Good afternoon, everyone. Can I ask you
to please make your way to a seat? We're
going to begin our presentation. Thank
you.
You got your
supposed
Have a seat.
>> Right.
Good afternoon everyone. Welcome. I'm
Suzanne Holder, manager of training and
development in the building department
and your MC for today. I'll open our
gathering by honoring the land and
territory. Oakville as we know it today
is rich in the history and modern
traditions of many First Nations. From
the lands of the Anesnab to the Adawa
Daron and Hodeni, these lands
surrounding the Great Lakes are steeped
in First Nations history. As we gather
today on the sacred lands of treaties 14
and 22, we are in solidarity with
indigenous brothers and sisters to honor
and respect mother earth, the original
nations of the trees and plants, the
four-legged, the flyers, the fin and the
crawlers as the original stewards of
mother earth. We acknowledge and give
gratitude to the waters as being life
and being sacred and to the carriers of
those water teachings, the females. We
acknowledge and give gratitude for the
wisdom of the grandfathers and the four
winds that carry the spirits of our
ancestors that walked this land before
us. The town of Oakville is located on
the treaty lands and territory of the
Missagas of the Credit. We acknowledge
and thank the Missagas of the Credit
First Nation, the treaty holders for
being stewards of this traditional
territory.
Welcome to the building permit
information session. Uh welcome
councelor Hlett Theel. We're very
pleased to have you join us and welcome
to our inerson guests and to our guests
joining us online. We're delighted to
have you here and to learning more about
building permits and what to expect when
you work with us. Please um for our
guests here uh you have you've had a bit
of time to interact with our interact
with stations and meet our staff. Um,
and we'll make sure that there's more
time at the end of this session for you
to engage and learn more and have um,
all of your questions answered about any
projects that you're wondering about or
more information that you'd like. Um,
and for those of you online joining us,
um, please contact us. We'll have our
information up on the slide that you can
contact our team at any time if you have
any questions about any projects or um,
you need any assistance with building
permits.
So, I'd like to introduce our building
department leadership team. Um, Ralph
Kaminsky is our chief building official
and director.
Uh, Yanni Panagakis is deputy chief
building official. Um, Tim Lee is our
manager of zoning and committee of
adjustment and Philip Smansky is our
manager of development construction. Um,
we just wanted to make sure that you
could put a face to a name if you've had
to um any the opportunity of having
interactions with us. Um, it's always
nice to know um that there is someone
behind the emails, behind the phone
calls, um, behind all the the hard work
that happens um, you know, to get your
permits and make things possible for
you. So, um, please never hesitate to
reach out to our leadership team if you
need any support. Um, and as well I just
want to say thank you so much to our
great staff uh for creating these um
exciting interactive exhibits for you
and being present to answer all of your
questions. They have wonderful knowledge
and I encourage you to reach out to them
today with your questions but also in
future. Don't hesitate.
So over the next hour or so we'll be um
covering a a pretty full agenda. Um
we're going to talk about when you need
a permit and um some of the rules around
that and when you don't need a permit.
Um, we'll look at the building code and
the zoning bylaw, how to apply step by
step to get a permit, um, what happens,
what to expect during inspections, um,
some tips and tricks around mistakes or,
um, what happens. And, uh, finally,
we've got some resources, and there'll
be time at the end for some Q&A as well.
So, I'd like to welcome Ralph Kaminsky
to the stage to uh, to just introduce us
and uh, why building permits matter.
Thanks, Ralph.
Thanks, Suzanne. And again, thanks
everyone for showing up here and
participating in our first information
session for building department. We're
trying to keep this light and informal.
In fact, I don't even like being behind
a podium here. But because of our online
guests, we need this format so that the
voice can carry. We're trying to create
a casual format to let you the residents
and the building applicants know that
that we're here to help. We do have a
very uh rigid process. We do have forms
that need to be filled out. We have a
process that needs to be followed. We
need to adhere to the Ontario building
code very closely. Our staff are
obligated to comply with or seek for
compliance with the building code and
only the building code. So, we walk a
fine line between what we can require
people to do and what we can encourage
people to do. We have a lot of knowledge
in this department. We have a lot of
knowledge across the province and other
building departments. We are designers.
We are builders. We are former
contractors. We are homeowners. We're
do-it-yourselfers, so we know what it's
like. Whatever application you're going
through, you'll find someone on our team
that's been there and understands the
pain or the nervousness that you're
going through to get a building permit.
Excuse me. Building permits are
important because they ensure that the
construction has been vetted to be in
compliance with the building code and
other applicable regulations. Now, this
is important because it protects each of
us from any responsibilities that that
may be thrust upon us where we need
something to rely on. The building code
protects us, protects our investment,
and protects our decisions. Compliance
with the zoning bylaw protects us from
ensuring that what we've built isn't
compliance. Sometimes what we do annoys
our neighbor. Sometimes we say, "Why are
they allowed to do that?" Well, the
public process that creates the zoning
bylaw sets the standards and the
guidelines for which construction can
take place. We just make sure that
they're complying with those
regulations. Right? So, there's a
there's a relationship that we have with
the with the designers, with the
applicants, with the homeowner that
tries to tries to bridge all these uh
conflicts when they exist and we can all
live and work in harmony.
What we're talking about is basically
safety. safety of the building, safety
of the occupants, safety of the
equipment within that. That's from the
drinking water to the structural
integrity of the building. What Suzanne
pointed out is the various displays we
have here. And you'll have time to meet
with the staff after our formal
presentation, if you will, and ask any
questions and learn a little bit more
about that. Before you get to them, we
will hear from this fine group here,
which will provide you a little bit more
detail. Again, the important takeaway
here is that this is an an informal
relationship that we're trying to
establish here. Let you know that we're
here to help. We have a very serious
responsibility. We have tools that allow
us to enforce our our position, but we
prefer to create a very collaborative,
interactive, helpful environment. So, as
I said, this is our first uh
relationship with the public in this
format. I'm pleased with the turnout. I
know it's a small group, but this is the
first time we're we're we're doing this.
We're hoping that word will get out that
this is a beneficial exercise and
encourage more people to participate.
We're planning in the spring to have a
more structured uh event for designers
and builders and contractors where it'll
get more technical. This is a very high
level, we'll call it an introductory
course, if you will, to the building
department and the building permit
process.
I have on the slide here legal and
compliant. It's important for you when
you when you purchase a property or when
you sell a property that people
understand that the work that has
happened on that property has been
vetted and is protected by the issuance
of a building permit.
It's the next point. So again that the
resale of your property when you have
any concerns with your property
you should feel comfortable and be
assured that if a building permit was
issued for the property the building is
is properly constructed.
I should put a caveat on there. What the
building department is not responsible
for is workmanship. So in new
construction, there is another program
that the Ontario government has, the
Terrion program. They're responsible for
workmanship. They also have a program
that's responsible for the quality of
the contractors. The building department
has no authority over that workmanship
and quality of the contractor. That's up
to the homeowner to establish and build
a relationship with a trustworthy
contractor and a trustworthy designer.
But full circle to the building
department, we're here to help. If you
have any questions or concerns with the
drawings that are being prepared or with
the construction that's taking place,
please don't be afraid to reach out to
the building department. If you have any
questions wondering if what you're doing
or contemplating requires a building
permit, don't be afraid to reach out to
the building department. We're not
keeping notes. We're not saying, "Hey,
this person asked you a question. We
need to make sure that they're not
building without a permit." We're here
to help. We want to be part of your
process. So, I'm going to turn it over
to Yachti, who's going to go into a
little bit more detail and walk you
through what we need for the building
permit. Thank you, Yachti.
So, every project must satisfy two rule
books. One is the Ontario building code
and the other one is the zoning bylaw
which uh Tim will will come up and speak
a little bit more to that effect.
Certainly. How's that? Okay. Uh so two
project uh two every project must
satisfy two rule books. So the the
Ontario building code and the zoning
bylaw. So the Ontario building code is
basically the guidelines on how to
construct. uh really comes down to it's
a it's a provincewide technical manual
that uh speaks to the standards for safe
safe construction.
So it covers structural integrity of
buildings. It covers the fire safety,
plumbing, HVAC and energy efficiency.
Sets the minima minimum standards for
things like stairs, guard heights, um
railing heights, etc. Um and it's really
ultimately um enforced by the building
department.
>> Thanks Arie. Um so what is zoning?
Zoning helps shapes our communities
um how properties can be used and
developed in our community. Um, it's a
municipal bylaw that sets out the rules
for what you can build, where you can
build it, and how properties can be
used. These rules addresses such things
as building height and size, uh,
setbacks from property lines,
uh, parking and driveways,
um, and other development standards.
It's it's important to note that zoning
requirements still apply even if your
project does not require a building
permit.
So here in Oakville, we have two zoning
bylaws.
Bylaw 2014-14
generally applies south of Dundas and
north of the 407. And bylaw 200989
generally applies between Dundas Street
and Highway 407.
So, make sure when you're looking at the
zoning bylaw, um, you look at the
appropriate zoning bylaw to your
property. This will help ensure that
you're looking at the right rules and
standards to apply to your project.
Kind of broke.
and when in doubt when trying to
maneuver through the zoning bylaw, Tim's
team is available to answer any of your
questions.
All right, so this comes up a lot. When
do you need a building permit? Um, so
most renovation, construction, and
demolition projects require a building
permit. Um, you know, the best thing is
when you're in doubt, reach out.
One of our staff members are happy to go
through it. check our website and we'll
identify which which renovation projects
may or may not require uh building
permits. So things that generally do
require building permits are things like
changes to the structure. So if you're
taking out a loadbearing wall and
replacing with a beam, you want to get
that open concept in your house.
Absolutely need a building permit. Uh
things that people don't consider are
things along the lines of when you're
taking out a load bearing wall. that
load bearing wall isn't just
structurally holding up the second floor
or the roof. Uh it also houses
mechanical systems uh plumbing systems
which have to get rerouted. So if you
eliminate um important returners are
going up to your second floor by taking
out that load bearing well you've
diminished the quality of your your your
heating system. Uh other things are um
additions or or changing floor area if
you're if you're adding it in addition.
I think that that one's a little more
straightforward. Things that are
modifying your your mechanical plumbing
system. So, sometimes even a bathroom
renovation where if you're just looking
at expanding it, taking up a closet
space, you're moving around plumbing
fixtures, it requires a building permit.
Uh and finally, um you're using a space
differently. So, unfinished basement, if
you're looking to introduce a a finished
basement, you want to expand your recck
room, you want to put a theater room
down there, it does require a building
permit. And of course, if you're looking
to add a secondary dwelling unit into
your your home as well.
So again, common projects that require
building permits, additions, new
porches, um covered porches, you know,
do need to comply with the zoning
regulations. So there's always a
percentage that applies and and it's
always best to to reach out to us if you
having um you need to assistance in in
trying to decipher some of those um
those bylaw or zoning bylaw
requirements. Uh finished basement, a
deck, even though a deck has some
nuances, and I'll I'll touch on that
later on, would require a building
permit. Structural changes, again, if
you're moving those loadbearing walls,
it's um it it it does impact the the
system as a whole.
plumbing and drainage, HVAC, fireplaces,
changing out your furnace doesn't
require a building permit. However, if
you are modifying your duct work to
serve um to serve the home differently,
that's something that uh would require a
building permit. Detached structures,
uh few years ago, the building code
changed slightly in terms of what size
of shed requires a building permit. It's
uh we've adopted a 15 square meter. So
about 160 square f foot shed does not
require a building permit or garden
structure provided there are no uh uh
it's it's a singlestory and there are no
plumbing fixtures as well.
And again, if you're adding a
residential unit to your home, whether
it's in the basement and or an addition
over a garage to add that or or a coach
house, again, something that would
require a building permit.
This one we get asked a lot, what things
don't need a building permit? Um, so
we always kind of chuckle and say things
like, well, do I need a permit to paint
my walls? No, you don't need a permit to
paint the walls. But if you're putting
up the new walls, you need a building
permit for that part. So, if you're just
looking to give your house a facelift,
adding wallpaper, painting, things like
that, does not require a building
permit. Updating flooring, taking out
carpeting to put in some laminate or or
hardwood flooring, again, no permit
required. um kitchen renovations. If
you're just, you know, like for like
changing out kitchen cabinetry, provided
you're not doing any major plumbing um
plumbing changes and and rerouting where
where your your existing kitchen sink
is. Again, no permit required. If you're
reshingling your house, again, if you're
using similar material, a building
permit wouldn't be required. Swapping
out windows, provided that the windows
are the same size, you're not expanding
the width of the windows. Uh that's
generally when you would require a
permit and again small sheds it's under
15 square meters and there's no plumbing
and singlestory a building permit would
not be required. Now the caveat to all
this is even though you don't require a
building permit you still need to build
it in accordance to the Ontario building
code and you still need to comply with
other regulations such as a zoning
bylaw, conservation, etc. So, uh, again,
if you're not sure about what, uh, your
property requires, reach out to us and
we can help guide you, even though a
building permit may not be, uh, required
to carry out the work.
All right, here we go. Decks. What about
a deck? When do you need a deck permit?
Well, decks are one of those things that
always trip people up, and I think it
even trips up the building department as
well when we're looking at it, cuz we're
kind of always debating this this one.
So decks larger than 10 square meters
and higher than 2 feet61
mters requires a building permit. The
other caveat is if you are attaching a
deck to your house, doesn't matter the
size of it. Soon as you're connecting it
to your house, that requires a building
permit. You're modifying the system. And
you'll you wouldn't believe how many
people try to attach their deck to the
brick facade. And that's a big no no.
Um, so rule of thumb, um, low
freestanding deck may be exempt, but,
uh, it's always best to check your your
zoning because in in some cases it would
also count as, um, as some coverage.
Okay. the focus of the Ontario building
code. Um, your drawings are are accepted
and reviewed against a series of of
parts and and sections within those
parts of the building code. So, the some
of the main main things that uh we're
looking for throughout the review
process is uh the structural integrity,
the the footings, the framing, the the
spans of beams, the loading on on on
elements within the structure. We're
looking at fire safety, so fire
separations, adequate alarms in place.
The code's always updating and always
introducing some new new standards and
regulations. So, even in the in the past
past year or so, and I might date
myself, my team will correct me later.
Um there there were additional um
requirements with respect to smoke and
carbon monoxide alarms added. So, um,
another key point is sometimes a
contractor might tell you, I don't need
to do this and I don't need to do this.
Well, they may not always be up to date
and that's why we're going to be doing
our spring workshop to help everybody
else stay up to up to pace with the uh,
ever evolving building code.
Uh, things we're also looking at exits
and regressing. We would just want to
make sure res residents are safe when it
when they are looking to modify p
portions of their home. Adding a a
bedroom in your basement requires a
larger window just to have a second
means of egress. And then soon as you
start introducing a a a
secondary dwelling unit within within
your your basement, it also changes the
exiting requirements.
um plumbing, HVAC, energy efficiency, um
and things like guards, stairs. We're
reviewing the height of guards, stair
tread, risers. Um ultimately, it's it's
to ensure your safety within within the
building. So, the safety of your
yourselves and and the occupants of of
every building.
applying for a permit. There's is a
highlevel step-by-step guide because I
know there's some back and forth within
this, but uh before you want to start uh
a project, just do a pre-check. Find out
what your zoning is. Find out if your
property has uh designation like
heritage or if it falls within
conservation
um boundary because at those points you
may require additional approvals and
you'll hear us talking about applicable
law and these are the items that do form
applicable law. It's these other other
regulations that are tied closely with
the building permit issuance to ensure
that uh you're not only complying with
the Ontario building code, the zoning
by, but any other flags that may be on
your property. And we we commonly refer
to these as flags. Um but it's it's just
to help ensure that these are all um
verified. At that point, once you kind
of know what you can build, um hire a
qualified BCN designer, architect,
engineer. They know the way to navigate
through the building code. They know the
way to navigate through the zoning
bylaws and and know where to go to get
all those other additional approvals.
At that point, prepare, assemble your
drawings,
get the forms together, pay the
applicable fees, and submit to the
online portal. Um, at that point once
we've kind of assessed your application
and and deemed it acceptable to review,
we'll we'll put it into the plan we've
review process where a series of
individuals will we'll review it based
on the the discipline of review. Um,
that point if we have comments, it's an
opportunity for you to revise those
comments, send it back to us into uh
with the corrections. At that point,
everything's good and we've met all the
other applicable laws. will issue your
building permit and you're ready to
start construction. That's when the fun
starts and that's when the dust starts
kicking up within the within the uh
renovation and whatnot. Um, and as you
go through the construction, there are a
series of of inspections that are
required under the building code that uh
are are done in a in a subsequent manner
and we can assist you with navigating
through that as well.
So typical documents that you need to
apply for a building permit. I know this
is very high level and then but these
form the basis of what most projects
would need. So you need a site plan.
Show us show us the property. Show us
the limitations of the property
structures you're putting on there. How
far those structures are from the
property line etc. Need floor plans.
just to mention drawings showing um not
only structural elements but things like
carbon and smoke alarms um heat
registers etc.
Um required to provide us elevations
kind of helps determine size of windows
windows in conjunction with with um
property line show heights of stairs
etc. Um provide a cross-section. And the
cross-sections are usually what tell us
a little bit more about and that's where
you start getting into the structural uh
requirements and and how things are
being held up.
Uh, and then we get to the forms.
Schedule one, if you're using a BCIN
designer or if you're designing it
yourself, you'd want to complete uh
you'd have to complete a schedule one
form. And then again, it's those
applicable law approvals I was speaking
of earlier, which are outside of the
building department, but are are
elements that we'd be looking for at
time of issuance.
So caveat out of all this depending on
the scope of the project it's always
best to to engage a qualified
practitioner be it a BCI qualified
designer architect or engineer they best
to navigate you through through the uh
design process
typical typical fees and timelines um
around smaller residential projects a
complete application is under the the
under the building code is is is falls
under a 10-day permit. Um, we do our
best to follow the 10-day permit uh
turnaround review time. Um, some
residential projects do fall into a
15-day, but you're generally looking at
this timeline for uh if not an issued
building permit, at least a series of
comments of what needs to be corrected
uh prior to the permit being issued.
Typical permit fees range uh again
depending on scope anywhere from $250
all the way up to $2,000. And this again
changes with the scope, number of
inspections that would be part of it and
uh the se the number of reviews that um
that need to be brought in for uh the
type of project that you're doing.
Quality is a is a big piece. If um if
it's not a quality application, it it it
does cause delays. It causes delays in
the number of reviews that are taking
place, the number of times the file goes
back to you. And subsequently, if we're
looking at a series of projects that are
all going through multiple reviews, it
just increases the timeline for
everybody. So, um, when in doubt, it's
something you're not comfortable in
designing yourselves, I, uh, encourage
you to use use designers that, um, know
the code and, um, and the zoning by law.
So, once the building permit's issued,
um, again, it's a series of inspections
do get generated
for for most projects. You're going to
follow the, um, as it's being
constructed. So footings, foundations,
below grade plumbing happens. Um then
you start getting into framing
inspections, plumbing roughens and HVAC
roughens.
After that you start getting into
installation, sealing things off, final
interior uh and um final interior, final
mechanicals, plumbing and that
ultimately leads to occupancy. Um,
again, sometimes these these inspections
stagger and can work in conjunction.
Again, if you're not sure what
inspection to call next, always speak to
your inspector. Um, they're also there
to to help guide you and ensure that
you're you're you're following the
inspections. It's never a good idea to
cover anything up before um before it's
been inspected. It could cause delays.
We may need we may ask you to open
things up so we can have a closer look
at uh work that was covered up and we
did not have the benefit of of
reviewing.
So some common mistakes that homeowners
do make uh starting before a building
permit is issued. I know a lot of the
times contractors in place, designers,
um you know, we have if I get my
contractor in, they can start in this
this window. A lot of times those
permits come in days before the per
before the construction is scheduled.
It's never a good idea to start before a
building permit. It could lead to some
some ugly things, and I'll get to those
later on. um
assuming that your neighbor's advice is
current. Uh again, it's kind of going
back to the code changes. Things are
always modifying. The zoning bylaw was
change was recently updated, made some
modifications. So, uh if you're not
sure, reach out to us and uh we'll we'll
guide you along that path. Submitting
incomplete drawings. Um quality is is a
is a big thing. So, it's if we're not
getting substantial information for us
to be able to make an informed decision
to issue a building permit, we're not
it's going to take us longer to issue
that building permit. So, the better the
quality, the the the more uh the more
success you're you're bound to have in
in obtaining that building permit. Um,
don't rule out zoning. Don't rule out
all other applicable law.
Um, you know, there's the the
do-it-yourselfer like that that go
beyond what they should be doing. Um,
you know, don't engage into plumbing
activities or electrical work should be
left to licensed contractors to carry
that piece out. And don't skip those in
in skipping those required inspections.
It's it leads to uh delays in in getting
your project finalized.
These are kind of, you know, building
building permits are are are required by
law. This is something that chief
building officials we we don't like
doing. We don't want to go out
heavy-handed, but you know, there are
because if you are not if you're not
following the rules and you are breaking
the rules, there are there are potential
risks that you're taking. So, we could
issue an order could to comply. We could
issue that all works on the property
stop. We may ask you to remove a
structure that was built without a
building permit. Could lead to
prosecutions and fines. Um, and
ultimately it could also impact the
resale uh value of of your property. Um,
so good news is if you're
coming in early, getting your permits in
place, you shouldn't have to get
yourself into this situation.
And I think I've exhausted my speaking
right now and know we might all need a
little break for me and I'm going to
call up uh Phil to uh speak a little bit
about some other um requirements.
>> Good afternoon everybody.
So, in addition to the town's well, the
Ontario building code's requirement for
a building permit, the town of Oakville
has a site alteration bylaw.
So, this bylaw kicks in really when
there's a large movement of earth or or
fill. So, when you're doing a large
renovation project or let's let's say
you're rebuilding a house or you're
doing a large renovation and you're
adding to your home's footprint,
uh the site alteration bylaw would kick
in. And when that happens, that means
you typically need a permit and that
goes through development engineering and
that's reviewed and it's
there's a bunch of considerations that
are uh looked at including
sediment erosion controls, surrounding
trees, the degrading and drainage of the
land.
So under this um permit if it's required
some considerations. So, new and old
properties, you're going to have an
existing drainage pattern. So, new
subdivisions have a more advanced, old
areas
have more complicated drainage patterns.
Typically, you your work doesn't want to
affect those. You want to protect your
neighbors and make sure everything is as
existing or doesn't increase any impacts
to to neighboring properties. Um, some
other considerations. So, if you're
installing
an addition and it requires a sump sump
pump, that sump pump should be
discharging to the front of the
property. We don't want it discharging
to the back or the sideyard impacting
neighbors. Um, even something as simple
as downspout placement for an addition.
We don't want it aiming at your
neighbor's property. You want it kind of
directed into a swale discharging to
grade. Uh for larger projects that
increase the hard surfacing of a
property, development engineering
typically requires some sort of storm
water management. So that could be like
an infiltration pit, some kind of um
soak away feature that takes the rain
water, puts it into the ground and
disperses it. Additionally, all pools
will need a sight alteration permit.
If you have any questions on the second
booth on the on the left hand side um
yeah that's it for me.
Thanks Phillip.
So, I know that uh Ralph would like to
say some closing words in terms of the
presentation and then so I'll invite
Ralph to come on up and say a few words
and then we'd like to um open the floor
up to any questions that you have. Um
sort of a broad um kind of questions in
in terms of building permits or anything
that we've talked about tonight in terms
of zoning and um uh development
construction as well, pools, those kind
of things. Um, but if you do have
individual project questions, those are
probably best handled uh one-to-one with
our staff, which we will be um back at
our our stations and um able to answer
those questions and have a more fruitful
discussion with you. I'm going to turn
things over to Ralph now.
>> [clears throat]
>> So again, I just want to thank everyone
for for participating here tonight, but
I just want to add a
thing or two to what what what Yanni had
mentioned when he talked about the the
building code, the zoning by line, and
when we need a building permit, and when
we need inspections. It's not random.
It's not we decided at this not at this
area or this location we need a building
permit. Behind every ask that staff have
of an applicant, there's a reason for
it. You may not know it as a
do-it-yourselfer. As a homeowner, you
may not know it. Right? When you move a
plumbing fixture, and we say if you
exchange it, that's okay. If you move it
too far, it creates a problem with
venting. How your plumbing system is
vented, which can be a problem because
it relates to an improperly protected
ventilation. By ventilation, I mean of
your your drainage system. So, sewer gas
can actually enter in your home. Really?
I didn't think that was hazardous by me
moving my kitchen sink, but that's a
possibility. When Yanni mentioned
windows, we we control the the number of
windows that are permitted in the
sideyard for fire protection. When your
pro when your building is too close to a
property line, we increase the fire
protection of that wall and we limit the
number of windows on that wall. So, in
the event of a fire, that fire doesn't
spread to the joining property. So
sometimes an applicant doesn't
understand why the building department
is asking for something and sometimes we
don't do a good job explaining why we're
asking for something. We we kind of
assume that there's an understanding,
but we realize that doesn't always
exist. So we're going to do our part to
communicate better with you what it is
that we're asking for and why we're
asking for it. So, when you're going
through our process, if you have any
questions, if you don't understand why
someone is asking something of you,
we're happy to answer that question. I
was once told that the building code is
a book of answers. It's a response to
something that went wrong, right? So,
when something goes wrong, we think this
can't happen again. We have to write a
regulation to prevent this from
happening. So, we create a standard and
we say if we enforce this, hopefully
this won't happen again. We've asked the
province to tell us what was the issue
that prompted this. What are the the
what are we looking for here? The
functions and objectives of each of the
codes statements, right? They did that
for us but very vague. If we better
understood why the code exists, why that
provision of the code exists rather, we
would be more equipped to better answer
that question. A simple example I can
provide for you is a 4-in gap that we
require between guardrails and a 4-in
gap on stairs. It was determined that
children like to stick their head
through guardrails and like to climb
over things. So 4 in was the size of a
child's head that would not fit through.
Right? If it's bigger than that, the
child is is smart enough. So they they
they determine this dimension based on
an accident of children sticking their
head through through pickets and getting
stuck there. So there is some logic to
everything that exists in the code.
Sometimes we don't understand it.
Sometimes the code writers don't even
remember it. That's why they do code
overhaul. And when they make changes to
the code, they invite the public to
participate in this process and see if
they can't remember why this regulation
exists. So the code does change. It
changes significantly every five years
or thereabouts and they have interimm
amendments every two and a half years or
somewhere in the middle. Right? So I
just want you to understand there is a
there is a reason for everything we ask
for and if you don't understand why
something is asked of you by all means
ask. All right? And we will do our best
to answer those questions. With that
said, the the the staff are still here
to answer any questions at the tables,
but if anyone has any general question
right now that they would like to ask,
I'll do my best to answer, but in all
likelihood, turn it over to one of my my
fine co-workers to answer the question.
So, I'll open up to the floor before I I
close it and let you wander around and
and meet us.
Oh, we have a question, counselor.
All right, resident first.
Yes.
>> Eventually it gets to us but it starts
in planning. So So those are planning uh
conversations. So when we create well
there's a whole different meeting on
that I shouldn't speak to it but high
level we have an official plan which
addresses things at the very high level
from the official plan we create the
zoning bylaw once the zoning bylaw is
created Tim and his team interpret that
to uh to meet those
Yeah,
that's a whole different conversation.
It's a that's a whole different process.
We'll be happy to answer all those
questions for you, but I can't do that
justice right now. But but I understand
I understand your point there. Yeah,
counselor.
Yes.
>> I think we do that. Yes, we encourage
it. So there there has been some some
changes in in the way we process
applications. Uh engineering approval
was separate from building. I think it
was two years now that we we made a
change. So, we brought Phil and his team
over to building to try to consolidate
those approvals. There are still some
separations like you might say, uh, that
doesn't apply to pools. That's correct.
So, that the the pool permit and the
pool process is a little bit different
primarily because pools aren't governed.
Residential pools are not governed by
the building code. There's a bylaw that
that manages pools and the pool
construction. So, it's it's kind of an
anomaly and we're still trying to figure
the best way of managing the pool
permits. Phil and his team get involved
simply from understanding the impact of
putting that structure in the on a
property. What impact that might have on
uh the drainage patterns of the joining
property and the property on which it
exists.
Yes.
>> Yes.
don't
work. So when you do an inspection, you
just clarify what you are actually.
>> So the the the building code regulates
elements of construction. It tells you
what what material is suitable to use,
how the material is fastened, that it
has to be plum, it has to be level. But
if the but if it's poor workmanship and
and primarily it's on finishes that we
get into workmanship um
help me out. Do we have an example of
workmanship that we can
>> I think things like trim work things
that you know ends not corners not being
done
talk to Jared and Michelle over there
later
examples of things that would be gaps in
flooring things like that that aren't
under
fall under
>> so just if I can just add further to
that that Terrion does publish a
guideline which which everyone has
access to on what the tolerances are for
workmanship. So you can look up and
actually I think they still have a
really cool model so it's easy to
follow. You look at your house are you
inside the house or outside the house
you click on that and you walk your
yourself through if I can say that and
then you'll see what the workmanship
levels are right like a floor has to be
level but a floor can't be level it has
to have a slope to it to it drains. So
when is it level and when is it sloped
appropriately. So those standards for
example are written in the in the
carryon guidelines of what proper
workmanship is.
Yes.
Yes.
Yeah. And and just on that I can I can
share some examples that will really
frustrate a homeowner. Some especially
on a new home, some people close the the
deal of their new home on a building
occupancy or final inspection. Don't
ever do that because the building code,
there are provisions in the code that
aren't applicable to what you'd be
looking for. For example, you don't need
trim. You don't need a carpet. As long
as the floor is smooth, we would pass
occupancy inspection on a home that has
no carpet, no trim,
right? You don't want that as a
homeowner. You don't want to move into a
home under those conditions, but we have
to allow it. Why would you allow it? You
say. Good question. When you're
renovating a home, we don't ask people
to vacate their home because it's not
finished, right? So, we have to make
sure that there are some as long as the
minimum safety requirements exist in the
home, the home can be occupied,
right? So, I think it's a good it's a
good piece of information for people to
know when they're looking at a new home
that make sure that you occupy the home
on your terms. Don't leave it up to say
the occupancies break granted by the
building department. You will in most
cases be disappointed.
Yeah.
A building permit is to be posted in a
conspicuous location.
tough question.
Trees are so and we we left this I think
my
um
so trees are a huge part of our building
permit process and what we tried to do
tonight is is just keep it to building
permit. Um you know the tree piece is
not applicable law. Every building
permit application that comes in that is
uh doing exterior works we circulate it
to the forestry department. So it's part
of what's called a tree declaration
form. We advise the forestry department
that there is work subject work that
will be happening here. So we work very
closely with them to ensure I just
didn't want to step on forestry's toes
by by uh in and kind of bringing it
because there are many departments that
are affiliated with the issuance of a
building permit. Uh tonight we just
wanted to demonstrate this is this is
what the building department does and in
future uh workshops like this we're
happy to to increase um the the number
of of other departments that are are
here just to demonstrate how it it does
touch so many departments.
>> I just want to add also Janet about
about trees. So under the site
alteration permit there is a whole tree
process where there's an arburous
report. We ensure all the tree
protection is up and we're protecting
all the neighboring trees and existing
trees as best as we can.
Any other questions?
Going once, going twice. Sold. Again,
thanks for your attention and coming out
here. We appreciate that.
Feel free to stick around and ask staff
any questions and and check out our
Oakleaf. I don't know.
>> I was going to go on about Oak Leaf, but
no.
Yeah, with Bill 23 things.