audio test one for the meeting stream.
audio test two for the meeting stream.
Check. Check. Check.
And if folks want to take their seats,
we'll get going. Um, probably about 30
seconds or so.
Good morning everyone.
Welcome to our 72nd Oh, I got to mute my
computer. 72nd and finals uh planning
and housing committee meeting. I think
it's a take your kids to work day. So,
for those of you who are with your
parents, welcome to Planning and Housing
Committee, the most kick-ass awesome
committee there is at city hall.
>> Oh, they're coming up later. Amazing.
Um, okay. So, after 72 of these, you'd
think I'd be fairly good at it, but I'm
not. Uh, what order am I going to go in?
First, I would like to acknowledge that
Ottawa is located on the unseated
territory of the Algangquin Anesab
nation, whose culture and presence have
nurtured and continue to nurture this
land.
Set. May I get a roll call, please?
>> Councelor Brochington
>> here.
>> Councelor Curry
>> here.
>> Councelor Dudes
>> here.
>> Councelor Johnson
>> here.
>> Councelor Kavanaaugh
>> present.
>> Councelor Kelly
>> present.
>> Councelor Kits here.
>> Councelor Low
>> present. Councelor Tierney
>> present.
>> Councelor Trustster
>> here. Vice Chair Gower
>> here.
>> Chair UFO.
>> Thank you very much. If folks will
indulge me, this is our last minute uh
meeting. I'd like to take uh four or
five minutes uh just to pass on some
thanks before we get underway if that's
okay with the committee. Uh so first of
all, thank you to uh you the committee
members. Um most of the files that cross
our desk at this committee are going to
change communities in ways that
residents sometimes don't feel
comfortable with. Um I believe that you
have fulfilled your responsibility in
assessing those applications with
dedication with uh commitment to a
better city uh and certainly with
integrity. Thank you for making it easy
to work with you. And uh I want to say
thanks to our honorary committee member
uh Kelly Kelly Groer. Thank you very
much for uh making this job such a a
pleasant and um uh easy thing to do. Uh
Marcia, I want to say thank you uh to
you and to your team. Uh you are all
consumate professionals. You put in very
long hours. I don't believe you have the
resources you need to do everything that
you're doing and I'm amazed that you can
do it. Um, we created the zoning over
the course of this term of council for
tens of thousands of homes. You have
worked hard to create a department that
says yes to housing. You've been
responsible uh responsive to counselors
uh probably to a fault. I know that we
are not the easiest people to work with.
I want to thank you and all of your team
members for your dedication to public
service and to your dedication to a
better Ottawa. Um, I want to say a
special thanks to Carol Ready. I don't
know if Carol's in the room. Carol,
Carol, you took very even-handed
stewardship of a very difficult file in
the comprehensive zoning bylaw. You were
absolutely committed to a great
consultation. You were also responsive
to us, probably to a fault. You were
responsive to residents in a in a a
really heartwarming way. uh you have
made a huge contribution to building a
better Ottawa uh for all the generations
to come. So, thank you very much for
that. Um
thank you very much staff and uh and
committee.
So, I'll just say that when people uh
live within walking distance of an LRT
station, their doctor, their library,
groceries, a record store, uh not only
does the planet benefit from reduced
greenhouse gas emissions, the city
benefits from a more sustainable cost
structure, but residents themselves are
healthier, they're happier, and they're
more connected. This term of council,
we've created the zoning that will allow
that. Uh I would be remiss not to note
though that the flip side of
intensification is gentrification. Uh
those great neighborhoods that we have
created and that we will create are
going to be accessible to fewer and
fewer people. Uh fewer and fewer people
in Ottawa are going to be able to afford
to live in them. And the market is not
going to deliver housing that's
affordable to everyone in 15minute
communities. I have really admired and
felt strongly about this committee's
heartfelt commitment to getting more
affordable notfor-profit housing built.
And I'm just going to conclude these
remarks by asking uh that those of you
who are returning uh all of our staff,
all of our stakeholders in the gallery
today to recommmit in the next term of
council to making sure that the great
neighborhoods that we're building
through zoning are accessible to
everyone. So, thank you very much to
everyone for all that. Chair, I think uh
we should also recognize you for
chairing this committee for the last
four years. It's the end of an era
today. Thank you.
>> Thank you, Catherine.
>> All right. So, this is a public meeting
to consider the proposed comprehensive
official plan and zoning bylaw
amendments listed as items 51, 71 to 73,
and 75 to 78 on today's agenda. For the
items just mentioned, only those who are
specifically identified in the planning
act who make oral submissions today or
written submissions before the
amendments are adopted may appeal the
matter to the Ontario Land Tribunal. In
addition, the applicant may appeal the
matter to the Ontario Land Tribunal if
council does not adopt an amendment
within 90 days of receipt of the
application for a zoning bylaw amendment
and 120 days for an official plan
amendment. To submit written comments on
these amendments prior to their
consideration by city council on
November 12th, 2026, please email or
call the committee or council
coordinator. Are there any declarations
of interest?
>> Sure. Get my screen back up. Beautiful.
Uh, none. Are the minutes of our meeting
71, October 7th, 2026 confirmed?
Amazing. Uh, responses to inquiries. Uh,
I know, uh, councelor Carr does have,
uh, some questions on the Habitat for
Humanity item. Uh, is it okay if we hold
that one?
>> Thank you. Postponements and deferrals.
Uh, we have the item before us, 1740,
1754, 1760 Boulevard, etc. Uh, I don't
see that there are any but the
proponents who wish to speak to that
one. Uh, that's an altista word. Did you
want us to hold that one?
>> I just want to say one thing.
>> Do you want to say one thing? Go ahead.
We can let those planners go.
>> I just want to express my appreciation
um to the folks involved to the
developer and uh the consultant I think
was Fen. This there was a it
accidentally didn't get circulated
previously. So it came up in an election
blackout period when I was unable to
have a consultation with the community
um to organize one myself. They met with
my community associations. The community
associations were uh not pleased that
there was exemptions to the bike the
bike parking and um they quickly amended
their application uh and um now it's
compliant with the the bike parking
bylaw. So I just I really appreciated
the the fact that they listened to the
community members and that that was
amended. And uh I'll just note that the
community did not have an issue with the
increase in height. Um the concern was
with the bike parking. So very happy to
see that passed and um yeah just wanted
to express my gratitude there.
>> Amazing. Thanks for that councelor Carr.
Um we don't have any uh public
delegations. There is correspondence on
the file. Uh did any members wish to
have that one held besides councelor
Carr for a quick question? No. Uh to the
applicants if the committee is prepared
to carry this. Do you still wish to
speak?
Thank you very much. Uh so is that item
carried? Thank you.
The next item.
>> Yeah, we have delegations. Okay. So, um
there is the Build Ottawa 2025 annual
report. Uh did anyone anticipate asking
for that one to be held for a
presentation or questions?
>> Okay, we'll hold that one. And there is
a technical amendment that Vice Chair
Gower will put forward. We'll get to
that when we get to the item.
We have the S4 Literum West of Bank
future neighborhood um file there. Staff
are prepared to make a presentation.
There are no public delegations on it.
The applicants are here. Did members
anticipate asking for that one to be
held for questions? No. I'll take a look
see if uh councelor D. Ro is here. No.
Um to the app or did any members wish to
have that one held?
Oh, Steve's in the corner.
I don't see him. No worries. Hi, Steve.
Uh, so to the applicants, if the
committee is prepared to carry this, do
you still wish uh to speak?
>> No. Thank you, Chair. Thank you for your
time.
>> Thank you. Uh, colleagues, is that item
carried?
>> I'm starting to remember how to do this.
There is the lifting of part control on
Smite Road. We're going to deal with
that as soon as we come back to the
start of the agenda. So, we can let
councelor Carr get out for a commitment.
There is a presentation on that one. And
we do have public delegations, so we'll
hold that. There is the zoning bylaw
amendment for 1345 uh Baseline Road.
Staff are prepared to make a
presentation if required. We don't have
any delegates signed up to speak to that
one. Do members have um a desire for a
presentation?
>> A quick comment. Go for it.
>> You chair. So, um I just want to thank
staff and the public for all the work to
date on this um application. I am
supportive of the application. This is
the former Scouts Canada site or the
current Scouts Canada site that will
likely become a residential development.
Um, two main points that are really site
plan issues that I just want to put on
the record because their main concerns
within the community are um when the
HVAC system is built on the rooftop that
it be uh protected with respect to
uh emanating noise and impacting the
abuing residential community. There have
been some towers recently built in River
Ward and Capital Ward where this has
become an issue. There's also a pathway
that connects the northern residential
community of Central Park to the Smart
Centers Mall and Baseline Road itself.
And we want to ensure that that pathway
connection for pedestrians and cyclists
is not compromised. So, we don't think
it will be, but I just want to raise
this as we work on the site plan that we
uh in particular put these two items at
the top of the priority list. Thank you,
Chair.
Thank you very much uh councelor
Brockington
to the applicants if uh committee is
prepared to carry this. Did you still
wish to speak?
>> Thank you. Uh colleagues is that item
carried.
>> Thank you.
The zoning of 3930 Riverside Drive. Uh
the repeal of bylaw 2025 258. There is a
presentation
that can be done on this one. Had anyone
anticipated holding the item?
Nope. Um
to the applicants. Um I think Jeff Parks
is uh if committee is prepared to carry
this. Did you still wish to speak?
Thank you.
Excellent. Uh thanks to everyone's work
for uh getting uh getting to this point.
Glad to see something will move forward
there.
Moving on, we have the zoning bylaw
amendment for 3971 Greenbank Road. We do
have um public delegations to speak to
this one. So, we'll hold the item.
>> Do we not carry it? I was making
assumptions.
>> 7.4. Is the item carried as
recommendation carried?
>> Thank you.
>> Oh, okay.
The uh public delegations who were
signed up were in support of the
application. Um so they apparently don't
need to speak. Um on 3971 we do have a
presentation if anyone wants to receive
that. Did anyone anticipate asking for
the presentation? No. Uh so to the um
consultants if the committee is prepared
to carry this. Do you still wish to
speak?
>> Thank you. Um is that recommendation
carried?
>> Oh
yeah. Mrs. Green Bank. Oh, you do have
questions. Okay, so we'll hold that one.
7.6 is the zoning bylaw amendment for
343428
Woodruff Avenue. Uh I believe we're
going to be holding that. We have public
delegations. We'll get a presentation
at 475 Terry Fox Drive zoning bylaw. Um
we have a number of delegations on that
one. So we'll hold the item.
And 7.8 is the OOLT settlement uh for
the OPA and zoning bylaw amendment at
2175
Prince of Wales Drive. We have um public
delegations. We'll get a presentation on
that one. So we'll hold that item.
See if there's anything on the back end
we can carry. uh the status update on
planning and housing committee inquiries
and motions for the period ending
October 23rd. Does anyone have any
desire to receive presentation or
questions? Is that item carried? Thank
you.
Uh and then we have the motion
of which notice has been previously
given. Uh councelor Gower had the motion
with respect to the CIP. I know
councelor Johnson has got a direction
that she wants to provide on that one.
Uh do you think this uh does anyone have
questions on that? We'll hold the item.
Amazing.
>> Okay, let's go back to the top and I'm
going to go to the first Alta Vista item
>> which is the lifting of part lock
control at 230 Smith Road. Uh we have a
presentation on that one.
Yeah. Yeah. We just want to get Marty
out.
>> I have to go.
>> Oh, you've never done I don't know.
Good morning, sole. Whenever you're
ready, we are in your hands. Uh,
>> thank you so much.
I should I just wait for the slides to
go up?
Should I wait for the slides to go up or
can I go ahead?
>> Um, go ahead and start.
>> All right. Uh, good morning, uh, chair
and members of the committee. Um the
item before you today is the lifting of
parlot control application for 230 Smite
Road. Next slide please.
The subject site is located um to the
south side of Smite Road between
Altavista Drive and Furbank Avenue. It
has an area of approximately 845 square
meters and a frontage of 25 m. The
property is currently occupied by a
single detached dwelling. The
surrounding properties are similar
single detached dwellings and there is a
lowrise office building with surface
parking directly across the street uh
north of Smite Road. Next slide please.
Uh the subject site is within the outer
urban transit and is designated corridor
main street as you can see on this
slide. Section 5.3 notes that more
diverse housing forms are encouraged to
meet the need of an evolving
demographic. Development of main street
corridors within the outer urban transit
is contemplated as miss highrise. And
furthermore, section 5.314 speaks to the
provision of a range of dwelling unit
sizes in multiple dwelling units on
corridors. Next slide, please.
The site is also within the Alta Vista
Fairrest Riverview Park secondary plan.
The secondary plan contemplates low-rise
neighborhood development for the south
side of Smi Road. As you can see that
yellow band at the top. Each lot will
accommodate a three-story apartment
dwelling which is consistent with
secondary plan designation of lowrise
neighborhood. Next slide please.
The new zoning bot amen uh zoning bo um
zones the site as main street zone one
maximum building height 20 m. A range of
mixed use development within a more uh
compact lock fabric is contemplated on
the main street zone in accordance with
official plan policies to encourage
pedestrian oriented development and
create continuous frontage that will
animate the public realm. Uh [snorts]
the proposed apartment dwelling is a
permitted use in the zone. Next slide
please. Uh application summary. So a
parl control is an alternative form of
land division to plan of subdivision or
consult consent application which allows
division of land within a plan of
subdivision. The proposal will subdivide
the land into two parcels to contra
construct an 8-unit three-story
apartment building including three
parking spaces on each lot. The site
control application is not required as
each building is less than 13 units. The
devel the development complies with
official plan policies in the zoning
bylaw. [snorts] Um staff typically have
delegated authority to approve the
application as and as part of the review
process, conditions of approval have
been imposed prior to registration of
the bylaw to address um any concerns
such as joint use maintenance of the
driveway separation services, water
capacity, storm water management, noise
entry planting. Uh next slide please.
Thank you.
Thank you very much, Miss Soyak.
Excellent presentation. Thank you. Well
done. Um, okay. We do have a public
delegation on this. Before we uh come
back, I would just ask the applicants.
Um, Miguel, did you want to uh or um
sorry, Scott, did you want to uh go
after the public delegation or before?
>> After just answer any questions. So, in
that case, we'll go to Judy Cari.
She was online.
Sorry, just give me one second trying to
figure out this new uh new format of
Zoom. Uh good morning everyone and thank
you for for giving me this time. Um I am
the president of the Faircraft Heights
Community Association and I would like
to primarily primarily object to this
alternative partlock control process. Um
there are problems with the process um
in this instance and we thank the
developer that they did reach out and
and do some consultations but this
process typically does not involve a
public consultation and there's an
important role that residents play
because we're on the ground. Certainly
we can't expect um planning department
to know the nuances of every road nor
can we expect counselors to. So as an
example sole in her wonderful
presentation mentioned that there's uh
parking on the north side of Smith.
Indeed, there is, but that's not public
parking. That's not a nuance that she
would know unless she was able to drive
out there and become familiar. Um, the
other challenge that we we have is is
that in this park lot control process,
counselors are put into an awkward
position to make a decision on which
they don't have expertise. They're not
planners themselves.
I would also point out that the optics
are off. Um, from a planning department
perspective, there could be a perception
of circumvention of established process,
which is the committee of adjustment
process for a fee. [gasps] Um, and for
counselors, I would think that this puts
elected officials into a very awkward
position of having to make a decision
that directly impacts neighbors, which
could have an impact on their property
value, their enjoyment of their property
as well. And how we got into this
situation is that the language of the
planning act is vague. There's a
reference to being able to use this part
lock control process uh for lots of land
that are subject to a plan of
subdivision.
And having spent 25 years in the federal
government working on legislation,
regulations, and policy, [gasps] I would
say that when you have vague
legislation, you can interpret it
broadly, which means all plots of land
that are part of a subdivision, which
effectively draws in pretty well every
lot of land um uh in Ontario
um that has been created since the
1860s.
Or you can take a more narrow
interpretation where the plans of
subdivision reference really relates to
lots that are being developed or
proposed for development. And you'll see
that other jurisdictions like Missaga
have taken that more narrow approach. Um
I would posit from the rules of
statutory interpretation that a narrow
approach um for this interpretation of
plans of subdivision for the potlock
control should be taken. Um and again I
would suggest that uh the city review
the process as a whole from a legal and
policy perspective including
benchmarking with other Ontario
jurisdictions and hopefully revert back
to the original committee of adjustment
process
which involves the appropriate parties
using their appropriate expertise.
In terms of the application itself um we
recognize that what is being proposed in
terms of number of units is allowed in
the new zoning bylaw. Um, do we think
that it will fit with the the the lot
pattern of the neighborhood, the lot
fabric? No. Um, do we have a question of
what uh the the mayor has said about um
uh preserving to a certain extent uh
community uh culture? We're not sure how
that fits in, but we know that the new
zoning bylaw does allow for um the
number of units um as well as for for
potential severances. Uh but I think
more importantly the concern is is that
this neighborhood like a lot of others
in uh Ottawa are not necessarily built
for the number of proposed units under
the zoning bylaw. And that's why it's
really important that communities are
consulted so they can point out the
challenges that might exist. If you've
had the opportunity to read the comments
from others, you could see there's a
request for a traffic study. You saw the
picture. There is a sharp right turn off
of Alta Vista onto Smith. The placement
of this particular lot from a traffic
perspective is very problematic. Um
there have also been other uh comments
made about storm water. Yes, thank you.
Um and we do recognize that planning
department has put in uh additional
provisions on storm water. We find that
very encouraging, but that might not be
enough. And I would point out that there
have been instances of flooding in Alta
Vista as other wards. uh specific
severance on the corner of Altist and
Mount Batton in 2020 to build two new
houses has resulted in flooding on
neighbors properties um to the point
where both of the neighbors are
considering paying out of pocket to
regrade their backyards. And so I'd like
to take this opportunity to plant a seed
um with this committee that
consideration should be given to the
creation of a fund of victims of infill
because really residents should not be
paying to address the bad outcomes of of
um a development or infill that's
happened right next to them. Lastly, I'd
like to say there's another little
challenge, the disconnect between
cutting trees and tearing down and
building. Sometimes there are time gaps.
this particular block. There have been
three developers who've looked at and
walked away. Um, and we've had trees
raised and nothing's happened on a
particular lot. Um, we've had other
instances of houses being torn down and
they sit uh the lot sits vacant for
years because it isn't developed. So,
just if this committee and council could
look at finding some kind of a way to
connect those two so that we don't have
those
>> cut off there. Um, but thank you very
much for the comments. Uh, any
questions? Councelor Carr.
>> Hi Judy. Thanks very much for coming out
today and I know I've had discussions
with you and the neighbors on this
development. Uh I think for today my
questions to staff will focus on um uh
the the specific process. Um but I take
your points on the trees, the storm
waters, the infill, the impacts. We've
discussed those. I just want to ask you
one question. Um when the sign was put
up uh for this particular property, did
you have any conversations with the
developer? Did you or the neighbors have
any conversations about this development
and the process?
Um, I have not had any conversations
with the the developer myself. I believe
some of the neighbors have introduced
themselves to the developer, but I don't
know that there have been in-depth
discussions.
>> Okay, perfect. You mean introduced by
when they've been on the lot sort of
thing.
>> Yes.
>> Okay, perfect. Thank you very much.
Thank you for coming out today.
>> And thanks,
>> Judy. I don't see any further questions
from you. Thank you very much for your
delegation today. Uh Scott, that was the
uh last public delegation. So, you've
got uh 5 minutes to make a presentation
or respond to anything you've heard.
>> Thank you, Mr. Chair, members of the
committee. My name is Scott Al. I'm a
senior planner at Foten Consultants, 420
O' Conor Street. I'm joined today by
Miguel Trombllay, a partner at Foten,
and um Jeremy Silbert, director of
planning and acquisitions at um Tarish
Homes, who are the land owner and the
applicant in this case. Uh so um given
Miss Soyak's detailed presentation, I'll
try to stick to, you know, um some of
the more precient points rather than the
planning background, but we'll go
through a bit of both because as we all
know, they interlace. So um if I could
get the next slide, please. Um, and so
this is the site. We already saw this
diagram. It's uh characteristic of the
lots you have along Alta Vista Road and
Smite Road, which is to say a large
single family uh lot. Um uh um referring
back to uh the era of development that
it was uh established. Uh next slide,
please. This is the existing home. Uh
you'll see it has a basically a curved
layby driveway with two accesses and it
has a large mature tree in the front
yard. Um the intent is to retain the
mature tree. You'll see um when we touch
on the site plan that the building
frontage is well set back from that tree
and that's a benefit because of the
angle of the overall right of way
relative to the lot. Uh next slide
please.
So, uh, we, uh, maybe I'll dwell on this
slide for one second, which is to note
two things. Um, firstly, Smith Road is a
main street corridor. This is where some
of the highest densities aside from hubs
are permitted within the city of Ottawa.
Um, in this case, we are proposing a
three-story two-story apartment
building. So, uh, well within a scale
that's complementaryary to the existing
Smith Road development. You'll also see
to the northwest um, the rapid transit
corridor. Smith Road is obviously a
rapid transit station that is within 600
meters of the site. So, we're talking
about um development on a mainstream
corridor that is within uh comfortable
walking distance to transit. Uh next
slide, please.
Uh, and here's the zoning, which Miss
Soyak already had pointed out, but
again, just to reiterate, the main
street one zoning part of the new zoning
bylaw, which is really trying to sponsor
forms of infill that are more manageable
by builders and less um complex to
navigate as far as the intricacies of a
given site. Um, the maximum permitted
height here is 30 m. We are uh well
below half of that. Um, next slide,
please.
Uh so proposed development yes we are
using lifting lot part lock lot control
um in order to subdivide the site. Uh as
was pointed out by some of the remarks
this is a planning act mechanism that is
permitted where you have an established
plan of subdivision and uh the intent is
to make changes within that plan of
subdivision. Um uh we went to the city
um to work with them to um gain their
support in order to proceed with this
process. Um it is staff delegated
meaning that staff bears an opinion on
whether it can proceed. One of the
elements of discussion was will you pay
to provide a sign on site to provide
public notice uh which the applicant
agreed to do so. Um beyond that the
buildings themselves so in case this
wasn't clear they are fully zoning
compliant. The proposed lots are fully
zoning compliant in terms of scale.
There's no minor variances needed for
this. There's no site plan control
needed for this either. um it falls
below those triggers. Uh it is simply
the mechanism we have selected for um
subdividing lots. Um and we could get
into the why of that if uh if uh the
committee would like to understand that
in more detail. Um next slide please.
So uh this is the last thing I just want
to illustrate about um the approach
being taken. So when you propose a part
lock control application, you do not
necessarily need to provide a a concept
or a site plan because the applicant is
being transparent in the fact that this
will be going through building permit in
the short term should this be approved.
It is a modular housing format that will
um basically um allow for efficient uh
housing starts on these sites. We're
removing uh the two access approach off
of um Smite and uh implementing a one
access approach here between the two
buildings. Both buildings have a
frontage and public realm presence on
Smite Road. All the parking is to the
rear. Um as you know, parking isn't
required here, but just um under the new
zoning, but just with consideration to
um expected tenants, uh parking is
proposed for some of the buildings. Um
three spaces per building. And of
course, bike parking is proposed in
accordance with the requirement of the
bylaw. No relief is um sought from that.
So um that goes over the the gerine
points of the um proposal here, but we
are available to answer any questions.
Thank you.
>> Thank you very much. Do any members of
the committee have uh questions?
No, I know I do. Why this process? I've
been through like a ton of infill
in my ward. No one has done a severance.
>> May maybe if I I have some remarks, Mr.
Chair, but I believe um so does Mr.
Trombllay. But uh so that uh firstly
I'll start by saying um when when you
conduct infill um the most um the most
financially appropriate or the most
affordable application fee is consent,
right? So and it's also the most time
effective. So the question is why would
someone seek part lock control? The
nature for that is that it's a more
predictable process that is worth
essentially the extra investment. And so
um contrary to some of the remarks
provided earlier it's not as if going
through parl control removes the
planning aspect as we've all reviewed
there was a staff report prepared by a
planner who we worked with there was
conditions assigned. It is a predictable
process in that way. Um uh and again
your committee has done as you as you
just implied many applications of these
kinds and you are familiar with the
planning process. That is not out of
question either. Um sympathetic to the
concerns about the public notice point
of it is why the sign was posted again
which is not required for the process
but a reasonable element to it here. But
again it comes down to predictability.
um when these developments take place
obviously there's a lot of um risk being
borne by the developer so this is one
mitigation of risk thanks and I asked
the question deliberately the uh we have
seen developers who have brought things
that should be minor variances to this
committee for reasonzoning because they
can't count on the committee of
adjustment uh pursuing its its mandate
um we and this is coming from the other
side a staff delegated process should
have been relatively predictable Um but
in this case the uh the counselor did
choose to lift delegation and you know I
know for the development community out
there you'll be you'll be looking twice
at doing this or at least making sure
that the counselor is on board before
pursuing this process. Uh but it does
speak to the importance I think we did a
good job in this term of council of
appointing committees of adjustment that
uh were going to do their job uh within
the the mandate that they have within
the statute. Um, some of you will be on
the nominating committee for the next
committees of adjustment. Uh, please pay
special attention to making sure that
we're appointing board members um who
who understand what the role of the
committee of adjustment is. Um, so thank
you for that answer. That uh is exactly
what I was expecting to hear. Um, and
with that, do you have any any other
questions?
>> I have one question, but I have question
I have lots of questions for staff.
>> Yeah, we can go straight to staff if you
want.
>> But can I ask one question?
>> Please do. Thanks very much in the
council for the area. Um when you talk
about the committee of adjustment and
the level of predictability, are you
referring to the length of the process
and the cost? Like have there been
examples where for example the committee
of adjustment has turned down
applications and then you've had to go
to the OOLT to get them overturned. Has
that happened to you?
>> Uh through you Mr. Chair. That's
basically the idea. So what I'll
reiterate is typically an application
for consent is less less cost intensive
and less timeline intensive. It's
typically um you know uh 2 to 3 months
to get through the process. The issue is
um what I would call there's a a bit
more volatility and one part of that is
because of the constrained timeline. So
staff have a lot less time to review the
applications and a lot less time to
communicate the comments. So uh
sometimes they come out on the floor and
for one reason or another it gets
refused and then yes if it goes to the
OOLT um it's um as you know an extensive
and expensive situation whereas the
difference with parl control is um you
know Miss Hamlin and Miss Soyak could
speak to the fact that we have an
iterative dialogue where you know we
come in with a a proposal and they say
well you know the conditions for this
are a great example where they said we
have these conditions and we said well
for sure we're doing a drainage study or
a drainage plan. We're doing a noise
control study. We are doing a suite of
studies. So there is some predictability
but again we were able to work with
confidence that by the time we came
before this committee we would be uh in
a position of staff support where with
the consent sometimes you don't have
that opportunity and even moreover
sometimes you do have support and at the
committee you're more likely to be
overturned just as our experience.
[snorts]
>> Okay. Thanks. I have a concern about the
number of applications even in my
community that were over that were voted
down by the committee of adjustment and
then the developer had to go to the OOLT
to get them overturned. I'd be curious
to know from staff. I'm not on this
committee so I can't issue a
uh inquiry to know how many times that
happened and what the if there was a way
of calculating the cost to the
developers of that. I'll just say that I
have lots of questions for staff about
the process, but the housing that is
needed in this community for people that
work at the hospital um staff um there
was a shortage of rental housing.
Medical students are one of the biggest
um groups that come to see me to say
that we need more rental units. We've
just opened up the new advanced medical
research center. You of Ottawa students
will want to relocate uh in this area.
So, I know that the housing will be
used. We I will I have ongoing
discussions with the neighbors about
their concerns about other development
aspects, but um my questions to staff
will be about the process, but thank you
for coming here today.
>> Excuse me. Uh yeah, thank you for your
comments. Appreciate it.
>> Thank you very much. I don't see my
screen over. I don't see any further
questions from members. Thank you very
much for the presentation. Uh questions
of staff. Council car.
So just a few quick questions. So in the
case of a seance, the city of Ottawa has
delegated authority to sever to the
committee of adjustment
uh because they [clears throat] can
under the planning act under section 44.
Is that correct?
The committee of adjustment is a
committee of council. So it's a quasi
judicial um committee of of of citizens
who are appointed to that. So it's a
little bit different than delegated
authority. But yes,
>> but but we delegated that to we've
delegated they they have the authority
correct to do it under section 44. And
by delegating um the severances
uh
you know for the purpose of dividing
land that ensures that decisions are
based strictly on objective planning um
statutory tests and the city's official
plan as opposed to political pressure.
Correct.
>> I would argue that is why there is an
arms length approach. um
and city staff make recommendations,
provide comments to the committee of
adjustment. It's the same team in this
case, my team reviewing this one as
provide the comments to committee of
adjustment. Um the committee makes their
own decision. So the the elected
representative is not involved in the
committee of adjustment, nor should we
be. It's independent quasi judicial
tribunal making a decision on a seance.
Correct.
>> Yep. Correct.
But this process that has the exact same
outcome requested that I concur on this
application. Correct. In order for it to
be passed. Yes. Okay. So we have
developed a completely separate process
to ensure that it's an independent
process making these decisions but yet
there is a way that the counselor
themselves can make the decision and the
last few applications for part lock
control similar ones have been made by
the counselor concurring. Correct. as a
result of the council concurring.
>> That's how the governance is set up.
Yes.
>> Okay. So, when you look at partlock
control across the province and what
it's used for, um Hamilton,
[clears throat] Richard, Mhill, Toronto,
Milton, Kitner, uh would you say, you
know, what I found that it's
specifically used um primarily with
semi- detached and townhouse
developments so that the boundaries
between individual units are set. Would
you agree that that is how we use part
control is probably not in line with
best municipal practices.
There are several different ways to
create lots. You can do a plan of
subdivision. You can do parlot control
or you can go through consent process at
the committee of adjustment and
applicants choose which one sort of fits
their needs. Um
the um the reality of part lock control
as was explained in the uh in the
presentation is that the criteria for
for that to for someone to use that uh
tool is that it must be within a plan of
subdivision.
And I mean as as as Judy the uh the
resident even said the the planning act
is does not have a lot of u u
limitations. I guess it it sets that out
as a as an approach to use to create to
create lots and other municipalities
have chosen to um limit how they use it.
Um in the in this I can give you the uh
the breakdown I guess of how um public
consultation is different between the
all three. Um but I think in in the end
we have the same team at the city in
terms of staff doing the review making
recommendations about conditions for
part lock control and um
and and we arrive at the same um end.
there's no like there's no uh
shortcutting I guess of the review in
terms of the like the um the governance
that relates to the delegated authority
bylaw which is not you know uni uniquely
under you know the planning act that's
an Ontario or sorry that's an Ottawa
bylaw
and does the city of Ottawa I I I
believe they stated that they intend to
put guidelines forward on part lock
control to develop them so that it's
clearer.
>> Marcia Wallace will take that question.
>> Hello through the chair to the
councelor. Um so two things on committee
of adjustment. There was a housing
acceleration plan commitment that was
made as one of the recommendations
council unanimously passed. When that
came forward, it involved us coming back
and evaluating how the committee of
adjustment functions and whether uh
anything uh should be done to streamline
that and and several of the comments
you've heard um around the table and by
the delegate are are sort of feeding
into that conversation. So, we are on
track to bring that forward sometime in
27, but it is one of the remaining
pieces coming under the housing
acceleration plan. And that is where
incidentally you'll get the numbers you
were talking about in terms of how
frequently does the um committee
overturn things or reject staff advice
and and all of that will be there. So no
inquiry needed. I'll save someone that
step. Um but the other part in terms of
part lock control because of this file
we have multiple and you know over a
dozen examples um that are where we use
this with delegated authority and it
really attracted no attention at all.
This one uh did and because uh you chose
to lift it which you have the right to
as a counselor. It doesn't happen very
often but that's why we're having this
conversation. We are going to bring back
uh we're working on something with legal
because there is very broad authority
under the planning act in how you use
partlock control. As you pointed out,
different municipalities have taken
different uh positions on this and so
we're going to take a thorough look and
I do appreciate the awkwardness of our
delegated authority bylaw when this
became something that we were doing
through a delegated authority. then we
come to the counselor for concurrence.
We would not have done that in a
committee of adjustment and as the staff
pointed out, it's the same review. It
just goes down two different paths. So,
we want to look at we want to support
infill. We also want to deal with the
issues that the resident pointed out.
So, we're also working on an infill
guide because bad infill or infill that
constructs and creates storm water
issues on the neighboring property is
not what we want either. So, we're
working on a guide to support the
industry and residents, and we're
working on a report to come back to
committee and council that will really
look at where and how does part fit into
the overall strategy to encourage infill
development in Ottawa.
>> Okay. Thank you very much for that
explanation. And just to explain why I
did not concur, we were either in or
days before an election blackout. Um and
I was being asked to concur on a
severance which the committee of
adjustment typically approves in a
process that completely eliminates the
counselor's influence. So I was not
comfortable uh doing that and I as you
know I asked a lot of questions and some
counselors have been approving these but
uh
I'll leave it to this committee to make
that decision. I did not feel that in an
election blackout for me to be the one
signing off on something that normally
goes to a quasi judicial tribunal was
something I was comfortable with. As I
indicated, um, you know, the neighbors
have concerns. You've spoken to what's
being done about that, but I do know
that, um, this type of housing is is
needed, particularly in that community,
uh, with hospitals. And I, you know, we
we moved it up to six stories. Um, I
guess this term a few few years ago
because of the province. This is
three-story development. Um, you know,
could have been a massive land assembly
with a much bigger development. Uh, and
it's not. Um, so I support the
application. I don't support the
process. That's if I can say that
fairly.
>> Councelor, I totally agree and that's
why we feel that we have to come back
and and talk about the process. It's not
a well um used or well understood
process, but we feel that it will be
increasingly requested of us. So we
should really figure this one out. And
we also um the reason we did
notification even though it was not
required was for exactly the same
reasons. It was very bad timing in terms
of the community and trying to be
transparent about what we're doing in a
awkward situation. So, I'm I'm glad you
brought it forward. Thank you.
>> Thank you.
>> Thank you very much, Councelor Carr.
Thank you to staff. Are there any
additional questions on this item?
Councelor um Curry,
>> I just w like to make a comment. I'm
really glad to hear we're going to get
more information on this because this is
in my opinion the beginning of something
pretty significant that's about to
change in this city. I think we're
seeing little bits and pieces of it, but
I think we're going to see more and
more. And it's all well and good for us
to say we want more housing, but it
doesn't fit everywhere. And that's I
think what the community is trying to
say in so many uh ways to us at this
committee, but instead we always have to
say well there's no planning rationale.
We'll be saying that I'm sure today I
will be for sure. Um, and then you know
things happen but old lovely
neighborhoods are about to change
significantly and people are not going
to be happy and it doesn't work. And I
will just tell you one specific example.
My mother's street in Scar Bro used to
be this lovely little street and it was
all great. It's now a disaster because
people have taken these lots and created
these monstrosities. They're all quite
ugly. I'm sure the people on the street
are not listening right now, but they're
horrible looking. There's unbelievable
traffic mess. There's endless parking on
the street. No kids can play hockey.
Street hockey is a done thing. Um it's a
reality for these small communities. So,
I'm glad we're going to get more uh
guidance on this because let me tell
you, this is our reality going forward
and people in old neighborhoods are
trying to desperately trying to keep
some of that character. And uh it's
going to be lost if we don't make some
significant uh changes. I think I
understand the need for housing. It's
that sometimes it doesn't work.
>> Thank you, councelor Curry. Are there
any additional comments? No. Is the
recommendation carried?
Thank you.
All right, let me figure out where I am
now.
>> Held that in for me, but now I have to
go.
>> Okay,
>> so can I hold it at counselor? It
doesn't come up to council, does it?
>> Okay, I'll hold it at council. I'll hold
it at coun.
>> Thank you very much for accommodating
me.
>> No, thank you um for
>> having us.
We'll move on to item 61, the Build
Ottawa 2025 annual report.
There is no uh presentation that we had
anticipated. Uh vice chair, did you want
to put the technical motion on the table
now?
>> Yes. Um whereas the report recommends
committee and council receive the
audited financial statements of build
Ottawa for the year 2025 in the annual
report attached as document one. And
whereas supporting document one did not
originally include the build Ottawa 2025
annual report and only provided the
audited cons consolidated financial
statements. And whereas a new document
one has been provided to staff that
includes both the build Ottawa 2025
annual report and the audited
consolidated financial statements. And
whereas an amendment to the report is
required to update the supporting
document one. Therefore, be it resolved
that planning and housing committee
amend the report.
Uh item 6.1 Build Ottawa 2025 annual
report supporting document one build
Ottawa 2025 annual report including
audited consolidated financial
statements. Thank you.
>> That is an amazing motion. Thank you.
>> Okay. Um so that item was held. I think
someone had questions for it. Uh Vice
Chair Gower. Um yeah, I just um I don't
remember all the context, but since
2009, Build Ottawa has
uh the land sales have resulted in 108
million. 6% of that has been directed
affordable housing, but we do have a
policy that says 25% should go to
affordable housing. Can staff just
clarify the 6% versus the 25% target?
>> Sure. uh through the chair, not all of
our lands that we sell are are
residential. So the affordable housing
contribution applies only to residential
uh sales as well as institutional sales
that involve residential uses. So in
some instances we we've sold lands for
industrial, for commercial, for church
uses and a lot of times those lands are
are much more valuable than residential
lands which skews that percentage.
>> Okay. And it looked like in some of the
recent examples in recent years that
have been residential, you've been
pretty much on that 25% target for
residential. Is that correct?
>> That's correct, Shar.
>> Okay. Thank you. Um
there always seems to be a tension here
in a bit of a dual mandate for Build
Ottawa that
uh our our finance department counts on
money to be generated through land
sales, but we've also we also want to
see affordable housing. And I feel like
there's a tension there and two mandates
that don't always match up. And I was
wondering if staff could comment on
that.
>> Sure. So, as you mentioned uh through
the chair, as you mentioned at the
beginning of your comments, the uh Land
Development Corporation has been around
since 2009, and it was originally set up
with a very long name, Ottawa Community
Land Development Corporation. Uh it took
me about a year to to remember that. Um
but when it was set up, it was primarily
set up to to sell land, generate revenue
for the city, uh and and provide, you
know, just an additional tool where the
city can be acting as a property owner
as opposed to, you know, the chief
planning official. So we can we can act
just as a regular property owning
through build Ottawa to sell the lands.
um in rec in this term of council this
that's about to end I guess uh our
mandate shifted and and we were geared
towards trying to encourage affordable
housing when we're selling land and so
it it is a challenge to balance uh the
revenue and and the mandate to provide
affordable housing but it still provides
a very important tool for the city not
only affordable housing or revenue but
we we also look to try and create
economic development uh We're trying to
uh you know give options even for
institutional uses. Uh a great example
was our our Longfields project uh in in
uh like 2010 to 2015 times uh where we
reserve land for institutional uses for
churches uh you know that needs to be
part of a community too. So it's an
important tool. I I think with the new
term of council coming forward, there is
opportunity to relook at our mandate and
see what what should be important for
this uh corporation for the city. Should
it be revenue generating affordable
housing or some of these other uh
community benefits that we're always
trying to do?
>> And can you put into more context 2005
2025 there were no were no sales. Um,
how much of an anomaly is that compared
to the year before and compared to the
trends you're seeing in 2026?
>> Well, what I can say is, you know, when
you're in the land development
corporation business, there's es and
flows of revenue, right? And so, in in
over a term of council, we might have
one year where we don't make any money
and then by year four, that term, we we
we knocked it out of the park. This term
has been very difficult. uh partly with
economic conditions and the market
conditions. It's it's just hard to sell
land. Uh in previous terms, you know, we
could advertise a piece of land, not
even put a price on it, and we're going
to get way over our appraised value
because there was a lot of demand. This
term of council, you know, the it's it's
just a tough market, you know? I mean,
let's hope last night's election results
south of the border might uh uh spark
the economies everywhere and things
might start to improve and we can start
getting back on track.
>> Okay. I I think it is something council
have to look at. It is also a a strange
tension that the
build Ottawa in terms of meeting
affordable housing goals
does better when there's a healthy
market. To me, healthy market is another
word for more expensive home prices. So,
we're relying on, I guess, the regular
market going up as much as possible to
fund the affordable. Just seems like
we've got all these tensions and
conflicting priorities. So, um I guess
I'll I'll watch as council wrestles with
that in the next term.
>> Chair, if I may just make a a quick
comment to re-emphasize a point that um
my colleague Peter had made. um the
Build Ottawa tool, although the mandate
has been um prioritizing housing that's
more affordable than what the market
would otherwise provide, it's a great
tool to allow council to achieve a broad
range of objectives. So, absolutely
generating revenue from sale of
properties that are no longer required
by the um city organization is one
important outcome. However, in doing
that, um Build Ottawa has the ability to
apply conditions for the use of those
lands as well. And those that does not
need to be affordable housing. It could
be a broad range of public um benefits
or public value that could be derived
from those lands. So it could be for
example um to support health related
outcomes, other social outcomes,
cultural goals. It could be um I think
Peter mentioned economic development. So
if there's potential uh needs in the
future related to that. So, it's um it's
a really flexible tool that allows
council to achieve um a broad range of
outcomes that it seeks to achieve in a
particular period of time.
>> Okay. Thank you, chair.
>> Thank you very much. And uh I I won't
belabor the point, but I think um you're
absolutely spot on in in everything you
said. Uh vice chair, uh I'll be watching
also with interest to see how the
mandate for Build Ottawa changes. Um, a
lot of that land could be put more
productively, I think, into the hands of
our not for-profit partners, uh, more
quickly in order to get truly affordable
housing that would remain, uh,
affordable in perpetuity. Uh, I don't
see any questions from members. Is the
technical motion from Vice Chair Gower
carried?
>> And is the report as amended, carried?
Amazing.
Bear with me while I figure out where we
are.
7.5. Amazing.
All right. This is the zoning bylaw
amendment for 3971 Greenbank Road. Um I
think we are anticipating
No,
just going straight to Okay, everybody's
going straight to Cer Hill to ask
questions.
>> Uh perfect. I wanted to thank staff
first and foremost uh for the work on
this portfolio. I know it's been going
on for a number of years. I also note we
have uh some uh members of the Baraven
Islamic Center board here in the in the
audience as well. Thank you very much
for the hard work that's gone into this.
I just want to address a few questions
just to make sure going forward that
we're in the right space on this. Would
we be even having this discussion on
this report today were it not for the
restriction of on street parking on
Greenbank and Barnesdale roads?
Chair, councelor, thank you for the
question. I think it it is 6 months ago
counselor as you know we were receiving
ongoing emails about the concerns out on
both Green Bank and Barnesdale whereas
today we don't have anybody signed up to
talk in opposition to this file. So
absolutely staff's recommendation is
contingent on these parking restrictions
remaining in place. So traffic services
did identify a significant safety
concern here associated with parking and
pedestrian activity and we have lots of
video and supporting photographic
evidence. So the restrictions really are
not simply a a matter of convenience
here. They are needed to keep keep this
site operationally safe and to mitigate
those concerns that come with this
temporary use. Thank you.
>> The current speed limit on Greenbank
Road next to the MAC Barhin Islamic
Center site is 80 km an hour. Uh does
staff have a position regarding the
option of reducing the speed limit uh
south of Kapamore as it pertains to
pedestrian and community safety?
So, generally speaking, we do know that
that lowering speeds can generally help
with reducing collision risk, but we
have not done that assessment for this
area as of yet, counselor. So, this is
something that we could take back and
engage our traffic services team in. I
don't have an answer for you on that
today. I wouldn't want to speculate what
would come out of that assessment. It
depends a lot on the design of the road
and other um area measures in terms of
in terms of whether those safe th uh
limiting traffic would result in those
impacts we want to see. So let's take
that back and have a look at it and I
can uh can do that with our traffic
services team.
>> No, thank you very much. Um, can staff
speak to the need for compliance with
building code and parking restrictions
as the center operates within this
temporary resoning and how compliance
links to options to evolve to a
permanent resoning.
>> So, I think what we know when we're
dealing with temporary resoning is that
permanent resoning is not automatic. Any
decision that is going to be made around
temporary or around permanent zoning
rather will require council approval
once again. So being you know showing a
record of compliance during this
temporary period which can last as long
as 3 years and has to come back and ask
for those permissions to be extended if
they're not actually in a position to
redevelop the site which is what they
are working toward here on this site. Um
they you know they absolutely have to
remain compliant with those provisions
in order to demonstrate to the community
and to council that that this use is
appropriate here and and can work. So,
>> uh, that's all, Mr. Chair. Thank you
very much for bringing this, uh,
resoning forward. I appreciate it, and I
would ask my council colleagues to, uh,
support this. Thank you very much.
>> Thank you very much, chair. First of
all, I'm going to say I'm entirely
supportive. This is great. And this is
really just a comment because I know
councelor Low faced similar situation in
his ward. And in my ward, the wonderful
Centertown Mosque took over a former
church and now we have a mosque on Kent
Street, which is fantastic. But I think
as our city grows and as we welcome more
Muslim communities um to Ottawa, which
again is a great thing, this is another
example where planning and
transportation tend to be quite siloed.
And the needs of a mosque are very
different than the needs of a church,
for example, because if you're having
prayer services 5, six, seven times a
day or, you know, many times the
transportation needs coming in and out,
parking, leaving, they're just
different. And so I just wanted to flag
this is maybe something that we have to
have a conversation about as a city. How
do we make this work for everyone
because I'm really excited about
Centertown Mosque in my community. It's
been really really wonderful. Uh but
it's also kind of grandfathered in to a
street where there's not a lot of
parking and I hear a lot of concerns
because people get tickets. So I just
think it's I don't know what that
conversation would look like and how we
would bring people together. But as we
have new faith communities with
different needs expanding, it's really
worthy of a conversation because um some
of our regulations were not built in a
way that work well for the people um who
attend these services and for the
surrounding communities. So I don't know
what that looks like, but I just in
classic Katherine Kits uh format um I
just want to say this this constant
dovetailing of planning versus
transportation and how to figure out how
to make them work together. I don't know
what that structure looks like, but
maybe as we go into governance review,
it's it's a conversation we need to have
about how we desiloize transportation
and planning from from planning
committee. Thank you very much.
>> One committee to rule them all.
>> Committee.
>> I want to chair that committee.
>> Thank you very much. Um
>> I got one week. Yeah. I don't see any
further questions. Nope. So, is that
item care? Sorry. Oh, the applicant.
Shoot. Got my language. Uh, do the
applicants, if the committee's prepared
to carry this, wish to speak.
>> Thank you. Is this item carried as
recommended? Thank you. Thank you very
much, Councelor Hill, for your
engagement on that one.
Next held item is 7.6, I think.
the zoning bylaw amendment for 3400 and
3428 Woodruff Avenue. Let me get up to
speed. Right. So, we have anticipated
the presentation for this one. We'll
move into public delegations. Um after
the presentation, councelor uh Low, did
you want to put your directions on the
table? Okay. So, we'll get staff
presentation. Councelor Loe's got some
uh direction. We'll move into the public
delegations and then have an opportunity
to ask questions of staff.
And whenever you're ready.
>> Oh, good morning, chair, committee
members, and members of the public. This
presentation is for a zoning bylaw
amendment for 3400 and 3428 Woodruff
Avenue. Next slide, please.
The site is shown by the red star and is
located on the west side of Woodruff
Avenue and south of Palmativia Drive.
The Heart's Desire community is located
immediately to the west and south and is
separated from the development site by a
10-meter landscaped buffer. The Heart's
Desire community is comprised of large
lots with low-rise residential
development and is on private wells and
subject systems. A church property and
low-rise residential developments are
located to the north and across Woodruff
Avenue to the east. Next slide, please.
The site is located in the suburban
transact designated minor corridor with
an evolving neighborhood overlay. A
range of housing types are permitted up
to a maximum of seven stories in height.
The goal is to support the evolution of
the suburban transct towards 15-minute
neighborhoods while retaining while
relating well to the neighboring
properties. Minor corridors are
designated due to their direct north
south and east west orientations, the
existing or planned frequency of
transit, their connection to multiple
amenities and communities, and the
opportunities for the road to be widened
to accommodate cycling and pedestrian
infrastructure over time.
Over half of the subject site is located
within a 600 meter radius or a 9-minute
walk of the Chapman Mills Transitway, as
shown by the green arrow. Clearbrook and
Nepianwood stations are shown in the
green text to the north. The nearest bus
stop is a four-minute walk to Paul
Mativier Drive. Next slide, please.
In zoning bylaw 2008 250, the site is
zoned R1 VV exception 636, which permits
detached dwellings with a maximum height
of 8 m and a maximum of 25 dwelling
units. Surrounding zones are R1E to the
west and south which permit maximum
heights of 8 m, I1B for the church to
the north which permits a maximum height
of 18 m and R3Z to the northwest and
east across Woodruff Avenue with maximum
heights between 10 and 11 m. In zoning
bylaw 2026-50,
the site is zone N1B636,
which permits detached dwellings with a
maximum height of 8 m and a maximum of
25 dwelling units. The lots to the west
and a portion to the south in the
heart's desire community are zoned
neighborhood unserviced NU, which
permits a maximum height of 11 m. The
properties to the northwest and across
Woodruff are zoned N3B which permit a
maximum height of 11 meters. And the
remaining nearby properties are zoned
institutional N1D and minor corridor
which permit a range of uses with
maximum heights between 11 and 15 m.
Next slide, please.
The proposal is for a low-rise
development consisting of a private road
with 16 low-rise residential buildings
for a total of between 160 and 172
dwelling units.
The heights are the tallest along
Woodruff Avenue and within the interior
of the site and decrease to the west.
Area A is proposed to be mostly
three-story residential buildings with a
maximum height of 14.5 m. Area B would
permit two-story buildings with walkout
basements up to a maximum of 10 m in
height for the street town houses.
Area C represents the rear yards of the
proposed townhouse dwellings. The
maximum height would be 3.6 m which
would only allow for a backyard shed but
would not permit a livable structure.
Area D abuing the heart's desire
community is an existing 10meter wide
landscaped buffer where no buildings or
structures will be permitted.
Over half of the existing trees within
the buffer are being retained and the
trees that are being removed will be
replaced at a 2:1 ratio. Next slide
please.
Many engineering issues were reviewed
for this zoning amendment application.
The summary is is as follows. With
regards to storm water management, only
one sixth of the site will continue to
drain west while the rest of the storm
water will be managed on site. This will
greatly reduce the amount of storm water
that flows to the abuing properties.
In terms of groundwater impact
assessment, the city's senior engineer
has reviewed the groundwater impact
assessment and has agreed with the
findings that the radius of influence
from the proposed development does not
extend beyond the property boundary.
However, out of an abundance of caution
and on behalf of the heart's desire
community, a baseline water quality
sampling program will be established in
order to monitor if there are any
changes that occur after construction.
In terms of servicing, the capacity in
the city's infrastructure has been
reviewed and it is noted that there is
capacity available for the proposed
development. Next slide, please.
The proposed um zoning amendment for
bylaw 2008250 is to permit the
residential typologies to reduce the
interior sideyard setback for an
accessory building and to permit a
maximum of 172 dwelling units. Next
slide, please.
The zoning amendment for bylaw 2026-50
is to permit the low-rise residential
typologies to permit a maximum of 172
dwelling units, the same as per bylaw
2008250.
However, there are additional reliefs
required from the new bylaw seeking
relief from the bicycle parking and
landscaping provisions as detailed in
the report. The last three zoning
amendments from bylaw 2026 will provide
guarantees for the abuing property
owners that the 10-meter landscaped
buffer along the west and the south will
remain. It will ensure that there is an
additional building setback from the
buffer of 6 m
and that there will be a maximum height
of 10 m at the western edge of the
development. These provisions will be
implemented through a zoning schedule.
Next slide, please.
The recommendation is that planning and
housing committee recommend council
approve the amendment for 3400 and 3428
Woodruff Avenue to permit the proposed
low-rise residential development.
Next slide, please. Thank you. If
there's any questions, I'd be happy to
answer them.
>> Thank you very much for that. Um, so
what we'll do is I'm going to ask
Councelor Low to put a couple of
directions that uh he has on the table.
I won't ask staff to undertake them just
yet. I'll let them percolate for um the
uh questions to uh to delegates and
staff, but go ahead council.
>> Thank you, chair. Um I don't know in
which order they have them in this in
the um system here, but the first one is
uh that staff request developer to
consider adding units to the water
sampling program as follows. 8121618
Newand Drive, 2026 Howard Court, and
3440 3448 Woodruff Avenue.
The second direction
is that staff request the developer
consider increasing the on-site storm
water retention capacity above 100-year
totals such as by increasing the size
and quantity of the storage chambers or
other means. Thank you.
>> Thank you very much. We'll uh get some
staff commentary on those when we get to
questions to staff. So, we'll move now
into the public delegations. Uh Brent
Evans is online.
Hi, you guys hear me?
>> Hi Brent, we can hear you. Can Oh, now
we can see you. Whenever you're ready,
you have five minutes to make a
presentation to the committee.
>> Thank you. Uh, good morning, Mr. Chair,
members of the committee. My name is
Brent Evans, and I'm speaking today on
behalf of the collective Arwin land
owners uh in W 24 immediately abuing the
proposed development on Woodruff Avenue.
I want to preface this talk with the
fact that the real community of hearts
desire does not oppose the development
of the Woodruff property at the current
R1 zoning density. Our community is not
an urban subdivision. We are an
unservice rural residential residential
enclave of 3/4 to 1.5 acre lots that
rely entirely on private well and
individual septic systems to survive. We
are here today because this application
proposes an aggressive 172 unit ultra
highdensity development placed on an
elevated lob jammed against directly
against our fragile subsurface
infrastructure. A development that
represents a eight-fold increase in the
original R1 density.
Um, by packing 16 multi-story buildings
and and a private ashevalt road network
onto this property, developer will strip
away the land's ability to absorb
rainwater, uh, replace permeable soil
with a footprint of hard concrete and
ashalt surfaces. The developer claims
they can mitigate this massive influx of
imperous uh, subsurface runoff by
trapping it on site using an underground
storm water system designed for a
standard 100-year storm. I'm here to
tell you that this planning for a
100-year storm in the current climate is
dangerous, outdated fantasy. Uh that
ignores the recent urban flooding events
throughout Ontario and particularly
Ottawa.
Uh look what actually happened in in the
city of Padawa this past summer alone.
Uh we just lived through the absolute
rainiest summer on record in Ottawa's
history. On Canada Day, our immediate
southwest sector was pulverized by a
catastrophic, record- shattering
200-year weather event. In just 5 hours,
a staggering 167 millimeters of rain
felt right here in our corner of the
city. It completely overwhelmed local
neighborhood drainage systems, flooded
7,000 basements, and drove nearly
half a billion dollars worth of storm
insurance claim across the city. Later
the same summer, we were hit again by a
second historic rainfall that shattered
daily threshold thresholds. Uh if this
proposed 172 unit development had been
active this summer, its engineered
100-year sistn system would have utterly
been utterly overwhelmed twice because
this site sits on a higher elevation
than our properties. That failed
overflowing containment system would
have washed over our lots and
hydraulically destroyed our private
septic fields, backing up sewage into
our homes and permanently contaminating
our drinking wells. If you don't believe
me, I urge you to look at the
development plan with a developer's
brilliant plan for emergency runoff.
They have emergency arrows pointing at
our properties and a plan to use the
ditches on Nuland Drive to handle their
flooding.
The city cannot continue to approve
highdensity infill based on obsolete
historical models. We know for a fact
that historic Chicago summer storm water
data used to plan our city's
multi-billion dollar west end traffic
infend transit infrastructure was
completely overwhelmed nearly destroyed
and nearly destroyed by the exact these
exact rains. Those studies are
fundamentally out of step with climate
change. If the city's primary transit
terminals cannot handle this new climate
reality, why are we gambling the
drinking water and established of
established residents on a private
development subsurface box? Furthermore,
let's talk about the reality of
underground system holding stagnant
water. Uh it requires intense perpetual
high-cost maintenance. If it is not
cleared of sediment and debris by
annually, it will fail. With stagnant
water comes a massive underground
breeding ground for mosquitoes and a
structural harbor for rats and mice
directly adjacent to our rear yards.
Worse yet, the specific materials being
proposed to construct this massive
subterranean unit carry a meager
one-year manufacturer warranty. This
plastic and synthetic underground
containment kits are absolutely not
built for long-term municipal structural
utility. Once the developer finished
selling these units and turns the
property over to the condo board, our
neighborhood will be left holding the
bag when this unmaintainable
infrastructure inevitably collapses. To
justify jumping straight from low
density R1 ultra high dens to ultra
highdensity R4Z zoning, the applicant
relies heavily on the site's proximity
to Nepian Woods transit station. This
argument is geographically facious. The
developer is playing a game with two
entirely different planning metrics. The
city uses a straight 600 meter radius
map buffer as a crow flies to define
transit oriented development areas. I'm
running out of time. Uh I'll just sum up
to say that we are not opposed to to
development of this property, nor are we
asking you to halt Ottawa's growth. We
are asking you to commit to leaving the
zoning of this property at its current
RO1 level to protect our homes and
properties and septic systems and wells
from inevitable flooding. And the the
not the less than half of this property
falls within within the 600 meter radius
of the transitway system which is uh
the which Kelly Croer stated
incorrectly.
>> I'll need to ask you to wrap up and cut
off there.
>> Yeah. So, thanks for your time today.
>> Okay.
>> Thank you, uh, Councelor Low.
>> Thank you. Uh, thank you, Chair. Thanks,
Brent, for coming out to committee. Um,
well, you didn't come out, but thanks.
Thanks for participating in committee.
Um, I um I appreciate the the comments
that you shared. They're not they're not
any different from from the comments uh
that uh that that you and your neighbors
have uh shared uh with me previously. I
I do think that there you know I I do
have questions uh later and and
currently about um the the context of
this section of Woodruff Avenue which is
something that you brought up right at
the end of your presentation there about
about its you know for me it's the the
minor minor corridor designation. It
doesn't doesn't really make sense for
this section of Woodruff and I I can
elaborate on that a little later during
questions to staff. Um but uh the within
um within what uh what the developer had
uh proposed um you know you had
mentioned that there were uh you had
mentioned and the plan shows that there
are some uh underground um um storage
chambers as as the plan calls them. Um
and and and I do agree with I do agree
with some some of your comments about
the 100red-year total because that is
based on historical data. um it is it is
an average um based on historical data
that I think um does that does fluctuate
right and and will fluctuate and likely
likely probably has fluctuated if we if
we go back and measure it based on this
summer and and the
>> sorry councelor do you have a question
for the delegate
>> three other times no I I don't actually
have a question it is a comment thank
you for coming out but but I do agree
with some of your comments and that they
will be brought up in questions of staff
thank you
>> thank you very much councelor Low
Councelor Curry do you have a question
for the delegate
>> thank you chair I have a question for
the delegate
Uh Brent, thank you for coming out. I'm
the city council for Canada North where
we had 600 uh almost 600 homes flood uh
and water and storm water are us.
>> So I want to ask you, did you do any
research about any other areas, you
know, [clears throat] in Ontario or
anywhere that has looked at this system
because uh that I haven't heard a lot
about this. I I've heard talk about it,
but have you actually found any other uh
neighborhoods that had this and how it
worked? You seem to know a lot about it,
but I'm wondering if you have specific
examples. I I looked and I couldn't find
specific examples. I'm not an expert in
urban planning and I don't I wouldn't
even know where to search for a lot of
that stuff. I just did, you know, a
regular a standard search as best I
could. Um, but I did research the actual
materials and the that they were
proposing to use for this sister system.
If they are not installed exactly
correctly, they will fail. And there's
only a one-year warranty on these. These
are not meant for long term long-term
urban use. It's a It's the developers
uh it's the developer solution to a
problem they can't solve. Right? They
have they have this
massive property uh with no permeable
soil on a hill overlooking, you know,
four neighborhoods effectively. Um and
they plan to use our ditches as their as
their scapegoat. If you look at the plan
itself, they have emergency runoff going
onto our properties. That's their
solution. When this system fails, their
solution is to dump the flood water onto
our properties. And we our properties
can barely our my property barely
handled the rain. I mean I and that's
because it's been prepared over the last
40 years for such an event. Any
additional runoff would have overwhelmed
my my property. I I guarantee it.
>> Thank you. I'll have definitely
questions for staff on this and
specifically to our engineers. Thanks a
lot.
>> You're welcome.
Thank you, Brent. I don't see any
further questions for you. Thank you
very much for your uh intervention today
and we'll move on to Jeff Dawson
who is online.
>> Yes. Hello. Uh thank you. My name is
Jeff Dawson. I'm the president of the
Hearts Desire Community Association and
um yeah, as a as a wider group within
the community, just wanted to uh comment
on this. Um our community association is
very concerned about this development.
We raised a number of items with uh with
city staff which they addressed. We
don't necessarily agree with everything
they did, but uh there are a couple of
further items um that I would like to uh
get on record with with the committee.
Heart's Desire is a community
immediately adjacent to the proposed
development on its southern and western
boundaries. The homes are serviced by
private wells and septic systems which
are vulnerable to environmental
conditions and major climate events.
Regarding the baseline water sampling
program that uh that the developer has
proposed, the hearts desire community
association supports the uh the
following statement from councelor Low
on water. Residents in Hart's desire
have expressed concerns about the
development's impact to groundwater and
storm water as the neighborhood is
privately serviced by private well and
septic systems. I'm encouraged by the
groundwater impact assessments results
and recommended a baseline baseline
water sampling program for 91 131 1921
Newland and 3436 Woodruff and suggest
including all the properties on Collie
Howard and Newand plus 19 and 25 Brenor
as well
given the importance of the groundwater
to the residents we agree that is
important to have a reasonable baseline
sample should any further issues related
to the state or condition of the
groundwater water um come up that
applies to the that supply our residents
gr the expanded baseline water sampling
program will help to alleviate that
situation
regarding storm water management. Uh the
following is a statement from the
applicant's service design brief related
to storm water management.
The areas draining to western property
limits on Newland Drive runoff from the
10-meter landscape buffer provided along
the westerns and south property line
will not be altered and continue direct
flowing onto existing grass swales to
the to the Newand drive roadside ditch.
Flows will be significantly reduced
under post-development conditions,
decreasing from an area of 1.268
hectares under pre-development
conditions to 0.204 hectares under
post-development conditions. While the
community association agrees with this
statement, we feel that is incomplete.
What is not addressed is the outcome of
any event exceeding a 100red-year storm
event. As uh Councelor Low and uh Brent
just brought up, the developer
postdevelopment storm water drainage
plan shows emergency flows of water from
the control drainage area of the
development on the 10-meter landscape
buffer on the west side of the
development which could result in
additional concentrated flows towards
the private lots in heart's desire. We
could not find any explanation on what
would cause an emergency overflow of the
system as the
or any attempt to quantify the volume of
the runoff. The storm water system as
designed appears to be built to manage
storms up to a 100red-year event.
Anything beyond this will apparently
overwhelm the storm management system as
designed and potentially trigger an
emergency flow of storm water towards
Hart's desire properties.
A 2020 report by the city of Ottawa and
the NCC predicts increases in both the
quantity and intensity of precipitation
in the area in the coming years. The
prediction seems to be in line with
actual climate events as 100 years as
100-year events have been recorded in
Ottawa three times in the last 22 years
in addition to the 200-year event in May
of 2026.
Property damage due to altered drainage
from neighboring properties can lead to
legal liabilities for the land owners
responsible for the release of the
water. Our community association
residents would like to minimize the
risk of potential future property damage
and the associated litigation related to
storm water flows between properties.
One potential risk reduction strategy
would be to improve the storm water
system for from how it is presently
designed to a system better capable of
managing the increasingly frequent major
storm events that are impacting our
city. Thank you,
>> Jeff. Thank you very much for that. Bear
with me just one moment. Uh councelor
Low.
>> Thanks, Chair. Thanks for coming out,
Jeff. Um uh some of those concerns like
the ones that Brent had raised will be
brought up during questions to staff.
Um, I do have a question this time um
for for you. Um, in the second direction
that I had put out there um requests uh
direct staff to request the developer to
consider increasing the on-site storm
water retention. [clears throat] I know
that um excuse me, I know that I
specifically mentioned uh such as the
quantity of storage chambers and but I
also added and other means. Um do you uh
just just sort of broadly do you do you
believe um that would be sufficient to
address at least some of of the concerns
that you've raised with the with the
runoff?
>> Um
I I'm I'm not a I'm not an expert but I
mean as as as Brent pointed out as I
pointed out the existing system see you
know it's it's built to deal with
hundredyear events.
um we have no guarantees that you know
any particular event will be limited to
100 year, 200 year, 500 year, 500 year
whatever. So anything that I believe
would uh um expand the existing systems
capacity to manage the the storm water
would be helpful. Uh having said that
the the develop the the plans the sistns
only hold water up for a to a two-year
event. So the as designed the the sistns
are actually quite quite small and the
difference between a 2-year event and a
100-year event is is managed by water
ponding on the surface. So increasing
the size of the sistns might help a
little bit. Obviously it depends on how
much you increase them by but um I mean
it'd have to be huge to manage you know
significant events. Um so it might be a
partial solution. I'm not sure it's the
entire solution and I'm not an expert
either.
>> Okay, appreciate that. Thanks, Noel.
I'll bring that up with um during
questions to staff and I think at least
one other counselor will as well.
Thanks.
>> Thank you very much, Councelor Low. I
don't see any other questions for you uh
from the committee members. Jeeoff,
thank you very much for your uh
presentation today. Uh the applicants
are also in here and invite them to make
a presentation or answer questions or
however they want to choose or five
minutes.
Thank you, chair. Um, we also have uh a
few folks from our team joining us
virtually. We should have Mark Bet, uh,
Mike Laflam and Xavian Buchanan on um,
virtual, which uh, I think we just want
to wait a moment for them to get
promoted to speaker if that's okay. We
also have Mike Buchet, the client, um,
online as well.
Apparently, everyone is online, so
>> Okay, perfect. Thank you. Okay, great.
Um, yeah.
Um, thanks everyone. My name is Tamar
Nahal. I'm a planner at Foten. I'm
joined by my colleague Matt Mceliot.
He's a principal at Foten. Um, we do
have a slide deck. We don't necessarily
need to run through it, but we did want
to respond to um some of the concerns we
heard today. Um, if we could please flip
to slide two. Um we do have um so I'll
I'll speak quickly to this and then also
ask um that our team perhaps respond to
comments and questions as well because
they are of course the experts. Um but I
have pulled some of the expert excerpts
from our um reports and materials. Um so
one of the things that our groundwater
impact assessment does note is that the
wells um were anticipated to be have
relatively low impact um due to the
construction deatering. That's the water
that's removed during the construction
activities. Um, and if we flip to slide
three, the groundwater impact assessment
did propose to uh study um to have a
baseline watering water sampling pro
program. As we've heard today, there
have been requests to expand this. The
current um properties that are proposed
to be part of the program are shown on
the screen. Um there are presently 1 2 3
4 five addresses and the re the request
that we've heard from um councelor Loe's
motion is to expand this. Um we do have
our team online to speak to whether this
is necessary. However um we we have
spoken with them and their their
response has been that the they stand by
their report and the um expanse is
sufficient. However, um we have spoken
with our client um and we don't have
concerns with this motion as requested
to to consider adding units. So that
will be explored. Um and that is
certainly something that is going to be
explored during the site plan process.
Um similarly, the other direction that
was requested to explore opportunities
to increase the on on-site storm water
retention will be explored as well
during site plan. um as as the current
application before us as a zoning bylaw
amendment. Um if we can please please
flip to slide eight. Um I do want to
mention that because this is a zoning
bylaw amendment and we're not um here to
speak to site plan. The the issue before
us is looking at the reszoning from the
the current existing zoning um to really
bring it into conformity with this minor
corridor designation. Um the proposed
development is for predominantly two and
threetory buildings which is considered
low-rise. So the recommended um
reasonzoning having assessed it we feel
is reasonable for the minor corridor in
a suburban transct. As we heard from
Tracy during her presentation um
[snorts] it does permit up to five or
seven stories. Um so we're not seeing a
a an incredible increase in um in
density being proposed. It's quite
consistent with the neighborhood. Um, we
also in addition to proposing a low-rise
development, we still provide
transition. Typically, we don't provide
transition between houses in the same
height band. So, although we are
proposing um low-rise, we're still
locating the um obviously the shortest
buildings to the west. Um, which will
provide a transition, although we don't
typically see that. Um, and if we could
flip to slide seven please.
Um there's been a lot of discussion on
the uh impacts of of storm water runoff.
I I also wanted to highlight that there
highlight the expansive landscaping
proposed that's not only been proposed
as new but also to be maintained. Um so
we will see a net gain of 110 trees
although 24 do have to be remain removed
to facilitate the development. Um a good
portion um are dead, four four are dead,
eight are poor. Um, so we will see that
this soft landscaping is able to absorb
the storm water runoff. Um, and before I
see we have about a minute left, so
perhaps I will ask um our our our um
subconsultant team who's online if they
could please speak to the questions that
have been raised um Mark Betett's online
if he could speak to the the storm water
runoff concerns related to um the
Sistern and these emergency ditches that
were raised by um Mr. Dawson and um Mr.
Evans. Thank you.
>> Yeah, just check. Can everybody hear
audio working?
>> Yep, we can hear you.
>> Okay. So, I guess a lot of a lot of
issues were raised, a lot going on. Try
to distill in a minute. Um going to Mr.
Evans's point, he was concerned about
the imperousness of the site. He's he is
absolutely correct. As part of land
development, you create additional
imperousness. Um we take that into
consideration when we do the design. Uh
we we apply design standards and look at
a variety of storms. Uh typically refer
to them as like a two, a five or a
100redyear design storm. You're looking
at uh light frequent storms and that's
what the tanks are intended to serve.
You're trying to minimize the frequency
of nuisance events that will lead to
ponding. And we designed all the way up
to a 100year event. That's the the
criteria that we currently design to I
completely hear and understand what he's
saying when he's looking at the the
recent heavy rainfall we had on July 1st
and that leads to there was some concern
about
>> Yeah, you're you're not going to be able
to finish that thought. I'm sorry.
That's the end of the five minutes. I
imagine councelor Low might be able to
formulate a question that would allow
you to pursue that a little bit. Uh are
there any questions uh from the
committee? And I'm sorry I just need to
go back to the start of my screen.
Councelor Low.
>> Thank you, Chair. Um, hi Mark. Yep,
exactly it. So, my question for you is,
um, you know, how do we I know that
you've designed the site for the
100red-year uh, uh, rainfall event
total. Um, I'm sure that you're also
familiar with the fact that it is based
on historical averages and it can
fluctuate as as time goes on. Um, recent
trends of course have shown that shown
that it will probably fluctuate upwards.
Um so, um yeah, I would appreciate some
some additional information on how how
uh the the site addresses storm water
and uh retention and and also runoff. Um
as well as the question that that Brent
uh Mr. Evans uh and maybe Jeff as well
had raised about the the emergency
arrows that are on the the emergency
runoff arrows rather that are on the
west side of the site.
>> Absolutely. So, as I was saying, we
design up to a 100redyear design storm.
That's that's the threshold and the
criteria that we design to currently.
That's the city standard. What the other
thing we do is we look at we we stress
test the event. We say what if we get
something even worse than a 100year.
What we do is we add another 20% onto
that 100year design storm. Is that
right? Is that wrong? That's what we do
right now. And what our intent with this
is let's make sure under that 100 plus
20% event that the houses and the
occupants remain safe that people aren't
flooded. We will accept nuisance ponding
in the roads. We'll accept overland
conveyance. What we're trying to do is
get the water away from the dwellings,
keep them out of basement. So, this is
when you look at what we what I've
identified as the emergency flow that
the community is concerned about. If we
exceed the 100red-year design storm,
there's a pocket area at the at the rear
yard of the town homes that would flow
and exceed would not be captured. So,
flow that would go to the heart's
desired community would include runoff
from the buffer strip area. That's the
natural green space, the treed area, and
it would potentially
include runoff from the rear yard of the
town houses.
So whereas right now you've got about
half the site draining to the Harts
community and the other half draining to
Woodruff
uh under postdevelopment conditions once
we've built the development about 85% of
the development will be captured and
drained and routed to the Woodruff storm
sewer.
Does that answer your question? Uh yeah
actually. So um I believe would I am I
correct that in the site plan um there
are some additional catch basins uh just
behind the rear yards of the more
traditional town homes in the left side
of the property.
>> Correct. At at on the western edge of
the development behind the towns there's
uh a rear drainage system that captures
and conveys flow back to the Woodruff
storm sewer. Although what we've
identified is if we exceed the design
the 100red-year storm if we get walloped
you would have potentially overland flow
going to the buffer strip which would
then go through to the uh the community
to the west.
>> Okay. Thank you. Um two two-part last
question two-part question is um the uh
first part is how much um you know in
within the landscape buffer how much of
that uh overland flow can a landscape
buffer um well I guess ground how much
of that can the ground absorb um before
it has to continue flowing off site. And
then the second part of that question is
um um if we were to increase the design
of the if we were to increase the design
of the storm water retention to you know
above the hundred 100redyear uh events
like like I mentioned in the direction
um realistically um what do you think
you can achieve?
>> Tricky questions. Um,
so
the green space buffer, uh, it's going
to, under most rainfall events, it's
going to absorb the runoff. It's just
going to sponge up and be absorbed into
the ground. But as obviously you get
heavier and heavier rainfall events, at
some point you will have what's called
overland flow. It's just water is
trickling off and and uh, in this case
flowing to the west. uh my analysis
looks at the project development. I have
not analyzed
where it's going to the west. It's going
there currently under existing
conditions. We're sending less there
under future, but exactly where and how
much we have not analyzed. We could look
at it.
>> Sorry, you had a second question
>> uh to do with the the the storm tanks,
right?
uh it's something
>> mentioned as an example because because
it just says uh it's it's kind of broad
and and deliberately so to uh to
consider increasing the retention
capacity above the 100 years
>> right so I guess the question then
becomes you know what specifically would
we be designing for to what criteria
what are we trying to achieve I mean
obviously I'm hearing the concerns of
the community um it could be explored
right?
You know, the more storage you put, the
more you're throttling the flow back.
Most of the flow in this case is
actually going to Woodruff. So, just a
point of clarification, make sure uh
Hearts Desire Community is clear.
Overland flow, even under emergency
conditions exceeding the 100year, 85% of
the site goes to Woodruff.
So you're you're having less flow routed
to the heart's desire community under
postdevelopment conditions.
Okay. And this is uh I know the hearts
desire community will continue to be
engaged with this process uh when when
we get to the site plan. Um this is uh
staff know as much um and so uh and so I
hope that those conversations are
fruitful. Um what I've done here is
within the limits of what I can do. So
uh thanks uh thank you for your time and
thanks uh thanks for the presentation as
well. You're You're welcome.
>> All right. Thank you for those answers.
Um I have a bunch of different
questions. Number one, the baseline
water assessment for those wells, um
will there be blasting for this project?
>> No. No. There
>> there's no blasting at all.
>> Any blasting?
>> No.
>> Okay. So, uh that's better because
blasting often can create cracks and
then you have problems with wells. But
if there are problems with wells as you
go along, basically my standard
question, and then what? [clears throat]
>> So, sorry, I'm dealing with a voice
issue today. Um, so the basic premise of
the baseline program is we work
collaboratively with the city to decide
on the number and extent of homes
included in the program. We take the
baseline samples before construction
starts. If during construction
um anyone involved in the program has an
issue uh we would collect a follow-up
sample to compare the new results
against the baseline. Uh that's why the
baseline's taken in the first place. If
there is a change in water quality then
we take the next step to investigate the
cause. Um again to your point um on
certain sites if there's blasting
involved then we'd have to look at what
the changes to water quality are. if
it's related to sediment load in the
water or if there's new parameters
whether it's iron or sulfur whatever
we'd have to look at what is the
difference and what could be causing it.
But it it basically if someone has a
complaint during construction the the
first step is to take a follow-up sample
and compare it against uh the baseline
results.
>> Yeah. I just ask committee members to
think about the rigomearroll for a
resident that has problems with their
well. Like you when you live on a well
like it's pretty much your whole life
and you have problems with your well in
the middle of a project beside you and
all of a sudden your well your water's
all filled with iron or rust or you have
no water uh that's a problem. So I mean
I just would say whatever happens with
this file there needs to be a real plan
for those residents. I if I was living
beside this I would be very worried um
because of how much everything depends
on your well. So I'll make that comment.
Uh the second thing is the 100red years
plus 20%. you know, can't I can't tell
you how many times I've heard this. Uh
100 years plus 20% is seen as like
terrible now today. Like we talk 300 in
Canada all the time. Um and it is so
risky to go with 100 uh year flood plus
20%. Um I just I guess I would ask what
engineer is going to sign off on this?
Is this the that the final sign off?
Which engineer is it going to be? One
from the developer or the city of
Ottawa?
Guess that's the question for me. So I
mean I I'm I'm an engine professional
engineer. I'm the design consultant on
behalf of Phoenix. We design to the
standard design criteria which as I said
is is the 100year but we assess what if
things go worse and it's like anything
you have to quantify that how much worse
and what we do is the 100 plus 20. Is
that right? Is that wrong? That's an
open question, right?
>> Yeah. I I I think it's wrong. I can
answer that for you. Uh because 100 is
nothing nowadays. You you talk to the
counselors around this table who've
dealt with the floods uh again and
again. 100 is nothing. Anyway, I just
wonder what engineer has to sign off on
it finally at the end of the day because
I would not ever want to be that
engineer. Um the other I want to ask is
this group ever done this sistern
project before that they have some uh
examples that we've already done this
it's great works perfectly any
experience with this
>> so I have done it it's it's currently
it's installed uh over nearfield in
Cedarview it's another project it was
for Phoenix coincidentally uh it's been
operate in operation for a few years I
would also like what what we've prepared
is a preliminary design in support of
the zoning application. So, it's
conceivable we could provide a different
storage system. We're not bound to
provide this specific tank,
right? There will be a site plan
application, right?
I don't think there's any concern with
the tank. Um, I I hear what the
community resident has said, but I mean,
a one-year warranty is fairly typical on
many commercial products. I don't think
there's anything unusual there.
>> Okay. You have one example of this. I I
would be concerned about that, but you
know, everybody's got to try something
first and second time, I guess. Um, I
guess I would say, is there a chance
that this would not go forward if there
are too many issues during site plan? Is
that our understanding? Maybe that's a
question for staff, but that is the
reality. This could stop at site plan.
>> I I just like to clarify. So, I have one
case where I personally have a project.
I could dig up I'm sure I could dig up
many cases or examples throughout
citywide where the product is
implemented.
>> I think there there might likely be a
productive discussion to be had with
staff about where we go from the zoning
into site plan.
>> Perfect. Thank you. Okay, I'm all done.
Thank you.
>> Thank you very much, Katherine. Sorry,
councelor Kitz.
>> Thank you, Chair. Um, I'm gonna pull on
the same thread that my colleagues have
been. Um, so a question for Mr. Bette.
Is there any discussion in the industry
that designing to the 100
year standard
acknowledging plus 20% is not enough?
Like I appreciate and I I'll have the
same question for staff because it's our
it's our guideline. Um, but in the
industry, is there any concern that that
is no longer sufficient given what we've
been seeing?
>> There there's certainly chatter and
people have their opinions. Um,
I
I I
think at core, right, what we do is we
design to the city standard. I know I'm
evading your question,
but it's it's it's not for me to dictate
what the standard is.
>> No, I I I appreciate that and that as I
said, I will ask staff the same
question, but I was just, you know, as
professional engineers, you're in this
world. I was curious as to whether there
was a sentiment that yeah, this is the
standard that we are required to build
to, but perhaps it's worth revisiting.
So, I guess I would answer by saying it
was a few years ago that the push
went on to say, "Okay, let's let's
analyze the 100 plus 20." For for years,
all we did was analyze to the 100. That
was it. It's like anything. You have you
have a you have a defined end point,
right? We said, "Let's just stress test
it a little bit." And that's what we're
doing right now. I I personally have
comfort and confidence in what we're
designing in a modern we're analyzing
the hydrarology and the hydraulics and
I'm comfortable with what we're doing.
Now I know staff are investigating. I
think it's important with the flooding
events. There's complexity and nuance in
where and how did the failures occur.
And here we've got a modern brand new
development.
I personally am comfortable they would
be safeguarded if that same rainfall
occurred today.
>> Okay. Thank you. I appreciate that
answer.
>> Okay.
>> Thank councelor
>> Divine. Thank you chair. Uh I'm just
going to follow up uh just on the
questions that uh my two colleagues uh
just posed on the 100. Um and I very
much appreciate uh how you described
there that you are adhering to an
industry standard um and that you you
know you applied what you said a stress
test. For many years it was one in 100
and then you apply the stress test. In
your response to council kits you said
and I completely understand it's not for
me to dictate uh what the standard is
just for the clarity of everyone uh
engaged in this conversation. I am
certainly invested in this conversation.
Um who is it uh whose authority is it to
dictate that standard?
>> I think that's a question for staff is
yeah
>> thank you. Um and I also appreciate what
you're saying on that. um you have a a
degree of confidence in this because as
you apply your stress test and as you
apply uh sound engineering, you're
looking at other modern methods on how
to mitigate against all that runoff uh
beyond what may have been just uh
established norms on how to handle that.
So um anyways, thanks for the clarity on
that and I'll I'll direct that question
to staff when we get to them. Thank you.
>> Thank you, chair. I'm back. Um, I was
hoping to actually save uh save some of
the questions uh for staff, but uh but
because we're pulling on that thread.
So, my my first question just so just so
the community can be prepared is do you
um do you or or does anyone here from
Phoenix Homes have an expected um
timeline for this uh for the for the
site plan application? I know I know
concurrently all the documents have been
uploaded with the resoning, but I'm
curious if you uh you have an expected
timeline of the actual um um uh site
plan control going ahead. Um or let me
know if that's a better question to post
for staff
>> through you chair. Um the question is
just in terms of approval timeline, we
hope to have this approved in uh in
short order uh within the next few
months. But to your point, I think uh
you've provided us with good direction
to further investigate some of the
issues brought up today. I'm glad we had
our expert here given the flavor of the
conversations.
>> Yeah. No, I I I think so too. And I'm
glad that uh I'm glad that my colleagues
with more more recent experiences with
flooding have uh have have chimed in
here um because uh because it is an
important topic um like like councelor
Curry said the the well and septic
systems that the residents and hearts
desire depend on are can actually be
life or death and uh and and you know I
I do think that uh that safeguarding
them um whether it's through uh whether
it's through monitoring whether it's
through uh something that can come after
the fact or whether it's through um you
know expanding or improving the on-site
storm water retention is is is something
that's uh you know like it's imperative
to to safeguard that. So um I have more
questions for staff later on. Um and uh
so yeah, thanks.
>> Thank you very much. I don't see any
further questions for the delegate. So
thank you very much for the intervention
and we will move on to questions of
staff.
>> Councelor Kelly. Thank you very much,
chair. And uh I will leave the um
overland water discussion to my other
colleagues. Uh but I would do want to
drill down, no pun intended, on wells uh
because that is an issue that comes up a
lot in rural areas. And so I was um you
know um noticed that it's an issue here
as well. And so there was a question
asked and I don't necessarily um believe
that the applicant's consultant is
responsible for answering this
particular question but they were asked
um and were unable to answer it and I
believe we've we've asked this question
before and not received a very clear
answer on some rural files but it's an
important one.
So if there is issues with a well when
something does happen um for from an
adjacent property or a project that's
happening there whether it's blasting or
whatever dewatering for construction um
who would be responsible in the event
that a uh city approved project
negatively affects someone's ability um
to draw water uh from their well. Who's
who's responsible for fixing that
>> chair through you? It would be we would
create requirements through the site
plan control agreement that would you
know require the developer to be on
notice should there be any kind of so we
have a we have a number of tools we
could we could draw we could take
securities we could look at
opportunities for temporary systems
again I'm I'm speaking in
generalizations because the risk of this
is is deemed to be abundantly low in
this situation but we would be using the
site planning process to come up with
safeguards, if you will, that in the
event that something were that there
were to be impacts to wells that that
temporary source of water would come
through the developer. So,
>> you're on mute.
>> Thank you very much. Um that leads me to
uh another question andor comment that I
I didn't come into to this meeting um
planning to talk about but so many
conversations we've had around this
table particularly well and I mean I
remember the ones from my ward very
clearly and I'm sure there's been many
across the city where residents or the
people that we represent are very
concerned about particular aspects of
the conversation whether it's water well
safety fires for a battery energy
storage system where we're being asked
to approve zoning
ahead of the answers to many of the
questions that residents are really
seeking answers to and for which we
would be much more equipped to answer
these questions and and make these
decisions if those questions were
answered ahead of time. So, is there any
potential
future solution to that where and I know
we've now lost control over the um we we
cannot revoke delegated authority when
it comes to site plans. So, once we
approve zoning, we've pretty much lost
all control over what occurs on these
sites. Um so, I was just wondering if
you could comment or if there's anything
any mechanisms at our disposal to to fix
that. um whether it's conversations with
the province, are these things baked
into the planning act? Like could you
comment on on that aspect of this
conversation?
>> And I would uh I'll just ask um to to be
brief and colleagues, we have two more
files after this one that have
relatively lengthy delegations list. So
uh I'll rein this in a little bit and
just ask folks to focus on the zoning
merits of this file to the extent that
we can. And I know everyone is very
sensitive about the flooding
implications in light of this summer's
event. But uh just something to keep in
mind, a number of people are waiting for
us to get to the next files.
>> And chair, what I will say is we did ask
for the hydro geological a groundwater
impact assessment to be done with
zoning. So we made that a requirement
here whereas that
maybe technically isn't a requirement,
we did want to have that information and
we wanted to have those asurances ahead
of time. So that's why we are able to
have this discussion here.
Great to hear. Thank you, Chair.
>> Thank you, Councelor Low.
>> Thanks, Chair. Um, thanks for uh thanks
for all the work uh and time that you've
put into this and and all the phone
calls and stuff that you've taken from
me over the last little while. Um, I um
in in terms of the I'm I'm going to talk
about something uh different from from
the storm water first. Um then I'll go
back to it. Um but uh but in terms of
the uh zoning application um the one of
the one of the things that one of the
documents in the sorry the traffic
impact assessment noted that uh there's
a certain number of I think it's like
40ome or 50 something vehicle trips uh
sort of person trips generated um oh no
that is vehicle trips vehicle trips
generated during the peak hours um it it
assumes a um it assumes a I think
transit usership of about 25 to 30% um
during those peak hours. So, um my my
concern there is that one that that's an
assumption, but also two um the there's
a nearby intersection at Woodruff and um
Crest Haven Palativier where you know
routinely we've gotten um really close
to to warrants for signalization and
roundabouts. There actually used to be a
signal there and it was removed in 2015.
But um but what can we do within the
zoning process to um to address that
intersection? Is there anything we can
do within the zoning process to address
that intersection?
>> Councelor, we rely on the information in
the TIA and in this case, we haven't met
those warrants that are required and I
think overall the TIA does consider the
traffic from this development to be
quite modest. So, as you mentioned, it's
an additional some 40 uh vehicle trips.
So, uh here we know the driveways, you
know, meet the design and the sighteline
standards. We have new pedestrian
infrastructure going in here that's
going to improve area connections. So
from our perspective the you know the
the development actually improves active
transportation and I think the existing
network can accommodate the extra
traffic but we do hear those concerns
and we know we are close. So I know my
general manager Marcia and I have talked
about this and we're going to go back
and we're going to take a look at this
intersection and see what kind of
opportunities there are. Um but it
requires a broader conversation outside
of this zoning application.
>> Yeah.
>> Yes. Through the chair, I would just
sort of add to that that uh we are with
our traffic colleagues uh constantly
looking at uh road safety and so perhaps
this can be revisited when we talk about
the update to the road safety plan and
how those criteria and choices get made.
But we're we're right now looking at the
traffic impact assessment and based on
that report, we feel that it does meet
uh the current scenarios with these um
pedestrian improvements will be enough
to support the traffic. But we always
monitor in these new situations and we
can have this conversation again when we
talk about road safety and priorities.
>> Thank you. Um no, I appreciate and look
forward to that conversation. I think I
think we're going to do that between now
and council as well. um the uh on on the
storm water. So the the geote the
hydrogeeology report rather is is
typically not required but but you had
agreed to require it as part of the
reasoning uh process. Um first of all I
am grateful I am grateful that you did.
Um and second um how what kind of it's a
similar question as a as the
intersection like what kind of an impact
can can the hydro geology report have on
on site plan? Um and and also uh does it
have any pull at all on the resoning
process? like let's say let's say um the
it's not satisfactory and I know I know
you had indicated that it is but if it's
not satisfactory what kind of an impact
can it have on the success or not of uh
the city at the for example if we were
to refuse this
>> chair through you I think if we had
found a situation where we had deemed
that some wells could be impacted by the
development occurring that we would have
had to come up with zoning measures to
protect for that so maybe that looked
like alternate se setbacks maybe the
design had to be done differently. So,
so certainly zoning allows us to set
those parameters around setbacks early
on in a process. We're not prevented
from doing that through site plan as
well where technical safety health
provisions come up as a concern. So just
because we're setting zoning setbacks
here today, if we were to find something
fundamentally different at the site
planning process where human health,
where wells, what have you were
impacted, we would be able to make those
recommendations through site plan. So
>> okay, thank you very much. I'll have
some comments at the end there. Um but
uh appreciate the answers for now.
Thanks.
>> Thanks, Chair. Just the one question
that I noted before this time for staff.
Are we um looking at revisiting whether
the 100year standard is sufficient today
through the chair?
Okay, I'll take that. Um [laughter]
so to answer that question, um I've been
in contact with our colleagues on the
infrastructure side who are also paying
attention to this file and others. Um, I
would say that uh we're looking at
whether or not the industry standards as
were discussed by the consultants really
are adequate in Ottawa's circumstance
and I would argue that many
municipalities are doing that given the
impacts of climate change and while we
never know uh we're always continuously
looking at things. So, you know, it's um
meanwhile development and land um deals
continue to happen. So, we have to work
with the information we have and I I
believe the site plan is a robust
process that really as uh um the
planners have identified really gives us
that health and safety lens in order to
make those decisions. And storm water is
a major part of what site plan does. And
so, you know, is the ditch and the
ponding adequate to deal with storm
water? That's exactly what we're going
to be looking at. And it will be um our
our own engineers that review that and
and help make those recommendations for
site plan. But the infrastructure side
is looking at our standards whether or
not the 100redyear level is still what
the city should be standing uh behind
whether or not we need to change any of
our guidelines. That is coming forward
in the report that uh council is
expecting to see as a result of the July
1st floods. So that is we are working
cooperatively and we expect that to
occur and in the meantime sight by sight
we use our tools around site plan to
make sure that we are mitigating risk as
much as possible on any given location.
>> Okay, thank you. Uh thank you for that
response and I'm glad that it's going to
be coming back to us sooner than later
because development is coming fast and
furious. So thank you.
>> Thank you councelor Curry.
Yeah, thank you. So, the question that
the resident had about who's monitoring
these sistns and uh the maintenance, you
think about, you know, my colleagues
here right beside me. What what we heard
from residents over and over again was
that catch basins weren't cleared and,
you know, there was all, you know,
leaves and debris and who was
responsible for that? Was that us? Some
of it grass had grown over. In this
situation, would this be that the
private uh owners would be responsible
for maint maintaining this or would this
in the end be the city?
Uh this is something through you chair.
Um this is something that can be
included as a condition for the site
plan approval and uh it will be
maintained by the I guess owner of the
property. So it's this development.
>> All right. Well, that's fascinating to
me, you know, because that I don't know
who monitors that or how that all works,
especially if this is relatively new. I
did a quick search and there's a couple
of uh parts of Ontario, cities that have
had this type of technology, but it
would be important maybe for you to look
at what they've done, I gather, in
Whitby is one of them. Um because that
can be part of the reason why we end up
with flooding when people are not
maintaining this and and uh there aren't
some strict rules around that. Um the
other question I'll ask to staff is the
same one I had. At the very end of the
day, after everything is done, which
engineer signs off as a final approval?
Is it a city engineer or a developers
engineer?
uh chair, the developers engineer puts
their stamp and credentials on those
reports that the city then receives and
also approves.
>> I asked this question another time like
a reasonable person would think there's
bias there. These things happen all the
time. I mean the reality is the
engineers wear that ring. You know 1907
I think it was a Quebec bridge fell, St.
Lawrence Bridge fell and people were
killed and that iron ring uh guarantees
that you know their stamp means that
they believe that the public is safe. So
the reality is there's that and then
there's the but we will also lose
billions of dollars if this doesn't go
ahead and so when will I get hired again
if I don't approve these types of things
and that's a human element to this right
and and we are all sitting here just
watching it happen but I just think that
there's a lot of risk here I understand
I think uh GM Wallace's answer there in
terms of site plan and and the powers
the city has are real um I just I'm
hoping that this discussion indicates to
staff that this is I'm certainly quite
concerned about this if if and I I think
other people are as well. So that that
would be a clear message you're getting
from this committee right now.
>> And councelor if I may have an
opportunity to add to that when we do an
engineering review internally it is very
comprehensive. So it is more than one
engineer reviewing this file. So we have
a development review engineer that then
circulates to a myriad of engineers
across multiple departments including
those that work in storm water and
modeling. So this is very much a team
effort across the city that engages, you
know, anywhere from five to 10 engineers
who are evaluating consistently against
best practices against all of our
guidelines to ensure that these things
are safe and will work. So just wanted
to add that.
>> Okay. Thank you very much.
>> Thank you very much, Councelor Curry.
Councelor Low.
>> Well, mine's kind of a comment, too. I
just wanted to give councelor Lo the
last word. Um, you know, I think that
the quiet part that no one's saying out
loud is obviously if we change our
standard, it's going to cost more and
we're trying to keep housing affordable.
But I think given the gravity of what
the consequence could be, we have to
weigh that. And as you're hearing,
counselors are worried about this. We've
seen instances of overland flooding. So,
I just wanted to sort of put that out
there. We know that it's going to cost
more if we require developers to do more
and that is going to have an impact but
we have to weigh all these things uh in
the decisions that we're making. Thanks.
>> Thank you. No, I appreciate the
discussion that's uh that's been going
on around the table here. The you know,
thank you to staff. Thank you to uh to
to um Foten for for the answers. I
almost said Novatech um for for the
answers. And and you know, these are to
to give you some context. Hearts Desire
is a rural hamlet that was developed and
subdivided in the 50s and 60s that was
became surrounded by the suburban
development in in the 2000s. And when
that suburban development happened,
these same concerns came up about
wellwater, about the impact to uh the
safety of the wellwater because it
really is it can really be life and
death, right? We, you know, we we hold
um the reason why councils across
Ontario are are personally responsible
for the quality of our municipal
drinking water systems is because of
past uh past issues. So this can be life
or death for for people uh for um people
with the well and septic systems in this
community. Um where we are kind of stuck
is the fact that this is a reasonzoning
application and a lot of everything else
that we've talked about goes into site
plans. So you know this is a perfect
application under the old rules um
because we can do a lot under the old
rules but under the current rules I'm uh
you know it's it's a bit of a reluctant
support for the reasonzoning for me. Um
but uh but within the context of the
official plan, within the um yeah,
within the context of the official plan
and everything that's sort of um that
that governs us in the planning act, uh
this this there's no path to success for
us as a city at the OOLT. Um I do
implore um you know, I would I would
really like to stress the fact and the
reason why I had these directions is
because I want to stress the fact that
it is important, right? The the storm
water, the runoff, the the impact to
well qualities. I think we've
established that the the impact from
construction will be low, but it is the
ongoing impact um post development that
that that is a legitimate concern for
for for my residents and and by
extension for me. Um and and so uh I
really hope that uh you do you do engage
with the community as the site plan
process comes up. And I really hope that
Jeff uh Jeff Brent and others uh in
Hearts Desire um engage with this
closely uh and and that uh and that uh
you know staff sorry and that the
developer also uh participates in this
closely. They've been responsive to to a
lot of feedback so far. So I'll give
them that. Um but but I'm hoping that
it's not for show, right? Um because
these are these are uh legitimate
concerns. The last thing I'll bring up
is uh within within the minor corridor
designation. Um it is this section of
Woodruff is um questionable in terms of
his designation because the name
Woodruff Avenue does not invoke a
residential street, but this section of
Woodruff is a residential street. And
this is something that I'll bring up uh
in the future um as as a as something
that I think we need to correct um in
terms of how how we designate this
section of Woodruff because it really is
not it really is very different from
everything north of Crest Haven and
Pomativ. So um yeah, thank you.
>> Thank you very much councelor Low. Uh
two staff uh councelor Low has asked you
to uh undertake two things. Are you
willing to undertake those as direction?
>> Yes, we can accept the directions.
>> Okay. Thank you. Um I don't think there
were any amending motions put on the
table.
There's a good discussion. Uh so are the
recommendations carried?
>> Descent.
Okay. Uh carried with a descent from
councelor Curry.
Thank you.
On we go. Item 77 is the zoning bylaw
amendment for 475 Terry Fox Drive. There
are four public delegations on this one.
Um,
so we'll get a presentation from Amanda
Davidson.
Hi, Amanda. I'm not sure if you've
presented to the committee before. Is
this your first one? Second. Okay, we're
looking forward to it. Whenever you're
ready.
>> Good morning, chair, members of
committee. My name is Amanda Davidson
and I'm here to present the staff
recommendation for a zoning bylaw
amendment application for 475 Terry Fox
Drive for the development of three
six-story residential apartment
buildings. Next slide, please.
The site is located on the north side of
Terry Fox Drive and east side of Canada
Avenue. The site is a regular in shape
and approximately 1.2 hectares in size.
The site is a former untraveled city
rightway and generally sits at a lower
grade compared to adjacent lands. Next
slide, please.
Uh, the subject site is located within
Ward 4, Canada North. Surrounding land
uses consist of low-rise residential to
the northeast and northwest, low-rise
commercial to the west, a park to the
southeast, and Karp River to the south.
Further east of the site are additional
smallcale and large-scale commercial
developments. Next slide, please.
Within the city's official plan, the
site is located within the suburban
transct and is designated minor corridor
with a small portion of the north of the
site designated neighborhood. Uh it is
noted that the minor corridor
designation is applied to a depth of 120
m from the center line of the corridor
which is Terry Fox Drive and the
proposed development is within the area
of the site designated as minor
corridor. Next slide please.
The proposal is for three mid-rise
six-story residential apartment
buildings with a total of 182 dwelling
units. Uh, two buildings are proposed
along Terry Fox Drive and one along
Canada Avenue. And site access is
proposed in the northwest corner of the
site from Canada Avenue. The proposal
includes, excuse me, uh, 173 resident
parking spaces and 37 visitor parking
spaces with 90 spaces provided in in an
underground parking garage and 120
within a surface parking lot. The
proposal is also subject to a concurrent
site plan control application to deal
with matters relating to the site
design. Next slide, please.
Uh, the images before you are the
building elevations which illustrate the
proposed built form. The buildings
feature a peaked roof design and include
a half floor at the sixthstory to
provide a step back at the rear of the
buildings which face towards the
adjacent low-rise residential
development. Next slide, please.
Uh the zoning bylaw amendment
application responds to both the city's
former zoning bylaw 2008250 and the new
zoning bylaw 202650.
Under zoning bylaw 2008250, the
applicant's request is to reszone from
local commercial urban exception 1706,
maximum height 11 meters to residential
fifth density subzone AA urban exception
1706 with a maximum height of 20.5 m.
The proposed reszoning is generally to
permit the the mid-rise apartment
building with a reduced parking
requirement and to allow the increase in
height. Next slide, please.
Under zoning bylaw 202650, the current
zoning is minor corridor zone 2, urban
exception 1706, maximum height 11
meters, and the proposed zoning is minor
corridor 2, urban exception 1706 with a
maximum height of 20.5 m. The request is
for the increased height, reduced
bicycle parking requirements, a reduced
landscape buffer around the parking lot,
and to remove the requirement for active
entrances.
Uh it is noted that there is an existing
urban exception applicable to the site
which was established through a 2009
zoning bylaw amendment. The current
resoning will amend the urban exception
to remove some of the pre-existing
zoning provisions and establish new
sight specific provisions. Next slide
please.
Staff recommend approval of the
application as the proposed use and
built form is in conformity with the
official plan policies. Uh the official
plan notes that mid-rise building
heights between five and seven stories
may be considered through a zoning bylaw
amendment for minor corridors in the
suburban transct. The official plan is
generally supportive of intensification
and increased density along corridors
and intends to support a range of
dwelling unit sizes in the suburban
transct including multi-unit dwellings
on corridors. The official plan notes
that transition is to be provided to
abuing designations by locating the
maximum permitted building height and
density closest to the corridor with
stepbacks as appropriate. The official
plan notes that parking requirements may
be reduced along corridors. Staff are of
the opinion the transition has been
adequately achieved through the
provision of large setbacks, a step back
at the fifth story and through the site
layout. The proposal maintains a
landscape buffer with sufficient room
for new tr new tree planting and tree
retention to provide screening to the
adjacent residential uses and staff are
of the opinion that the provided parking
rate of 0.9 spaces per unit is
appropriate. As noted, the site is also
subject to a concurrent site plan
application and the design details
continue to be reviewed through that
concurrent process.
And that concludes the um staff
presentation. [snorts]
We're available to answer any questions.
>> Thank you very much for that. uh very
helpful. There are four public
delegations. Uh Terresa O'Neal and Rory
Bax are here with Ironclad Developments.
Um I'll give you the option. You can
present uh your five minutes now or you
can um do it at the end of the public
delegations to respond. So it looks like
you're going to do it now. So
>> uh thank you chair. We'll take the
opportunity to do our presentation and
then make ourselves available to answer
as many questions as uh committee may
like. Uh good morning. My name is Rory
Bash and uh my colleague Theresa O'Neal
will uh provide today's presentation. Uh
she's there on the screen and uh we're
just getting the slides up on uh the
screen as well. So Teresa, over to you.
>> Excellent. Hello chair and committee.
Um, as noted, I'm Teresa with Dylan
Consulting, joined by Rory Partner with
Dylan Consulting, and I believe we're
also here with Michael from Ironclad
Developments today. And we've been
working on behalf of Ironclad
Developments uh in support of the zoning
bylaw amendment for their proposed
development at 475 Terry Fox Drive in
Ottawa. Next slide, please.
The subject property is located within
the city's builtup urban area. It has
frontage on both Terry Fox Drive and
Canada Avenue. The subject property is
currently vacant and consists of an uh
undeveloped open field. The property's
location supports active transportation
and transit connectivity. Future
residents will have direct access to the
city's sidewalks and the Innill uh park
trail network, cycling routes uh as well
as bus stops with frequent service. Next
slide, please. And thank you.
Ironclad is proposing a six-story
residential development consisting of
three multi-unit buildings with a total
of 182 residential units. The proposed
buildings will frame Terry Fox Drive and
Canada Avenue, adding an adding an urban
form um at a prominent intersection.
Notably, 35% of the units are designed
to be accessible, supporting a more
inclusive and diverse range of housing
options. The courtyard is proposed on
the interior of the site, keeping the
functional elements of the site, such as
loading spaces and utilities internal
and screened from the public right of
way. as well. Expansive landscaping is
proposed along the property lines to
create a positive relationship between
the existing and proposed built forms.
In summary, the design of the
development integrates with the public
realm, includes a mid-riseu built form
as permitted by the city's official
plan, enhances pedestrian and cyclist
connectivity, and provides high quality
uh amenity spaces including a dog park,
uh outdoor amenity areas for people to
enjoy, um an indoor amenity area, as
well as individual balconies. Next
slide, please.
Uh the underground parade is depicted on
this slide. In terms of parking, there's
a total of 210 vehicular parking spaces.
120 of those are located on the surface
at grade with 90 located within this
underground park. There's seven
accessible spaces and 37 dedicated
visitor parking spaces. The proposed
bicycle parking is for a total of 137
spaces. 37 being short-term spaces
located outside the building and 98
being long-term secure spaces located
within the parade along with two
inclusive bike parking spaces. Next
slide, please.
The elevations of the buildings facing
Terry Fox Drive and Canada Avenue
feature balconies and windows creating a
favorable interface with the public with
the public realm. Next slide,
please. Perfect. As shown, the massing
of the proposed buildings is oriented
towards Terry Fox Drive, providing
generous back generous setbacks from the
rear lot line and providing space for
landscaping to improve the sense of
privacy and improving the sense of
privacy for adjacent uh low-rise
properties. And further you can see the
sixth floor of each building is designed
as a half floor, creating the visual
effect of a fivestory building when
looking from the adjacent lowerrise
neighborhood. And this design feature
was implemented to address the
community's back on views and privacy.
As well, the proposed development
includes a peaked roof design uh which
compared with the typical flat roof
design used for mid-rise buildings. The
proposed peak roof uh design is more
cohesive with the existing neighborhood.
Next slide.
All right. For over two years, Ironclad
Developments Incorporated has been
working with the city to advance and
refine the proposal for this development
and a timeline of this is shown on the
slide. They have completed
pre-conultation and worked through
various iterations of both the zoning
bylaw amendment and site plan control
applications. Ironclad has taken
feedback from the community and the
city, incorporating it into the site
design. For example, limiting the
building height to a maximum of 17.5 m
within 10 m of adjacent properties.
Overall, we're very appreciative of the
feedback and the time and attention on
this application. This development
represents good planning and it is it is
in my independent professional opinion
as a registered professional planner in
Ontario that it be approved um as
outlined in the city's report. Okay,
last slide.
Perfect. Thank you. This concludes our
presentation and we are available for uh
questions from committee. Thank you so
much.
>> Thank you very much uh Miss O'Neal.
Thank you very much Mr. Bach. Um there
are four public delegations. We'll start
with uh Yan Mingao
who has a slide uh deck and I believe um
they're online.
I'm sorry. Uh does anyone have
questions of the applicant?
Uh no. So uh they chose to go first with
the their presentation. So, uh, now's
your opportunity to ask questions of
the, uh, the applicant.
Uh, councelor Curry,
>> thank you for that. Um, and on the, um,
amount of consultation here prior to
even putting in an application and then
coming back again after making a lot of
changes uh, is really appreciated. The
absolutely the community is upset. you
know, there are petitions, but I want to
make sure this committee is aware of how
uh generous you were in terms of your
time and attention to the need for
communities to have consultation and the
need for changes to for them to feel as
if they are listened to and changes
made. Um, so a couple things I just want
to ask. If this is approved, um what
we've seen in Canada in the past is
where a developer will designate a
person who will then lies with the
community during the site plan uh time.
Is that a possibility?
>> Um I I believe so. In fact, uh the vice
president of development um Michael
Kubishi, which uh from Ironclad, which
is actually headquartered in Winnipeg,
um made the trip personally to be here
in Ottawa for today. and it demonstrates
the level of commitment uh that Michael
uh is bringing to the file and he will
continue to be involved uh in subsequent
steps. So, you know, he's been the point
person from the very beginning and will
continue to be involved.
>> Okay, that would be very helpful. We've
found that that works really well in
Canada where you they have someone that
they can go to. Um the other thing I
would ask is if this is approved, do you
anticipate going to construction fairly
soon?
>> Uh yes. Uh right now the architectural
team is working as quickly as they can
to uh get themselves positioned into
building permits so they can get
foundation permitting uh and move
forward to construction. Um this is not
a application where the developer
intends to just get a zoning and sit on
it for any number of years. There's
momentum behind getting this thing
built. Uh and there's a huge amount of
impetus uh for that to happen. And one
of the reasons why we're here at this
particular juncture is because there is
a transaction that needs to happen and
one of those conditions is that the
reasonzoning be in place. So there is uh
quite substantial pressure on the
developer to move this forward and get
this built.
Um, the other thing I was going to say
is that there have been and I will ask
staff some questions about the Terry Fox
the exit out and the way the road works
there, but um there was concerns by the
community that the developer had not
done a particular study other than
looking at it on Google. Um I don't know
if you saw that um email that email
train back and forth trail back and
forth but would there be any further uh
transportation studies or um additional
studies done to look at how the traffic
will flow around that area?
>> Uh generally from what I understand in
terms of the process that has been
undertaken thus far is that the traffic
study was prepared by the traffic
engineer and provided to city staff. Uh
and as you actually heard on some other
files, city staff do a very thorough and
diligent review of the technical
materials that are provided. So the same
was done for uh this proposed
development. Uh and city staff do not
have any concerns in regards to traffic
volume uh circulation patterns any of
those types of things. So, you know, I
really do put my faith in city staff
that uh if they agree with the um
proponents traffic engineer that the
site will function and traffic will
function uh uh you know as those
engineers understand.
>> Okay, great. I'll have further questions
for staff. Thank you very much.
>> Thank you.
>> Okay. Uh does anyone else have any
questions for the applicant?
No. Thank you very much for your
presentation today. So, now we'll go to
our public delegations. Yan Minga.
Uh Rory, you can leave the seat. Thank
you.
>> Hello.
>> Hi. And may we can uh hear you. Your
camera's not on, but that's entirely up
to you. But we can hear you. So,
whenever you want to go and we have your
presentation ready to go as well.
>> I didn't see the slide yet.
>> Yep. So, we got the slide deck up on
screen. Whenever you're ready, you have
five minutes to make a presentation to
the committee.
>> Okay. So, good morning chairman and the
member of the committee. My name is
Yaminga and I live in Inio Crescent and
just in the neighborhood of the site. Uh
my this is a new house building in the
canal north but my main concern is about
safety. I this side has a 182 units.
They were using only one driveway just
one driveway under avenue. So had the
driveway been this driveway I didn't see
that they have been
safe. The TI analysis only unless the
capacity does not show anything related
to the safety review needed to answer to
answer this question.
Next slide please.
this side
we can see clearly and I also I marked
the inlay on this and the the building
propose on the on the map so we can see
every car every visitor every delivery
use use this oneway driveway it use this
one driveway it at north tip of the site
it about 18 158 meter from the Terapox
signal.
Southbound traffic coming down a hill.
The hill start at the Hville Drive about
the 400 meters back.
There's a curve just before the driveway
and the speed is 60.
Between the drive and the signal,
there's a sh station.
It's open 24 hours. It has a car wash
and also there's a bus bus stop there.
SH station has two driveway.
One is in Terry Fox not only let you
drive right go west.
So if you want to go east, you have to
leave the can avenue and then have to
move the left turn lane and have you
have a 88 m before the signal. And here
also behind the queue that can be 38 m
long according to study.
And then at the near the near the uh in
intersection the traffic report the the
analysis report
said that there's 34 collision
collisions at this intersection in in
five years. 11 of this wellended
collision is on the same southbound
approach on can avenue.
Next slide please.
So this place here is the same stretch
draw scale the elevation is come from
the applicant's own data.
The orange part is the steepest
about the 4%
is sitting right between site driveway
and the SH driveway
and also in local that about 50% of the
new res
trip they will head to south they go
they meet at same place so they will
join
they will join the the semi traffic at
the territory for folks. None of these
is in the traffic study. The SH station
is not mentioned not once.
Next slide.
So city owned TI guidelines call for
that three tracks. First document every
driveway within 200 m on both side of
the road. The SH is a 70 m away but it's
not there. Second
reveal the access in the field
that's include the driveway across the
street and the grade here. Access
section line were checked by Google
maps.
Nobody mention the grade. Nobody mention
the measure the speed.
Third,
if there are more than five collision of
one type in five years, review them in
the field. Here there's 11 collisions at
the same direction, but there's no field
review.
Please ask staff whether this review
were done where they do where they where
they are document.
Next slide please.
So my major concern about this this
chart traffic. So my first request
basically I wanted this amendment
makement refused
>> if you could wrap up you're just at your
time but I'll let you finish your your
sentence.
>> Yeah I I I I request city just refill
this amendment at the current prop
purpose. If you can then if cannot then
just approve with the holding provision
and until all the safety issue is
resolved.
That's all. Thank you.
>> Okay. Thank you very much for your
delegation. Are there any questions from
committee members? Councelor Curry.
>> Thank you and thank you Yaming for
coming today and for presenting and such
a great PowerPoint to help people
understand uh what the challenge is. Um
so I you heard that I asked the question
of the developer. I'm going to ask a
similar question for staff uh next. But
my question to you is well I have two
questions. Number one, when you looked
at that collision data,
>> where did you I didn't I think I missed
it. What was the source uh that you used
to get those collision uh numbers?
>> The the collision number is at the at
the epics TIA application TI form. They
collect data from from 20 2018 to 2022.
That's the extend data. They don't have
data. It's it's out obslate but they
show they show up the problem.
>> Okay, great. I want to just make sure
the committee understood that it's
official data. It's not just, you know,
an observation by the community or
something. This is official data. Um,
the second question I have is if this is
approved, and you heard the question I
asked, I'm hoping of the developer that
they would appoint someone to work with
the community as we go through site
plan. Would you be willing to still stay
connected to this and be involved at
that time?
>> I think so. But but but I don't think
this should go to site plan because
right now we are talking talking about
the amendment. I think I want this tied
to the amendment because when good side
plan everything they can change or easy
to change or out of public control.
>> Absolutely. I'll ask those questions of
staff what can be done with that. I just
wanted to make sure in case it does pass
because these are difficult ones to vote
against I find on this committee but uh
we want to make sure that during site
plan some of these things are addressed
if that's what happens at this committee
uh at the end of this when we take a
vote. But thank you very much very much
for coming and presenting today.
>> Yeah. Sorry I I just last one last
comment in this side we have this 182
units there. There are a lot of car
movement right now. I don't think this
this safety is actually addressed. The
TI is basically incomplete.
>> Thank you and main I'll uh wrap it up
there. I appreciate the intervention
today and we're going to move on to
Katherine Moore.
>> Thank you.
We're just checking to see if
Katherine's online.
Okay, it doesn't look like Katherine's
online. If Katherine uh if you do uh
join, please let us know. Uh and then
Zed Chen will be our third delegate.
It'll just be a moment or two to get uh
zoomed into the
discussion.
>> Hello, I'm here. Can you hear me?
>> Hi there, David. Uh whenever you're
ready, you'll have five minutes to make
a presentation to the committee. Your
camera is off so we can't see you but we
can hear you.
>> Okay. Thank you very much. Good morning
chair and a member of the planning and
housing committee. My name is Yuda Chen.
I'm speaking on behalf of uh more than
100 petition signer who are all
residents local residents of Canada
North 4 in opposition to the staff
recommendation and the proposed
application for
475 T Fox Drive.
Our community is not against the
housing.
>> Is the start video there?
>> Sorry, some interruption.
But uh good planning require care sound
adjustment and respectful for binding
commitment. This application is not a
minor technical tweak. It is a severe de
overdevelopment data task that ask for
sight specific relief across six core
planning plan uh pillars by selectively
cherrypicking rule between current bylaw
2008-250
and the future bylaw 2026-50.
We urge you to reject this application
based on four fundamental concerns.
First, failing to honor municipal
commitment. In 2009, when the city sold
this public land, it established a sight
specific 11 meter twotory height limit
under exception 1706 to protect
surrounding low-rise homes. The
developer is now asking 20.5
m.
this up to 9.5 m above the existing site
limit and even
by 5.5 meter above the general suburban
CM2 ceiling under the bylaw 2026-50
permission to consider materrise
building on a minor corridor is not an
entitlement to exceeding the maximum
height. limit in meters on a constrained
triangular parcel.
Second, severe technical uh
non-compliance.
The applicant is cutting corners on
essential standards. They are sort
vehicle parking space under current
rules. They are slashing long-term
biking parking from 137 to 98 spaces.
They are shrinking the monetary 5meter
landscape buffer to 3.5 m. Most
alarmingly, they are removing active
street facing pedestrian entries along
Ty Fox Drive, replacing them with locked
emergency exit, creating a dead hostile
streetcape.
Third, traffic safety hazard. The
applicant traffic uh impact assessment
relies on outdated data aign this deep
4.3%
grade at the proposed entry. A slope
historically linked to severe winter
collision near the already congested Ty
Fox Drive and the Canada Avenue
intersection for zero community benefit.
The proposal is a single use residential
complex that taxes our already strained
infrastructure, doctors and daycarees
without offer anything in return.
Commercial developer are ready to build
the uh medical clinics and daycare space
our community need on this site under
current journey. As councelor Kury
mentioned earlier on another item and
cited her mother's resation street
situation housing project should not be
allowed to create disasters instead of
fixing a mass of disaster in the future.
Just don't start it now. Joning rule
exists to protect communities not to
maximize maximize developer yield.
Please reject this application and the
staff recommendation. Thank you very
much.
>> Thank you very much today. Uh Kathy,
sorry.
[laughter] I got like a week left.
>> You can call me Kathy.
>> Exactly. Counselor Curry, please.
>> Thank you. Thank you. Thank you so much
for coming and presenting today. And
Katherine, we'll get to you as soon as
we uh finish this delegation. Um thank
you.
>> So um one of the things you mentioned
was that that you're representing this
community um and many others who put in
a who signed a petition. So there was a
petition after our first consultation
that had 471 names on it and then there
was a second consultation and event and
presentation and the second petition
came in and it only had 106 signatures
after the developer made a number of
changes. So, I'm just wondering if you
have any kind of uh explanation for
that, why there was a reduction in the
number of signatures. Still a lot of
signatures. I'm just wondering if any of
your points uh were covered that you
could imagine uh affected the number of
signatures in the second petition.
>> Yeah, I think you know everyone uh
residents here we are all uh mostly uh
working full-timely and also during the
summer uh vacation time. So many people
was absetting when we doing uh the
another round the partition and even our
uh uh the member of partition the the
group was on vacation the other one
after another. So we just came back in
October uh starting back October but
even now the our original organizer of
our group now is visiting already
departure overseas visiting so that's
you know everything is u during the
summer vacation is sifting a lot
>> okay but the concern from the community
become even even um uh bigger because uh
the the new Monday mandate application
by the developer didn't address the
issue at all from beginning.
>> Okay. And I'll have some questions on
that for sure. The second question I
would have is um I understand that the
community largely believed in 2009 that
this would always be a commercial
development and I believe the councelor
at the time worked hard to ensure that
that would be the case. Do you think
it's understood by the community that
zoning and provisions like that are not
something that could be permanent or is
it uh do you think there's an
understanding that once something is
zoned something it stays forever? Um I
think we understand that but the
principle of bilo exist is to protect
community citing expectation and
limitation but those limitations should
be respected
under currenting by law even further uh
the future foring by law there are
limitation there are specifically set
there if we allow every developer Just
cutting corner up exceeding the height.
Uh cutting the space required for
parking. Cutting space for the uh bike
uh uh space uh cutting uh the buffers uh
zone from 5 m to 3.5 whatever the number
but you know all this the cutting corner
corner corner and then the essensor
standard are not me at all. So the bylaw
is is nothing.
>> Okay. Yeah, I I understand. I know it's
very frustrating for a community. My
last question is just if this happens to
pass at planning committee, would you be
willing to be involved as we go further
with site plan?
>> Yeah, I would like to be involved with
site plan, but first the juning
the current site plan application
clearly does not meet the juning
requirement. even for their applied new
zoning for CM2. It still does not meet
in six pillars.
>> Okay, thank you very much and thank you
so much for coming to to present to us
so that our my colleagues can understand
your frustration.
>> So can I just add one sentence? So
>> I
Z I'm sorry I'm gonna have to cut you
off there. Counselor has asked the last
question. We're going to move on to our
next delegation who will be uh Katherine
uh Moore.
>> Okay. Thank you. Thank you. Thank
>> Thank you. I can you hear me?
>> We can hear you whenever you're ready. I
have five minutes to make a presentation
to the committee.
>> I would like to ask this committee to
continue to honor the verbal contract
that they made with the Canada residents
by not reszoning 475 Terry Fox Drive.
The city of Ottawa's decision to realign
Terry Fox resulted in the creation of
this very small, oddly shaped parcel of
land. And at that time and in good
faith, the Canada residents worked with
the city of Ottawa to have this property
appropriately zoned to ensure a win-win
for both the city of Ottawa and Canada
residents. The result was the area was
zoned commercial low-rise with a height
not to exceed 11 meters. Now, let's fast
forward to the present. Your committee
has just been asked to approve zoning
and development plans that would allow
three sixstory buildings 22 1/2 mters
high with 182 families to be crammed
onto this small site. And to do so will
not only require reszoning but also
sightsp specific relief on a number of
issues including reduced green space and
landscape buffers, reduced bicycle
spaces, increased building height,
exceptions for refu collection and
reduced parking amongst others. And with
so many many required exceptions, this
proposal is clearly wrong for this site.
Now, the city of Ottawa's strategic plan
states, "Over the next decade, the city
of Ottawa's goals are to be a place
where residents experience a good
quality of life." Well, signitories to
the petition against reszoning this area
are telling the city that resoning will
negatively impact their quality of life.
In fact, Canada residential development
has moved at such a highly accelerated
pace that the October data shows this
market has experienced a significant
slowdown. Intense housing development is
also creating a serious strain on
infrastructure and creating safety
concerns and I cannot state strongly
enough that the safety issues cannot be
glossed over. Canada and the broader
Ottawa area are currently experiencing a
historic surge in severe traffic
collisions, marking a 10-year high and a
40% increase in collisions. Rapid
increased density at this intersection
will create a dangerous situation known
to traffic engineers as a strode. And a
strode is an extremely dangerous and
inefficient hybrid of a street and a
road which fails at both. Further, the
rising traffic congestion, pedestrian
and cyclist conflicts, and intersection
strain must all be seriously considered.
Now, the city of Ottawa and his and this
committee have kept their promise to
Canada residents over the year and
maintain current zoning. And at the time
of this agreement, our city councelor,
Maryanne Wilkinson, to her great credit,
listened to our concerns. She found a
mutually acceptable agreement for
development and zoned this land
appropriately.
For safety and a host of other concerns,
we are asking that this committee
continue to respect this agreement and
vote no to reszoning 475. Terry Fox
Drive because honoring commitments
ensures the maintenance and integrity of
relationships.
Thank you,
>> Katherine. Thank you very much for that.
I'm just looking around to see if there
um Councelor Curry.
>> Yes. Thank you, Katherine. Uh I really
appreciate you uh being here. I I'm
going to ask you the same question
because I've got I'm going to ask a lot
of the questions you uh referred to in
your delegation, but if this passes, uh
would you be willing to work with the
developer on site plan and me uh if it
does go forward?
>> Well, Kathy, thank you. But I do not
believe that the reszoning should be
approved and therefore I don't believe
that there's any,
you know, cooperation with the developer
on developing this monstrosity. This was
seen years ago and we know that this is
going to create safety concerns. The
Terry Fox Drive is a corridor. It's it's
considered a road. It's not a street
where, you know, um residents can slowly
at 40 kilometers an hour go in and out
of their dwelling.
Traffic will be slowed because they're
going to have to make active entrances.
And if they don't, then that's just yet
another exception because they know that
this will create safety issues. Thank
you.
>> Thank you very much, Katherine. You'll
hear a lot of questions I'll have as we
ask questions of staff. Thank you for
coming today.
>> Thank you, Kathy.
>> Thank you very much. Uh, Miss Moore, I
don't see any further questions from you
for from committee members. So, thank
you for the intervention and we'll move
on to questions of staff. Uh,
a celebrate delegation. Say the other
one didn't show up. Yeah. Okay. So, uh,
councelor Curry,
>> thank you very much. And first of all, I
just would like to say a huge thanks to
Amanda. You, you know, your diligence in
answering every single email and we've
had many. You know, we had the petitions
and tons and tons of questions on this.
Uh, so thank you very much for how
quickly you got back to residents on
this. Now, you know that people are very
upset about this. So, let's I I haven't
got an order of operations, but number
one, I guess I want to ask you about the
possibility of a holding provision
because that the community doesn't feel
this traffic study was done properly uh
regarding Terry Fox. So, you heard the
delegation. Uh what do you think about
that?
>> Mr. Chair, um thank you for the
question. So the site plan has been
running parallel with the zoning
application and we have reviewed the TIA
and we're comfortable with findings of
the TIA and moving forward with the site
as it's designed. So we wouldn't be in
support of a holding provision.
>> So you've already done that because the
comment about only sight lines were
looked at by Google. Can you explain
where there more was there more to it
than that because there were they're
saying there are so many collisions at
that intersection.
>> Yeah, that's correct. There is a TIA
that was submitted. So, a full TIA was
submitted and reviewed by staff. We
looked at it uh diligently. We looked at
the sight lines to the intersection. We
looked at the um there's actually a left
in coming down Canada Avenue. It'll be a
protected left. So, that'll bring cars
coming into the site uh going towards
Terry Fox off of the um the main through
fair to the intersection. And we've
looked at the the intersection design at
uh Terry Fox and Canada Avenue to
understand how that's operating. inclion
data does incorporate into the the TIA.
So we feel that the the intersection
where or the the access where it's
located on Canada Avenue is actually
ideal away from the intersection and
away from Terry Fox itself.
>> Okay. So there will be changes as well
though with a dedicated left. So
currently, yes, there you if you look at
the street today, there is a painted
there is a space for a left and through
the site plan application, we're going
to be having the applicant do the the
line painting work to make sure that
that left is is um legal and clearly
marked.
>> Okay. Um, the other question I had, this
is, this is not from today, but people
were very concerned about where the
garbage was to be located because there
are houses right behind these this piece
of property and people were asking for
that to be changed. I'm wondering if you
have a comment on that
through you, chair. Thank you for the
question. Um, so staff are evaluating
the garbage collection area through the
parallel site plan process. Um it's
noted that uh some of the previous
provisions in this the urban exception
1706 do speak specifically to garbage
collection but staff have reviewed under
the current um zoning framework and it
would be in conformity with that. Um it
is noted that the uh collection area is
about 18 m from the common property
line. Um and that is with um the
landscape buffer which uh is at 7.5
meters for the majority of the site um
plus parking area between um the garbage
collection as well.
>> Okay, thank you for that. The trees at
the back, a lot of the residents were
concerned because they back onto this.
They wanted to make sure there was still
that level of privacy with all that
landscaping. Um do you have a comment on
that? On the picture it looks like
there's a lot of trees. I would say
right now a lot of them will be taken
down but um do you have a comment on
that?
>> Uh yes, thank you for the question for
you chair. Um so there's a retention of
about 13 mature trees along that
existing landscape buffer um including a
number of red oak and spruce and those
trees are designated for retention
through the um site plan process. Um and
then there is proposal for new tree
retention not just throughout the site
but also along that landscape buffer to
provide that additional screening.
Okay, the next section, next stage if
this were to pass today, um is site
plan. What opportunities will there be
for the community to contribute that to
that with the city?
>> So, Mr. Chair, thank you for the
question. The site plan because it's
been going parallel, it's quite far
along and app uh residents have been
engaged uh with city staff on site plan
matters, but um so there there still is
an opportunity. It's always open until
we move to an approval, but I I do want
to point out that staff and the
applicant are closing in on a on a first
conditional approval.
>> Thank you. I just wanted to make that
point that there is still some time
because I've been watching that was my
point about Amanda, how many emails she
has responded to already and taken into
consideration. Um, so a lot of these
this feedback has been taken into
consideration, but there still is time.
Um, I want to hear what the rest of my
colleagues have to say if they have
comments and then I will have a wrap-up
uh comment at the end because I want to
talk about what the OOLT might think
about if we were to refuse this
application.
>> Understood and thank you uh councelor
Judas.
>> That was going to be my question. Um, we
we had heard from a number of the
delegations about uh you know their
opposition to this, how they would ask
for us to vote against it. We've seen in
the in the correspondence that you know
the neighborhood is is had been under
the belief that this would not be zoned
to residential that they wouldn't see
this kind of development at this
property. I'm
I'm intri interested in legal's opinion
on if there is any planning rationale uh
that committee could lean on if we were
to vote against this application and how
we would fare at the OOLT because I I I
know that that was something that was
brought up by delegations. So I'd like
to to know if legal has a a view of
that. [clears throat]
>> Mr. Chair, thank you for the question.
Um if if this were to be um refused by
council after a recommendation for the
committee to that effect um we would
follow the usual process that that
occurs when um a refusal occurs contrary
to a staff recommendation. We would seek
outside um planning expertise to support
council's position. Um we would of
course to be successful at the OOLT we
would have to have that expert witness
and um we would then um if we weren't
able to find that expert witness we'd
have to report back to council on on
that result as well.
>> So I think and I get that and obviously
you couldn't have an expert witness from
staff because staff had approved it. So
I you know once again that requires
outside. I guess my question though is
and may maybe it's more of a
philosophical question. I I have a
similar property in my ward. This was
many many years ago. Um and it was very
low the low zoning. It was low
development. There wasn't any you know
intention to change from single family
homes. There was two on this very large
property. Uh it was through a
housekeeping motion in a previous
previous council that it was changed to
Main Street Arterial and next thing you
know residents who thought that this
would always be what it was or if it was
changed it would be similar to what it
was was now looking at a ninestory
building that is going to put an immense
amount of pressure on the
transportation. It's right across from
two it's across from two schools. I
don't know how we're going to deal with
it and we're having to live with this
now because that was zoned for that. So
I guess what I'm wondering is is there
any basis in past president
past promises to residents that could
give us any legal standing? I feel like
I know the answer, but I'd like to hear
what your view is
>> in terms of a a rationale for for a
refusal. Um
generally uh to be successful that
rationale would have to be based on
planning instruments and an agreement
between the developer and residents with
respect to their intentions for the use
of the property which may have been
discussed in the past wouldn't be a a
policy a planning policy rationale that
could be successful at the board. Um,
so I if I think am I addressing the
question there correctly as to the
um the rationale for a refusal?
>> Yes. I I mean it's kind of a loaded
question. I don't really give you an
easy one. I
>> Yeah,
>> I think it's unfortunate that we are
looking at this application. I I think
that it's unfortunate that residents had
been, you know, under a long-term belief
that this would not change from what had
been the zoning that was allocated to
it. Um I don't I don't believe that we
would have a lot of standing at OLT. Um
and I wish that we I wish that we uh had
some kind of legal format with which we
could oppose this, but I I don't know
that there's an avenue to that. Um,
sorry Kathy, I stole your stole your
question, but um, I'll pass it back to
you. That was my question.
>> Thank you very much, uh, councelor
Dudas. Um, I don't see any further
questions. I don't have any myself.
Councelor Curry on.
>> Yeah. Uh, honestly, uh, councelor Dudas
made a number of the key points. When I
held the first consultation, and as I
said, this was even before they put in
an application. I said to the community,
things have changed dramatically. you
know what it's been like at planning
committee here like most things we have
to pass we always asked is there a
planning rationale to vote against this
so the community is not happy with a
whole bunch of things but I said to the
community at that point what we're often
doing is trying to make things better or
less bad however you want to see it but
in terms of having a planning rationale
to vote against it alto together there's
very little chance the OOLT would vote
against it would be a lengthy appeal
process that would cost a lot of people
a lot of money and probably end up with
nothing Even if, as our legal uh advice
is telling us, we could find an expert
who would uh disagree with city staff's
recommendation. This is the reality of
it, right? So, I could absolutely vote
against this and say to the community,
"Yeah, I stood with you. I voted against
it." But it's not realistic. The reality
is that the OOLT is not going to uh say,
"Well, because the community doesn't
want it and they understood many years
ago it was going to stay the same," that
they will uh they will vote against it
as well. I I actually did a search of
the recent OOLT uh ration for what the
OOLT is caring about these days and I
mean one of the things was whether it's
a natural heritage feature and it
functions as natural heritage. That's
not the case. Uh that there are natural
hazards and flood planes with
unstoppable uh slopes. That's not the
case here. The flood plane mapping that
was just bun done by the Mississippi
Valley Conservation Authority as
Councelor Kelly will tell you was just
done and it it did not affect this site.
In fact, it moved away from this site.
Um the uh compatibility with major
facilities and sensitive uses, that's
not a reality on this site. It's across
from the Karp River flood plane and it's
beside a a park. Um there is no cultural
heritage and the servicing capacity is
not an issue. There's already servicing
to this site. The only thing that I
thought would even generally apply that
we did not hear today was about whether
it it um it doesn't protect employment
areas. So, this was to be a mall, a
strip mall. And the reality is, you
know, again, it would be a strip mall.
There would be a few businesses, a
hairdresser or whatever. It's also right
down the road from from Sentrum. It's
also right down the road from a little
uh strip mall that is besides All Saint
beside All Saints High School. It's
directly across the road from another
strip mall where there are many
different businesses. So, uh, while I
can appreciate the community would have
liked another mall there, the argument
at the OOLT that this would be
preventing, uh, employment uses, I don't
think that would hold up. And and that
is what it comes down to. Is there
actually a planning rationale? And I
don't think there is. So, I know the
community will not be happy, but I will
be supporting this because I think that
is what makes sense to do. And I will be
working very hard with the community to
see if there's anything else that can be
done during site plan to make this
better and absolutely looking at what is
happening with that with that
intersection at Terry Fox and Canada A
because the collision data is worrisome.
But um that's what I have to say. I
appreciate the community's involvement
and I really appreciate the help of
staff and the developer here to to get
us to something that I think is
different from what was originally
proposed. So uh thank you very much.
Thank you very much, councelor Curry. Um
I don't think there are any amending
motions on that one. Is this item
carried? Carried. Thank you. Uh folks,
we'll take a 15minute break uh before we
come back to the uh OLT settlement on
Prince of Wales. I expect that'll
engender some discussion. And then there
will also be the uh motion on parkland
dedication that was brought forward in
the last um uh meeting as well where I
expect there to be some uh discussion as
well. So let's come back uh in 15
minutes.
All right, we've got uh two items left.
Uh item 78 will come up first, which is
the Ontario Land Tribunal Settlement and
Official Plan Amendment and Zoning bylaw
Amendment for 2175 Prince of Wales
Drive. Uh we're anticipating a um
relatively abbreviated presentation from
staff at which time we will go into one
two four public delegations on the item
and then uh the applicants will have
their five minutes to uh respond to what
they hear before we move to questions
staff. So with that I will turn it over
to you guys. We're in your hands.
>> Thank you. Uh good afternoon Mr. Chair
and members of committee. I am here
before you today to present staff's
recommendations for the official plan
and zoning bylaw amendment applications
for uh 2175 Prince of Wales. The
applications have been appealed to the
Ontario Land Tribunal and staff's
recommendations are proposing to settle
the appeals.
Next slide.
In terms of the site location, the site
is located northwest of the Ottawa
International Airport and at the
southeast intersection of Prince of
Wales uh drive and West Hunt Club Road.
Next,
in terms of the site context, uh the RTO
River, which is a UNESCO World Heritage
site at this location, um runs along the
site to the east and to the north
there's a uh creek. Um, surrounding land
uses include low-rise residential uses
to the south along Waterbend Lane and
across Prince Wales Drive, there are a
mix of institutional, commercial,
office, and automotive uses varying in
both scale and height. Uh, and at the
northwest corner, uh, as you can see on
the screen here, there's an existing
mid-rise office building. Next slide.
Terms of the official plan designation,
the site is designated neighborhood
within the outer urban transact. Next
slide.
Also within the official plan, the site
is situated along a transit priority
corridor and is also at the intersection
of two arterial roads and along a scenic
entry route.
Next slide.
The official plan identifies natural
heritage features on the lands and the
site also falls within the uh airport
operating influence zone.
Next slide. Just a little bit about the
uh application history. So the zoning by
amendment was first circulated in 2009
and then more recently when a request to
increase the height was made. Um the uh
the city had advised the applicant that
an official plan amendment application
would be also required and uh in July
both applications were appealed on the
city's failure to make a decision within
planning act timelines. Uh on the slide
here you can see some of the key changes
between the original and current
proposals including a reduced height
from 12 to nine stories and uh remove
some of the auto automobile uses uh uh
such as automobile body shop uh gas bar
storage yard and also um all um
residential uses were removed as they
were deemed to be incompatible with the
uh airport authority.
Next slide please.
So staff's recommendation um is uh is to
support the area specific policy that
will permit building heights up to nine
stories that will permit a range of
non-residential uses. Um and staff are
recommending that any development on the
site ensures appropriate transition to
the low-rise residential uses to the
south and provides appropriate buffering
along Prince of Wales Drive at the South
property line as well as Crito River.
Next slide. Terms of the zoning bylaw
amendment, staff are recommending that
the site be splitzoned. Area A to be
reszoned to a neighborhood mixeduse
zone, subzone 2, and area B to be
reszoned to an open space facility zone
where no development will be permitted
along the um water corridor.
Slide. Of the 44 uses originally
requested, staff are recommending
approval for 28 non-residential uses as
shown here. Um the eight uses marked
with an asterisk are noise sensitive
uses that will need to be um advised of
nearby airport operations before
advancing.
Staff are recommending that the
properties uh the property have height
limits above site sea level to ensure
compliance with airport height
restrictions. Area B as well will have a
three-story height limit within 20
meters of the southern property line to
help achieve suitable transition to the
lowrise residential uses to the south.
Next slide please.
Staff are recommending two holding
symbols to address sight specific
requirements before development may
proceed. The first holding symbol will
require key technical studies to be
submitted and approved as part of a
future site plan application. And the
second holding symbol will require noise
sensitive uses to implement noise
mitigation measures and notify future
owners of uh nearby airport operations.
In summary, staff are recommending
uh approval of the applications. Staff
are satisfied that the proposed revised
policies, the split zoning, the sight
specific zone provisions and holding
symbols will ensure that future
development fits within the surrounding
neighborhood and addresses all required
airport, environmental, heritage,
engineering, and transportation related
considerations prior to any
construction.
Thank you. Happy to take any questions.
>> Thank you very much for that. We will
move on to public delegations. But first
a quick technical question. If uh this
committee uh recommends and then it's
subsequently adopted by council the OPA
and zoning bylaw, then the proponent
will drop their appeal uh at the Ontario
Land Tribunal.
>> That's our understanding. Yes, chair.
>> Okay. I'm seeing some shaking heads. So
we'll uh we'll explore that a little bit
further. Um let's move on to the public
delegations then. First of which is Ali
Moajer.
Who is online?
Everyone's online.
and we're just waiting to get the
delegate
into the chat. Okay. So, we don't have
Alli with us at the moment. So, we're
going to move on to Bill Bza.
>> Hi. Can you hear me?
>> Bill, we can. Your camera's not on, so
we can't see you, but that's okay.
Whenever you're ready, you have five
minutes to make a presentation to the
committee.
>> Very good. So, good afternoon, chair,
members of the committee. My name is
Bill Barzo. Uh, thank you for allowing
us to speak today. We are the residents
of Waterben Lane and the surrounding
neighborhood. We have legitimate fears
as it is us who will suffer the
potential consequences if the settlement
proposal is accepted as is. I want to
begin by making something very clear. Uh
we are not opposed to the development on
the site in question. Uh we recognize
that Ottawa is growing and that
intensification is necessary. Uh and on
that note, I want to start with this
very question. How do largercale
commercial operations in an established
residential neighborhood which exists
both to the north as well as the south
that bans the rubber fit in with the
official uh plans reference for small
neighborhoods serving businesses. This
is at the heart of our concern about the
settlement proposal. We have reviewed
the staff report and the responses to
the hundred comments submitted by the
residents. We see that our concerns are
acknowledged, but action to resolve them
is deferred post approval. We are
essentially being told approve the
height now, approve the permitted uses
now, and we will then figure out the
consequences later. Simply, the
settlement proposal appears very
premature.
Let me first address the building height
and neighborhood compatibility. Given
that the official plan contemplates
neighborhood buildings up to four
stories, why is a sevenstory building in
an isolated commercial business park
being used as justification
for a nine-story building in an
established residential neighborhood?
One that's would be inserted between the
north and the south. Why isn't one of
the more recent erected buildings just
down the street, which was restricted to
three stories because of its residential
surroundings, a more appropriate
comparison?
Also, the proposal treats a mere 20
mirror transition strip as an exe as an
acceptable step down from the ninestory
building to the road. We do not believe
this provides meaningful protection for
the residents across the street. Imagine
for a moment looking out your front
window across water waterbend lane at
the space occupied by approximately five
parked cars on the site in question. And
now immediately beyond that, a ninestory
concrete wall arises, completely
obscuring the view you once enjoyed.
This simply can't be right. Yet, that's
the leeway that's proposed. Secondly,
the proposed zoning permits a range of
commercial uses, but many of them are
regional in nature and not necessarily
small scale. As an example, how does a
potential 24-hour warehouse with trucks
coming serve a 15-minute neighborhood or
improve the lives of the families living
across the street?
Why should a residential community have
to accommodate the traffic, noise, and
operating characteristics of businesses
that serve a wider regional market?
I will repeat myself. We would welcome
small-cale daytime businesses such as
medical, dental clinics, professional
offices, cafes,armacies, the such that
serve the surrounding community and
reflect the city's own version for
15-minute neighborhoods and other you
and use other approved commercial areas
for larger scale businesses. Thirdly,
Prince of Wales and Huntub Road already
experience significant traffic
congestion, sometimes brutal. I think
people probably know this and certainly
some of you must. Residents have
overwhelmingly identified concerns
involving this intersection, Shefflin
Bridge, turning uh uh uh movements,
pedestrian cyclist uh safety, and the
potential for traffic to enter Waterbend
Lane, which is a narrow residential
dead-end street. How do we know that if
the existing road network can
accommodate some of these permitted uses
at this location? Why are we being asked
to accept the settlement before the
transportation impacts have been fully
assessed? Moreover, what happens if the
completed studies show that the
infrastructure cannot support the scale
of development post approval? Will the
city be prepared to reduce the permitted
density or restrict the uses? Or will
residents simply be told that the
decisions have already been made?
Fourth, who will protect residents from
commercial flood lights, vehicle
headlights, late night deliveries,
island trucks, loading bays, and all
that jazz? What about the question of
unattenuated noise up and down the river
that this could introduce? Why are we
being asked to trust that these problems
can be solved later when the scale and
nature of this development are being
established today?
Shouldn't these matters be properly
understood before the city commits to
this development as is? Per perhaps
their greatest concern is the way the
settlement handles public consultation.
Let's be realistic. If the ninth store
height and incompatible commercial
permissions have already been approved,
what meaningful decisions would actually
remain open to public input? Can
residents challenge the scale of the
building at that stage? Can they
challenge the use that it's already been
permitted? Or will it be left to arguing
about landscaping, fencing, and so on
while the most consequential decisions
are already legally established?
Why should residents have to pursue a
potential OLT appeal to challenge
decisions when this could have been
properly examined before
before approval? That is. So folks,
please consider who's being asked to
carry the risk here. It is not the
planning department. It's not the
applicant. It is us. We are the
residents who will be looking at this
building every day. We are the families
who willing. [clears throat] Yes, I know
I'm short on time. I'm almost finished
just giving you a
>> I'm sorry, Bill. I'll need to cut you
off there, but uh councelor Divine does
have some questions for you.
>> Thank you, Chair.
Mr. Ne.
>> Hello.
>> Hello.
>> Hello. Hello again.
>> Thank you, chair. Um uh hi, Bill. Thank
you very much for your delegation. Um,
and thank you to all the residents, not
just of Waterben Lane, but of of of
Pinang Glenn and Countryplace. Uh, you
guys are all very very wellversed in uh
in the history of this uh file. So, I
will have a couple questions for you,
but um and I I'll your letter that I
read was very detailed. So, I'll just
some of your summary concerns are are
very very apt. like you brought up the
same fact that my colleague councilor
Kelly spoke to earlier where because of
how we are handcuffed now. Um we are
approving ahead of the fact um
situations that we then have to just you
know act on faith that mitigations will
be put in place. Um one question I have
for you uh Mr.
you made reference. So, as a resident of
Waterbend Lane, you made reference to
what uh we only saw here in that diagram
where zone A is the buffer zone. Um, and
I'm not sure if I I want you to try to
paint a picture here. So, if you live on
Waterbend Lane and that small 20 meter
buffer which represents five to six
parked cars, that is uh that is the
buffer. It's your understanding, and
I'll get staff to to confirm this later,
but Bill, is it your understanding that
within at the end of that 20 m buffer,
you would be then faced with the
prospect of a nine-story building?
>> Precisely. And the reason why is because
it's very clear in the diagram that says
that I believe it's not area A. that
you're you're referring to one of the
earlier diagrams, area A versus area B,
the the sanctioned area where there's
environmental protection versus the area
that is actually considered uh more of
the zoning, but that doesn't actually
include the the buffer zone. There's a a
7.5 meter which is incorporated into a
larger 20 meter. And so that 20 m is
from the edge of the road of Waterband
Lane that then goes to the uh the the
location of where a building could be
built. So if you think about it,
>> when you actually if you were actually
doing this, you're not going to use that
small thin transition to build a three
or four story building to transition the
the tower would completely overwhelm. So
most likely there would be the
likelihood uh or I should say that
possibly a parking lot or some other
thing that may be there. It really
doesn't matter. Even if you did have a 3
meter or threetory building, it still is
overwhelmed by that that uh uh that that
building. So you have a you have a
concrete wall effectively in your front
yard.
Yeah. And I and I understand from having
been through this process before that
when we measure uh what can happen at
the setbacks um we we just automatically
imagine that there will be you know a
uniformly concrete block at that point
which you know might not be the case but
it could be the case.
>> And I know that one of what had been
described as a concession on this file
was the the gradual stepping down to
Waterbend Lane.
>> Precisely.
>> Pardon me.
>> Precisely. Yes.
>> Yeah. But if it is so, and I'll get
staff to confirm this, if it is so that
within that narrow 20 meter buffer, you
could theor theoretically have a 20 uh
ninetory wall right there, um that does
not seem uh in line with what was
described as a concession. My other
question to you,
>> I know that the residents have wrestled
with what for them would be the ideal uh
use of this land, if any. Um and there
are, as you know, there are choices
before the the owner. um they haven't
determined what their ideal land use is.
One could be an auto dealership, another
could be a retail plaza. And I've heard,
I believe in your letter and in letters
from other residents, that what
residents would prefer, if anything, was
a retail plaza because it could offer,
as you even said, local shops that could
be of use um [snorts] to the residents,
i.e. aligned with what the OP
designated. However, you know though
that if it were to be a retail plaza,
that would have far more traffic impact
than say a car dealership. So, can I ask
you if you had to choose, if you had a
preference between uh a retail plaza,
which may be of greater benefit to local
residents but have bigger traffic
impact, or a car dealership, uh even a
luxury car dealership that would look
lovely but not be of much use to many of
you but have less traffic impact. Which
would you prefer, if I may ask?
>> Well, so the the whole notion of a it's
a loaded question because the whole
notion of actually uh um considering a a
a retail strip mall may not necessarily
be the the right answer either. I think
it depends very much on the mix of
what's actually in there. In my own
mind, in the discussions we've had, it's
been more along the lines of more
professional services. It's been along
the lines of of servicing the community.
So that way a commercial like let's face
it if you take a look at any of the the
uh um dealerships that are around you
don't see a lot of traffic there. Our
bigger concern there happens to be the
flood lights and all the light pollution
that would cause and the point of a
warehouse if it was to actually work 24
hours which wouldn't be unreasonable for
trucks to come in come out. I mean, you
are actually looking at a lot of noise
and and and if there's a warehouse that
actually has open bays, that noise of of
things could be strickling or or pushing
down to the back of the river, you could
have noise that's uh not being uh
attenuated. There's a whole bunch of
concerns here. Some of them vetted more
than others, but we're just raising the
concerns because we are worried that
there is not enough of the assessments
that are done on your end. uh that is
the planning department to actually say
it's okay guys it's safe you don't have
to worry about the river you don't have
to worry about this because we've got
that covered give you another example
and let's assume and I'm going to go to
your point uh counselor is that let's
assume that you know there's a n-story
building that does get uh although I
would hate to think of it that it
actually gets accepted and what then
happens is that so mechanics are are
then performed and all of a sudden you
can't put it anywhere close to the zone
B where it's environment environmentally
safe and it could only potentially be
located close or near Waterb Lane. Maybe
that's the soil mechanics dictate that.
Assessments to my knowledge have not
been done. The traffic assessments have
not been done. There's there's very
little in the way to support this. It's
the cart before the horse. And this is
the issue. Hotel is one thing. Not sure
the the traffic patterns that would
ultimately reside. But if a tri if if if
if a if a dealership was the choice I I
don't see it as I could I I still see
this under the banner of large or larger
commercial businesses doesn't belong. We
want to see the sort of uh 15minute
uh uh um activity or commercial
businesses that are considered smallcale
and actually are in in line in alignment
with the city's own vision of the
15-minute neighborhood.
>> Thank you, Bill. Um, we'll see what uh
your other fellow residents have to say,
but I also just want to appreciate you
raising the point that I'll certainly
raise later of having used that building
across the street, the sevenstory office
tower, as a comparator. Not exactly the
most relevant comparator. Once you cross
Hunt Club, you're in a completely
different neighborhood, a completely
different world. It's not really apples
to apples. Thank you, Bill.
>> Okay.
>> Thank you, Council Divine. Uh, thank
you, Mr. Bza. I don't see any further
questions for you. Appreciate the
intervention. So we now have Ali Mahajer
uh available to make his or his
presentation.
Okay, I'm sorry. We're still
experiencing some issues with Mr.
Moajer's
tech. So we'll move on to Elizabeth
Sorfleet.
>> Good morning. Oh, good afternoon
counselors and councelor Divine. Thank
you for the uh opportunity to comment.
>> Uh I oppose the uh the application. It
is most regrettable that the deadline
was missed which lands the council and
the planning committee in a very
unfortunate situation but I still oppose
it. First the ninetory height. It is
totally out of character and uh it
contravenes the city's own uh limits on
height.
Secondly, uh there are a number of uh
contraventions. It's not it it appears
to present a primmaaccia contravention
of the city's strategic plan and of
develop Ottawa. It is not at all
consistent with Ottawa's older adult
plan and um
we own a whale. So my question to be
left with you and does not need to be
addressed today is who would carry the
financial liability to make whole to
residents that are affected by any
negative impact not just about wells but
anything else. I also have not seen any
environmental assessments or
consultations done with the river uh
with the Ottawa with the Reto River
Conservation Authority or with the
authority itself or with NCC which owns
the shoreline.
So what's the impact on those large
institutions? I am a former uh federal
government planner and reporter to
parliament and I would say to you that
if you were ministers, if you were my
MP, which is the prime minister, and if
you were the Senate that I was
presenting to and given policy advice,
uh as a planner and reporter on
accountability and performance
accountability and also as a specialist
in legislative and uh regulatory
development.
I would advise you strongly to oppose
this application. So, as I said, we are
unwell, so we worry about that. We've
been affected by several storms. So, I
want to know who is going to be
financially liable to make whole uh any
impact on us as well owners. And uh we
have wildlife along both sides. As Dr.
Bereza said uh we already have traffic
congestion in that Prince of Wales is a
highway Hunt Club especially since the
extension to West Hunt Club is very busy
and Riverside as probably you all know
uh well has been listed as one of
Ontario's worst intersections for
traffic. So any additional commercial
traffic that would bring in higher
[snorts]
volume of traffic uh would be
not good for the community. I don't see
any discernable benefits to the local
community. I don't see how it will
benefit any kind of uh local employment
because these are not uh community-based
businesses. they may benefit Ottawa if
we have something that's health uh and
medical services and so on and so forth
uh or if it were a public library or uh
a recreation center which we badly need
here. We have enough problems uh here
and there's no benefit whatsoever. Uh I
also want to say that um you know the
impact on the wildlife uh would also not
be good and I understand from my
neighbor Mr. Sakul that the last time
there was development he's right next
door to us there was an infestation of
rats on his property which is a public
health issue and he I think uh Dennis
will speak well to that. Um, so you
know, for all these reasons, I see no
benefit whatsoever. This is prime real
estate property. It's a beautiful
property, and the only reason for the
planning committee to go along with this
application and for the city to go along
is revenue. Well, as I said, it's a
prime piece of property. There are other
ways to raise revenues. That's a
multi-million dollar property that's
there. there are things that can benefit
our community and the larger community.
So, um just want to say that uh
I think I' I've said I've stated my
comment um and I would strongly advise
you not to approve. Thank you.
>> Thank you very much for your
presentation. Councelor Divine has some
questions for you.
>> Thank you, Chair. I'll be brief. Um
Elizabeth, [clears throat] thank you for
your presentation. Uh, and I do
sympathize with your concerns. Uh, if
this was the city's parcel of land, then
we would be able to have a completely
different conversation, but I do have to
respect the fact that we don't own it.
Um, it's owned by another organization
and that owner, they own the land and
they have the right to try to do what
they want with it. That said, it's our
job to try to make sure that we put
something that is suitable. Um um just
so you know, I believe, and I'll confirm
this with staff, I do believe that the
RVCA, the RTO Valley Conservation
Authority, was consulted on this. I'll
confirm that. I'm not sure if the NCC
was. I don't even know where the NCC's
ownership starts or begins, but I'll
certainly ask that of staff just to make
sure that their input from a from a
conservation or heritage u um impact has
been considered. But thank you for uh
presenting.
>> May I follow up on that, Councelor
Divine? you know, there's another piece
of property that has been empty for a
long time.
>> And I'm I'm sorry, Elizabeth. I didn't
hear a question there. So, um, thank you
very much for uh for the intervention
today. I don't see any further uh
questions for you. So, we're going to
move on. I believe we have Alli with us
now.
So, we're going to uh move on to Dennis
Sely and we'll see whether we can get
Alli in that uh that cleanup spot.
>> Good afternoon. Can you hear me?
>> Hi, Dennis. We can see and hear you.
Whenever you're ready, I have five
minutes to make a presentation to the
committee.
>> Can you hear me everyone?
>> We can we can hear you.
>> Protocol's been been established. I'm
getting a lot of echo. I'll do my best.
I just want to establish I didn't just
come along. My late father bought the
property, a neighboring property in
1946,
although I was born much after that. Our
family's been in the neighborhood for a
long time. In fact, we went to school
with Marie Ch's family. So, um my
concern is something that came up when
there was a previous uh interest in
developing and that's about egress and
degress or traffic flow.
Um, back when another person or group
was looking to buy it, there was an
agreement that there would be no traffic
egress degress onto Waterbended Lane.
There would also be no opportunity to
turn left onto Prince of Wales Drive
from subject property. And there would
be no new traffic light installed
between Hunt Club and Deacon Street.
There's just not enough room. If you sit
with me in my front yard on any given
afternoon, it's a parking lot.
So my concern, like my neighbor Bill
said, something is going to go there.
And as Elizabeth said, it's valuable
property. We all understand that it's
about traffic flow. If I own the
property, I want to maximize my money
because it was eight or nine acres at a
good chunk of money per acre.
But access is going to be key whether
entering or leaving the property. So, I
would ask that the committee, whatever
comes out of this, um, they they uphold
the agreement, whether it was verbal or
written years ago, that no traffic on or
off Waterbended Lane, no left turning
onto Prince of Wales Drive from said
property,
and uh, no new traffic light. If you
look at the Met Church across the
street, you can when you're heading
south on Prince of Wales Drive, you can
turn into the church or you can turn
right heading south out. You can't make
a left turn. It's the same although it's
violated for the ESO gas station on the
corner. No left turn onto Prince of
Wheels drive. There's enough accidents
on that stretch and I joke that the uh
the official theme song on that stretch
of Prince of Will's Driver, the
ambulances coming across the Hunt Club
Bridge and we don't need any more of
that. We have to use our heads. Our
heads have to be used when they're
looking at traffic flow on or off the
site, whatever decision is made on what
will happen with the property. As I
said, I've been there all all but 6
months of my life. And my dad bu bought
there in 1946.
So, we watched it change from two-lane
Prescott Highway to uh the freeway. So,
thanks for this opportunity.
Um, thank you, Chair. Hey, Dennis. Uh,
Dennis, thank you for presenting and
thank you for getting right down to to
pragmatic safety issues. Um, so just so
you know, I have had conversations with
the proponent and we did speak about uh
egress onto or off of Waterbend Lane.
Um, and I was given assurance that the
only intentions they have for Waterbend
Lane is the opportunity for an emergency
access should emergency vehicles need to
to access the site from that waterbend
lane. U, of course, we're back at that
catch 22 where we won't have any say on
site plan. So, all I can do when we get
to questions to staff is is either
confirm from the proponent that that is
their their plan and ask staff if
they'll be able to hold the proponent to
that to that offer. Um, as for the
concerns you've raised about Prince of
Wales in general, you are right, Prince
of Wales and West Hunt Club is one of
the city's most dangerous intersections.
Um, we'll see if that gets addressed
this term, but my primary concern is um
concerns over this file and its ongoing
impact to transportation in that
corridor. You asked in the question
about whether or not there will be a new
traffic light at at this site. Um, I
don't think I've heard anything about
that. So, I'll I'll see if I can get
info on that from staff. Uh, but thank
you for presenting. Uh, Dennis,
>> thank you very much, Councelor Design.
Thank you. Uh, thank you, Dennis. I
don't see any further questions for you.
I appreciate the uh delegation today.
So, we can move to the applicants. Who's
going to Oh, oh, I'm sorry, Ally. Uh, we
think we might have you back now. Could
you try
speaking?
>> Can you hear me?
>> Oh, we can hear you. Excellent.
>> Good. Because my computer failed me. My
apology. So, I'm right now speaking to
you. I can see you well on the computer,
but I could not talk to you. So I'll
phone given my five minutes long there's
a lot said by Mr. Sley and by Mr.
So I won't repeat those. My name is Ali
Muhajer. I reside at 12 water ben lane
and I've been granted to present
represent the other four dwellings and
families living in this lane.
So for those familiar not unfamiliar uh
with the area water lane is a narrow
residential dead end lane to the south
of the subject property with only five
dwellings. It was never designed to
accommodate any potential increased
traffic uh from the development of this
nature and magnitude.
What I can tell you is I can just go
through what has happened since 2006 not
go further further in the history. In
2000 March 2020
2026 there was um a plan submitted. We
carefully reviewed the that proposal and
his numerous supporting documents and
submitted our detailed comments and
concerns to the city planning committee
and the council through Miss Kimberly
Baldwin on March 14, 2026.
And the second step is now we
acknowledge that several of our concerns
have been recognized and incorporated
into the latest report which
unfortunately they pending further
assessment and consultation.
One of which actually you just raised in
terms of the UNESCO uh heritage site
redo redo system and we said has uh
heritage Canada parks Canada have RVCA
redo valley conservation authority have
they all of them been consulted the
report said they they've been contacted
but what's the outcome and who is
accountable that for final decision is
not clear at
So uh we appreciate that uh these things
have been considered in the latest
report and they have talked about it but
three major issues from our point of
view the residents of waterb remain. The
first one is is as has been brought up
traffic ingress and eress while V waterb
lane. This uh water lane is simply not
suitable for any additional development
related traffic. Any vehicular access
through this tiny lane would compromise
all five resident safety, accessibility,
accessibility and quality of life. While
we understand the need for further
traffic studies uh concerning Prince of
W drive, one decision can be made now.
Water bin lane must be permanently
excluded from all access routes through
these developments. Even if they want to
put one axis for emergencies as just
brought up, it has to be clearly
annunciated and uh described the
conditions.
So they can do what Tiger Development
did exactly diagonal from this lot. They
introduced uh they introduced a separate
access road which is a very practical
solution.
The natural light the light pollution it
is needs to be addressed. The natural
vegetation buffer identified in the
original application is significantly
compromised by the 2020 storm and
subsequent major weather events and uh
and unfortunate
three losses. The existing screening can
no longer provide the anticipated level
of protection.
We therefore request additional clearly
defined and enforcable measure to
minimize the light pollution and protect
privacy of neighboring fire properties.
The commitment should be established now
and not defer to later studies or
speculation.
And finally is the noise solution. I'm
going to cut it short. certain permitted
users under the proposed zoning would
generate could generate noise
incompatible with the established
residential uh character of the
neighborhood. We request proper
assessment of the impact together with
clearly defined noise limits, operating
restrictions where necessary and
enforcable mitigation measures to
protect the nearby residents.
We recognize the importance of
development and responsible community
growth. We are not opposed to the
development. We simply believe it must
respect the existing residents, their
safety, privacy and quality of life.
Our three requests are reasonable and
achievable. We are asking for clear,
definitive, and enforcable commitment on
traffic access, light pollution, and
noise pollution before the project
proceeds.
Thank you. for listening and I wish you
all a wonderful rest of the day.
>> Ali, thank you very much
>> for those uh comments. I don't see any
questions for you. So, thank you very
much for your time today and uh we'll
now move on to the applicant. Uh who's
going to speak?
Mr. Town.
>> Thank you, Chair Leaper. I will be
making a presentation. And I'll give a
few minutes for my colleagues who are in
the room with you today to come down to
the table and I I'll take a moment if I
may to introduce them before the clock
starts ticking on my presentation.
Um, so in the room with you to assist me
in answering questions following my
presentation are uh Dave Johnson who is
the director of real estate for Meyers
Automotive Group. He represents our
clients and he represents the owners uh
of the land. Uh Mr. Arthur Gordon who is
a principal with Castle Glenn
Consultants. Um his firm prepared the
traffic study uh sub submitted to the
city in support of the applications and
he will be available to answer any and
all questions that the committee may
have with respect to traffic and in
particular access to the site. Uh Mr.
Michael Powan, a partner with Gowling
WLG, probably familiar to most members
of the committee, who is our legal
counsel,
Adam Thompson,
my colleague from Novatech, who is the
file lead, and myself, Murray Ch. I
think I'm known to most members of the
committee. I'm almost retired, but I am
currently a senior planning advisor with
Novatech.
With those introductions out of the way,
Mr. Chair, I'm happy to proceed with the
presentation and thank you for staff for
putting it up. If we can uh go to the
next page, please.
If we can go to the next page, please.
Mr. Chair, you've heard from staff on
what the recommendations are with
respect to an area specific policy. Uh I
would note for the committee's benefit
that we when I say we, I mean the
professional planners at Novatech are of
the opinion that the area specific
provisions with respect to permitted
uses are actually not required. It is
our opinion that these uses actually
conform to the provisions of the
neighborhood designation in your
official plan and if we go to a hearing,
we could take that position at a
hearing.
Otherwise, uh I can state that we
support the staff recommendations with
respect to the official plan amendment.
Next slide, please.
There are a number of area specific
provisions in the zoning amendment that
staff are recommending to you today. I
would highlight that there is a height
schedule with which provides for a
transi transition to the residential
properties on the south side of
waterbend lane. I would go on to note
that the zoning bylaw protects a 7.5
meter landscape strip along the north
side of Waterbend Lane, which will uh
facilitate the retention of some of the
existing vegetation along Waterbend
Lane, but also creates an opportunity
for some significant additional planting
along Waterbend Lane to buffer the
future development from those
residential ial properties. And finally,
I would highlight that the open space
facility zone prohibits any development
within 30 meters of the RTO River or the
what I would call the gully to the north
of the property. Next slide, please.
As noted in the staff report, since our
initial application was filed many, many
years ago, uh, in consultation with
staff and with our clients concurrence,
we have eliminated a number of uses,
including automotive body shop, light
industrial uses, and nightclub from the
or from the recommendation that is
before you today. Next slide, please.
Mr.
Chair, members of the committee, we've
listened carefully to the concerns
raised by residents both at a community
meeting held a number of years ago, but
also their comments that have been
provided to city staff.
Concerns about lighting and spillover
lighting will be addressed through site
plan. There's a standard site plan
condition that prohibits any spillage of
light onto adjacent properties and we
will have to produce a lighting plan
that demonstrates that at the time of
site plan approval.
Noise. There are city bylaws regulating
noise. An opinion letter has already
been provided by gradient wind in
support of the current applications and
a further detailed noise study will be
required for the lifting the holding
provision one.
With respect to protection of the
environment, there's a number of uh
safeguards in place. There's the city's
sewer connection bylaw and sewer use
bylaw. A note for everybody's benefit
that all the floor drains in the service
bays of a car dealership are connected
to the city's sanitary sewer system. Mr.
Johnson is here uh to answer any further
questions that you may have specifically
related to environmental impacts of an
automotive use. Next slide, please.
Site access has been discussed in the
traffic study prepared by Castle Glenn
and Mr. Gordon is here to answer any
questions that may be related to traffic
access or site access and traffic
with regards to suggestions earlier that
we should be looking at residential uses
for this property to make it abundantly
clear residential uses are not
permitted. even use stronger language
that they are prohibited under Transport
Canada regulations because of our
proximity to the airport. There have
been a couple of comments or questions
today about the Reto Canal and the
UNESCO World Heritage site. We can
confirm and staff can confirm that Parks
Canada has reviewed the application and
in writing have confirmed that they have
no objections to the zoing and official
plan applications that are before you
today. Next slide, please.
>> Murray, you're out of time. I'm sorry.
Uh do you have uh one or two sentences
to conclude?
>> I only have two sentences left, Mr.
Chair. Uh with respect to height, NAV
Canada has uh reviewed the applications
to the nail act. No objections. I would
ask or we would ask that planning and
housing committee accept the
professional planning opinion advice
from staff supported by the professional
planners at Novatech and we'd ask that
you carry the report recommendations.
Thank you very much.
>> That was four, but I'll allow it.
All right. Uh, [laughter]
Mr. Chair, if I may, there were two
questions raised earlier that I'd just
like to quickly respond to.
>> Um, yes. So, we've been through the
public delegations. Um,
>> one by you, sir, and one by a public
delegation. First, the NCC owns no land
in this area. Um, the commenting agency
was Parks Canada, and they're good with
this. Second, you asked a question about
process, sir. um there would not be a
withdrawal. This matter is already
before the uh tribunal. What this
committee and eventually council uh will
be asked to approve is a settlement. Um
assuming that it is approved, that
settlement would go before the tribunal.
It would take uh a half a day uh perhaps
to uh get that approval. And I've looked
over and my friend Mr. Shum is nodding
his head agreeing with me.
>> Okay. So, uh if we adopt this OPA in
resoning, uh then the applicants in the
city would skip hand in hand to the
tribunal uh and it would be an easy
settlement and the matter would be uh
ended.
>> Yes, sir. Thank you.
>> Perfect.
>> Thank you. In that case, I'm going to go
counc.
>> Thank you, Chair. I thought there might
be from committee first. Um so, uh thank
you colleagues. Uh thank you staff and
proponents. Um so yeah this is in my
ward and uh so I'll start by recognizing
that I recognize that any property owner
has the right to develop their land in a
suitable manner and in a way that
protects even maximizes their
investment. Um and I know that it has
been a very very long road for this land
owner on this parcel. However, my duty
and the duty of the committee is to
ensure that any and all development
advances the communities and the city's
best interests and most importantly that
we protect against uh the very real
impacts that a development of this scale
could pose to quality of life not only
for my residents but to residents in
many wards that use this transportation
corridor uh of Prince of Wales. So, I
have several questions for staff. I may
have questions for um proponents as
well. Uh I'll start off on traffic
impact and the hold provision which I
think I refer to as -H1.
So in this file we're looking at a
comprehensive
>> just uh just for clarity councelor
Divine it is time to ask questions of
the applicants
>> of the applicants. All right thank you.
All right. Um so to the applicants then
could you confirm as I've had
conversations uh with some of you before
on this that in the site plan as you
envision it. Can you confirm that there
will not be any regular use of Waterbend
Lane and that the use of Waterbin Lane
would be restricted only to emergency
access and therefore we should not
expect to see any vehicles on Waterbin
Lane as singular site unless there's a
fire or thereof.
>> Mr. Gordon will answer this question.
councelor,
we're at a point where there is no site
plan in front of us right now. We've got
five different land uses to look at. You
mentioned an emergency access only. I
believe it applies. It's a legitimate
access in terms of getting trucks and
ambulances, fire trucks in and around
the site, particularly recognizing the
congestion along Prince of Wales Drive
if they need to get in there in an
emergency. Uh it's it's a it's a it's an
issue that should be uh addressed, but
for each of these different land uses,
the proximity of where that access could
potentially be and is an access required
or not has to be addressed as we go
forward as part of getting
resolving this holding issue.
>> Thank you. Uh question to the chair. If
this is just questions to the applicant,
I can have questions to staff later on.
Correct.
>> Yeah. They're a delegation. We pose good
questions to the delegations and then we
move on to questions.
>> So just to clarify that and I know that
you have not solidified what the
intended use of the of the site might
be. Does that mean that no one here from
the proponent can guarantee that the
only intended use of waterbend lane
would be for emergency access vehicles
only?
>> I would advise my client that you should
know what the land uses are before
committing to that. In other words,
access to Waterbend Lane for your
customers might be something that is on
the table because that's different than
what I heard yesterday from from owners.
>> Um, again, we want to be able to
identify what the land uses are. And the
opinion that I would give you is wait
till we got a plan in front of us
>> right then and there is the fault with
this whole thing that we are making
approvals on things that we don't even
know what it's going to be yet. But I
heard from the proponent yesterday that
the only intended use of water bent lane
would be emergency vehicles. You were
saying we don't know that until we know
what it is. So, I want staff to take
close note of that. Um, another question
I'm going to be asking staff their
understanding of what the lifting of the
H1 provision is. Um, is it your
understanding that for the H1 provision
to be lifted that all you need to do is
submit an updated TIA to the
satisfaction of the GM or that the
actual traffic conditions which
currently are level of service F equals
failure that those situations have to be
improved beyond that. If I can answer
that sir. Um the short answer is at site
plan the city has the ability
um to seek um uh to deal with traffic
impact of the proposed development and
not the current state of the road. So uh
the city cannot ask a proponent to fix a
road. That's the city's job. Okay. The
only thing at site plan that can be
asked for is to address the specific
implications of a proposed development.
>> Correct. And I'm not expecting the
proponent to fix the the road, but is it
your understanding that let's say you're
at site plan and you are ready to go and
bring bulldozers onto the site, but the
road itself is still level of service F,
i.e. still a failure. Um, is it your
expectation that you can proceed with
construction or are you thinking, well,
we've got to wait until they fix the
road?
>> So, two things. Um, no one can proceed
with construction without a building
permit. Um, no one can get a building
permit and until, uh, the zoning has
been complied with. In order to comply
with the zoning, the holding provision
needs to be lifted.
The uh the issue is that in the holding
provision, sorry, in seeking to lift a
holding provision, the city can only
enforce that which is in the holding
provision.
So it can't invent other things.
>> I I know. And the problem is that the
holding provision can be lifted if the
resubmitted TIA is to the satisfaction
of the general manager, but we don't
define what to the satisfaction of
general manager means. It could mean
that there are plans 5 years down the
road. We don't know yet. I'll ask that
of staff. Um,
can I ask your opinion on um
if as we heard that one of the
concessions in the negotiation you had
with the city is that there will be an
appropriate uh transition down to
Waterbend Lane, but as we heard from Mr.
Berza and as is in that document Y
you've got zone A which is a 20 m buffer
and if from the property line of
waterbend lane to 20 m at that buffer
which is only six cars theoretically
that's where they could build a
nine-story wall. Is that correct?
>> Mr. Chair, I'll I'll answer this
question. the the you're correct in
theory that a ninestory building could
be erected 20 mters from the property
line, but I would urge you to recall in
my presentation that it's not a wide
open 20 m with nothing there. There is a
requirement to provide a 7.5 meter wide
setback from the property line where you
can't do anything except provide
landscaping. The intention of that 7.5
meter buffer which is increased
significantly from what would otherwise
be three meters under the underlying
zoning bylaw. The intention is a to
protect the existing vegetation and b to
provide an opportunity to pro
significant additional planting which
would provide screening of any
development of the site whether it's two
stories, three stories or nine stories.
>> Thank you. Just so I understand then uh
Mr. town. When you say there's the
property line at Waterbend Lane, then
there's zone A, which is a 20 m buffer,
and then you said there's a 7.5 m line
buffer within that, were you correct in
saying that waterbend lane, property
line, then 20 m of nothing, and then 7.5
m of of landscaping and then possibly in
theory 20 m 9tory wall. It would it
would be most helpful if we could put
the figure up from a staff presentation
and and certainly staff can assist if
you direct the question them. But no,
the 7.5 meter buffer is immediately
adjacent to Waterbend Lane. So, if you
can visualize this,
having that buffer closer to the
Riverbend Lane and closer to the
residential properties on the south side
of Riverbend Lane provides a far more
effective screening than if that seven
and a half meters was on the uh opposite
side. So, thank you staff for putting
this. So, let's walk through this
carefully.
So area A
there's no buildings permitted and it's
7 and a half meters wide and that's
where the land existing vegetation will
be protected and additional landscaping
will be provided as a condition of site
plan approval.
Area B is where the height limit is
limited to approximately a threestory
building and and that is and then you
get to area C which is 20 meters from
the property line and only when you get
to area C would you be permitted a
ninestory building and at this point in
time we can only speculate as to where
that building might be located for for
marketing reasons and visibility
reasons, it's more likely that the
taller structures will be in the
northwest corner of the property. But
theoretically, and to your question,
there's a possibility that a ninestory
building could be erected 20 meters from
the property line, but will be screened
by 7 and a half meters of existing and
additional uh landscape buffer.
>> All right. Thank you. My last comment
question, can I hear from uh the
proponent because um I heard somebody
make reference to the possib Yeah. Mr.
Sali, the delegate made uh raised a
concern about a a new signalized traffic
light in between West Hun Club and I I
presume uh Waterbend Lane. I know you
don't know what the intended use is yet,
but within your various plans, is there
the prospect or are you looking at the
option of having that new traffic light
there? So very early on years ago
uh when we were first uh negotiating or
discussing the development of this
property with the city, we were talking
about the possibility of a signalized
intersection that would provide access
to both the Metropolitan Bible Church on
the west side of Prince of Wales Drive
and this site. In the report that has
been prepared by Castle Glenn in support
of these applications, there is no
recommendation of a signalized traffic
uh intersection between Prince of Wales
and Waterbend Lane.
>> Good. Thank you. Thank you. Thank you,
Chair.
>> Thank you very much, Councelor Divine. I
don't see any further questions for the
applicants. So, thank you very much for
your time today. Uh which leads us into
a discussion with staff.
And I'm going to guess that it's going
to be councelor Divine first.
>> Thank you very much. Um so uh to start
so uh here we're looking at a
comprehensive zoning amendment
permitting highintensity use on a
corridor where the adjacent intersection
west club and Prince of Walos is already
designated already operates at what I
believe to be a very very abysmal level
of service f uh failure. There's no
level of service worse than that with
peak time traffic cues approaching um
stretching over 400 meters. Um
furthermore, the city's own
transportation master plan explicitly
identifies the need to widen Prince of
Wales from two to four lanes between
Colonade and Hunt Club including the
bottleneck at CN uh railbridge. So this
is already a massive congestion issue.
My question staff note that a detailed
transportation impact assessment will be
submitted at site plan under this
holding provision. Given those
pre-existing corridor failures, what
absolute legal or engineering threshold
does the H1 provision holding provision
enforce?
>> Mr. Chair, thanks for the question. So
through site plan control, the the
wording is completed to the
satisfaction. we would be looking at a
TIA that's approved. So, we would go go
through the whole TIA review to see how
the land use that the proponent is
coming forward with in a site plan, how
the TIA supports that. And I acknowledge
that there's external factors on Prince
of Wales that make it make it uh uh
traffic issues, but we would be looking
at how where the accesses are. Are they
right in right out only? uh and moving
forward on any modifications that the
applicant needs to do uh whether it be
pork chops to make the right in right
out and where they are to support that
land use that comes forward through site
plan.
>> So I [clears throat] think um I think
that answers part of the question but it
doesn't address my concern about we're
putting more development uh of an
unknown nature onto an already failed
corridor. So, can I just get clarity? In
order to lift the hold, the new TIA must
be quote approved to the satisfaction of
general manager. But I don't know what
counts as to the satisfaction of GM. So,
as bluntly as I can, can this hold be
lifted simply by the proponent
submitting a new TIA report regardless
of whether the traffic problem is
actually solved? Or does the city have
the legal authority under that provision
to refuse to lift the hold until the
intersection is actually capable of
handling this load?
because already it's failing.
>> Um, okay. So, through the chair, I'll
maybe take that on um as general
manager. So, the the provision means it
has to be done well. So, we would look
and it would be reviewed by several in
transportation to make sure that it was
a a good quality um report. In that
report, it it identifies what additional
burdens are being put on the network as
a result of this development. And then
that gives us the right to ask for
improvements as this site interacts with
this area as part of the site plan
conditions. It doesn't allow us to make
as the as the um proponents uh agents
have pointed out, it doesn't allow us to
make them fix a bad intersection. But um
presumably in situations like this, we
find some ways that the what is
happening on that site could help the
city fix the area. So, we would be
looking at what the city needs to do and
and and I would argue that it would be
its uh urgency to fix this area goes up
as we start to see more development. So,
that's on the city to fix what's going
on here, but um it also opens up an
opportunity where some of the fixes
might be actually using parts of this
site or at the expense of the the
proponent. So, that's the analysis we
would be doing.
>> Great. And I know that there's
absolutely uh onus on us to uh to catch
up. Uh quick little so uh in the uh
comments from from proponent we heard
that there is no certainty on whether or
not they intend to use waterbend lane
for anything other than emergency
access. Not at all what I heard from the
representative of the owner. So I can
imagine that we little waterbend lane
would be very very concerned about that.
The staff have the right to put any kind
of holding provision or any kind of
limitation pre-sight plan that water
bend lane can and should only be used if
there's a fire, flood, rabbit dog
outbreak, whatever. We should not have
360 customers using waterbend lane.
>> Thanks for the question. So staff's
recommendation with the H is for the
transportation study that we just
mentioned. And when we get that
transportation study, uh we would go
through it and make sure and work with
the the community through the site plan
application and the developer to to see
where accesses should be. Uh so through
that review is is how we would determine
appropriate accesses and staff have in
our authority site design. So site
design would include where an access uh
could be. So, we' be we' be reviewing
that and taking the community's concerns
into account as we reviewed their TIA
and where they proposed accesses.
>> And do I even have the right to bring
some kind of direction between now and
council that speaks to putting
limitations on access to Waterbend Lane?
I'm not even sure if I'm allowed to do
that because it's site plan control.
>> Chair, uh, thank you. I the council
doesn't currently have um the ability to
dictate terms of a site plan approval.
However, this would be um a zoning bylaw
amendment to lift the hold um that would
be coming either under delegated
authority or conceivably back to
council. Um so the question of whether
or not there would be the ability to
limit the access point um it it is
conceivably possible that council could
do that through a zoning bylaw
amendment. However, the holding symbol
here today, as as staff have clarified,
isn't aimed to wait until the
transportation study is in to look at
the the best place to access the site.
>> Does that mean that I can or cannot
between now and council bring a a
direction or a motion that speaks to
adding something about limiting access
there?
>> It it would be within the authority,
chair, within the authority to direct
staff to bring a staff initiated zoning
bylaw amendment to change the site. Um
that would that would be subject to
appeal by the applicant if that was if
that was done.
>> All right. Thank you. Um a different
topic. Um so this file has over 10 years
of history. It's been through planning
consideration more than once. Um in
previous evaluations of this file, city
planners concluded that a car dealership
was inappropriate and unsuitable for
this site, which was the position held
by the community. Given that traffic and
corridor congestion have only
deteriorated over time, given that the
community's position has not changed,
why have staff altered their prior
position to make an auto dealership um
permissible appropriate today?
>> Thank you, chair, for the question. Uh
yes, um staff have uh over time
evaluated the application um in the
context of uh official plan and and uh
policies in effect. um at the time and
and currently now we have a new official
plan that was established in 2022 uh
which set uh the parameters for which
this application will be evaluated. And
in this case um the larger scaled
non-residential uses are per permitted
provided they can demonstrate that
they're on a major road um on a transit
network and can demonstrate
compatibility with the neighborhood. in
which case staff are comfortable that
they have satisfied those three criteria
to um to support an official plan and uh
zoning by amendment.
>> Following up on that, does that mean
that through the new official plan with
all of its guidelines about neighborhood
communities and 50-minute communities
that it's in the language of the new
official plan that we went from no cars
to now cars are acceptable here?
>> Automobile dealer.
Chair, if I may speak to some of the
historical side of this, I I was
involved in the application when it came
forward uh and was active, you know,
2019 roughly or or the previous
application where we took that stance
against car dealerships. There was a
number of policies that we were looking
at at that time, including the scenic
entry route policies along Prince of
Wales and the nature of the car
dealerships that we were seeing at that
point in time. Since then, we've seen an
evolution in the car industry. We've
seen less um you know, car stacking up
front and more modern type of of
developments with um you know, if you
think about the the dealerships that
have been built along Hunt Club Road in
the last uh 10 or 15 years, they're more
indicative of what we think we would see
in this situation today than they than
the previous ones. and and so that that
evolution in the car industry has has
led from that being a no to what it is
today.
>> Following up on that, would that mean
that the only kind of uh car dealership
usage that would be permitted would be
of that nature and not like lose used
cars? I I think if you look at the um
the language in the report and the
zoning details, there's limitations on
front yard storage and uh there's
there's staff can probably speak to it
in greater detail than I can around the
protections of of that facade on the
Prince of Wales, but I I don't
anticipate this site being developed as,
you know, I I think you said lose lose
lose used cars. I think it's uh
something where we especially given who
the proponents are uh we would expect uh
you know a sizable dealership if that
ends up being the ultimate use
>> and that is what I have been told by the
proponent but it's good to hear that
that's the uh the change in policy. Uh
my last question on on height. So in
granting the right to build up to nine
stories staff's report relies on the
sevenstory building across the way as a
comparator. that building on the other
side of Hunt Club in a completely
different neighborhood as it were, part
of an industrial park. Um, that's not at
all really uh a comparator according to
what neighborhood we're in. Furthermore,
a much more recent comparator directly
across the street from 2175 Prince of
Wales at 2200 Prince of Wales, the city
strictly restricted heights at that
building to three stories to protect
adjacent homes. So that's a comparator
that is, you know, far more gerine to
what these residents think is their
neighborhood. Why is staff supporting
such a stark change away from
established local protective precedent
that staff set by allowing a ninestory
building directly adjacent to
residential neighborhoods?
>> Uh thank you for the question, chair. Uh
in terms of height, staff, uh staff's
analysis identified the site um at the
edge of the neighborhood. There's also a
road uh in between the site um and and
the um residential properties being
waterbend lane which helps provide that
transition between um you know that
allows for a transition in space uh to
transition uh in height and then as well
the zoning parameters set for the site
um require uh a low-rise residential
nature abuing waterbend lane and then
stepping up into a mid-rise
uh height uh at the center of the site
further away from the residential
properties.
>> Okay. We've used a sevenstory compar
comparator that is like you're in a
completely different neighborhood uh to
point to that as the comparator. Um it's
not exactly an accurate uh reference to
what this neighborhood already has
established and city staff were pretty
explicit in what they permitted which is
far lower um a few years ago. So it's
it's almost as if staff established one
position at one time and then pointed
across West Hun Club to use as an
indicator for this time. So it's it's
not exactly consistent. Uh but I I'll
leave it at that. But thank you.
>> Thank you, Chair.
Thank you very much, Councelor Divine.
I'm just checking to see if there are
any other questions of staff. There are
not.
So is this item carried as recommended?
>> Carried.
>> Carried. All right. Thank you. Thank you
much uh councelor Divine. uh advocacy on
your behalf of your community is
excellent.
We will move on to our final item I
believe the substantive agenda
which is the notice of which we had
received uh notice on the previous um
meeting. Sorry, it's getting to be a
long meeting here. So there was the uh
motion that was brought as notice
finally at uh last planning committee
with respect to the requirement for 15%
land delegation. I'll ask the vice chair
to reread that motion. Then I'm going to
ask staff to just remind us what that is
and why that's being brought forward. Uh
because it's not councelor Gower's vice
chair Gower's motion. Uh at which point
we will then move into uh questions for
staff and I know councelor Johnson um is
um uh looking to ask staff whether they
would undertake some direction as part
of the discussion. So, Vice Chair Gower,
got it.
Whereas staff are working with the
applicant to finalize conditions of site
plan approval for the development at
1500 Marville Road. Whereas the parkland
dedication bylaw requires a 15% land
dedication or 15% cash in leo parkland
or a combination thereof for the
purposes of park development within the
subject development area. And whereas on
October 8, 2025, council approved the
housing acceleration plan which capped
the requirement for CILP at 10% for
development applications within hubs and
major corridors for an 18-month period,
but did not alter the 15% land
dedication requirement. And whereas
there should be a consistent application
of allocation between land dedication
and CILP.
Therefore, be it resolved that planning
and housing committee recommend that
council temporarily wave the requirement
for 15% land dedication and reduce the
requirement to 10% to align with the CIP
cap adopted through the housing
acceleration plan for an 18-month period
ending April 7th, 2027.
>> Thank you very much, Vice Chair. So to
uh staff, what are we voting on?
[laughter]
>> Thank you, chair, and to the committee.
I know it's been a long day. Um this got
deferred last time. It was a little
sloppy with the way we brought it
forward, so apologies for that, but I'm
glad we could have the conversation. Uh
when we brought forward the housing
action plan that was approved by
council, the report itself talked a lot
about parkland and the costs around
parkland for overall development. But
the motion in or the recommendation that
was eventually passed by council
specifically said CILP which meant that
it was tied to the cash in lie of
parkland not the parkland itself. We've
since got an internal legal opinion to
cl to confirm this but we have
inadvertently created an unlevel playing
field between uh whether in a project we
get land versus money. If you were in a
um um hub area or a major quarter like
this uh project reference in the whereas
clauses is, you were asked to provide
10% if it was going to be it's capped at
10% of the land value for cash if that's
what we're taking. But you have to give
15% if it's physical land. So we we have
inadvertently created the situation
where it is harder if you give us land
than if you give us money. And we always
ask for land first. We get as much land
as we can. And on smaller sites, which
is usually what we see in these um hub
areas, we are taking cash. So that's
probably why the recommendation was
drafted as such. So from my perspective,
this is uh correcting an imbalance. This
just gives parity to whether you get
land or whether you get money. And from
that perspective, um we're saying let's
uh make it fair. Uh this is the first
one to come forward that where we were
taking land that created this situation.
So you can see it's pretty infrequent
because we've been um doing this for now
uh over a year since that report. But
we're saying only until that 18-month
period was going to expire, which is the
early part of April. And there will be a
report coming from um my colleague uh in
strategic initiatives to report on the
uh all of the initiatives from the
housing acceleration plan and um uh with
there's there was some motions about
coming back with some metrics around um
evaluating the impact of the financial
incentives approved by council. So at
this point, we're just trying to create
a level playing field and the bigger
conversation about whether this should
be done going forward can could be
addressed in the in the subsequent
report coming at the end of Q1.
>> Thank you very much. So colleagues
questions to staff. Councelor Low,
>> thank you. I think I I believe you said
this during your your remarks just now,
but to to be clear, this will not
retroactively
um uh apply to any files before 1500
because I I know the 18month period ends
in April, which means that we've kind of
burned through a select we burned
through a portion of the the 18 months
already, but this won't like no one's
going to come back and say, "Hey, we we
redid this file a year ago and now
you're changing this."
uh chair through you I don't
it's a good question and I don't think
that we have considered it so I don't
know that but but offh hand I cannot
think of any sites that have come
through that have given us
the issue here is that we would never
reach a 10% cap in cash on these sites
we're always looking for land so
somebody's not going to be given 11 12
13 14% cash which then results in a 10%
cash cap so I can't really think of a
situation where land would be impacted.
Could somebody come back and ask for
some cash back if they had exceeded that
10%? So they had provided 10% in land
and then 11 12 13 in cash potentially.
>> Okay. Okay. Thanks
C.
>> So Marcia, I really appreciate um you
explaining that a little bit better. Um,
I know originally when I saw this, I
thought this was a huge policy change.
Um, but it sounds like by accident it
was omitted in the first proposal from
staff. Is that that's correct?
>> Yes. I think uh when we were drafting
the recommendations, you remember there
was something like 55 recommendations. I
the task force and the conversation that
led to this was a lot about
cash and ll because that was the most
common example. um we we did not intend
to make it harder if you were giving us
land because that's always our
preference. Uh and it was only after
this came to light on this example that
we realized we have created a double
standard whether you give us land or
money. So that's why we're recommending
uh creating par and moving that forward
>> and it's harder to get land than cash,
right?
It's harder. Uh, absolutely. Because
that's the developable space and and we
are um keep in mind our our parkland
bylaw is currently under appeal which is
why so much of the parkland money is uh
embargoed and can't be used because we
are fighting over how uh it is
calculated in the first place. So, we
are planning on bringing forward a new
parkland bylaw um early in this term of
council to see if we can step away from
the appeals, unlock the funds, and move
forward with um a more modern and
compliant with there's been some
provincial legislation in the space as
well. So, uh it's always a fight when
you are trying to deal with parkland and
uh and so um trying to get land is our
first choice and on large sites it makes
a lot of sense because uh we need that
parkland um in the city and and when you
have a large site it's your best chance
to try to secure it.
>> I'll be frank. I was going to vote
against this um because to your point,
you know, we need that green space,
right? And once it's gone, it's gone.
you're not getting it back. So, it's
almost more valuable uh to preserve the
15% in my mind than it is to to um you
know reduce it to the 10%. But I now
understand that we kind of cornered
ourselves. Um do you think this is going
to unlock some of that development that
this whole the whole intention was to
accelerate housing development? Is this
going to help them between now and
April?
So, I'll I'll let my colleagues uh
answer with um
we don't see a lot of projects moving
forward that are um
uh at this point that are in this
situation. That's why the whereas clause
only speaks to one project, but there
are a handful that are um pushing to get
their project through site plan so they
can take advantage of the cap that was
put in place. So, I would say generally
if you're if your project is close and
you could take advantage of any of the
financial incentives that were in the
housing acceleration plan by creating a
time limit of 18 months, we've created
this waterfall edge where people are
eager to get their project through so
they can take advantage of whatever
incentives we uh have on the table. So,
we're already feeling that pressure
because we're getting closer to that. Um
but there are not many projects that we
know of that are it's um you know a
small handful that are in a position
where we are talking about a a large
portion of land being given to us but um
also requiring cash to make up that 15%.
There's just not that much big
development projects like that in the
pipeline.
>> Okay. I I really appreciate that. I will
support this then knowing that there is
as you put it a waterfall edge. I don't
know that I would support the continued
10% going forward after that date
whether it's on the cash and loo or on
the land. I'll be honest with you. We're
going to build places for people to
live. They should have access to green
space so they can enjoy the place they
live particularly in very dense parts of
our city. So, I really want to make sure
that we continue to to think of that as
part of the lived experience. When you
live in a house or you live in an
apartment or you live in a building, you
get to have green space attached to it
somewhere and within walking distance.
So, I see that we've cornered ourselves.
I will support this. Um, but I will be
watching for when that deadline ends
because we'll have to have a frank
discussion on whether this becomes a
policy going forward.
>> Thank you, counselor. Councelor Johnson.
Um, thank you very much and uh thanks to
the chair for uh four years of of great
governance here. Um, I wanted to thank
Marcia for taking some time to speak
with me about the motion between the
last meeting and today. I bocked a
little bit just with the presentation of
the information at committee given some
of the you know comments you know
similar to some of my colleagues where
it felt like a reduction in community
benefit uh sort of brought to the table
without you know a good consideration
for the local context.
Um for me, you know, I was really
interested in understanding
um further to our conversations, what
are the uh perceived or or uh already
measured um benefits to housing starts
that these financial incentives had
promised. Um and so could you comment on
um you know with with respect to this
motion? Um
h has this parkland one been one of the
more uh meaningful uh incentives for
projects or are you seeing other ones
that have been uh more impactful up
until this point
chair through you with respect to this
particular incentive we have not seen a
lot of uptake and I think Marcia
provided the rationale because there are
very few prominent sites over five
hectares
in hubs and corridors. So, where we're
trying to fuel that development, we just
don't have a lot of these mega parcels.
So, this one has been sitting on the
sidelines and we're hoping to to provide
a little bit of incentive for that today
to get one of these um permitted before
year end. Uh in terms of incentives on
park, we've seen a lot of uptake on the
deferral program. So, developers also
have an opportunity to push forward
payments right now through some of these
incentives. And at last count, I believe
I checked in a few weeks ago, there were
over $10 million that are being deferred
to um building permit occupancy. So
that's just so so developers are able to
pull permits and not have to worry about
that large fee before they start moving
people in and collecting some of that
money back. So that deferral has been uh
there's been a lot of uptake on that.
>> Okay, very good. So, you know,
certainly, you know, my motion on the
housing acceleration plan was to ask for
additional uh you know, uh feedback and
additional evidence for those financial
incentives as they uh come to expiry so
that we can make a decision as to
whether or not they are in fact giving
us the type of development that the city
is after. So, the direction that my
colleagues will see uh will speak to
that uh a little bit more. Um my concern
in this particular application was that
you know we do have a very large builder
um with a margin that I believe frankly
I'm I'm not certain whether or not it
was I mean the the developer will say
that it was contingent on a margin um
and we can't argue with that but I might
uh suggest that if we're going to be
offering financial incentives we might
be able to apply them to development
that might be a little more challenging
for some of our mid-rise or uh uh
smaller developers who are looking to
build um in intensification uh context.
So I'll wait for the chair to uh decide
when to put that on, but um I'm very
interested in making sure that when
we're uh allowing for, you know, public
dollars to go towards development that
we're going to get the kind of outcome
that we see as being most beneficial to
the most people. Oh, thank you. So, um
yeah, so just to put a little more um uh
specifics on what I'm hoping that report
in April uh will come back to show us um
that staff clarify the reporting on the
effectiveness of the financial measures
introduced through the housing
acceleration plan and consider including
where available information on the types
of housing benefiting from the measures
including low-rise, mid-rise, high-rise
developments and the number of housing
units associated with each type. The
size and type of developer benefiting
from the measures, including large-scale
development companies, midsize builders,
and smaller developers. The geographic
distribution of developments benefiting
from the measures, including their
locations by ward. Whether the measures
are incentivating the incentivizing,
pardon me, the types of housing and
developments needed to achieve the
city's housing objectives, whether the
benefits are reaching the projects and
developers for which the incentives are
most needed. Thank you.
>> Thank you very much, Councelor Johnson.
That all strikes me as very useful
information to have and um uh even if
I'm not around I'll be very interested
to see what it has to say. Our staff
willing to take that as direction.
>> Uh yes uh most of that would be um from
our department. I did confirm with
strategic initiatives who will be
bringing the report forward and they
were also uh comfortable with the
direction.
>> Thank you very much. We'll look forward
to seeing that. Uh anything further
council Johnson? Nope. Uh councelor
Divine.
>> Thank you chair. Um, so as this uh
motion does pertain pertain specifically
to 1500 Maraveville, which is in my
ward, I'll speak to what's happening
there. Um, because I have had some
productive conversations on that parcel
over the past few weeks with staff and
the proponent. And while I do have
concerns or confusion or how we arrived
at the proposal that's before us, I do
recognize that my community is getting a
tangible benefit here. That said, over
the negotiations on this file, we
shifted in relatively short order from
an anticipated 15% parkland dedication
to a mix of 10% land plus 5% cash in L,
which was on offer to the proponent to
what is before us today, capped 10%
contribution.
That said, I understand that securing
10% raw land in the center of the
Maravel Triangle is a significant
opportunity for a central public park
right in the middle of what will be
thousands of units of development over
the next generation. My concern, which I
believe has been abated, was that in
losing that final 5%, we lost a strip of
land that brought that park right out to
Maravel Road itself, replacing a
streetfacing public realm with another
tower. Um, however, that tower
represents phase nine, the final phase
of this multi-phase project, which is
going to be many years down the road. In
my discussions with the developer this
week, they've agreed to provide the city
with temporary use of those phase 9
lands so that those lands can remain as
green space contiguous with the 10%
park, bringing that green presence all
the way down to Maraveville Road in the
interim. My question to staff, as we
discussed yesterday, will staff be open
to incorporating and discussing this
temporary use agreement with the
proponent as you continue negotiating
the site plan agreement on phase two.
>> Mr. Chair, thank you for the question.
So, I'm going to start the question and
maybe I'll hand it over to Garrett in
case he wants to add something. But we
are happy to I'm hearing that the
developer is open to having the city use
uh some of their land in the interim. So
staff are absolutely happy to work with
them on an arrangement. and staff would
be looking to understand some of the
finer details and report back to your
office such as grading, is there tree
removal, um how are we programming it
and then maybe the costs associated if
in fact the developer
doesn't go down the path of all these
costs. We want to present to you uh what
would be needed and then because there's
active u site plan and a master plan. I
just want to make sure I hear from uh
from Garrett and legal services to make
sure that what we're doing here is is
not a counselor involving themselves in
site plan control and put that on the
table.
>> No, chair. That's achievable through um
through a process working with the
developer.
>> Great. And as this is all brand new,
like only discussed like in the last 48
hours. Um, and
>> with with apologies, the the the motion
that's on the table is whether or not to
adjust the uh cash in um ratio. Um, so
could I ask you to uh restrain your
questions to that topic area?
>> Then I'll ask a question. You tell me if
it's I'm not even I'm not even sure if
I'm about to ask is relevant or not. Um,
as those discussions that you're going
to have progress over the coming weeks,
would staff be willing to work
collaboratively with my office on a
motion or direction for an upcoming
council meeting just to properly
formalize the exploration of details for
that temporary green space arrangement
or is that outside of mine?
>> With the greatest possible brevity,
please move on.
>> Yeah.
>> Yes, Mr. Chair.
>> That's some really good brevity. Thank
you. Anything further, councelor?
>> No, thank you, Chair.
>> Thank you. Uh, C Vice Chair Gower. Yeah,
I guess I wanted to wrap up. Um, we we
approved the housing accelerator plan
and all of the measures in it last fall,
uh, because we wanted to move really
quickly because we were not seeing a lot
of housing starts of any type. We're
still in that situation today. Um but
when we move quickly uh we we passed uh
this particular cash in the new policy
without fully realizing the implications
without identifying that there would be
a discrepancy between land and cash and
new dedication.
So we're fixing that now. Um so I think
that's all we're doing here. We didn't
fully anticipate a year ago what we were
doing because we were acting quickly.
And the other thing too is I think 10%
of land is still way more valuable to a
community than 10% equivalent cash value
because let's be honest as counselors we
are not using our cash and le budgets
except for chair leaper to purchase new
land. That's pretty rare, right? This is
going into amenities, picnic shelters
and benches and so on, but rarely land.
So even 10% land acquisition along a
quarter like this is really significant.
Thanks chair.
>> Thank you vice chair. And yeah the uh
those purchases of land um and and
adding even pocket parks into a very
dense neighborhood like is extremely
helpful. Um okay so staff have uh taken
councelor Johnson's direction. Uh is the
motion carried?
>> Carried.
>> Thank you. All right. That's the
substantive agenda. Uh we do have the
information previously distributed the
aforementioned cash of parkland
balances. I hadn't had any um uh
requests to lift that. We don't have any
in camera items. There are no notices of
motion for consideration in a subsequent
mo meeting. I don't think um any
inquiries
nope. Uh we don't have any other
business. We are adjourned to a next
meeting to be determined.
Colleagues, this has been the privilege
of a lifetime working with you. Thank
you very much. Have a great afternoon.
Thanks.
>> Take care.