← Back to summary
Full Transcript
Committee Approves Development, Denies One Design - 28 Oct 26
Oakville · October 30, 2026
Mhm.
>> Hey.
>> Thank you.
Good evening. Tonight's Committee of
Adjustment hearing is being held by
video of conference and live streaming
video on the town's oakville
uh dot ca.
This hearing is to consider applications
or minor variants and consents held
under the authority of the Planning Act.
Please keep in mind intent of the
process is to review the application
that is before the committee,
listen to the evidence and then make a
decision.
This process is not intended to be used
to resolve any concerns or disputes that
may exist between the town, individuals,
or organizations.
If a request for a deferral is made and
the committee grants such a request, the
applicant authorized agent must contact
the secretary treasurer
to schedule a new hearing date. In order
to conduct an effective and an
efficient electronic hearing, we have
adopted the following process.
If you are watching the live stream of
this hearing on oakville.ca and if you
wish to speak to an item on the agenda,
please call 815-60
95.
That That number again is 905-815-6095.
The phone number is also posted on your
screen below the live stream page at
oakville.ca. Staff will be standing by
to take your call.
When you call in, staff will ask for the
your name, item number that you wish to
address, and your telephone number.
Further instructions to be
will be provided
when you do call
to join the video conference.
When the chair of the committee calls
for interested parties,
please press star six to unmute
yourself.
The applicant agent will be given
opportunity to briefly explain to the
committee the basis of their application
and answer any questions that may arise.
A maximum of five minutes will be
provided for that presentation. You'll
need to state your name, full name, and
address for the record, and any
submissions beyond the five minutes will
be at the discretion of the committee.
All delegations must also state their
full name and address for the record,
and a maximum of five minutes will be
provided for each presentation. All
remarks and questions are to be directed
to the chair,
and any submissions beyond the five
minutes will be at the discretion of the
committee.
Any applicant or agent who will then be
provided further five minutes to respond
to their comments made by interested
parties and answer any questions
from the committee members.
If the applicant or agent has any
concerns found in staff report,
particularly with any proposed
conditions, this will be the opportunity
to advise us.
This matter will then be taken into
committee for a decision, and it will
mark the end of all discussion.
Any person desiring a notice of decision
for the application must provide a
written request, preferably through
email to the secretary treasurer.
Written notice of the committee's
decision will be mailed no later than 10
days for minor variances and 15 days for
consent
to the applicant agent or any other
person who has filed a written request
for such notice.
The last date to appeal the decision to
the Land Tribunal will be
noted on the decision.
Only the applicant, specified persons,
or public bodies may appeal to the
committee's decisions to the Ontario
Land Tribunal.
Please note that in November of 2022,
Bill 23 legislation, the More Homes
Built Faster Act, amended the Planning
Act to remove appeal rights for members
of the public.
If no appeal is received within the
prescribed time frame, the decision of
the committee becomes final and binding,
and the Secretary Treasurer will then
notify the applicant
and anyone who has received a copy of
the decision through written
correspondence.
People participating in the hearing are
to be courteous to and respectful to the
members of the committee, town staff,
and any other person participating in
the electronic hearing.
Tonight's electronic hearing is being
video recorded and available for future
viewing at Oakville Club B. Thank you.
I have no regrets this evening. I have
one uh any declarations of pecuniary
interests?
Mr. Tulasky, go ahead.
>> Thank you, Madam Chair. Madam Chair, I'm
going to declare conflict on A 129
at 1247 Crawford Court. I have a
long-standing relationship with the
family of one of the uh applicants.
>> Okay. Thank you. Noted, Mr. Tulasky.
Madam Secretary Treasurer, do I have
requests of deferrals or withdrawals of
applications? If you are
interested in
>> Yes, Madam
>> withdrawing or deferring.
>> Sorry. Madam Chair, we have one hand up.
Uh Mr. William Hicks. I'll move him in
one moment.
>> Good evening uh
Good evening Madam Chair and members.
Uh with respect to the application at
82nd Street, I wish to request a
deferral. There's a number of
inconsistencies and questions
in the reports from the planning
department, so I would like some time to
work together with them and heritage to
rectify those and uh make sure that
everyone's on the same page cuz as it
stands, I'm not sure the committee would
be able to make a decision
based upon the information that's before
them. So.
>> Okay, thank you Mr. Higgs. Mr. Higgs.
I can't seem to pan out
to see the numbers. numbers.
Okay.
I will need some time to figure this out
after after
this next one. Can um
um
uh ex-support plan out
so that I can see the members?
There's an echo that I can't hear that I
can't hear myself.
>> I can see them all from my screen, but
>> Yeah, for some reason for some reason
Okay, I
apologize to everyone.
I'm going to disconnect and reconnect.
Sorry.
I'm not sure what happened.
Okay, members, Mr. Hicks is requesting a
deferral to work with town staff. Um
given the
comments, all those in support.
The The application has been deferred.
Thank you for your patience, Mr. Hicks.
Okay, anyone else, Madam Secretary
Treasurer?
>> Madam Chair, there are no more hands up
from those in the audience.
>> Okay, thank you.
Okay, so the first item on our agenda is
application 054 of 2026
at 1562
Vinisha Drive.
>> Hi, can you hear me?
>> Yes, go ahead, Mr. Merritt.
>> Thank you. Good evening, members of the
committee.
Um my name is Alexander Merritt, and I'm
representing the owners of 1562 Vinisha
Drive. Um thank you for the opportunity
bringing this application back to you
following our deferral in April.
Um following that meeting, we took staff
comments into consideration, reviewed
the design, and made revisions intended
to reduce the overall scale and massing
of the proposed dwelling.
Um we recognize that staff continues to
have concerns regarding the requested
residential floor area ratio. However,
we believe the revised plans represent a
considered response to those concerns
and that the proposed dwelling is
appropriate for the property and its
surrounding neighborhood.
Uh could you just go to the next page,
please?
Um, these revisions included a reducing
of the overall depth of the dwelling,
pulling back of the second story above
the garage, reducing of the ceiling and
roof height in the open to above area at
the rear, and
reducing the overall size of the
dwelling with a reduction in RFA and
coverage. Um, in that reduction, we were
also able to remove one of our previous
variances requesting additional
coverage.
Um, regarding the requested floor area
ratio, the application seeks 39.3%
where 37% is permitted.
As staff notes in its report, the
overall area of the dwelling has been
reduced by approximately 20 square
meters compared with the original
submission.
Um, combined with the other design
revisions mentioned previously, we feel
this represents a a genuine effort to
respond to staff comments.
Uh, we also note that staff has no
objection to the requested interior side
yard setback variance, recognizing that
these site constraints are created by
the easement.
Um, neighborhood context and design
compatibility have been key
considerations from the beginning of our
design process,
uh, with significant effort made to
align the proposed dwelling with the
objectives and principles described in
Livable Oakville.
The design incorporates several
deliberate strategies to reduce
perceived massing and create a more
articulated built form. Uh, these
include lowering roof lines over the
second story front facing windows,
breaking up continuous walls with roof
lines into distinct architectural
elements using window projections and
recesses of wall planes,
and using different materials and
horizontal detailing to separate the
first and second story in order to
deemphasize the massing of the dwelling.
A further efforts to reduce the
verticality of the dwelling, uh, is in
the use of the single story front porch
uh, to bring focus to the main entrance
on a scale comfortable for for
pedestrian. Um, the use of generous
first story windows also adds to the
dwellings visual interest and lightness
of first floor massing of the primary
facade.
Uh, to conclude, we acknowledge staff's
concerns and appreciate the opportunity
to address them through these revised
plans. We have made deliberate changes
to reduce the dwellings overall depth,
size, and perceived massing while
maintaining a functional and cohesive
design.
We respectfully ask the committee to
consider and approve our application
given that we feel it passes the four
tests of the Planning Act and is an
appropriate development for the
neighborhood.
Uh, thank you for your time and
consideration. I'm happy to answer any
questions you may have.
>> Thank you, Mr. Mayor. Are there any
questions
of
Mr. Mayor at this time?
If town staff would be kind enough to
just go back uh, to the
screen pointing at uh, council chambers.
I again, I'm not sure what's happening.
I can only see the speaker and myself on
the large screen. Can town staff
panel back to
council chambers?
>> All right. Madam Chair, it uh, it might
be
>> There we go.
>> settings on your Okay.
>> No, I've tried everything. I I don't
know what's happening tonight. They They
If they can just please do that every
single time for those four applications
that we have tonight, then then we can
figure it out later.
Um my gallery view for some reason is
just not working. It's It's only
allowing me speaker view.
So, I'm not really sure what's
happening.
Okay. Uh now I can see everyone on the
screen and town ca- um
town chambers.
Are there any questions of Mr. Merritt
at this time?
Okay, I see none.
Um oh, thank Okay, go ahead, Mr.
Telawsky.
>> Thank Madam Chair.
Um Mr. Merritt, despite staff's order of
the side yard variance, it appears
that variance is only being required
because you're shifting the building
further from the easement to accommodate
a window well. So, is it not possible to
shift the window well and shift the
building to towards the easement to
eliminate that variance?
>> It It would be possible. That variance
is kind of a two-parter. For one, it is
kind of a relic from the previous uh
recent amendment. Uh originally, we were
in compliance with that side yard
setback. Um the other component of that
is we It would shift the building
further back and there are We are
already trying to reduce the overall
depth of the dwelling as that is part of
the staff comments, a part of the reason
they they didn't agree with. So, it's in
an effort to keep it uh
kind of further forward so it doesn't
project as far back relative to its
neighbors.
Um and it's still in compliance with
many of the other houses in the
neighborhood who have had that zoning.
The house had been designed before the
most recent amendment, so it's kind of a
relic of that.
>> Thank you. Madam Chair, if I can ask
question to staff.
>> Go ahead, Mr. Klapwyk.
>> Okay, Mr. Hassan, the the applicant has
indicated they've made significant
changes as I read the staff report.
Staff are of the opinion that the
a lot of the issues are similar to the
original one. Would you care to expand
on that?
>> Yes, through Madam Chair. Um I guess
unfortunately in the presentation there
wasn't a side-by-side comparison of the
original application to the revised
application, but it is contained in the
staff comments. Um
the open to below area at the back on
page
uh what page is it in the comments?
Page
seven, I believe. Um kind of more
clearly indicates where the roof was
lowered and the open to below um space
is below the 7-m threshold for what
would be additionally counted towards
the residential floor area, but it's not
as apparent and visually um clear on the
front elevations where changes have been
made. So unless um
the the plans are overlaid on top of
each other, which staff do
um to see where changes have been made.
Um when you hold them up side-by-side,
the dwellings essentially look the the
exact same. So there was no substantive
changes that staff could see that would
result in a change in the staff comments
from the original to the revised
submission. Notwithstanding that as Mr.
Merritt said, um the side yard setback
variance um is new, um but I can also um
add to that that the applicant has gone
through two cycles of the development
engineering permit
uh application review and there were no
concerns raised with that side yard. Um
so that's um where staff stand in terms
of the issues and concerns um with the
additional residential floor area ratio.
>> Thank you.
>> Sorry.
I'm having technical difficulties today.
Now my screen's all black. Um
Mr. Tansky, would you kindly take over
as chair until I figure this out?
>> Probably a good idea.
>> Okay, thank you.
>> Are there any members with any
additional questions of the applicant or
staff?
I see none. Madam Secretary Treasurer,
has anybody called in to speak to this
matter?
>> Mr. Chair, there have been no calls and
no one in attendance has their hand up.
>> Okay, thank you.
And we will close the discussion on this
matter and
look for a motion.
Mr. Arcastle.
>> Mr. Chairman, good day.
Um
Uh I um
I like staff have some um
concerns with respect to the overall
massing of the site and uh
I think perhaps
like like the questions that were asked
previously
uh I have some reservations with respect
to uh the side yard set back
um and the
um
minor efforts that would be necessary in
order to be able to accommodate that
side yard set back. Um
I feel as if the um I'm of the opinion
that the um the the massing and the side
yard are contributing to a building that
is not consistent with the with the
neighborhood and has a mass that is um
um
not appropriate. I will put forward a
motion to refuse the application um
finding that it does not conform to the
general intent and purpose of the bylaw.
Um yeah,
thank you.
>> Mr. Hardcastle, is there any discussion
on motion to deny the application?
Mr. Dickey.
>> Thank you, Mr. Chairman.
Um
I vote would be to approve.
I find that the design is appropriate
and
mitigates against some of the size.
Normally, I'd be opposed to a side yard
setback, but two factors are affecting
me there. They have a wide side wall
side yard setback on the other side. I
know that's due to an easement and they
got stuck in the middle of
of
the the news implementing the new zoning
bylaw. So, and of course council, I mean
sorry, planning department doesn't have
a problem with the side yard setback.
So, my to to comment, I will not be in
favor of denial. Thank you.
>> Thank you. Any other discussion on the
motion to deny?
Seeing none, I just add that I
tend to agree with Mr. Hardcastle.
Well, I don't think the side yard
setback is even variance is necessary.
With a little bit of effort as
as we both suggested, the the issue is
really the massing and I I understand
the applicant feels they've done a
significant effort to pull back the
second floor above the garage. For one,
I would have expected
the second floor to be pulled back on
the sides as well to try to mitigate the
impact of the variances being requested.
With that, the motion is to deny the
application. All those in favor of the
motion to deny?
All those opposed?
Mr. Dickey,
it is uh in favor of the motion to deny
one opposed. I'm sorry sir, your
application has been denied.
>> Thank you for your time.
>> Thank you.
>> Okay, thank you Mr. Thawsky. It's 14
point now.
>> Let me know if it happens again.
>> Um just to clarify, Madam Secretary, you
can mark me absent on uh on this last
one because I did not attend the
discussion, that's why I did not vote.
>> Yes, thank you, Madam Chair. Have you
down as absent.
>> Thank you.
Okay.
>> [sighs]
>> So, the
uh next item on the agenda is
application 127 of 2026 at 177
Woodhaven Park Drive.
And um I have Mr. Tanner as the agent.
Again, that's application 127 of 2026 at
177 Woodhaven Park Drive.
>> Good evening, Madam Chair. It's uh Joel
Tanner with the office of Simple Design
Studio on behalf of Lindsay Bruce this
evening.
Um
we are looking at a brand new build here
at 177 Woodhaven Park Drive. Next slide,
please.
So, this is a current single-family
home. Uh we are looking to remove the
existing envelope and completely replace
it with a new
uh two-story dwelling. So, there's a
partial single-story on that far
right-hand side, which is the south side
of the building envelope in order to
allow more light infiltration in the
core of the house,
and a unique use of materiality found
throughout the uh building envelope.
Next slide, please.
So, we're seeking two variances this
evening. First variance requested is a
lot covered variance.
Um the proposed overall we're sitting at
uh 28.91
as our overall proposed lot coverage.
25% is allowed, so we're sitting just
over a 3.91
in additional coverage.
Uh we did highlight that area in in the
sand color.
Um that area is actually just a below
grade component. Um so we just want to
note that just to kind of give you an
overall perspective on
um that particular component.
Um you know, if you were to remove that
component, we go from
um
297 down to 277.5,
so it splits that that overage in half.
>> [gasps]
>> Um we we were pretty strategic in terms
of the building heights, the stepped
massing both not on just on the front
elevation, but also on that side
elevation
in order to kind of, you know, push and
pull so that we're not just, you know,
building a a simple two-story box, but
we've got some nice projections and
materiality to to jazz up the front
facade as well as the rear facade and
the side envelopes.
Um
second request of variance is a
parapet height increase. Allowable is
0.3, we're sitting at 0.66. Keeping in
mind this is only for a portion of the
building. It is not the entirety of the
the building envelope. So it is the
furthest stepped back volume from the
street facade. Um
and uh this is a uh this is this was
actually added due to the the bylaw
justifications in June 2026.
Uh next slide, please.
Um so we feel that, you know, the
proposal put forth is fairly minor in
nature. Um you know, we we're within lot
coverage regulations or sorry, we're
within GFA calculations, we're within
setback regulations.
Um
and uh you know, we do feel that the
proposal is is going to be beneficial to
the streetscape and uh and quite
attractive for the other neighborhood
dwellings. There's been a lot of a lot
of redevelopment over the years and open
up the uh
discussions with committee. Any
questions? More than happy to jump in
and provide some commentary. Thank you
so much.
>> Thank you, Mr. Bruce.
Are there
any questions or items of
clarifications?
Go ahead, Mr. Dickey.
>> Thank you, Madam Chair.
>> [clears throat]
>> Mhm.
>> Um
some of these height um
regulations in the new
zoning bylaw are are obviously new to us
and maybe you could just
explain if
it your request is for a 0.662
uh
meter high parapet wall above the
maximum height.
So,
the maximum is just uh sorry, I the
maximum
height is just um
measured to the roof top of the roof and
now the the zoning bylaw would you would
allow you to go 0.3 m above that maximum
height from the flat roof and now you
want to go up to uh 0.662. I just
understand the concept. I'm not talking
about the numbers right now.
Just if you could explain that to me a
little better.
>> Yeah, yeah, through through Madam Chair.
So, so the the new bylaw um basically
the the max allowable building height um
on a flat roof dwelling was modified so
it we got forced from 9 m down to 8 m.
Um so, the
0.3 m is the max allowable parapet
height uh when we are exceeding the max
allowable height.
Um the max allowable building height in
totality. Um so, it's an above and
beyond calculation.
Um the the driver on the parapet height
it is
a lot of the times partially
aesthetically driven by our firm. In
this case, it also is driven off of how
we're sloping the
water to drain off of the roof cavity.
And so, that calculation for um
Sorry, that calculation for basically
sloping the drain and and containing the
water properly is another factor in
driving these parapet heights on some of
these dwelling designs.
>> Okay. So, from the street So, okay, it's
the
No, let me back up.
So,
if I understand again, I don't think I
do.
From the street, in theory, it would be
it would be 8 m to the top of the flat
roof, and then another
0.662
m above that. So, from the street,
you're looking at a height of 8.
I mean, the view from the street is what
I meant. You're looking at a height of
8.662?
This is what I don't understand, right?
I don't under- really I'm not sure that
I get the concept here.
>> Got it. Um through you, Madam Chair, um
Brandon Hassan, maybe you can speak to
the to the additional clarifications
required with uh with Mr. Dickey. Um
the
we we should also we can also maybe pop
back to the presentation to image number
two,
uh or or slide number two, the the
render, or even
uh
even the la- the second last slide
before the thank you page.
Um so,
on this top right-hand image,
the
the back set wood siding cube
that you're seeing, so the furthest cube
in the middle of the building envelope,
that's the part of the parapet that is
increased in height. So, the stone
detail you're seeing, which looks to be
the tallest, most dominant detail,
um in this in this case, actually isn't
the tallest component. The tallest
component is the wood cladding
in behind that stone pillar. So, this
this perspective is actually really good
to explain those layers that we built
out from the entry canopy to the second
floor canopy to the stone canopy, but
that wood volume is actually the tallest
of the four or five, I guess.
Um Madam Chair, I'm not sure if Brandon
can jump on and clarify the additional
detailing.
Just regarding the the bylaw.
>> Mr. Hassan, are you with us?
>> Um, through you, Madam Chair, just for
clarification, Brandon uh did not
prepare comments on this file. This one
was one that I had worked on.
>> Okay, sorry, Mr. McKnight. Go ahead
then.
>> No problem.
Um, I'll just note that the intent of
really regulating the parapet is to
control the overall height and massing
and visual impact of a building, of
course,
but still allow for those architectural
features that contribute to design.
Um, the parapet itself is really viewed
by staff as a design addition that only
helps to break down the massing of the
dwelling at the end of the day, and
therefore there were no concerns raised.
Um, and in addition, it's only a smaller
design element, so it doesn't cover the
full sum of the building,
and that is why staff provided
supportive comments.
>> Does that answer your question, Mr.
Dickey?
>> I'm still confused, but uh
I'll live with that.
>> Thank you.
>> Thank you.
Okay, any other questions of Mr. Bruset
this time?
Okay, I see none. Has anyone called with
interest for this application, Madam
Secretary Treasurer?
>> Madam Chair, there have been no calls
and no one has their hand up.
>> Okay, thank you. Then we'll move the uh
discussion
to
um take a vote.
Who would like to move a motion?
Go ahead, Ms. Price.
You're muted.
>> Taking into account my site visit, the
reports by the agent and staff, and
there being no letters of opposition, I
find the variances to be minor in nature
and are in keeping with the general
intent and purpose of the official plan
and zoning bylaw and are desirable for
the appropriate development of the land.
As stated by staff, the proposed
projection presents a modest increase
associated with the design of the
dwelling. I believe the overall height
and massing will not affect the
surrounding neighborhood. In conclusion,
I find the four tests have been met and
I recommend the application be approved
subject to the following conditions.
The dwelling be constructed in general
accordance with the submitted site plan
and elevation drawings dated September
25th, 2026
and that the approval expires 2 years
from the date of the decision building
permit has not been issued for the
proposed construction.
>> Thank you, Ms. Price. Any discussion on
this recommendation?
I see none. All those in support?
Okay.
The application has been approved none
opposed.
>> Thanks so much, committee. Have a great
evening.
>> Have a good evening.
Um application
128 of 2026
at 624 Third Line.
Again, that's application 128 of 2026 at
624 Third Line.
I have Chris Pereira here as the agent.
>> Good evening, Madam Chair. Can you hear
me?
>> Yes, go ahead.
>> Wonderful.
Um good [clears throat] evening. My name
is Chris Pereira. I am the principal of
M Bahar Planning and Design Limited. We
are the planning and urban design
consultants for the owner of the
property, which is Circle K Group of
Companies.
Um the subject lands are located at the
southwest corner of Speers Road and
Third Line as a corner site and as we
can see on the screen,
um the subject lands maintain vehicular
access from both Speers Road and Third
Line. The property itself is
approximately 0.62 hectares in size with
approximately 106 m of frontage along
Third Line and a smaller 42 m of
frontage along Speers Road.
So, the proposal seeks to redevelop the
subject lands by rebuilding a new car
wash building generally in its current
location.
The site design expands into the empty
southern portion of the of the lands to
accommodate the stacking and queuing
lanes, and those can be seen on the
right side of your of the image, which
would be south.
>> [clears throat]
>> The existing gas station
canopy and retail store will remain in
their current locations. This
application is part of an ongoing site
application with staff.
So, in order to implement this design
that we're looking at on the screen, a
variance is required from the bylaw. So,
as outlined in the staff report, whereas
7.5 m is required for a rear yard
setback, the proposal maintains a
minimum 3.5 m rear yard setback. And
this is shown very clearly on actually
figure one of the staff report. It's a
kind of a zoomed in um
um key key key plan. But, if you want to
zoom in on the pay station on the right
side of the screen, we can see exactly
where the
uh to the right of that, actually. It's
between the pay station and the property
line on the right side, exactly. So,
this is the area that we're talking
about. So, that dimension 3.610
m is the pinch point, and the variance
is being requested for 3.5 m.
So,
the [clears throat] proposed reduction
in to the setback will not negatively
impact the surrounding land uses in any
way.
Uh nor does it negatively impact the
overall site plan's ability to be
designed properly, including necessary
landscaping to assist with storm water
management and drainage.
The rear yard of the subject lands
shares a property line with a furniture
store {slash} warehouse {slash} office
use.
And along that shared property line, the
furniture store maintains parking and a
driveway access to the rear of the
property, where trucks and deliveries uh
can access the loading areas of those
buildings.
So, the proposed reduction to the
minimum uh required setback from 7 1/2
to 3 1/2 is solely needed to accommodate
the canopy structure over the pay
station kiosks.
Uh this is an open-air canopy structure
and um as staff have noted in their own
report, um does not create any undue
massing or scale impacts on the
surrounding area
um as it is not fully enclosed and it is
actually at a lower height than the
facility itself.
Uh the canopy itself will be uh screened
by uh notable perimeter landscaping,
which doesn't show up on this plan, but
there is a detailed landscape plan that
was provided as part of the site plan
package, which shows a heavily screened
um landscape buffer along that south
property line.
Um being adjacent to the driveway that I
just mentioned at 586 Third Line.
Uh lastly, we have reviewed the staff
report. We are in agreement with their
assessments of the four tests, and we
are in agreement with their
recommendation. We have also um reviewed
the conditions or the recommended
conditions, and we are in complete
agreement with them.
Um thank you very much for your time,
and I'm available to answer any
questions committee may have. Thank you.
>> Okay.
Thank you, Mr. Perera.
Does anyone have any questions or items
of clarification at this time?
Okay, I see none. Has anyone called with
interest for this application, Madam
Secretary-Treasurer?
>> Madam Chair, there have been no calls
and no one in attendance has their hand
up.
>> Very well. Then, we'll take this matter
into committee then. Who would like to
move a motion?
Go ahead, Mr. Telawsky.
>> Thanks, Madam Chair. Madam Chair, I'll
move that this application be approved
as applied for,
finding that it meets the four tests of
Planning Act. I don't see any impacts um
being generated from this variance.
The variance relates to
a canopy structure that's minor in
relation to the overall site
development, and as noted by the
applicants it's adjacent to another
commercial industrial use. I would make
that approval subject to development
proceeding
in full accordance with final approved
site plan elevations to the satisfaction
of the director of planning and that the
approval expires 2 years if a building
permit hasn't been issued.
>> Thank you, Mr. Talowsky. Is there a
discussion on this recommendation?
See none. All those in support.
8 approved. Application has been
approved, none opposed.
>> Thank you very much.
>> Thank you.
Um
application 129 of 2026 at 1247 Crawford
Court.
Again, that's application 129 of 2026 at
1247 Crawford Court.
I have um Steven Hunt here as the agent.
Go ahead, Mr. Hunt.
>> Madam Chair, I think I should be removed
after this one.
>> Oh, yes.
Uh
Sorry.
Um Oh, yes. That's the one that you
declared a conflict for.
Um town staff should be doing that now.
Give me a moment, Mr. Hunt.
Okay. Town staff has removed Mr.
Talowsky.
Okay, you may proceed.
>> Thanks, Madam Chair. Members of
committee, uh once again, I'm Steven
Hunt,
>> [clears throat]
>> North Royce agent and designer
for this uh property and principal in
PenDesign Associates.
Uh subject property as we know is 1247
Crawford Court. It's an established
[clears throat] neighborhood in East
Gwillimbury.
The lot is irregular in shape
with approximate frontage of 31 and 1/2
m and area of 1338 sq m.
>> [clears throat]
>> It is zoned RL1-O
under uh
by-law 2014-014
and the OLP designates it low-density
residential special policy area.
>> [clears throat]
>> Property was purchased by our client, a
young couple that wishes to raise their
family in the neighborhood. Family was
home was designed with the long term in
mind.
We made best efforts to also comply with
the zoning by-law in terms of overall
size and lot coverage and mostly all the
setbacks.
As outlined in the application, there
are two minor variances
requested that we felt were necessary
given specific
uh property characteristics.
Um first variance to permit a front yard
of 7 and 1/2 m where as 9.89 m is
required.
One can see that in the uh right side of
the uh lot, the easterly lot line to the
front corner of the garage. That's the
closest pinch point
this home on the property.
Um
the
zoning requirement is 9.89 m.
Um this is set by the average setback of
homes on either side.
>> [clears throat]
>> Second variance
to permit a height of 9.3 m
where 9.0 m
is required.
Um I think what we could do is just
maybe skip to uh
uh page four which can show
some of the the the massing of the home
just very quickly. You can see it's a
two-story on the west side of the
property and one-story garage on the
right side.
Page 12 has a rendering
to your overall character again.
Two-story massing. Uh we worked with
staff to uh
reduce uh eaves lines and
getting closer approximately to the
character
uh the neighborhood and again a
one-story garage.
Uh no rate. It's it's a false former
there. There's no living space.
And if we can go to the last sheet, page
13,
it's a little clearer
uh diagram.
So, in terms of the first variance, as
you can see, the front lot line is
regular in configuration. The shortest
shortest depth
on the side.
And this is as I said where the variance
applies. The balance of the front yard
is very large to the point where the
setback is over 18 m on the west side of
the property as the
uh property itself jets forward ahead of
the uh
turning circle.
One can say that the average front yard
is approximately 12.9 m,
well over the minimum. In fact, the
reduction applies only to a small area,
which is shown shaded that gold color or
yellow or yellow color in the front of
the garage there.
Um we believe is well set back from the
street. And also can see that the home
is well balanced on the lot to ensure
there is enough rear garden space. It's
It's actually still further forward than
it is
uh
back or given the 18-m setback on the
west side.
Purpose of front yard averaging is to
ensure mostly uh mostly on straight
streets
that there are no jarring contrasts with
respect to each home's placement on the
lot. And so, that as you're going down
the street, you're seeing things
generally align. In this case, the
street is naturally curving
and the flow and placement of homes
follow it.
As you can see in the
uh purply blue uh dash line, that's
where the existing house is and we're
kind of straddling where that house is,
purposely done.
We believe this placement enhances
rather negatively impacts the street
experience.
The second uh variance um
in its terms, the the property's the
topography is such that the The falls
from north to south, from the back to
the front of the property, approximately
1.5 m.
This means that the rear yard is
somewhere between 1 and 1 and 1/2 m
higher than the street, causing the home
to be raised up
accordingly.
Height happens to be measured from the
street side, so we have sort of an
elevated situation on the lot
created by a higher backyard.
This negatively impacts the form and
architecture of the home.
Um and so on. Exploring a slightly
a slight increase in building height, uh
staff asked us to uh do some research.
We hired a Gicha material land surveyor
to measure the height of the homes on
uh either side.
Um our request generally matches the
height of the home on the east side.
And it's within a foot of the home on
the west side. So, it's it's fitting in
there nicely.
We again believe this enhances the
street experience.
In fact,
as is always my firm's practice,
particularly here in the East Oakville,
we spent considerable time and effort
with staff to develop a home design
that suits this neighborhood.
As such, we're aware of staff's support
of the application.
We're also aware of one of the
neighbor's concerns.
As such, the the owner met with the
neighbor last night to explain the
nature of our request.
As far as I understand today, the
neighbor's concerns
with the application are
with Tron.
Not sure if they're
going to speak to the application or
not. But for background, the discussion
revolved around a misunderstanding of
the impact of the requested variances.
Uh as mentioned, the majority of home is
well beyond
the uh front yard setback being
requested. So, there was a concern that
the whole house would be uh jutting
forward. And that the portion of the
home that the variances apply to is
mostly one story. Look at the gold area,
one-story garage.
And therefore, it's it's not uh
overlooking, um shadowing
uh the front yard.
Uh
the the goldish color in front of the
adjacent home just represent
perpendicular sightlines from from the
front of that home. And as you can see
uh the garage is not within a direct
line of sight of their home. It does not
contain windows from habitable rooms
that might have overlooked as well. I'm
just quickly responding to some of the
concerns that the
the good neighbor uh
provided.
I believe it is an application like this
one
that the committee exists for. Namely,
to address matters and circumstances
that cannot be reasonably anticipated
within the general bylaw.
Every property and decision is unique.
Uh in this case, I believe the requested
variances are minor in nature and
keeping in general intent of the zoning
bylaw and official plan. And lastly,
it's desirable and appropriate for the
development of the property. Happy to
entertain any questions you might have.
>> Thank you, Mr. Hunt. Any questions,
items of clarification of Mr. Hunt at
this time?
Okay. I see none.
Who would like to
uh move a motion?
Uh sorry, Ms. Price. Just 1 second. Has
anyone called with interest for this
application, Madam Secretary Treasurer?
>> Madam Chair, there have been no calls
and no one in attendance has their hand
up. And uh I would just let you know
that that letter of opposition that did
come in was withdrawn today.
>> Yes, thank you.
Um
Very well.
Go ahead, Ms. Price.
>> Having taken into consideration my site
visit, the reports provided by the agent
and staff, and there being no letters of
opposition, I find the variances to be
minor in nature and not in keeping with
the general intent and purpose of the
official plan and zoning bylaw and are
desirable for the appropriate develop
development of the land.
The various design elements such as the
lowered roof roof lines, main wall
setbacks have helped to mitigate the
overall massing and scale of the develop
dwelling and make more compatible with
the surrounding neighborhood. In
conclusion, I find the four tests of
planning act have been met and therefore
recommend the application be approved
subject to the following conditions.
The dwelling be constructed in general
accordance with the submitted site plan
and elevation drawings dated September
16th, 2026
and that the approval expires 2 years
from the date of the decision if a
building permit has not been issued for
the proposed construction.
>> Thank you, Ms. Bryce.
Is there a discussion on this
recommendation?
Okay, I see none. All those in support.
Okay, the application has been approved.
Menno, post.
>> Thank you for your time.
>> Thank you.
Application okay. Let's wait for Mr.
Tolansky to be let back in.
Okay, welcome back, Mr. Tolansky.
Application 131 of 2026 at 160 Trafalgar
Road. Again, that application 131 of
2026 at 160 Trafalgar Road.
I have Anne Wine Fein as
>> Hello.
Uh good evening, chair and members of
the committee.
Um my name is Anna Wine Fein and I'm a
land use planner with Bousfields, which
is the land use planning firm located in
Toronto and we are the agent
representing the owner.
Um
Uh next slide, please.
I'm here today seeking approval for
minor variances that will facilitate the
development of a four-story residential
building in downtown Oakville.
First, I wanted to sincerely thank the
planning and zoning team at the town who
have been excellent to work with both on
this minor variance application and the
associated site plan application, which
is nearing completion. Um, the final
submission was made this September.
We have reviewed the comment report from
planning staff citing no objections in
addition to the resident comments that
were appended to that report.
Um, and just to say we agree with the
conclusions and conditions listed in
that report. And I'm hope hoping to
speak more directly to the resident
comments received a bit later in my
presentation. Um, I'll also note that we
filed a detailed planning analysis with
the application and I'm very happy to
get into specific details about any of
the variances if there are questions. I
imagine there will be, but for the sake
of time right now, we'll be moving quite
quickly.
As I mentioned, the site is located Oh,
Sorry, can you just go back back to the
Thanks. Um, the site is located in
downtown Oakville, which is identified
as a growth area in the Livable Oakville
Plan. Um, the majority of
intensification and development within
the town of Oakville is planned to occur
within growth areas in a manner that is
compatible with the surrounding area.
Um, the site is located on the west side
of Trafalgar Road mid-block between
Randall Street and Dunn Street. It has
an area of approximately 921 square
meters with about 28.8 meters of
frontage along Trafalgar Road and it's
currently vacant. Um, I provided a more
detailed description of the site, the
direct adjacencies, and a description of
the broader surrounding area in our
letter. Um, I won't get into it now, but
I'll just note that there's a row of
three-story townhouses to the rear
fronting Dunn Street, which has been, I
believe, some of the resident comments
we've received have come from residents
in those townhouses. So, I'll get into
that in a little bit. And now you can
switch to the next slide, please.
The site is subject to a previous
rezoning from 2015, um, exception 366 in
the bylaw.
The exception includes a variety of
zoning requirements for a four-story
residential building. Those zoning
requirements are based upon the building
concept which was prepared as part of
the 2015 approval.
Following the approval in 20 in 2015,
the current owner purchased the property
in 2017 and has continued to advance its
development.
The design continues to contemplate a
similar four-story residential building
and has made minor revisions to the
building and site design to modernize
and customize it. Exception 366 as
enacted is quite prescriptive with
respect to built form and other
performance standards and therefore the
current design requires variances. And
I'm just going to ask you to hold on
this um slide as well.
This is a rendering of the proposed
building. I'll give you some key stats.
It remains a four-story residential
building. It contains um eight units.
The original approval was for 11 units.
Um so we're below that threshold. And
there are two levels of underground
parking accessed by a car elevator.
The proposed building maintains all of
the above-grade building setbacks from
the original approval with the exception
of one variance that has resulted in
questions from residents, which I'll get
into briefly. I keep sort of saying I'm
going to get into it, but I will get
into it in just a minute. Um they refer
to it in their correspondence as
variance 13.
So maybe if I can actually ask you to
skip to page number seven and I'll
address this this uh variance in
particular. Whoops, sorry, just up one.
There we go.
Exception 366 requires the building to
be set back 3 m from the rear lot line.
However, it also allows for an
underground ramp to be set back on only
0.75 m. You can see that with that
orange little bar on the drawing on the
right-hand side.
As part of the redesign of the building,
the owners decided to switch the ramp to
an elevator. So car elevators, and you
can see it on the elevation drawing on
the left. It's a sort of single-story
entrance right here, a car elevator
entrance. Um car elevators are more
efficient than ramps because they take
up less space in an underground garage.
Um and in addition, a car elevator is
narrower than a conventional ramp. So,
we were able to pull the elevator
further from the rear lot line, thereby
increasing the setback from 0.75 m from
a ramp to 0.94 m to the elevator. The
rest of the building will meet the 3-m
minimum rear yard setback.
The switch from the ramp to the elevator
will result in less impact than the
approved 2015 design.
Uh as variance 13 is only required
because the zoning provisions
specifically mention a ramp, not a car
elevator.
So, I understand that there are uh
comments received regarding the
relationship between this building and
this elevator and the townhouses to the
rear, particularly regarding
construction of the building and
potential damages to um a retaining wall
and fence. And there's a shared driveway
that provides access to the townhouses
on Dunn Street. Um and those comments
arose related to this variance, that's
my understanding.
Um
but just to begin, the retaining wall
and driveway on the townhouse site falls
entirely outside of the subject site and
are not expected to be disturbed through
the construction process.
The owners are experienced developers
and they are working with an experienced
construction management firm that has
worked on much tighter and denser sites
in downtown Toronto and elsewhere in the
GTA.
However, accidents can occur on this
site and on any construction site. And
the residents of the adjacent townhouses
have been in contact with the owner
discussing how damages would be assessed
and responded to urgently without cost
to residents and with minimum
disruption. The owners have been
forthright in engaging with the
townhouse residents and will continue to
be so and have been looping in their
construction management firm to provide
details about the process.
As a I think as a team we are working
amicably with the residents to provide
the necessary assurance that their
retaining wall and driveway will not be
impacted.
Construction liability is typically
addressed as construction moves ahead
and is considered separate
So sorry, and is typically considered
separate from zoning matters.
In my opinion, this variance is
appropriate from a land use planning
perspective and is actually less
impactful than the existing zone zoning
would permit.
We are hoping the committee will approve
this and other variances today and allow
the conversation between my client and
the townhouse residents to continue
separately.
And if you I can just ask you to go back
to slide four and I'd like to wrap up
um
hopefully quite quickly. Um I also
understand that 13 variances is a higher
number than this than this committee
typically considers.
Uh in this regard, I want to briefly
mention the test of minor.
With a number of variances, there may be
a perception that the current proposal
is a significant departure from the in
force zoning.
In my opinion, the number of variances
should not be
part of the test of whether an
application is minor. Rather, the merits
of each variance should be considered
and evaluated individually.
Um I'll note that there have been a
series of tribunal cases that have led
to how we as planners assess a variance
or a group of variances as minor and the
conclusion of which is that the test of
minor involves an assessment of impact.
Um as I outlined in my letter filed with
the committee, it is my opinion that
each individual variance will not result
in unacceptable impacts and taken
collectively
um
will facilitate the construction of a
building that remains substantially
similar to the original proposal. And
this opinion is echoed in the town
comment letter um who did not um
identify any objections with our
proposal.
So in my letter filed with the
committee, I provided analysis of each
of the variances and I am happy to go
through each of them in detail it if you
have questions, but perhaps I'll
conclude now and state formally that is
my it's my opinion that this application
satisfies the four tests set out in
section 45 one of the planning act. The
application maintains the principles of
good planning and we recommend that the
application be approved subject to the
conditions listed in the comment report.
Thank you very much for your time.
>> Question for Ms.
Wanting.
Go ahead, Mr. Ostiguy.
Madam Chair, thank you for that very
helpful presentation.
And somewhat remarkably, I think you've
got 13 variances and you seem to have
distilled it down to one variance being
of concern to residents. So, I just
wanted to focus on that and
>> Mhm.
>> So, this I I got I think I got great
clarity from your presentation I didn't
have before.
So, the original proposal there would
still be an excavation
0.75 m from the property line
and probably a 1-m parapet wall around
the ramp.
And the current the only change here is
the excavation is actually moving
further away
uh from the property line and instead of
it being a parapet wall, it would now be
a probably a 3-m I think I I calculated
um enclosed uh
part on the building for a small portion
of the building that's furthest away
from the actual residents themselves. Is
Am I reading that correctly?
>> So, my understanding is that the ramp in
the original proposal was always
envisioned as being enclosed in the
building as well.
So, I don't think it was ever an open
ramp. I think it was
sort of a more more of like a
uh
downtown type concept where you would
have the ramp entirely enclosed in the
building facade. There would be a garage
door and and it would elevate and then
you would drive down the ramp and into
the building and then you would sort of
cycle through the underground garage. So
I
I don't think it was a parapet wall. I
think it was actually an a fully
enclosed ramp. And now we're replacing
that with a fully enclosed elevator that
is you're correct in saying further away
from that rear lot line.
>> Okay, so that's even more helpful. So
the only impact of this variance is to
have a similar structure further away
from the property line even though the
variance makes it sound like
you're building closer to the property.
>> That's correct. We were We worked and
you know, my my my thanks to
the planning and zoning staff was very
sincere. We worked very closely to make
sure that we had captured all of the
variances and we had structured them
properly. And when we worked with the
zoning team they said cuz we had put
forward an option, well, what if we just
change change the wording to say permit
a permit a ramp to permit an elevator in
that same location and they said no, we
would prefer it if you varied the rear
yard setback of 3 m to permit the
elevator rather than changing the word
from ramp to elevator. Do you understand
what I what I'm getting at there? That
was at the direction of the town that we
worded it in such a way. So I understand
why when residents of those townhouses
looked at that and said, oh, you're
reducing it from 3 m to 0.94, that is a
significant departure, but it's
due to the way the variance needed to be
worded based on our
dialogue with town staff.
>> And one final question, in scenarios
like this it's common to have
municipality require a pre and post
construction survey.
In this case in terms of the retaining
wall of the existing property, do you
know if that's been part of the
discussions with the neighbors?
>> It has been part of the discussion. It's
my understanding that um
that there will be necessary pre and
post construction surveys and monitoring
during construction and that is actually
typical protocol of the sort of building
permit process. So, I think that that's
something that's quite reasonable and is
expected to
Excuse me, is expected to occur.
>> Thank you.
Mr. Wassall, you had your hand up. Do
you still want to address anything?
>> Uh it's just to clarify for member
Tolensky that it would have the same uh
like the underground ramp would have the
same look as the car elevator does in
the drawings. It would just be longer
and a bit taller. Um so, they've reduced
the actual effect of of that built form
element.
>> Thank you.
Any other questions or items of
clarification?
Okay,
I see none. Ms. Wang, how many units are
in this building?
>> Um eight units.
>> Eight. Okay.
All right.
Um we do have uh two letters of
objection that I I will note on record
from uh Jed James and Roger uh Newell.
And they do seem to want to address the
committee cuz they've requested to
attend. So, has anyone raised their
hand, Madam Secretary-Treasurer, with
interest to speak to the committee at
this time?
>> Madam Chair, no one has called in and no
one has raised their hand. There is a
neighbor though in the audience that he
did have concerns and wanted to attend
and speak at the meeting, but his hand
is not up
right now.
>> Okay.
Okay. Right before we do take this
matter into committee, um I'll
just If you're in the audience and you'd
like to speak to the committee before we
do so, please uh raise your hand. If
not, then the matter will be taken into
committee, and the committee will do uh
will
take its vote.
>> Madam Chair, I do have one hand up now.
Uh Chris Carothers, I can move him in to
the meeting.
>> Okay. Go ahead, Mr. Carothers.
>> Yes, hello. Chris Carothers.
>> Go ahead, Mr. Carothers.
>> Thank you. Yes, I'm
one of the uh
um the residents in the nearby location
and we've been working with the
developer. They've been very forthright
and been helpful. And we are working
through an agreement in case of uh
um construction mishap, but I
They've been very forthright right and
and good to work with and so we don't
have any objections at this time.
>> Okay, very well. Thank you for making
mention of that.
Okay, if there is no one else seeking to
speak to the uh committee, we'll take
the matter into committee and uh start
the discussion. Who would like to do so?
Okay, go ahead, Mr. Tolosky.
>> Thank you, Madam Chair.
Madam Chair, I'm moved that this
application be approved as applied for
I mean that it meets the test of
Planning Act.
As I said earlier, I think quite
remarkably 13 variances
all of which are very um minor in nature
and
and even in a cumulative uh sense do not
uh appear to cause an impact. The uh
intended use is very much still
intact with these variances um with the
one variance that was
raised concern by the neighbors,
it would appear in my view that it's
actually a better scenario than
what existed in the previous approval
and it's just the perception of the
reduced setback that
raised the concern when it's actually
increasing the setback marginally from
what was previously approved.
>> [clears throat]
>> I would note there were letters of
objection
and uh
after our attendee supporting
I think the discussion has addressed the
issues that were raised in the letters
of objection and I would make the
approval subject to
building being
and
constructed in general accordance with
the final approved site plan and
elevation drawings to the satisfaction
of the director of planning
and that the approval expires 2 years if
the building permit hasn't been issued.
>> Okay, thank you, Mr. Tanski. Is there a
discussion on this recommendation?
Okay.
I see none. All those in support?
Okay.
All those opposed?
Mr. Hardcastle, are you yay or nay?
>> My apologies, Madam Chair. I am in
support of the application.
>> Very well, then the application has been
approved, none opposed.
Thank you.
>> Thank you so much.
>> All right.
Um
we have um minutes to confirm for
October the 14th.
Ms. Price, thank you.
And we have
um motion to adjourn.
Mr. Hardcastle, thank you. And we are
adjourned.