Gore Park Mixed-Use Redevelopment Reviewed - 08 Oct 26
Hamilton · October 08, 2026
All right, good afternoon everyone and
welcome to our virtual design review
panel meeting. My name is Edward Winter
and I'm an urban designer at the city of
Hamilton and coordinator of the design
review panel. On our agenda today, we
have a development proposal at 18 to 22,
24 to 28, and 30 King Street East and 4
Houston Street South in Hamilton.
Today we have the applicant team, city
staff, members of the public and media
are also in attendance.
Members of the public are welcome here
to observe the meeting. However, there
is no opportunity for commenting or
questions uh from the public and media.
Today's meeting is being recorded and
will be uploaded to the city of
Hamilton's design review panel web page.
Uh chair of the design review panel,
Jennifer Mard, will be leading our
discussion this afternoon. Jennifer, you
may begin the meeting when you're ready.
>> Thanks, Edward. Good afternoon,
everyone, and welcome. Edward, can you
please confirm that this session is
being recorded?
>> Yes, we are recording.
>> And are there any changes to the agenda
today?
>> Uh just that uh Olga is not in
attendance.
>> Uhhuh. Okay. Um, are there any
declarations of interest? Uh, any panel
members in attendance must declare any
conflicts of interest. I'll take silence
as a
>> as a confirmation of no conflicts.
Okay. On the agenda today is the review
of 18 to 20, 22 to 24, and 30 King
Street East and four Houston Street
South. The lead planner on the file is
Joseph San Severino. Development planner
Abdullah Pasha is standing by in this
meeting today. And for Joseph uh if
he'll be able to answer any policy
questions. Edward Winter, the urban
designer at the city of Hamilton, will
make a brief presentation.
Uh go ahead, Edward. And we're ready for
your five minute presentation.
I think you're on mute there, Edward.
>> All right. Thank you everyone for
attending. Our proposed development is
here shown in the blue uh rectangle with
the yellow star at the corner of Houston
Street South and King Street and the
Gore Park. Uh the proposed development
is a phase one of two phases consisting
of a 12-story mixeduse building with 159
units and approximately 524 square
meters of ground floor commercial space.
Residential units are split between
studio, onebedroom, two-bedroom, and
three-bedroom units. Uh noting that an
existing 10-story building on the corner
of Houston and King will receive a
two-story addition uh to align with the
new construction component. Building
setbacks feature prominently at the
seventh uh I think sixth story as well
as the 11th and 12th stories
uh and that sorry just the phase two uh
uh section is shown in the orange dash
box directly but adjacent.
All right. So, here we have the subject
site. This is looking from Houston
Street in King on
uh south southwest. Uh and then we see
the vacant site right now. Uh for those
that aren't familiar with the recent
history, uh there was previously some
buildings in between and the street wall
of generally four stories. Uh and that's
showing heritage context and uh what
will be more clear when we see the
massing uh which may otherwise look
unusual.
All right. So here's a view looking
along the Gore Park uh looking in the
direction uh west along and the proposed
subject site on the left.
Okay, apologies, my screen is lagging a
bit. Uh, this is now looking north
across the park uh from the subject site
showing the fountain in Gore Park uh and
some new construction on the right and
further back in the center.
This is the view east uh westward uh
from Houston Street to James Street
along the alley on the southern part of
uh phase 1. Uh the building on the right
is the 10-story uh existing building
that will be retained.
Okay, here's a view looking north on
Houston Street showing some again the
new construction um and the existing uh
along the north side of King Street and
Gore Park. On the left,
conceptual site plan showing the sixth
floor roof terrace and then the new new
proposed 12story uh on the south portion
of this uh property.
Uh and then that connection to Gore Park
on the north and the alleyway on the
south.
Showing some renderings. This is looking
south from above Gore Park
and again showing only phase one.
Okay. There was a formal consultation
held May of this year. Uh staff noted
that the low-rise 2 designation in
downtown Hamilton secondary plan permits
six stories, but that heights up to 12
stories can be permitted uh if it is
demonstrated that the development is
compatible with the surrounding
streetscape and existing buildings. And
the applicant would be required to
demonstrate that the development is
sympathetic to the heritage character of
the Gore.
Uh we did have some additional comments
from the cultural heritage staff
regarding the cultural heritage impact
assessment document. Uh and looking for
more information on the salvage
materials
uh from those previously existing
buildings. Um noting that the there was
mention of salvage materials but not
information on the quantity uh and how
those might be integrated into the
development proposal.
And then some of the salvage materials
uh were cornises, brackets, uh masonry
flowers and transom stones.
Um,
I think another uh, pardon me comment
from cultural staff was that further
information of the proposed exterior was
was being requested uh, and if there was
going to be the use of EHS uh, as it was
not clear through the the Chia on the
material selections.
Overall, the cultural heritage staff
noted that CHIO was written in a manner
that followed the city's guidelines, but
cultural staff will be asking for uh
some revisions and additional
information for future planning
applications.
And some of those suggestions were the
integration of salvage materials into
the proposed facades, not only as an
interior comment commemorative strategy.
um additional details on the leg
legibility of the commemoration strategy
from King Street East uh into the lobby
and um integration of salvage masonry
into the proposed facades uh and in
discussion on ETH's detailing for the
podium
for today. Our areas of discussion uh
will be the following.
How will the proposed development align
with the general character and built
form of the surrounding area? How does
the variation in proposed heights in
relation to the existing buildings
contribute to the area? Will the
proposed height of the development
impact the Gore feature sorry Gore park
feature? What materials are being
utilized and what facade work will be
conducted to better align the proposed
development with the surrounding
heritage landscape? And will the
proposed massing encourage a more
pedestrianoriented and walkable
streetscape? And these questions should
be geared around the following topics of
building massing, cultural heritage, the
pedestrian public realm, and overall
impact to Gore Park. And that will
complete the staff presentation.
Thank you, Edward. We're now ready for
the consultant to provide their uh
presentation and please keep this
presentation to 10 minutes. Thank you.
One second to share my screen.
Everyone see that?
Great.
Hey, good afternoon and thank you to the
panel members and staff for your time
today. My name is Khloe Simpson. I'm a
planner at Landwise and I'm joined today
by Shem from Kn Architects in Canada, a
heritage planner with WSP. Our clients
are also on the call and available for
questions.
Um I'll begin with just a brief overview
of the site context. Thank you Edward
for um your introduction. Um, and then
I'll hand it over to Shem and Cana to
discuss the design and um, some
compatibility considerations.
So again, Edward provided a great
description um, of the site, so I won't
repeat that information. Uh, but I did
just want to draw attention to the
photos in the middle of this slide
showing the buildings that did
unfortunately collapse last year. Um,
the proposed design really intends to
incorporate some of the select heritage
features from those buildings which
Kenica and Shem will discuss in more
detail.
The site is within walking distance of
daily service and commercial needs as
well as several open spaces including
Core Park immediately adjacent to the
site. Uh, it's also highly accessible by
transit and it's just steps away from
the future LRT line. As you can see on
the map,
downtown is really characterized by a
strong street wall and the new building
um as you could see um there's a gap in
the site right now. And so this new
building will help to fill that
significant gap in the streetscape and
will contribute to the downtown
environment which is already defined by
a range of building heights and
architectural styles.
In terms of policy, the site is
designated and zoned downtown mixed use
and it's intended to support a vibrant
pedestrian focused environment. The
proposed 12-story building will require
some relief from the zoning bylaw, but
the official plan does contemplate
heights of up to 12 stories where it can
compatibility can be demonstrated. In
our view, the design approach is
consistent with the policies for a few
reasons. First, it reinforces the street
wall and introduces active commercial
uses at grade. Second, it complements
the heritage character of the Gore
through its massing and material pallet.
Third, it incorporates stepbacks to
mitigate wind and shadow impacts and
maintain pedestrian comfort. Project is
also exploring opportunities for
affordable housing which would further
support the city's housing and
intensification objectives. I'll now
pass it on to Shem.
>> Yep. Thank you, Chloe. Yep. So, just a
little bit of quick uh history here. The
development initially started off as
just the infill portion of Long King due
the loss of the heritage buildings. Um
since uh then the client has decided to
include the for Houston property as part
of the development. So therefore there
are actually two connected components to
this project. Uh the vacant 10-story
office building at for Houston that will
be converted to the residential use uh
and the mixed and uh retail which makes
it mixed use and it'll be extended by
two stories in height. The second will
be the adjoining infill building along
uh King Street and that will share also
key circulation u components uh from the
built from the four Houston property. Uh
when designing there's designing this uh
this development uh there was very
deliberate attention to the alignment of
the core park fountain which you'll
later see and reflected in the floor
plans and the renderings. Um as well as
uh the elevations we had uh a cascading
glass feature that helps delineate the
building, break it up into smaller
elements. Uh the masking before you is a
result of several discussions with the
city. Uh yes, we did have a formal
consultation. We also had some
additional meetings in between. Uh we
have carefully masked the info portion
to respect the existing core park uh to
limit shadow impact. We've introduced
stepbacks on the fifth, 6th, 10th, and
11th floors. Uh as a result uh the
following plans uh will show you uh that
we'll be showing you uh the two
components uh how they operate as one
development including the amenity spaces
on the ground six and 12 floors. Next
slide please.
Uh starting with the uh level of
underground which accommodates parking,
bicycle storage lockers, a pet run
additional launch facility. The info
component connects to the existing
elevator staircase at Fort Houston
reducing the need for duplicate vertical
circulation. Next slide.
The ground floor plan uh separates
public facing uh public facing spaces
from the building operations. The retail
residential entrances occupy the King
Street frontage in the Houston street
frontages accordingly while the loading
waste moving and mail functions are
consolidated along the rear alley
connecting Houston and James Street uh
through the rear. The existing retail
unit at the corner of King and Houston
is thus maintained.
Next slide. Uh this is the enlarged plan
that clarifies the circulation strategy.
Pedestrian entrances address the public
streets while services, vehicles and
backup house functions continue to use
the rear alley for access. Next slide.
This is the essentially the fifth floor
plan which is representative of the
lower uh residential levels. It shows
the shared connection to for Houston.
The coreworking spaces are provided. The
residential suites positioned along the
exterior edge so that the internal
parking podium areas are screened from
view uh at core park.
The sixth floor contains the main indoor
and outdoor amenity program including
private dining, uh, a sauna, gyms, games
rooms, party rooms, etc. Uh, these
spaces connect directly to the outdoor
pool, terrace, barbecue, and outdoor
lounge areas.
The seventh and uh 12th floors
essentially are uh smaller full plates
to create a series of terraces. These
levels accommodate private patios,
shared amenity space, and upper level
residential program while giving the
building a clearly defined top and
stepping.
Um, this is the north elevation which is
facing Gore Park. Uh, it is organized
into distinct readable parts. A masonry
base with punch windows, a central
glazed spine marking the main entrance
and amenity zone, and a lighter glazed
cap beneath the dark roof overhang.
Secondary entrances serve the individual
commercial units at Fort Houston. Uh the
reclined envelope improves energy
efficiency while the inset glazed
balconies establish a consistent window
rhythm across the uh converted building.
The podium's rhythm is continued and
wraps around the corner of Houston into
the alleyway. The material pallet was
selected in reference to surrounding
context. primarily limestone uh clay
brick with pre-cast accents and dark
metal uh accents are present within the
the core park area.
The rear which is a south elevation
carries the same window proportions and
key finishes around the building while
integrating the loading waste and
service functions mentioned before and
they are accessed from the alleyway uh
as they are currently uh used today.
Next slide please. Uh along Houston
Street, the elevation continues the
transition between the converted office
building and the new infill component at
King uh through a consistent window
rhythm and a shared upper story
treatment. Uh the royal can to the left
uh or straight to the right the image
provides a local reference for treatment
of punch openings and buildings top and
material selection. Uh as an example,
next slide. This building elevation
shows essentially how the residential
floors in many levels and terraces are
stepped and terrace back towards the
south. again uh accommodating shadow
impact and transition.
And this rendering uh view is from Gore
Park which shows a converted building
and the infill uh as a read as a
coordinated composition with transparent
ground floor spaces defined entrance
zones and a lighter upper portion.
This rendering is from the corner of
King and Houston. The rendering shows
the entrance hierarchy, the retained
corner re uh retail unit. the the
relationship between the two street
facing elevations
and essentially this is the wider
context view uh makes the project and
program visible. As you can see the
pool, terrace, the shared amenity areas
occupy the sixth floor with additional
terraces at the upper levels of both
floor uh for Houston and the infield
building.
Okay. And this is essentially a time
sequence shadow study uh that confirms
the proposal creates limited incremental
shadow on G park. The shadow study
considers uh the as of rate neighboring
properties within the context of the
model. This provides the technical
evidence for the massing appro u
approach uh introduced earlier.
Okay. And I'll turn that over to Canica.
>> Thanks Sean. Um I'll be speaking for on
the heritage impact assessment findings
today. Uh if from a heritage
perspective, the property uh development
site occupies a prominent location
adjacent to Gore Park cultural heritage
landscape and is located in East King's
Street East cultural heritage landscape
as well as the historic Beasley
neighborhood. The site also formed uh
part of a commercial streetscape framing
Gore Park and contained several 19th
century commercial buildings uh which is
also mentioned by Chloe at the beginning
of the presentation. The CHIA that is
the cultural heritage impact assessment
found that no heritage attributes remain
for the former buildings along King
Street East as they were previously
demolished. The proposal retains and
adaptively reuses the listed heritage
property at four Houston Street South,
maintaining its historic relationship
with King Street East as well as uh Gore
Park and further reinforcing its corner
position through the new podium design.
As a result, no direct adverse impacts
were identified to these resources. As
you can see on this uh slide by the
north elevation from a design
compatibility perspective, the podium
responds to the historic streetscape
through basin compatible materials as
well as the vertical facade articulation
and uh the active retail storefront
that's proposed at the main grade and as
well as a scale that reflects more sort
of the traditional commercial frontage
pattern that we saw from the 1870s and
early uh 20th century historic fabric.
The upper stories are also set back
which was again mentioned by Shem
earlier which allows for additional
height while maintaining a pedestrian
scaled experience um and reducing visual
dominance from the public realm. Next
slide please.
Uh while much of the heritage building
fabric on the site has already been
lost, the Chia recommends a
commemoration strategy to acknowledge
the site's history and its contribution
to the Gore Park area. And as uh you can
see on this slide, we are looking at uh
interpretation opportunities uh within
the ground floor lobby with uh which
will be in a publicly accessible space
and as well as uh the intent is to place
it along the pedestrian areas where
visitors can engage with the history of
the site. So the focus would not just be
on uh explaining the history of this
particular site but also the uh entire
downtown block and its commercial
evolution and uh where feasible we would
be looking at the salvaged masonry uh
from the demolished heritage buildings
and incorporate them into the final uh
interpretation program. And the other
commemoration strategy that is being
looked at and incorporated in the
proposed design is that we have
deliberately aligned the Gore Park
fountain and uh the central axis with
the main entry along King Street East
for the proposed development. And
overall uh the proposal is anticipated
to have a positive impact on the
surrounding heritage context by reducing
uh I'm sorry by restoring the build form
to waken lands and reinforcing the King
Street uh east street wall which which
would support a walkable mixeduse
environment and uh also maintain the
site's historic relationship within Gore
Park. Thank you.
>> Thank you Kica. Um, and then finally, we
just wanted to talk about another
compatibility component with the visual
impact assessment. This was requested by
staff to study views of the escarment
from two different observation points.
One was from King Street at James
Street, and the other is King Street and
Houston Street. Um, and as you can see
here, there's before and after views of
the site from these two observation
points. Um, and you can see the proposed
development doesn't obstruct any
important viewsheds to the escarment.
And that's all for our presentation.
Thank you.
>> Thank you very much. Uh at this time, we
provide an opportunity for each of the
panel members to seek clarification on
any points that may require further
explanation from your team. Please hold
comments for now. Uh questions only,
please. And we will start with Shotti.
I think you're on mute there, Shotti.
>> Well, today is not my day. So, uh, so um
I was thanking everyone for the
presentation. Um so I have two questions
right now and one is that you touched on
um regarding the uh heritage uh kika the
um the heritage salvage um items. So and
you said that it will be in a publicly
accessible place. Um I see it inside the
lobby. Can you just clarify if it's
going to just be visible from the window
from the sidewalk or is an area where
people can walk through?
>> Yeah, thank you for the question. This
uh from my understanding this would be
publicly accessible because it is the
lobby at the at the main grade level and
uh we've strategically we're looking to
place it next to the window along King
Street East facade so that whoever is
passing by along that pedestrian walkway
um they are also able to see and it's
still we're still formalizing in terms
of what that interpretation panel would
look like but the idea that we're
looking or exploring right now is there
would be a panel which would be overhung
from the ceiling. And we are also
looking at opportunities to include the
salvaged masonry which would be kind of
at a display underneath that. And that
panel can have the timeline or the
commercial evolution of the site as well
as the downtown Hamilton block. And the
text and the imagery can be on both
sides of that panel. So it's going to be
visible from to somebody who's actually
outside and somebody who's also in the
lobby in the waiting area. So that's
kind of the preliminary uh approach that
we are looking at and exploring right
now.
>> Thank you.
Um so the next question might be for Shm
I I think uh as the architect um can you
just like um
tell us a little bit about why that
street wall the fivetory street wall um
facing Gore how was that established
that height
>> yes uh definitely so that street was
essentially established uh first through
a massing study about the shadow impact
on Gore
Um it did introduce a small step on the
fifth floor which we actually found to
be somewhat advantageous because we were
able to step back that last uh fifth
floor essentially transitioning to the
before transitioning to the sixth. Um
when you when you reference the original
buildings there was one one of the
buildings did have a set of dormers that
did also step back. So we thought, you
know, this is a great opportunity to
kind of to play with play off that step
back and and and use that as also a way
to uh then create a datam at the fourth
floor, which then references the pre the
other previous buildings that were there
as well. So it's a bit of a hybrid, I
think, between uh a couple of
strategies, but um it it certainly uh is
a product of of obviously of of shadow
impact, but we did manage to utilize it
in a way to to help establish a a couple
of uh datams that were uh
uh part of the existing buildings that
collapsed.
>> Thank you. That's it for me.
>> Thanks, Shotty. Eric, do you have any
questions?
>> Uh no questions of clarification.
>> Okay, Eric. Thanks, Graham.
>> Same for me. No questions. Thank you.
>> Okay,
Dennis, do you have any questions?
No, no further questions. Thanks.
>> Okay, I have a few. Um, uh, um,
whoever's sharing their screen, could
you go to the floor plans, please? Um,
maybe level two
and one. Yeah, level two.
>> This is level two. Essentially the fifth
floor to uh second, third, fourth and
fifth are essentially the same except
see except okay
>> there is there is a cutout in the second
floor for a double height lobby.
>> We do have the second floor at the very
end of the
>> it actually this will work then just
fine because my my question will is here
too. So from level two to five the the
pink units on the left on the new
building uh say three bed student. Could
somebody explain to me what that use is?
Is this a student residence or um hotel
or or how does that work?
>> Uh essentially my understanding that the
way they would be used that each uh
let's say bedroom would be rented
separately to students and they would
share the kitchen living uh areas as
common element for that for as common
spaces.
>> I can step in here a little bit as well.
Um the the intent for this property was
to provide some some larger suites that
are typically provided for uh that are
typically provided in newer
developments. It was just a way for us
to develop um suites that were a little
bit larger, but some that were more
designed for more family use and others
that could be designed for um for some
that could be geared more to to
students.
>> We we wanted to make sure that the
three-bedroom
um units we were allocating that there
were some that definitely accommodated
for families.
Absolutely. And and I applaud that. I I
think we need to um provide bigger units
than than maybe we have in the last uh
decades or so, especially in Toronto. Um
u it it's just the combination of use
that I would that I found curious. You
know, is this a student residence or is
it or is it um
rental accommodation? And I guess it
would would fall into more this it's all
rental, is it not?
>> It's all rental and an all mix. In our
last project,
>> um we have some three-bedroom suites
that are just over 1,000 square feet.
And our our big thing was,
um we do have a mix of students and
families there. Um but to be better
suited for a family, I think they need a
little bit more than 1,000 square feet.
So that's why throughout here you'll see
some units that are 1100,200 and would
be more of a target for the leasing team
to put families in those units.
>> I see. Okay.
>> Just uh I mean just from a land use
perspective and Dan please correct me if
I'm wrong, but this these ones that are
labeled as student are still it's a res
it's still residential. It's still
treated as a normal residential unit.
It's just that the layout
>> correct. they would all be leased the
the same way and we're not precluding
anybody else from from being in there.
It was just a way for us to to delineate
between some u design styles for the
three bedrooms that we're offering.
>> And under the building code, it's a it's
a residential unit.
>> Correct.
>> Okay. Thank you for that. Um uh in the
rendering
uh of the uh the aerial rendering of of
the outdoor view uh there's a you know
pretty great looking pool that that we
see um on that terrace and I'm wondering
how that works because there's a you do
have a pool mechanical room I think
below it but um I'm wondering how that
works structurally or even uh in section
to accomodate a pool there.
>> Yeah. So, essentially the pool sits
between two grid lines. There's
structure on either side and the deep
end essentially is sunken in um the deep
end I mean by not 10 ft deep end. It's a
deeper portion which is I'd say four to
five feet and underneath that you have a
mechanical room. So, uh there is no
suite underneath that portion and that's
where we accommodate that pool.
>> Yeah.
>> Yeah. It just looks so thin especially
in this rendering. But um
um and one final question um what
sustainability measures are you thinking
about currently and or what do you have
to do to meet building code?
>> So right now we're looking at um few
different options. um one right now
we're evaluating a geothermal system and
positioning this project for um some of
the CHC programs.
>> Great.
>> Um those are going to require us to to
score a certain amount of energy
efficiency points um somewhere I think
in the ballpark of um better than uh 40%
better than the um than the current 2020
NECB.
Um so we're evaluating that compared to
potentially using the district energy
system and with Hamilton.
>> Okay.
>> Also just want to add that um we are
replatting the 10-story office building
which would be a better performing
building envelope as well as from a
sustainability in terms of carbon we are
reusing the existing structure infrastru
and infrastructure of that building to
help facilitate the new portion. So I
think there there's quite a bit of um
carbon saving in that case.
Yeah, that's a great story.
Um, okay, I think that's all for
questions now. Um, we'll now move over
to panelist comments. Um, and provide an
opportunity for each panelist to write
their feedback. So, we'll begin again
with Shotti.
>> Okay. Thank you, Jennifer. So um overall
um I think um the massing is really well
studied. The variation in height and
stepbacks helps break down the scale of
the development and creates a more
interesting building form.
I also appreciate um the variation in
materiality
um across different components and the
expression the architectural uh
expression um to avoid having a like a
continuous large mass. This is a big
site. Um and I'm comfortable with the
overall 12 story height. um and you've
provided enough information and studies
to show that um it doesn't impact the
context in any adverse way. Um
especially that substantial upper story
setback and that pool that I would love
to be in it in summertime. Uh looking
over the park. Um really well thought.
Um
um
I as I said like I really appreciate the
architecture and the massing and
especially as um humans and not birds at
grade having that um fine grade rhythm
along King Street which is reflective of
what was there once upon a time.
Um that said I if I may I'm gonna just
put forward one thought uh for you to
consider um which is a kind of a
philosophical question but anyways in
reality architects always deal with it.
So um it's like
the question is whether the historic
rhythm that you are reflecting here
could be um maintained
while allowing some of the architectural
expression to be more contemporary like
the rhythm came from through the as
you're showing it the proportion of the
windows bay entrances and the material
change. Um but it's again just a thought
to be considered if the architecture
expression can be a little more
contemporary.
Um and one last point um I I really
applaud you for alignment of the
principal entrance with the core. I
personally think it's a the Gore park
fountain. I should say it's it's very
strong urban design gesture. Um but also
I wonder if um
You could work with the city if city is
um uh okay with it to work with you to
reflect that access on the pavement also
at grade again as pedestrians people
really experience a building mostly at
grade for that reason if that can be
emphasized uh with pavement and I let
some of my uh co- panelists here who are
landscape architect to if they want to
speak to that but from an urban
standpoint of you. I think that will
make an important um impact.
Um that's it for me. Thank you.
>> Thanks, Shotti. Over to you, Eric.
>> Thanks, Jennifer. Uh thanks for the
presentation. Appreciate the opportunity
to comment. Uh my my comments are going
to be fast. U generally very positive.
really appreciate um a few things like
not providing vehicular access onto King
Street and working with other parts of
the property. That's fantastic because
King is a great pedestrian street
through that stretch. Um really love the
retention of the existing office
building and looking at doing the
conversion and and uh into residential.
I really appreciate, you know, that's a
good way to provide housing going
forward for the municipality. Um,
love the Gore Park uh fountain lining
up. Uh, further to Shid's comments, I
say like get that tree pit out of there,
get that fire hydrant out of there and
work with the municipality to to ensure
you have that direct access without
impediment. Um, so I'd be hoping that
the developer might step up and cover
that cost to do that because of the
benefits to you. Um, beyond that, uh, I
really just want to see how, uh, you'll
incorporate elements of the the previous
building into, um, into the new
building, whether it's design, whether
it's, uh, pieces, or otherwise. Uh, so I
I feel like you just have a little more
to do with the Chia and just figuring
that out. And I understand you're still
fairly early in this process, but uh
generally love to see what's happening
here and you know being such an
important spot in the city uh that
you're looking at it from a a very good
perspective. Thank you.
>> Thanks Eric. Over to you Graeme
>> Jennifer. Thank you for the presentation
everyone. Um, I'm not going to have too
many comments and yeah, I'm just going
to probably just extend a little bit
more on what Chhatty started when Eric
said just on that on that front edge.
First, I want to say the um nice job on
the lots of rooftop amenities and
keeping those views towards the park.
Um, that's a great advantage to take uh
and keep with for that frontage. I'll
just say yeah, I think there's an
opportunity to um just adjust the paving
patterns a little bit, adjust the tree
placements a little bit. I think this is
all stuff that can go um as you get into
finer design through the SPA process um
to do that. Um I think there's
definitely opportunity staying within
the city's um urban braille guidelines
and also what's in the park already, but
I think it could just be adjusted a
little bit more to really strengthen
that um that alignment with the park.
Um, so I think it's it's worth taking a
look at that and um maybe the city won't
like it, but push the city a little bit
and uh and say, "Yeah, we want to move
this and it'll be better for the park.
It'll be better for the building." But
overall, very nice. Thank you.
>> Thank you. Um over to you, Dennis.
>> Thanks very much and thank you for the
presentation.
A little bit of repeat here, but um I
think overall there's a lot of great
things about the scheme, how the massing
reflects both the history of the built
form, but also uh strategically delivers
on not shadowing Gore Park. So kudos on
on that front. Um it does beg the
question for me about the relationship
to phase 2 and the the continuous
12story
um L, if you will. Um how does that work
with future plans? It would be just
great to see how together as a superb
block um and and an active city building
how that all works together. But I I
think obviously the the massing
currently as it stands works very well.
Um I would have hoped the elevation I
mean there's a lot of discussion around
the the honoring the past and I would
have hoped the elevation could have
expressed somehow in a contemporary way
the the narrow and vertical commercial
variation if you will somehow um in a
contemporary language. but um somewhat a
bit more of a a a kind of reference to
that. Um such a big history of of uh of
Hamilton along this frontage. So
although I do appreciate there are
current attempts uh it just seems a
little bit too uniform across across the
base in my opinion. But that's I think a
kind of minor comment. Um, this leads to
my another question I have about
the Acurate relationship and the actual
relationship which I love to to Gore
Park that that as a design move is is
very strong. Um, but my question is how
can we unlock more active at grade uses
along the street and would would it help
to kind of shift the lobby access more
towards the core and try to release some
of the the lobby square footage that you
have currently? uh to to more active
retail uses or commercial uses. So, it
just seems right now that the lobby
space seems quite generous and that
might be part of the the the current
programming strategy you have, but does
seem like it's a substantial part of the
footprint at grade. So, perhaps looking
at how to activate the grade along the
entire length of Queen Street would be
would be commendable.
And along that uh that vein, I have some
questions about the the kind of material
relationship uh between the built form,
street wall, the public space. This is
such a unique condition at street level.
Like pedestrians, it's very tactile.
You're rubbing up against it. I would
like to ensure that you know the the
material use is of the highest quality
and of a of a certainly of a heritage
richness if you will not necessarily in
style but in in uh material execution
there would be would be great along
along King Street and to that note it
would just be great to understand more a
bit more about the the the heritage
artifacts and the inventory that's at
hand and how that's being used and what
what your strategy is because this will
only add to the story and making this a
pretty high quality uh development. So,
thank you very much.
>> Thanks, Dennis. I'll uh summarize here
and add a few comments. Um and I I
concur with everything that my fellow
panelists have have said already. I I
this is such an important site for
Hamilton, you know, uh um and I applaud
your efforts to bring back the scale and
materiality and fine grain nature of the
heritage buildings that were lost. I I
think if done really really well, it
will be also an improvement to the the
office conversion building because uh I
think a lot will be added to to bring
that uh character and history back to to
this site. Um uh and I think what you're
hearing from a few of us is the struggle
between, you know, a historicist
rebuilding or a contemporary expression.
And I I think I I agree with the
strategy for the historic uh um
aesthetic avenue. Uh it has to be done
really really well. uh and as Shotti
said that we experience
a lot of that at grade and in the very
uh lower floors in wind domians in in uh
stone copings in cornice material. Uh so
I we went through your uh elevations to
look at what materials were placed
where. There was nothing on the
cornnesses. I think uh especially at
grade those cornises have to be uh
pre-cast or or stone. Like there's a
level of quality here that I think uh is
demanded because of this is such an
important site. Um, and and equally I I
like the fact that you're you're using
the stone material in a lot of places
and and brick uh in the lower portion
with the red brick. That's great. Uh I
would encourage you to use a lot less
ephus and more pre-cut, you know,
pre-cast brick panels can be affordable
and and mass-produced and and um put in
place quickly. So, I I know there's a
fine line on on managing budget, but I
think this site demands a special
attention to quality of materials. I
agree with what's been said about the
massing. I think it's really well done
in in um in addressing the scale of the
park and the sidewalk uh and addressing
the historical
uh character of the of the whole
precinct. Um
well done in the concealing of the
parking levels uh that the the street
edges are active and uh vehicular
uh circulation is managed on the laneway
and the and the parking levels are
nicely concealed. So that's really well
done. Um uh
I concur with some comments that have
been said earlier about uh inventory of
salvaged materials. Um the Chia report
doesn't really itemize what or how much
is there and and what or how much you'll
be using. I think in the next steps of
approvals with the city and I don't we
don't have any uh um influence on what
they will require of you but I I would
suggest that um
some renderings of exactly how you're
going to use those pieces in
inside and and their visibility from
from the street and from inside. I I
think there could be a more extensive
use of those historic materials perhaps
in the fireplace or or in the reception
desk in the lobby. I I think they can be
meaningfully used and not just in museum
display cases.
Um so I think a followup with City of
Hamilton Heritage's staff is probably
necessary given the importance of the
site. Um,
uh,
one thing I I was wondering about the
the black metal cornice that is in the
more modern pieces set back does feel a
touch too visually heavy. Uh, the the
the shaped cornises in the in the, you
know, historic molding shape are can be
delicately done and they reflect shadow
and light really well. But that the
black one up uh above it seems to be a
bit too flat and a bit too visually
heavy. And and I think if if the
development sort of eased into some
lightness in color, a little more
lightness against the sky, it would be
uh might be even better.
Um and I I look forward to seeing phase
two. I I think um it's an important
block and and getting the synergy
between phase one and phase two would uh
would be great for us to see in an
upcoming meeting. So that uh concludes
my comments. We now offer uh an
opportunity for the applicant to respond
to any of these comments or ask us any
questions. So open the floor to you
or can you
>> Yeah, if you want to go first maybe if
you have anything.
>> Sure. Uh thank you. Thank you for all
your comments. Um and I appreciate uh
that there's the interest into the
commemoration strategy in terms of the
not just the museum display because we
we are trying to explore that
opportunity uh ourselves. So as next
steps definitely we would be connecting
with Ken and the heritage staff and uh
uh just understanding in terms of like
the expectations as well as u how best
we can sort of narrate the story while
like you said and like not keeping it uh
as a museum piece. So uh we definitely
be working on that as next steps.
Thank you.
>> Thanks.
U maybe Chloe I can touch on a couple um
themes that were were mentioned in the
question period there. Um one is uh
phase two we uh we have been developing
phase two in the context of this phase
and uh we do have a I'm say a fairly
detailed plan but we do have the
interaction between the two phases and
we we kind of can keeping up with phase
two to help uh dovetail into this into
this initial phase. So that that is
something that we are very cognizant of
as we're working through the project. Uh
the other item is the materiality. Uh
certainly we we absolutely acknowledge
the the importance of the of this
development in and its context within
Gore and uh we are definitely looking at
using higherend material finishes
especially around uh the more tactile
areas at at grade the podium. uh we are
looking at essentially or exploring uh
limestone uh pre-cast elements uh more
authentic materials in those first four
to five stories so that it it does truly
speak to what is uh what was there
historically at least at once upon time
as as mentioned before. So um and then
the last one I um
we're all we're going to be continuing
to refining this through site. I I do
appreciate the comments obviously with
uh the dark uh darker banding uh those
admittedly are some pieces that still
have to get a little bit more uh love
and resolution but uh it's certainly
something we have on our radar. Thank
you.
Not much from a planning side, but I do
appreciate the comments on the massing
and um the effort that was made to get
it to um address those impacts on core
park and to get it to um the no net new
shadow. And uh yeah, we look forward to
looking at some of your comments and
through the site plan process.
I don't know if Dan you had any
questions.
here. No. Um, I'm good.
>> Great.
>> Okay. Thanks everyone. Thanks for a
great application. Uh, and uh, we'll
call this meeting adjourned.
>> Thank you, Jennifer.
Thank you.
>> Thank you.
>> Thank you. Thank you. Thank you.