Good evening. Tonight's committee of
adjustment hearing is being held by
video conference and live streaming
video on the town's Oakville uh.ca.
This hearing is to consider applications
or minor varants and consents held under
the authority of the planning act.
Please keep in mind the intent of the
process is to review the application
that is before the committee, listen to
the evidence, and then make a decision.
This process is not intended to be used
to resolve any concerns or disputes that
may exist between the town, individuals,
or organizations. If a request for
deferral is made and the committee
grants such a request, the applicant
authorized agent must contact the
secretary treasurer to schedule a new
hearing date. In order to conduct an
effective and and efficient electronic
hearing, we have adopted the following
process. If you are watching the live
stream of this hearing on oakville.ca
CA. And if you wish to speak to an item
on the agenda, please call 8156095.
That that number again is 9058156095.
The phone number is also posted on your
screen below the live stream page at
Oakville. Staff will be standing by to
take your call. When you call in, staff
will ask for your name, item number that
you wish to address, and your telephone
number.
Further instructions to be will be
provided when you do call to join the
video conference. When the chair of the
committee polls for interested parties,
please press star six to unmute
yourself. The applicant agent will be
given opportunity to briefly explain to
the committee the basis of their
application and answer any questions
that may arise. A maximum of 5 minutes
will be provided for that presentation.
You will need to state your name, full
name and address for the record and any
submissions beyond the five minutes will
be at the discretion of the committee.
All delegations must also state their
full name and address for the record and
a maximum of 5 minutes will be provided
for each presentation. All remarks and
questions are to be directed to the
chair and any submissions beyond the
five minutes will be at the discretion
of the committee. any applicant or agent
who will then be provided further five
minutes to respond to their comments
made by interested parties, answer any
questions from the committee members. If
the applicant or agent has any concerns
found in staff report, particularly with
any proposed conditions, this will be
the opportunity to advise us. This
matter will then be taken into committee
for a decision and will mark the end of
all discussion. Any person desiring a
notice of decision for the application
must provide a written request
preferably through email to the
secretary treasurer.
Written notice of the committee's
decision will be mailed no later than 10
days for minor variance and 15 days for
consent
to the applicant agent or any other
person who has filed a written request
for such notice. The last day to appeal
the decision to the land tribunal will
be noted on the decision. Only the
applicant, specified persons or public
bodies may appeal to the committee's
decision to the Ontario Land Tribunal.
Please note that in November of 2022,
Bill 23 legislation, the More Homes
Build Faster Act, amended the Planning
Act to remove appeal rights from members
of the public. If no appeal is received
within the prescribed time frame, the
decision of the committee becomes final
and binding and the secretary treasurer
will then notify the applicant and
anyone who has received a copy of the
decision through written correspondence.
People participating in the hearing are
to be courteous to and respectful to
members of the committee, town staff,
and any other person participating in
the electronic hearing. Tonight's
electronic hearing is being video
recorded and available for future
viewing at Oakville. Thank you.
I have no regrets this evening. I have
one uh any declarations of future
interests.
Mr. Towski, go ahead.
>> Thank you, Madam Chair. Madam Chair, I'm
going to declare a conflict on A129
at 1247 Crawford Court. Have a
long-standing relationship with the
family of one of the applicants.
>> Okay. Thank you. Not to Mr. Towski.
Madam Secretary, Treasur, do I have
requests of deferrals or withdrawals of
applications if you are
interested in
>> Yes, madam.
>> Sorry, Madam Chair. We have one hand up.
Uh, Mr. William Hicks. I'll move him in
one moment.
evening. Uh good evening, Madam Chair
and members. Uh with respect to the
application at 82nd Street, I wish to
request a deferral. There's a number of
inconsistencies and questions in the
reports from the planning department.
So, we'd like some time to work together
with them and Heritage to rectify those
and make sure that everyone's on the
same page because as it stands, I'm not
sure the committee would be able to make
a decision based upon the information
that's before them. So,
>> okay. Thank you, Mr. Mr. Hicks.
>> I can't see
out to see the members.
Hey,
>> I will need some time to figure this out
after
>> this next one can um
>> tech support
>> so that I can see the members
>> the members
>> there's an echo that I hear and I hear
myself
>> I can see them all from my screen but
>> yeah for some reason
>> for some reason
>> okay I I apologize everyone I'm going to
disconnect and reconnect reconnect
Sorry, I'm not sure what happened.
Okay, members, Mr. Hicks is requesting a
deferral to work with town staff. Um,
given the um comments, all those in
support,
the application has been deferred. Thank
you for your patience, Mr. Hicks.
Okay. Anyone else? Madam Secretary,
Treasurer.
>> Madam Chair, there are no more hands up
uh from those in the audience.
>> Okay. Thank you.
Okay. So, the first item on our agenda
is
application 054 of 2026
at 1562 Venicia Drive.
Hi. Can you hear me?
>> Yes. Go ahead, Mr. Merritt.
>> Thank you. Good evening, members of the
committee. Um, my name is Alexander
Merritt and I'm representing the owners
of 1562 Venicia Drive. Um, thank you for
the opportunity bringing this
application back to you following our
deferral in April. Um, following that
meeting, we took staff comments into
consideration, reviewed the design, and
made revisions intended to reduce the
overall scale and massing of the
proposed dwelling. Um, we recognize that
staff continues to have concerns
regarding the requested residential
floor area ratio. However, we believe
the revised plans represent a considered
response to those concerns and that the
proposed dwelling is appropriate for the
property and its surrounding
neighborhood.
Uh, could you just go to the next page,
please?
Um, these revisions included a reducing
of the overall depth of the dwelling,
pulling back of the second story above
the garage, reducing of the ceiling and
roof height in the open to above area at
the rear, and
reducing [clears throat] the overall
size of the dwelling with a reduction in
RFA and coverage. Um, in that reduction,
we were also able to remove one of our
previous variances requesting additional
coverage. Um, regarding the requested
floor area ratio, the application seeks
39.3%
where 37% is permitted. As staff notes
in its report, the overall area of the
dwelling has been reduced by
approximately 20 square meters compared
with the original submission. Um,
combined with the other design revisions
mentioned previously, we feel this
represents a genuine effort to respond
to staff comments. Uh we also note the
staff has no objection to the requested
interior sideyard setback variance
recognizing that the site constraints
are created by the easement.
Um neighborhood context and design
compatibility have been key
considerations from the beginning of our
design process uh with significant
effort made to align the proposed
dwelling with the objectives and
principles described in Livable
Oakville. The design incorporates
several deliberate strategies to reduce
perceived massing and create a more
articulated built form. Uh these include
lowering roof lines over the seconds
story front-facing windows, breaking up
continuous walls with roof lines into
distinct architectural elements using
window projections and recesses of wall
planes, and using different materials
and horizontal detailing to separate the
first and second story in order to
deemphasize the massing of the dwelling.
Further efforts to reduce the
verticality of the dwelling uh is in the
use of the singlestory front porch uh to
bring focus to the main entrance on a
scale comfortable for the pedestrian. Um
the use of generous first story windows
also adds to the dwellings visual
interest and lightness of first floor
massing of the primary facade.
Uh to conclude, we acknowledge staff's
concerns and appreciate the opportunity
to address them through these revised
plans. We have made deliberate changes
to reduce the dwellings's overall depth,
size, and perceived massing while
maintaining a functional and cohesive
design. We respectfully ask the
committee to consider and approve our
application given that we feel it passes
the four tests of the planning act and
is an appropriate development for the
neighborhood. Uh, thank you for your
time and consideration. I'm happy to
answer any questions you may have.
Thank you, Mr. Merit. Are there any
questions
of
Mr. Meritt? At this time, if town staff
would be kind enough to just go back uh
to the
screen pointing at council chambers.
I again I'm not sure what's happening.
I can only see the speaker and myself on
the large screen. Can town staff panel
back to
council chambers?
Madam Chair, it uh it might be
>> settings here. Okay.
>> No, I've tried everything. I I don't
know what's happening tonight. They they
if they can just please do that every
single time for those four applications
that we have tonight and then we can
figure it out later.
>> Um my gallery view for some reason is
just not working. It's It's only
allowing me speaker view.
So, I'm not really sure what's
happening.
Okay. Uh, now I can see everyone on the
screen in town C um town chambers.
Are there any questions of Mr. Merritt
at this time?
Okay, I see none. Um, oh, thank Okay, go
ahead, Mr. Towski.
>> Thank you, Madam Chair. Um, Mr. Mayor,
despite staff's support of the sideyard
variance, it appears that variance is
only being required because you're
shifting the building further from the
easement to accommodate a window well.
Is it not possible to shift a window
well and shift the building to towards
the easement to eliminate that variance?
>> It it would be possible. that variance
is kind of a two-parter. For one, it is
kind of a relic from the previous uh
recent amendment. Uh originally, we were
in compliance with that sideyard
setback. Um the other component of that
is we it would shift the building
further back and there are we are
already trying to reduce the overall
depth of the dwelling as that is part of
the staff comments of part of the reason
they they didn't agree with. So, it's in
an effort to keep it uh kind of further
forward so it doesn't project as far
back rel relative to its neighbors. Um,
and it's still in compliance with many
of the other houses in the neighborhood
who have had that zoning. The house had
been designed before the mo most recent
amendment. So, it's kind of a relic of
that.
>> Thank you, Madam Chair. If I can ask a
question to staff.
>> Go ahead, Mr. Kowski.
>> Thank you, Mr. Hassan. the the applicant
has indicated they've made significant
changes as I read the staff report
staffer's opinion that the a lot of the
issues are similar to the original one.
Would you care to expand on that?
>> Yeah, to madame chair. Um I guess
unfortunately in the presentation there
wasn't a sideby-side comparison of the
original application to the revised
application but it is contained in the
staff comments. um the open to below
area at the back. Um on page
uh what page is in the comments? Page
seven, I believe. Um kind of more
clearly indicates where the roof was
lowered and the open to below um space
is below the 7 m threshold for what
would be additionally counted towards
the residential floor area. but it's not
as apparent and visually um clear on the
front elevations where changes have been
made. So unless um the the plans are
overlaid on top of each other, which
staff do um to see where changes have
been made um when you hold them up side
by side, the dwellings essentially look
the the exact same. So there was no
substantive changes that staff could see
that would result in a change in the
staff comments from the original to the
revised submission. Notwithstanding
that, as Mr. Merritt said um the
sideyard setback variance um is new. Um
but I can also um add to that that the
applicant has gone through two cycles of
the development engineering permit uh
application review and there were no
concerns raised with that sideyard. Um
so that's um where staff stand in terms
of the issues and concerns um with the
additional residential floor area ratio.
>> Thank you.
Sorry, I'm having technical difficulties
today.
Now my screen's all black. Um,
Mr. Towski, would you kindly take over
as a chair until I figure this out?
>> Probably a good idea. Okay, thank you.
>> Committee members, any additional
questions of the applicant or staff?
>> I see none. Madam Secretary, Treasurer,
has anybody called in to speak to this
matter?
>> Mr. Chair, there have been no calls and
no one in attendance has their hand up.
Okay, thank you. And we will close the
discussion on this matter and look for a
motion.
Mr. Castle,
Mr. chairman.
Um
uh I um I like staff have some um uh
concerns with respect to the overall
massing of this site and uh um I think
perhaps uh like like the questions that
were asked previously uh I have some
reservations with respect to uh the
sideyard setback um and the um minor
efforts that would be necessary in order
to be able to accommodate that sideyard
setback. Um
I feel as if the um I'm of the opinion
that the um the massing in the sideyard
are contributing to a building that is
not consistent with the with the
neighborhood and has a mass that is um
um not appropriate. I will put forward a
motion to refuse the application
um finding that it does not conform to
the uh general intent and purpose of the
bylaw. Um yeah, thank you
>> Mr. Hard Castle. Is there any discussion
on that motion to deny the application?
Mr. Dicki.
>> Thank you, Mr. Chairman.
Um
my vote would be to approve.
I find uh the design is appropriate and
uh mitigates against some of the size.
Normally I'd be opposed to a sideyard
setback. The two factors are affecting
me there. They have a wide sidewalk
large sideyard setback on the other
side. I know that's due to an easement
and they got stuck in the middle of uh
of uh the the news imple implementing
the new zoning bylaw. So, and of course
council I mean sorry planning department
doesn't have a problem with the sideyard
setback. Um so my um just to comment I
will not be in favor of denial. Thank
you.
>> Thank you. Any other discussion on the
motion to deny?
See none. I just add that I tend to
agree with Mr. Hardcastle.
I don't think the sideyard setback is
even variance is necessary with a little
bit of effort as as we both suggested.
The the issue is really the massing and
I I understand the applicant feels
they've done a significant effort to
pull back the second floor above the
garage. For one, I would have expected
the second floor to be pulled back on
the sides as well to try to mitigate the
impact of the variance that's being
requested.
With that, the motion is to deny the
application. All those in favor of the
motion to deny.
All those opposed,
Mr. Dicki.
>> [snorts]
>> It is three in favor of the motion to
deny, one opposed. I'm sorry, sir. Your
application has been denied.
>> Thank you for your time.
>> Thank you.
>> Okay. Thank you, Mr.
Working fine now.
>> Let me know if it happens again.
Um just to clarify, Madam Secretary, you
can mark me absent on uh on this last
one because I did not attend the
discussion. That's why I did not vote.
>> Yes. Thank you, Madam Chair. I have you
down as absent.
>> Thank you.
Okay.
So the uh next item on the agenda is
application 127 of 2026 at 177 Woodhaven
Park Drive.
And um I have Mr. Tanner as the agent.
Again, that's application 127 of 2026 at
177 Wood Haven Park Drive.
>> Good evening, Madam Chair. It's uh Joel
Tanner with the Office of Simple Design
Studio on behalf of Lindseay Bruce this
evening. Um, we are looking at a uh
brand new build here at 177 Wood Haven
Park Drive. Next slide, please.
So, this is a current single family
home. Uh, we are looking to remove the
existing envelope and completely replace
it with a new uh two-story dwelling. So
there's a partial single story on that
far right hand side which is the south
side of the building envelope in order
to allow more light infiltration into
the core of the house and unique use of
materiality found throughout the
building envelope. Next slide please.
So we're seeking two variances this
evening. First variance requested is a
lot covered variance. Um the proposed
overall we're sitting at uh 28.91
as our overall proposed lot coverage.
25% is allowed. So, we're sitting just
over 3.91 uh in additional coverage. Uh
we did highlight that area in in the
sand color. Um that area is actually
just a below grade component. Um so, we
just wanted to note that just to kind of
give you an overall perspective on um
that particular component. Um you know,
if we were to remove that component, we
go from um 297 down to 277.5.
So it splits that that overage in half.
Um we we were pretty strategic in terms
of the building heights, the stepped
massing both not on just on the front
elevation but also on that side
elevation in order to kind of you know
push and pull so that we're not just you
know building a a simple twotory box but
we've got some nice projections and
materiality to to jazz up the front
facade as well as the rear facade and
the side envelopes. Um, second requested
variance is a uh parapet height increase
allowable is.3. We're sitting at 66.
Keeping in mind this is only for a
portion of the building. It is not the
entirety of the uh the building
envelope. So it is the furthest stepped
back volume from [clears throat] the
street facade. Um and uh this is a uh
this this was actually added due to the
the bylaw uh justifications in uh June
2026. Uh next slide please.
Um so we feel that you know the proposal
put forth is fairly minor in nature. Um
you know we we're within lot coverage
regulations or sorry we're within GFA
calculations. We're within setback
regulations. Um and uh you know we do
feel that the uh proposal is is going to
be beneficial to the streetscape and uh
and quite attractive for the the
neighborhood dwellings. There's been a
lot of lot of redevelopment over the
years and open up the uh discussions
with committee. Any questions? is more
than happy to jump in and provide some
commentary. Thank you so much.
>> Thank you, Mr. Bruce. Is there any
questions or items of clarifications?
>> Go ahead, Mr. Dicki.
>> Thank you, Madam Chair. [clears throat]
um some of these hyped um
regulations in the new zoning by are
obviously new to us and maybe you could
just explain if I it your request is for
0.662
uh meter high paret wall above the
maximum height. So
the maximum you just sorry I the maximum
height is just um measured to the top of
the roof and now the the zoning ber
would you would allow you to go 0.3 m
above that maximum height from the flat
roof and now you want to go up to uh
662. I just understand the concept. I'm
not talking about the numbers right now.
>> Just if you can explain that to me a
little bit better.
>> Yeah. Yeah. through three, you madam
chair. So so the the new bylaw um
basically the the max allowable building
height um on a flat roof dwelling was
modified. So we got forced from 9 m down
to 8 m. Um so the.3
m is the max allowable parapit height uh
when we are exceeding the max allowable
height. Um the max allowable building
height in totality. Um so it's an above
and beyond calculation.
Um the the driver on the parapet height
I is a lot of the times partially
aesthetically driven by our firm in this
case. It also is driven off of how we're
sloping the water to drain off of the
roof cavity. And so that calculation for
um
sorry that calculation for basically
sloping the drain and and containing the
water properly is another factor in
driving these parapit heights on some of
these dwelling designs.
Okay. So from the street so okay
no let me back up. [clears throat] So if
I understand it again I don't think I
do. from the street. In theory, it would
be it would be 8 m to the top of the
flat roof and then another uh 662 m
above that. So, from the street, you're
looking at a height of 8 I mean the view
from the street is what I meant. You're
looking at a height of 8.662.
This is what I don't understand or I
don't really not sure that I get the
concept here.
>> Got it. Um through you, Madam Chair. Um
Brandon Hassan, maybe you can speak to
the to the additional clarifications
required with uh with Mr. Dicki. Um the
we we should also we can also maybe pop
back to the presentation to image number
two uh or or slide number two the the
render or even
uh even the la the second last slide
before the thank you page.
Um so on this top right hand image
the
the back set wood siding cube that
you're seeing so the furthest cube in
the middle of the building envelope
that's the part of the parapit that is
increased in height. So, the stone
detail you're seeing, which looks to be
the tallest, most dominant detail, um,
in this in this case, actually isn't the
tallest component. The tallest component
is the wood cladding in behind that
stone pillar. So, this this perspective
is actually really good to explain those
layers that we built out from the entry
canopy to the second floor canopy to the
stone canopy. But that would volume is
actually the tallest of the four or five
I guess.
Um Madam Chair, I'm not sure if Brandon
can jump on and clarify the additional
detailing
just regarding the the bylaw.
>> Mr. Hassan, are you with us?
>> Um through you, Madam Chair, just for
clarification, Brandon uh did not
prepare comments on this file. This one
was one that I had worked on.
>> Okay. Sorry, Miss Mcnite. Go ahead then.
>> No problem. Um, I'll just note that the
intent of really regulating the parapit
is to control the overall height and
massing and visual impact of a building
of course, but still allow for those
architectural features that contribute
to design. Um the parapit itself is
really viewed by staff as a design
addition that only helps to break down
the massing of the dwelling at the end
of the day and therefore there were no
concerns raised. Um and in addition it's
only a smaller design element so it
doesn't cover the full sum of the
building and that is why staff provided
supportive comments.
>> Does that answer your question Mr.
Dicki?
I'm still confused, but um [snorts] I'll
live with that. Thank you.
>> Thank you.
>> Okay. Any other questions of Mr. Bruce
at this time?
>> Okay, I see none. Has anyone called with
interest for this application? Madam
Secretary Treasurer,
>> Madam Chair, there have been no calls
and no one has their hand up.
>> Okay, thank you. and we'll move the uh
discussion to
um take a vote.
Who would like to move a motion?
Go ahead, Miss Price.
>> You're muted.
Taking into account my site visit, the
reports by the agent and staff, and
there being no letters of opposition, I
find the variances to be minor in nature
and are in keeping with the general
intent and purpose of the official plan
and zoning bylaw and are desirable for
the appropriate development of the land.
As stated by staff, the proposed
projection presents a modest increase
associated with the design of the
dwelling. I believe the overall height
and massing will not affect the
surrounding neighborhood. In conclusion,
I find the four tests have been met and
I recommend the application be approved
subject to the following conditions.
the dwelling be constructed in general
accordance with the submitted site plan
and elevation drawings dated September
25th, 2026 and that the approval expires
2 years from the date of the decision if
a building permit has not been issued
for the proposed construction.
>> Thank you, Miss Price. There discussion
on this recommendation.
I see none all those in support.
Okay, the application has been approved.
None opposed.
>> Thanks so much, committee. Have a great
evening.
>> Have a good evening.
>> Um, application
128 of 2026
at 6243rd line. Again, that's
application 128 of 2026 at 6243rd line.
I have Chris Pereira here as the agent.
Good evening, Madam Chair. Can you hear
me?
>> Yes. Go ahead.
>> Wonderful. Um, [clears throat] good
evening. My name is Chris Pereira. I am
the principal of Embahar Planning and
Design Limited. We are the planning and
urban design consultants for the owner
of the property which is Circle K group
of companies. Um, the subject lands are
located at the southwest corner of
Spears Road and Third Line as a corner
site. And as we can see on the screen,
um the subject lands maintain vehicular
access from both Spears Road and Third
Line. The property itself is
approximately 0.62 hectares in size with
approximately 106 m of frontage along
Third Line and a smaller 42 m of
frontage along Spears Road. So the
proposal seeks to redevelop the subject
lands by rebuilding a new car wash
building generally in its current
location. The site design expands into
the empty southern portion of of the
lands uh to accommodate the stacking and
queuing lanes and those can be seen on
the right side of your of the image
which would be south. [clears throat]
The existing gas station um canopy and
retail store will remain in their
current locations. Um this application
is part of an ongoing site application
with staff. So in order to implement
this design that we're looking at on the
screen, a variance is required from the
bylaw. So as outlined in the staff
report, whereas 7.5 m is required for a
rear yard setback, the proposal
maintains a minimum 3.5 uh meter rear
yard setback. And this is shown very
clearly on actually figure one of the
staff report. It's a kind of a zoomed in
um um key key plan. Uh but if you want
to zoom in on the pay station on the
right side of the screen, we can see
exactly where the uh to the right of
that actually it's between the pay
station and the property line on the
right side. Exactly. So this is the area
that we're talking about. So that
dimension 3.610
m is the pinch point and the variance is
being requested for 3.5 m.
So [clears throat] the proposed
reduction in uh to the setback will not
negatively impact the surrounding land
uses in any way. Uh nor does it
negatively impact the overall site
plan's ability to be designed properly,
including necessary landscaping to
assist with storm water management and
drainage. The rear yard of the subject
lands shares a property line with a
furniture store/warehouse/off
use. And along that shared property
line, the furniture store maintains
parking and a driveway access to the
rear of the property where trucks and
deliveries u can access the loading
areas of those buildings. So the
proposed reduction to the minimum
required setback from 7 1/2 to 3 and 1/2
is solely needed to accommodate the
canopy structure over the pay station
kiosks. Uh this is an open air canopy
structure and um as staff have noted in
their own report um does not create any
undue massing or scale impacts on the
surrounding area um as it is not fully
enclosed and it is actually at a lower
height than the facility itself. Uh the
canopy itself will be uh screened by a
notable perimeter landscaping which
doesn't show up on this plan but there
is a detailed landscape plan that was
provided as part of the site plan
package which shows a heavily screened
um landscape buffer along that
self-propy line um being adjacent to the
driveway that I just mentioned at 586
third line. Uh lastly, we have reviewed
the staff report. We are in agreement
with their assessments of the four tests
and we are in agreement with their
recommendation. We have also um reviewed
the conditions or the recommended
conditions and we are in complete
agreement with them. Um thank you very
much for your time and I'm available to
answer any questions committee may have.
Thank you.
>> Thank you Mr. Pra.
Does anyone have any questions or items
of clarification at this time?
Okay, I see none. Has anyone called with
interest for this application? Madam
Secretary, Treasurer.
>> Madam Chair, there have been no calls
and no one in attendance has their hand
up.
>> Very well. And we'll take this matter
into committee then. Who would like to
move a motion?
>> Go ahead, Mr. Towski.
>> Thank you, Madam Chair. Cheryl moved
that this application be approved as
applied for finding that it meets the
forecast of planning act. I don't see
any impacts um being generated from this
variance. The variance relates to a
canopy structure that's minor in
relation to the overall site development
and as noted by the applicants that's
adjacent to another commercial
industrial use. I would make that
approval subject to development
receiving general accordance with final
approved site plan elevations to the
satisfaction of the director and
planning and that the approval expires
two years if a building permit hasn't
been issued.
>> Thank you Mr. Taski. Is there discussion
on this recommendation?
I see none. All those in support
the application has been approved. None
opposed.
>> Thank you very much.
>> Thank you.
Um, application 129 of 2026 at 1247
Crawford Court. Again, that's
application 129 of 2026 at 1247 Crawford
Court.
I have um Steven Hunt here as the agent.
Go ahead, Mr. Hunt.
>> Madam Chair, I think I should be removed
after this one.
>> Uh, yes. Uh,
sorry.
>> Oh, yes. That's the one that you
declared the conflict for. Um, town
staff should be doing that now.
Give me a moment, Mr. Hunt.
Okay, town staff has removed Mr.
Towelsski.
Okay, you may proceed. Thanks, Madam
Chair, members of committee. Uh once
again, I'm Steven Hunt, [clears throat]
authorized agent and designer
for this uh property. I'm principal and
Hunt Design Associates.
Subject property, as we know, is 1247
Crawford Court. It's an established
[clears throat] neighborhood in East
Oakville.
The lot is irregular in shape with
approximate frontage of 31 12 meters and
area of 1338 square meters.
[clears throat]
It is zoned RL1-
under by 2014-014
and the OP designates it low density
residential special policy area.
[clears throat]
Profit is purchased by our client, a
young couple that wishes to raise their
family in the neighborhood. family was
home was designed with the long-term in
mind. We made best efforts to also
comply with the zoning by in terms of
overall size and lot coverage and mostly
all the setbacks
as outlined in the application are two
minor variances requested that we felt
were necessary given specific uh
property characteristics.
Um first variance to permit a front yard
of 7 and a half meters whereas 9.89
meters is required. One can see that in
the uh right side of the uh lot, the
easterly lot line to the front corner of
the garage. That's the closest pinch
point this home on the property. Um the
zoning requirement is 9.89 m. Um
[clears throat] this is set by the
average setback of the homes on either
side. Second variance to permit a height
of 9.3 m where 9.0 zero meters is
required.
Um I think what we could do is just
maybe skip to uh
page four which can show some of the the
the massing of the home just very
quickly. You can see it's a twotory on
the west side of the property and the
onetory garage on the right side. Page
12 has a rendering
to the overall character again
twotory massing. Uh we worked with staff
to uh produce eaves lines and
getting closer approximate to the
character of the neighborhood. And again
a one-story garage on the right. It's
it's a false former there. There's no
living space.
And if we can go to the last sheet page
13, it's a little clearer uh diagram. So
in terms of the first variance, as you
can see, the front lot line is regular
in configuration. The shortest shortest
depth knee side and this is as I said
where the variance applies. the balance
of the front yard. It's very large to
the point where the setback is over 18
meters on the left side of the property
as the uh property itself juts forward
ahead of the uh turning circle.
One can say that the average front yard
is approximately 12.9 m well over the
minimum. In fact, the reduction applies
only to a small area which is shown
shaded that gold color or yellow more
yellow color in the front of the garage
there.
Um, we believe the house is well set
back from the street and I also can see
that the home is well balanced on the
lot to ensure there is enough rear
garden space. It's it's actually still
further forward than it is uh back there
given the 18 meter setback on the west
side. Purpose
of front yard averaging is to ensure
mostly mostly on straight streets that
there are no jarring contrasts with
respect to each home's placement on a
lot and so that as you're going down the
street you're seeing things generally
align. In this case, the street is
naturally curving and the flow and
placement homes follow it. As you can
see in the uh purpley blue uh dashed
line, that's where the existing house is
and we're kind of straddling where that
house is purposely done. We believe this
placement enhances rather than
negatively impacts the street
experience.
The second uh variance um
in its terms the properties the
topography is such that the grade falls
from north to south from the back to the
front of the property approximately 1.5
m. This means that the rear yard is
somewhere between 1 and 1 and a half
meters higher than the street causing
the home to be raised up accordingly.
Height happens to be measured from the
street side. So, we have sort of an
elevated situation on the lot created by
a higher backyard. This negatively
impacts the form and architecture of the
home.
Um, and so in exploring a slightly uh a
slight increase in building height,
staff asked us to uh do some research.
The owner engaged a interial land
surveyor to measure the height of the
homes on either side. Um, our request
generally matches the height of the home
on the east side.
It is within a foot of the home on the
west side. So, it's it's fitting in
there nicely. We again believe this
enhances the street experience.
In fact, is always my firm's practice,
particularly here in East Oakville, we
spend considerable time and effort with
staff to develop a home design that
suits this neighborhood. As such, we're
aware of staff supported the application
and we're also aware of one of the
neighbors concerns.
As such, the the owner met with the
neighbor last night to explain the
nature of our requests. And as far as I
understand today, the neighbor's
concerns with the application are
withdrawn. Not sure if they're going to
speak to the application or not, but for
background, the discussion revolved
around misunderstanding of the impact of
the requested variances.
uh as mentioned majority of home is well
beyond
the u front yard setback being
requested. So there was a concern that
the whole house would be uh jutting for
forward and that the portion of the home
that the variances applied to it's
mostly one story the gold area onetory
garage and therefore it's it's not uh
overlooking um shadowing uh the front
yard.
uh the the goldish color in front of the
adjacent home uh just represents
perpendicular sight lines from from the
front of that home and as you can see uh
the garage is not within a direct line
of sight of their home does not contain
windows from hab rooms that might have
overlook as well. I'm just quickly
responding to some of the concerns that
uh a good neighbor uh provided.
I believe it's an application like this
one
that the committee exists for, namely to
address matters and circumstances that
cannot be reasonably anticipated within
the general bylaw.
Every property decision is unique. In
this case, I believe the requested
variances are minor in nature, then
keeping in general intent of the zoning
bylaw and official plan. And lastly,
it's desirable and appropriate for the
development of the property. happy to
entertain any questions you might have.
>> Thank you, Mr. Hunt. Any questions or
items of clarification of Mr. Hunt at
this time?
Okay, I see none. Who would like to uh
move a motion?
Sorry, Miss Price. Just one second. Has
anyone called with interest for this
application? Madam Secretary Treasurer,
>> Madam Chair, there have been no calls
and no one in attendance has their hand
up. And uh I would just let you know
that that letter of opposition that did
come in was withdrawn today.
>> Yes. Thank you. Um
>> very well.
>> Go ahead, Miss Price. Taking into
consideration my site visit the reports
provided by the agent and staff and
there being no letters of opposition, I
find the variances to be minor in nature
nature and are in keeping with the
general intent and purpose of the
official plan and zing bylaw and are
desirable for the appropriate develop
development of the land. The various
design elements such as the lowered roof
roof lines, main wall setbacks have
helped to mitigate the overall massing
and scale of the diff dwelling and make
more compatible with the surrounding
neighborhood. In conclusion, I find the
four tests of the planning act have been
met and therefore recommend the
application be approved subject to the
following conditions.
the dwelling be constructed in general
accordance with the submitted site plan
and elevation drawings dated September
16th, 2026
and that the approval expires 2 years
from the date of the decision if a
building permit has not been issued for
the proposed construction.
>> Thank you, Miss Price. Is there
discussion on this recommendation?
>> Okay, I see none. All those in support.
Okay. The application has been approved.
None opposed.
>> And thank you for your time.
>> Thank you
application. Okay. Let's wait for Mr.
Towski to be let back in.
Okay. Welcome back, Mr. Tusk.
Application
131 of 2026 at 160 Trofalog Road. Again,
that's application 131 of 2026 at 160
Trofalog Road.
I have an Wine as
Hello.
Uh, good evening chair and members of
the committee. Um, my name is Anna Wein
and I'm a land use planner with
Bowfields, which is a land use planning
firm located in Toronto and we are the
agent representing the owner. Um,
uh, next slide, please. I'm here today
seeking approval for minor variances
that will facilitate the development of
a four-story residential building in
downtown Oakville. First, I wanted to s
sincerely thank the planning and zoning
team at the town who have been excellent
to work with both on this minor variance
application and the associated site plan
application which is nearing completion.
Um the final submission was made this
September. We have reviewed the comment
report from planning staff citing no
objections in addition to the resident
comments that were appended to that
report. Um, and just to say we agree
with the conclusions and conditions
listed in that report and I'm hope
hoping to speak more directly to the
resident comments received a bit later
in my presentation. Um, I'll also note
that we filed a detailed planning
analysis with the application and I'm
very happy to get into specific details
about any of the variances if there are
questions. I imagine there will be, but
for the sake of time right now, we'll be
moving quite quickly.
As I mentioned, the site is located Oh,
sorry. Can you just go back back to the
Thanks. Um the site is located in
downtown Oakville which is identified as
a growth area in the livable Oakville
plan. Um the majority of intensification
and development within the town of
Oakville is planned to occur within
growth areas in a manner that is
compatible with the surrounding area. Um
the site is located on the west side of
Trafalar Road midblock between Randall
Street and Dun Street. It has an area of
approximately 921 square meters with
about 28.8 8 m of frontage along Trfalga
Road and it's currently vacant. Um, I
provided a more detailed description of
the site, the direct adjacencies, and a
description of the broader surrounding
area in our letter. Um, I won't get into
it now, but I'll just note that there's
a row of threestory townouses to the
rear fronting Dun Street, which has been
I believe some of the resident comments
we've received have come from residents
in those town houses. So, we'll get into
that in a little bit. And now you can
switch to the next slide, please.
The site is subject to a previous
reszoning from 2015 um exception 366 in
the bylaw. The exception includes a
variety of zoning requirements for a
four-story residential building. Those
zoning requirements are based upon the
building concept which was prepared as
part of the 2015 approval.
Following the approval in 20 in 2015,
the current owner purchased the property
in 2017 and has continued to advance its
development. The design continues to
contemplate a similar four-story
residential building and has made minor
revisions to the building and site
design to modernize and customize it.
Exception 366 as enacted is quite
prescriptive with respect to built form
and other performance standards and
therefore the current design requires
variances. And I'm just going to ask you
to hold on this um slide as well. This
is a rendering of the proposed building.
I'll give you some key stats. It remains
a four-story residential building. It
contains um eight units. The original
approval was for 11 units. Um so we're
below that threshold. And there are two
levels of underground parking accessed
by a car elevator. The proposed building
maintains all of the above grade
building setbacks from the original
approval with the exception of one
variance that has resulted in questions
from residents which I'll get into
briefly. I keep sort of saying I'm going
to get into it, but I will get into it
in just a minute. um they refer to it in
their correspondence as variance 13. So
maybe if I can actually ask you to skip
to page number seven and I'll address
this this uh variance in particular. Oh,
so we're just up one.
There we go. Exception 366 requires the
building to be set back 3 m from the
rear lot line. However, it also allows
for an underground ramp to be set back o
only 75 m. And you can see that with
that orange little bar on the drawing on
the right hand side.
As part of the redesign of the building,
the owners decided to switch the ramp to
an elevator. So car elevators, and you
can see it on the elevation drawing on
the left, it's a sort of singlestory
entrance right here, a car elevator
entrance. Um, car elevators are more
efficient than ramps because they take
up less space in an underground garage.
Um, in in addition, a car elevator is
narrower than a conventional ramp. So,
we were able to pull the elevator
further from the rear lot line, thereby
increasing the setback from 75 m from a
ramp to.94 m to the elevator. The rest
of the building will meet the 3 m
minimum rear yard setback.
The switch from the ramp to the elevator
will result in less impact than the
approved 2015 design. uh as variance 13
is only required because the zoning
provisions specifically mention a ramp
not a car elevator. So I understand that
there are comments received regarding
the relationship between this building
and this elevator and the town houses to
the rear particularly regarding
construction of the building and
potential damages to um a retaining wall
and fence and there's a shared driveway
that provides access to the townouses on
Dun Street. Um and those comments arose
related to this variance. It's my
understanding.
Um but just to begin, the retaining wall
and driveway on the townhouse site falls
entirely outside of the subject site and
are not expected to be disturbed through
the construction process. The owners are
experienced developers and they are
working with an experienced construction
management firm that has worked on much
tighter and denser sites in downtown
Toronto and elsewhere in the GTA.
However, accidents can occur on this
site and on any construction site, and
the residents of the adjacent townouses
have been in contact with the owner,
discussing how damages would be assessed
and responded to urgently without cost
to residents and with minimum
disruption. The owners have been
forthright in engaging with the
townhouse residents and will continue to
be so and have been looping in their
construction management firm to provide
details about the process. As a I think
as a team we are working amicably with
the residents to provide the necessary
assurance that their retaining wall and
driveway will not be impacted.
Construction liability is typically
addressed as construction moves ahead
and is considered separate.
So sorry and is typically considered
separate from zoning matters. In my
opinion, this variance is appropriate
from a land use planning perspective and
is actually less impactful than the
existing zone zoning would permit. We
are hoping the committee will approve
this and other variances today and allow
the conversation between my client and
the townhouse residents to continue
separately. And if you I can just ask
you to go back to slide four and I'd
like to wrap up um hopefully quite
quickly. Um I also understand that 13
variances is a higher number than this
typic than this committee typically
considers. Uh in this regard I want to
briefly mention the test of minor.
With a number of variances, there may be
a perception that the current proposal
is a significant departure from the
inforce zoning. In my opinion, the
number of variances should not be part
of the test of whether an application is
minor. Rather, the merits of each
variance should be considered and
evaluated individually. Um, I'll note
that there have been a series of
tribunal cases that have led to how we
as planners assess a variance or a group
of variances as minor and the conclusion
of which is that the test of minor
involves an assessment of impact. Um, as
I outlined in my letter filed with the
committee, it is my opinion that each
individual variance will not result in
unacceptable impacts and taken
collectively
um will facilitate the construction of a
building that remains substantially
similar to the original proposal. And
this opinion is echoed in the town
comment letter um who did not um
identify any objections with our
proposal. So in my letter filed with the
committee I provided analysis of each of
the variances and I am happy to go
through each of them in detail I if you
have questions but perhaps I'll conclude
now and state formally that is my it's
my opinion that this application
satisfies the four tests set out in
section 451 of the planning act. The
application maintains the principles of
good planning and we recommend that the
application be approved subject to the
conditions listed in the comment report.
Thank you very much for your time.
question from Miss Win.
Go ahead, Mr. Towski.
>> Madam Chair, uh thank you for that uh
very helpful presentation
and somewhat remarkably I think you've
got 13 variances and you seem to have
distilled it down to one variance being
of concern to residents. So, I just
wanted to focus on that and
>> um because I I got I think I got great
clarity from your presentation I didn't
have before.
So, the original proposal there would
still be an excavation
75 meters from the property line and
probably a one meter air pit wall around
the ramp. And the current the only
change here is the excavation's actually
moving further away uh from the property
line and instead of it being a parapit
wall, it would now be probably a 3 m I
think I I calculated
um enclosed uh part on the building for
a small portion of the building that's
furthest away from the actual residents
themselves. Am I reading that correctly?
>> So my understanding is that the ramp in
the original proposal was always
envisioned as being enclosed in the
building as well.
>> So I don't think it was ever an open
ramp. I think it was sort of a more more
of like a a a downtown type concept
where you would have the ramp entirely
enclosed in the building facade. There
would be a garage door and and it would
elevate and then you would drive down
the ramp and into the building and then
you would sort of cycle through the
underground garage. So I I don't think
it was a parapit wall. I think it was
actually an fully enclosed ramp and now
we're replacing that with a fully
enclosed elevator that is you're correct
in saying further away from that rear
lot line.
>> Okay. So that's even more helpful. So
the only impact of this variance is to
have a similar structure further away
from the property line even though the
variance makes it sound like you're
building closer to the property line.
>> That's correct. We were we worked and
and you know my my my thanks to uh the
planning and zoning staff was very
sincere. We worked very closely to make
sure that we had captured all of the
variances and we had structured them
properly. And when we worked with the
zoning team, they said, cuz we had put
forward an option, well, what if we just
change changed the wording to say permit
a permit a ramp to permit an elevator in
that same location? And they said, no,
we would preferred if you varied the
rear yard setback of 3 m to permit the
elevator rather than changing the word
from ramp to elevator. Do you understand
what I what I'm getting at there? That
was at the direction of the town that we
worded it in such a way. So I understand
why when residents of those town houses
looked at that and saw oh you're
reducing it from 3 meters to 0.94 that
is a significant departure but it's due
to the way the variance needed to be
worded based on our dialogue with town
staff.
>> And one final question in scenarios like
this it's common to have municipality
require a pre and post construction
survey in this case in terms of the
retaining wall on the existing property.
Do you know if that's been part of the
discussions with the neighbors?
>> It has been part of the discussion. It's
my understanding that um
that there will be necessary pre and
post construction surveys and monitoring
during construction and that is actually
typical protocol of the sort of building
permit process. So I think that that's
something that's quite reasonable and is
expected to excuse me is expected to
occur.
>> Thank you.
>> Mr. Russ, if you had your hand up, do
you still want to address anything?
>> Uh, it was just to clarify for member
Tleski that it would have the same uh
like the underground ramp would have the
same look as the car elevator does in
the drawings. It would just be longer
and a bit taller. Um, so they've reduced
the actual effect of of that built form
element.
>> Thank you. Any other questions or items
of clarification?
Okay, I see that. Miss Wang, how many
units are in this building?
>> Um, eight units.
>> Eight. Okay.
All right. Um, we do have uh two letters
of objection that I I will note on
record from uh Jed James and Roger uh
Newwell.
And they do seem to want to address the
committee because they've requested to
attend. So has anyone raised their hand
madam secretary treasurer with interest
to speak to the committee at this time?
>> Madam chair, no one has called in and no
one has raised their hand. There is a
neighbor though in the audience that he
did have concerns and wanted to attend
and speak at the meeting, but his hand
is not up right now.
>> Okay. Okay. Right. Before we do take
this matter into committee, um I'll just
if you're in the audience and you'd like
to speak to the committee before we do
so, please uh raise your hand. If not,
then the matter will be taken into
committee and the committee will do uh
will take its vote.
>> Madam chair, I do have one hand up now.
Uh Chris Kurthers, I can move him in to
the meeting.
>> Okay, go ahead, Mr. Kathers.
Yes. Hello, Chris Kurthers.
>> Go ahead, Mr. Kthers.
>> Thank you. Yes, I'm uh one of the uh um
the residents in the nearby location and
we've been working with a developer.
They've been very forthright and and
helpful and we are working through an
agreement in case of a um construction
mishap, but I they've been very
forthright and and good to work with and
so we don't have any objections at this
time.
>> Okay. Very well. Thank you for making
mention of that.
>> Okay. If there's no one else seeking to
speak to the U committee, we'll take the
matter into committee and uh start the
discussion. Who would like to do so?
Okay, go ahead, Mr. Towski.
>> Thank you, Madam Chair. Madam Chair,
I've moved that this application be
approved as applied for finding that it
meets the test of planning act.
As I said earlier, I think quite
remarkably 13 variances,
all of which are very um minor in nature
and even in accumulative sense do not uh
appear to cause an impact. The uh
intended use is very much still intact
with these variances. Um with the one
variance that was raised uh a concern by
the neighbors, it it would appear in my
view that it's actually a better
scenario than uh what existed in the
previous approval and it's just the
perception of the reduced setback that
raised the concern when it's actually
increasing the setback marginally from
what was previously approved.
I would note there were letters of
objection.
Um and uh our attendee um supporting
um
I think the uh discussion has addressed
the issues that were raised in the
letters of objection and uh I would make
the approval subject to
building
in constructed in general accordance
with the final approved site plan and
elevation drawings to the satisfaction
of the director of planning and that The
approval expires 2 years if a building
permit hasn't been issued.
>> Okay. Thank you, Mr. Tosski. Is there a
discussion on this recommendation?
>> Okay. I see none. All those in support.
Okay. All those opposed.
Mr. Hardcastle, are you yay or nay?
>> My apologies, Madam Chair. I am in
support of the application.
>> Very well. Then the application has been
approved. None opposed.
Thank you.
>> Thank you so much.
>> All right. Um we have um minutes to
confirm for October the 14th.
Miss Price. Thank you. And we have um
motion to adjurnn.
Mr. Hart Castle. Thank you. And we are